Records from 2016 to 2026. Most recent: inspection, 14 May 2026.
Inspection history · 15
14 May 2026
Drydock Exam · COI Inspection · Deficiency Check · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8359160
25 June 2025
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8166883
28 May 2024
Internal Structural Exam · Drydock Exam · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7918465
21 June 2023
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7719668
28 June 2022
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 7489413
23 May 2022
Hull Examination · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7458159
23 May 2022
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7458178
21 May 2021
COI Inspection · Administrative Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7200845
18 June 2020
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6973981
20 February 2020
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 6912389
29 May 2019
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6915446
17 May 2018
Hull Examination · Annual Inspection · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6416597
23 May 2017
Administrative Inspection · Annual Inspection · DAPI Audit
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6153620
25 May 2016
Drydock Exam · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5886191
25 May 2016
COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5886196
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 14 May 2026
Resolved
Machinery and equipment installed on each vessel must be
suitable for the vessel and its operation and for the
purpose intended.
MI observed active leak on the shaft seal.
Repair shaft seal to the satisfaction of OCMI. 46 CFR 182.100
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 June 2026
Resolution: Tested main and brought up RPMs, no leak found
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 14 May 2026
Resolved
Machinery and equipment installed on each vessel must be
suitable for the vessel and its operation and for the
purpose intended.
MI observed active leak on upper bearing of rudder post
post vessel was maneuvering.
Repair bearing on rudder post to the satisfaction of
OCMI. 46 CFR 182.100
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 June 2026
Resolution: Tested steering with new bearing, no leak found
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 14 May 2026
Resolved
Vessel must carry adequate and up-to-date: charts of
large enough scale to make safe navigation possible; U.
S. Coast Pilot or similar publication, Coast Guard Light
List, Tide Tables; and Current Tables.
Operator could not provide charts or publications.
Provide charts and publications to the satisfaction of
MI.46 CFR 184.420
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 May 2026
Resolved 1 June 2026
Resolution: Operator provided photo of charts and pubs.
01 - Certificates & Documentation › 013 - Documents › Stability Information Booklet
Issued 14 May 2026
Resolved
A vessel must be provided with a stability letter, the
stability letter must be posted under glass or other
suitable transparent material, such that all pages are
visible, at the operating station of the vessel. If
posting is impracticable, the stability letter must be
kept on board in a weathertight container readily
available for use by the crew and display to passengers
and others on request.
Operator posted outdated stability letter on vessel.
Provide updated stability letter and post as
practicable. 46 CFR 176.306
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 May 2026
Resolved 1 June 2026
Resolution: Operator sent photo of stability letter page 2 which has been laminated with a sticky backing so it can adhere to the launch.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 14 May 2026
Resolved
The marine employer must have a sufficient number of
alcohol testing devices readily accessible on board the
vessel to determine the presence of alcohol in the
system of each individual who was directly involved in
the SMI.
Operator could not provide alcohol testing devices. Provide alcohol testing devices onboard or in office.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 May 2026
Resolved 1 June 2026
Resolution: Operator sent photo of alcohol swabs.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 14 May 2026
Resolved
For fixed-gas fire extinguishing systems, the
inspections and tests required by Table 176.810(b) of
this section, in addition to the tests required by 46
CFR 147.60 and 147.65. The owner or managing operator
must provide satisfactory evidence of the required
servicing to the marine inspector.
Operator could not provide servicing for pre-engineered
fixed gas fire extinguishing system.
Provide servicing report for pre-engineered fixed gas
fire extinguishing system. 46 CFR 176.810(b)(2)
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 May 2026
Resolved 28 May 2026
Resolution: Operator provided service report letter. MI called Rockland Fire and Safety Co. INC to confirm inspection on May 7, 2026.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 14 May 2026
Resolved
Placards containing instructions for the donning and use
of the life jackets aboard the vessel must be posted in
conspicuous places that are regularly accessible and
visible to the crew and passengers.
MI observed degraded placards for donning life jackets.
Replace placards for donning life jackets. 46 CFR 185.516(a)
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 May 2026
Resolved 3 June 2026
Resolution: Operator sent photo of new placard.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 25 June 2025
Resolved
A vessel must carry either a first-aid kit that meets the requirements in 46 CFR 199.175(b)(10) or a kit with equivalent contents and instructions. MIs observed multiple items in the first-aid kit were expired. Replace all expired first-aid items within one week.
