Records from 1983 to 2020. Most recent: inspection, 11 December 2020.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 24
11 December 2020
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7110270
9 February 2012
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 4241364
30 January 2012
COI Inspection · Deficiency Check
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 4234776
27 September 2010
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 3858074
20 June 2008
Internal Structural Exam · Drydock Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3235104
6 September 2007
Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3055149
19 February 2007
Deficiency Check · In-Service Inspection
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 2874174
12 June 2003
Hull Examination · COI Inspection · Simplified Stability Test · Construction Oversight
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1813181
1 September 2000
Examination of Repairs
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1403217
8 September 1999
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 661542
28 July 1999
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 214051
14 August 1997
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 661543
10 August 1997
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 212358
15 May 1996
Administrative
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1458300
11 May 1994
Hull Examination
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1379970
22 October 1993
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 661544
1 July 1993
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 845149
28 May 1993
COI Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1148819
4 May 1992
Hull Examination · Re-Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 958874
27 November 1991
Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1005886
12 November 1991
Drydock Extension
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 937790
6 May 1991
Re-Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 910937
4 May 1990
Hull Examination · COI Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1234430
9 January 1983
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 997544
Operations/Management › Navigation Safety › Carriage of Charts and Publications
Issued 30 January 2012
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Action required: 17 - Rectify deficiencies prior to departure
Due 2 March 2012
Resolved 6 February 2012
Resolution: Vessel rep emailed a copy of receipt with purchase of required navigation publications.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Service
Issued 30 January 2012
Resolved
Portable fire extinguishers have not been serviced. Extinguishers must be serviced.
Action required: 17 - Rectify deficiencies prior to departure
Due 2 March 2012
Resolved 6 March 2012
Resolution: Vessel rep emailed copy of service report from third party company (Sea Safety and Survival, Inc.)
Documentation › Certificates/Documents › Stability Letter
Issued 30 January 2012
Resolved
Vessel has not met the new AAWPP stability requirements. Vessel must adjust passengers and/or cargo on COI in accordance with new regulations.
Action required: 705 - Other - as specified
Due 2 March 2012
Resolved 7 February 2012
Resolution: Vessel rep has requested to reduce passengers/cargo during operations to meet AAWPP requirements.
Personnel › Manning/Qualifications › Minimum Safe Manning
Issued 6 September 2007
Resolved
Provide a Captain with a valid Master's license.
Action required: 701 - Prior to carriage of passengers/cargo
Due 10 October 2007
Resolved 17 September 2007
Resolution: Licensed Captain onboard.
Navigation › Piloting/Steering › Tide/Tidal Current Tables
Issued 6 September 2007
Resolved
Provide Tide TAbles and Tide Current Tables.
Action required: 701 - Prior to carriage of passengers/cargo
Due 10 October 2007
Resolved 17 September 2007
Resolution: Items onboard.
Lifesaving › Hand Flares › Expired
Issued 6 September 2007
Resolved
Provide 6 Red Hand Flares and 3 Orange Smoke.
Action required: 701 - Prior to carriage of passengers/cargo
Due 10 October 2007
Resolved 17 September 2007
Resolution: 6 red flares and 6 orage smoke onboard.
Communications › Radio Communications › EPIRB
Issued 6 September 2007
Resolved
Replace EPIRB Battery and properly mount the unit.
Action required: 701 - Prior to carriage of passengers/cargo
Due 10 October 2007
Resolved 17 September 2007
Resolution: EPIRB onboard and properly mounted.
Operations/Management › Bilge/Bilge System Management › Control of Oil Mixtures
Issued 6 September 2007
Resolved
Remove excessive oil from bilge in the machinery space.
Action required: 701 - Prior to carriage of passengers/cargo
Due 10 October 2007
Resolved 17 September 2007
Resolution: Bilge is dry.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 6 September 2007
Resolved
Replace the worn exhaust lagging in the machinery space.
Action required: 705 - Other - as specified
Due 10 October 2007
Resolved 17 September 2007
Resolution: Lagging renewed.
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type III
Issued 6 September 2007
Resolved
Replace lock on the MSD overboard discharge valve.
Action required: 705 - Other - as specified
Due 10 October 2007
Resolved 17 September 2007
Resolution: MSD valve locked.
Lifesaving › Buoyant Apparatus › Float-free Link
Issued 6 September 2007
Resolved
Install a weak link and replace the painter line on both BA's.
