Inspection history · 25
23 April 2026
Administrative Inspection · COI Inspection · DAPI Audit · Vessel Attendance
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 8340533
3 September 2025
Special Consideration · Administrative Inspection
Administrative · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 8226368
13 May 2025
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 8121513
13 May 2025
Administrative Inspection · Special
Administrative · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 8135192
20 March 2025
Drydock Exam · Internal Structural Exam · Administrative Inspection
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 8097023
8 May 2024
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 7908739
26 February 2024
Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 7870558
5 December 2023
Administrative Inspection · In-Service Inspection
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 7833852
20 October 2023
Administrative Inspection
Administrative · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 7811732
17 May 2023
Deficiency Check
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 7690748
1 May 2023
Annual Inspection
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 7678845
21 March 2023
Examination of Repairs · Internal Structural Exam · Drydock Exam · Deficiency Check
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 7654593
27 September 2022
In-Service Inspection
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 7567155
5 May 2022
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 7444781
3 December 2021
Administrative Inspection
Administrative · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 7361811
5 May 2021
COI Inspection · DAPI Audit · Administrative Inspection
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 7186266
1 March 2021
Drydock Exam · Administrative Inspection · Internal Structural Exam
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 7146842
4 May 2020
Deficiency Check · Administrative Inspection · DAPI Audit · Annual Inspection
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 6938823
24 September 2019
In-Service Inspection · Administrative Inspection
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 6820492
6 May 2019
Administrative Inspection · DAPI Audit · Annual Inspection
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 6690468
8 April 2019
Administrative Inspection · Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 6659602
14 May 2018
DAPI Audit · Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 6411813
8 May 2017
Deficiency Check · Annual Inspection · Administrative Inspection · DAPI Audit
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 6139014
5 April 2017
Deficiency Check · Administrative Inspection · Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 6113199
11 May 2016
COI Inspection · Administrative Inspection · DAPI Audit · Deficiency Check
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 5872638
09 - Working and Living Conditions › 091 - Living Conditions › Other (crew and accommodation)
Issued 1 May 2023
Resolved
Inspect vessel for unsafe conditions. Decking in way of head and toilet were missing after hull repairs.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 May 2023
Resolution: Deck renewed.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 1 May 2023
Resolved
Vessel required to have interconnected fire detection system. Vessel did not have onboard or installed interconnected fire detection system. Vessel limited to Limited Coastwise until fire detection system installed.
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 17 May 2023
Resolution: Interconnected smoke detection provided.
10 - Safety of Navigation › N/A - No Subsystem › Bridge Navigation Watch Alarm System (BNWAS)
Issued 1 May 2023
Resolved
Provide watch alert system. Overnight watch alert system was not provided. Overnight passenger operations are prohibited.
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 27 November 2023
Resolution: Updated COI, removed overnight pax.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 1 May 2023
Resolved
Provide first aid kit. Satisfactory first aid kit was not provided.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 May 2023
Resolved 17 May 2023
Resolution: First aid kit provided.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 1 May 2023
Resolved
Inspect electrical installations. Aft spotlights were wired via extension cord.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 May 2023
Resolved 17 May 2023
Resolution: Aft spotlight cord removed.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 1 May 2023
Resolved
Previous hull repair interior was exposed during 2023 drydock repairs. Insert in way of head overboard interior was not welded. Repair to be completed by 01 Jan 2024.
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 26 February 2024
Resolution: Corrected.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 21 March 2023
Resolved
Inspect hull plating. Pitting/wastage found under shower/head.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 13 April 2023
Resolution: Conducted a satisfactory leak test to the insert on the port-side of the hull
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 21 March 2023
Resolved
Inspect hull plate. Pitting noted in fwd bilge area. Repairs to be completed by 01 Jan 2024.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 26 February 2024
Resolution: Correcetd.
05 - Radio Communications › N/A - No Subsystem › VHF radio installation
Issued 5 May 2022
Resolved
This vessel is absent of VHF-DSC radio capabilities. All domestic passenger vessels that carry more than six passengers, with at least one for hire, must be equipped with a functional VHF-DSC radio. Provide evidence of properly functioning DSC radio or servicing report.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 June 2022
Resolved 2 June 2022
Resolution: Received photographic evidence of proper VHF-DSC installation. Satisfactory.
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 5 May 2022
Resolved
The inspected vessel is absent of current Abandon Ship, Man Overboard, and Fire-fighting drill/training logs. Vessel is required to maintain an updated record on-board that provides the date of the drill and a general description. Provide evidence of newly acquired and updated drill/training logbook.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 May 2022
Resolved 2 June 2022
Resolution: Received photograph of newly acquired log-book detailing Man-overboard, Fire, and Abandon Ship Drills.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 5 May 2022
Resolved
The inspected vessel maintains an out-dated roster for it's Drug and Alcohol compliance program. Marine employers shall establish programs for the chemical testing for dangerous drugs on a random basis of crew-members on inspected vessels who: Occupy a position, or perform the duties and functions of a position, required by the vessel's Certificate of Inspection. Provide evidence of current Drug and Alcohol compliance program along with new crew roster.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 August 2022
Resolved 31 August 2022
Resolution: Vessel owner provided evidence of current drug/alcohol consortium rooster.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 5 May 2022
Resolved
The inspected vessel currently maintains an inoperable bilge pump in the lazarette. Submersible electrical bilge pumps must be permanently mounted to the deck and capable of adequately pumping water from a watertight compartment. Repair bilge pump and provide evidence of satisfactory operation.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 May 2022
Resolved 2 June 2022
Resolution: Received photograph of corrected deficiency.