46 CFR 184.710
Action required: 705 - Other - as specified
Resolved 31 July 2025
Resolution: Vessel sent email showing def cleared, see documents tab to see def correspondence.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 25 June 2025
Resolved
A vessel not required to have a power driven fire pump by § 181.300 must have at least three 9.5 liter (2 1/2 gallon) buckets, with an attached lanyard satisfactory to the cognizant OCMI, placed so as to be easily available during an emergency. The words “FIRE BUCKET” must be stenciled in a contrasting color on each bucket. MIs observed the vessel only had 2 buckets on board and they were only 2 gallons. Replace all buckets with the right size and number of buckets within one week.
Action required: 705 - Other - as specified
Resolved 31 July 2025
Resolution: Vessel sent email showing def cleared, see documents tab to see def correspondence.
07 - Fire Safety › N/A - No Subsystem › Operation of Fire protection systems
Issued 28 May 2024
Resolved
A pre-engineered fixed gas fire extinguishing system must:
(1) Be approved by the Commandant;
(2) Be capable of manual actuation from outside the space in addition to automatic actuation by a heat detector;
(3) Automatically shut down all power ventilation systems and all engines that draw intake air from within the protected space; and
(4) Be installed in accordance with the manufacturer's instructions.
(b) A vessel on which a pre-engineered fixed gas fire extinguishing system is installed must have the following equipment at the operating station:
(1) A light to indicate discharge;
(2) An audible alarm that sounds upon discharge; and
(3) A means to reset devices used to automatically shut down ventilation systems and engines as required by paragraph (a)(3) of this section. Vessel's pre engineered system has a independent toggle switch spliced in to overide function and does not have an audible alarm when it is actviated.
Action required: 705 - Other - as specified
Due 28 May 2024
Resolved 1 July 2024
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 21 May 2021
Resolved
Vessel completed a repower prior to inspection, fill out the attached word document and return to the Coast Guard.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 17 June 2021
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 21 May 2021
Resolved
Ring life buoy grablines were wasted, purchase and install a new ring life buoy approved in accordance with 46 CFR 160.050.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 17 June 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 21 May 2021
Resolved
Bilge pump indicator light was inoperable, complete repair.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 17 June 2021
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 21 May 2021
Resolved
Forward masthead light housing was cracked, install new housing.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 17 June 2021
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 21 May 2021
Resolved
Electrical wiring in forepeak obstructed lifejacket access, mount electrical wiring to forepeak overhead.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 17 June 2021
Fire Fighting › Fixed Gas Fire Extinguishing System › Operating Controls
Issued 17 May 2018
Resolved
A pre-engineered fixed gas fire extinguishing system must automatically shut down all engines that draw intake air from within the protected space. Engine did not shut down during simulated activation of system.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 18 May 2018
Resolution: Proved proper operation of system via operational test.
Documentation › Manuals/Policy Documentation › Emergency Instructions
Issued 17 May 2018
Resolved
The master and crew of a vessel will be familiar with the content of and have mounted at the operating station, emergency instructions containing the actions to be taken in the event of fire, heavy weather, or man overboard conditions. Vessel does not have emergency instructions.
Action required: 705 - Other - as specified
Due 1 June 2018
Resolved 1 June 2018
Resolution: Posted Emergency Instructions.
Navigation › Emergency Steering › Communications to Emergency Steering
Issued 23 May 2017
Resolved
Provide means to demonstrate emergency steering.
Condition: Improper/Lack of Maintenance
Due 30 May 2017
Resolved 12 June 2017
Resolution: Tiller installed.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 25 May 2016
Resolved
SH01: Provide new first aid kit.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 8 June 2016
Resolved 26 May 2016
Resolution: Provided new first aid kit.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Controls
Issued 25 May 2016
Resolved
SH02: Prove proper operation of Fireboy System.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 27 May 2016
Resolved 26 May 2016
Resolution: Proved proper operation of Fireboy System.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 25 May 2016
Resolved
SH03: Post copy of COI on boat, visible to passengers.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 8 June 2016
Resolved 8 June 2016
Resolution: Posted COI.
Documentation › Manuals/Policy Documentation › Bridge Resource Management Policy/Procedures
Issued 25 May 2016
Resolved
SH04: Provide Coast Pilot [name withheld], and up to date chart.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 8 June 2016
Resolved 8 June 2016
Resolution: Provided new coast pilot, light list & up to date chart for area.
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 25 May 2016
Resolved
SH05: Organize forward life jacket storage area.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 8 June 2016
Resolved 8 June 2016
Resolution: Organized forward life jacket storage area.
Personnel › Certificates/Documents/Licenses › License, Master
Issued 25 May 2016
Resolved
SH06: Provide CAPT license, unable to get underway for drills.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 8 June 2016
Resolved 8 June 2016
Resolution: Provided captain's license.