02 - Structural Conditions › N/A - No Subsystem › Bulkheads - operational damage
Issued 5 May 2022
Resolved
This vessel currently maintains an engine room bulkhead penetration, located aft. Each bulkhead must be of sufficient strength to be capable of watertight integrity. Provide evidence of the sealed bulkhead penetration.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 June 2022
Resolved 2 June 2022
Resolution: Received photograph of corrected deficiency.
02 - Structural Conditions › N/A - No Subsystem › Bulkhead -corrosion
Issued 5 May 2021
Resolved
Inspect interior structure in accordance with 46 CFR 176.802. Noted significant delamination of aft engine room bulkhead in vicinity of port and stbd engine exhaust penetrations. Remove delaminated material and submit repair proposal.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 June 2021
Resolved 2 June 2022
Resolution: Captain has shown photographic evidence of rectified deficiency.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 4 May 2020
Resolved
Properly install interlock preventing the energizing of both ship and shore power simulanteously.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 May 2020
Resolved 26 May 2020
Resolution: Repairs conducted; all sat.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 4 May 2020
Resolved
Properly label breakers on ships switchboard
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 May 2020
Resolved 26 May 2020
Resolution: Repairs conducted; all sat.
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 4 May 2020
Resolved
Properly install exhaust lagging on main engines and generator.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 May 2020
Resolved 26 May 2020
Resolution: lagging installed; all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 4 May 2020
Resolved
Properly secure engine room bilge pump
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 May 2020
Resolved 26 May 2020
Resolution: Rags removed; all sat.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 4 May 2020
Resolved
Remove excessive rags from bilges throughout vessel
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 May 2020
Resolved 26 May 2020
Resolution: Repairs conducted; all sat.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 24 September 2019
Resolved
Port Bridge console 12v fuse block has line & load circuits on same bus bar, bypassing fuse protection. Properly wire fuse block so circuits are fuse protected.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 1 October 2019
Resolved 26 September 2019
Resolution: New power block installed providing proper circuit protection.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 24 September 2019
Resolved
Emergency lighting is missing or inoperative. Properly install working E-lighting illuminating escape routes.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 October 2019
Resolved 3 October 2019
Resolution: Proper emergency lighting installed.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 24 September 2019
Resolved
Galley smoke detector missing battery. Provide operational smoke detector.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 October 2019
Resolved 26 September 2019
Resolution: New smoker detector installed.
09 - Working and Living Conditions › 091 - Living Conditions › Lighting (Accommodation)
Issued 24 September 2019
Resolved
Repair inoperative rack lights and install globes or shatter proof bulbs.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 October 2019
Resolved 3 October 2019
Resolution: Rack lights repaired with shatter proof bulbs.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 24 September 2019
Resolved
Remove charcoal from galley storage cabinet.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 October 2019
Resolved 3 October 2019
Resolution: Charcoal removed.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 24 September 2019
Resolved
Label missing circuit breaker labels in both power panels.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 October 2019
Resolved 3 October 2019
Resolution: Circuit Breakers properly labeled.
09 - Working and Living Conditions › 092 - Working Conditions › Protection machines/parts
Issued 24 September 2019
Resolved
Repair missing fan guard in aft port berth.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 October 2019
Resolved 26 September 2019
Resolution: New fan guard installed.
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 24 September 2019
Resolved
Properly mount stbd engine room light fixture.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 October 2019
Resolved 3 October 2019
Resolution: Light fixture properly secured.
Operations/Management › Drug and Alcohol Testing › Testing, Equipment
Issued 8 May 2017
Resolved
Provide alcohol test equipment
Action required: 705 - Other - as specified
Due 22 May 2017
Resolved 24 May 2017
Resolution: Vessel provided test equipment
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 8 May 2017
Resolved
Replace ring buoy light battery and stencil ring buoy
Action required: 705 - Other - as specified
Due 22 May 2017
Resolved 8 May 2017
Resolution: Vessel replaced battery and stenciled
Lifesaving › Lifefloat › Floating Electric Waterlight
Issued 8 May 2017
Resolved
Replace identified line on lifefloat waterlight
Action required: 705 - Other - as specified
Due 22 May 2017
Resolved 24 May 2017
Resolution: Vessel replaced line
Construction/Loadline › Hull › Hull Plating
Issued 5 April 2017
Resolved
Renew Hull plating in steering compartment.
Action required: 705 - Other - as specified
Due 13 April 2017
Resolved 26 April 2017
Operations/Management › Vessel Activity › Underway
Issued 5 April 2017
Resolved
Get vessel underway after the hull plating is rewelded.
Action required: 705 - Other - as specified
Due 13 April 2017
Resolved 26 April 2017
Electrical › Electric Generation Source (service) › Conductor
Issued 11 May 2016
Resolved
Remove extension cord cable in #2 compartment.
Action required: 705 - Other - as specified
Due 25 May 2016
Resolved 18 May 2016
Resolution: Vessel removed extension cord cable.
Electrical › Electric Supply System (service) › Cable
Issued 11 May 2016
Resolved
Provide electrical junction box for connections in #2 compartment.
Action required: 705 - Other - as specified
Due 25 May 2016
Resolved 18 May 2016
Resolution: Vessel installed junction box.
Engineering › Sea-water System (primary cooling) › Piping
Issued 11 May 2016
Resolved
Install wire clamps on keel cooler hoses.
Action required: 705 - Other - as specified
Due 25 May 2016
Resolved 18 May 2016
Resolution: Vessel installed hose clamps.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 11 May 2016
Resolved
Provide safety cage around STBD engine rotating pulley/gears.
Action required: 705 - Other - as specified
Due 25 May 2016
Resolved 18 May 2016
Resolution: Vessel installed safety cage.