Action required: 701 - Prior to carriage of passengers/cargo
Due 10 October 2007
Resolved 19 October 2007
Resolution: Weal link installed and painter line replaced.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 6 September 2007
Resolved
Repair electrical box on the Port Navigational Light.
Action required: 705 - Other - as specified
Due 10 October 2007
Resolved 17 September 2007
Resolution: Repairs made.
Electrical › Lighting (service) › Lighting Fixture
Issued 6 September 2007
Resolved
Repair inoperable lights in the Motor Room.
Action required: 705 - Other - as specified
Due 10 October 2007
Resolved 17 September 2007
Resolution: Repairs made.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 6 September 2007
Resolved
Add an cover to the electrical plug in the Crew Cabin stbd bulkhead.
Action required: 705 - Other - as specified
Due 10 October 2007
Resolved 17 September 2007
Resolution: Repairs made.
Operations/Management › Bilge/Bilge System Management › Control of Excess Water
Issued 6 September 2007
Resolved
Install a bilge high level alarm in the Machinery Space.
Action required: 705 - Other - as specified
Due 10 October 2007
Resolved 17 September 2007
Resolution: Alarm installed.
Operations/Management › Bilge/Bilge System Management › Control of Excess Water
Issued 6 September 2007
Resolved
Repair the bilge high level alarm in the motor room, including a working light an audible alarm at the operating station.
Action required: 705 - Other - as specified
Due 10 October 2007
Resolved 17 September 2007
Resolution: Alarm repaired.
Engineering › Fuel Oil Storage/Transfer System › Valve
Issued 6 September 2007
Resolved
Lable the emergency fuel shutoff valve location.
Action required: 705 - Other - as specified
Due 10 October 2007
Resolved 17 September 2007
Resolution: Valve labled.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 6 September 2007
Resolved
Have the fixed CO2 Fire Extinguishing System Serviced.
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 September 2008
Resolved 21 July 2010
Resolution: New System installed.
Engineering › Diesel Engine (auxiliary) › Valve
Issued 6 September 2007
Resolved
Repair the fuel leak in the generator fixed piping system.
Action required: 705 - Other - as specified
Due 10 October 2007
Resolved 17 September 2007
Resolution: Fuel leak repaired.
Electrical › Mast › Lightning Ground
Issued 6 September 2007
Resolved
Repair the Search Light and make water proof.
Action required: 705 - Other - as specified
Due 10 October 2007
Resolved 17 September 2007
Resolution: Repairs made.
Engineering › Fuel Oil Service System › Valve
Issued 6 September 2007
Resolved
Repair inoperative fuel/oil emergency shutoff valve.
Action required: 705 - Other - as specified
Due 10 October 2007
Resolved 17 September 2007
Resolution: Operations restored to valve.
Electrical › Electric Supply System (service) › Cable
Issued 6 September 2007
Resolved
Remove all twist tie wire connectors from the electrical system in the Motor Room.
Action required: 705 - Other - as specified
Due 10 October 2007
Resolved 17 September 2007
Resolution: Item corrected.
Engineering › Steering Gear System › Ram
Issued 6 September 2007
Resolved
Make the steering compartment availible for inspection.
Action required: 705 - Other - as specified
Due 10 October 2007
Resolved 17 September 2007
Resolution: Completed.
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 6 September 2007
Resolved
Conduct underway MOB and Fire drills.
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 September 2008
Resolved 21 July 2010
Resolution: Drills are sat.
Electrical › Electrical Distribution System (service) › Wiring
Issued 6 September 2007
Resolved
Repair the 2 overhead lights in the steering Compartment.
Action required: 705 - Other - as specified
Due 17 October 2007
Resolved 19 October 2007
Resolution: Lights repaired.
Electrical › Lighting (service) › Lighting Fixture
Issued 6 September 2007
Resolved
Add the top cover to the stern navigational light.
Action required: 705 - Other - as specified
Due 28 September 2007
Resolved 19 October 2007
Resolution: Repairs made.
Lifesaving › Buoyant Apparatus › Floating Electric Waterlight
Issued 6 September 2007
Resolved
Provide a working water light for the stbd Buoyant Apparatus.
Action required: 701 - Prior to carriage of passengers/cargo
Due 28 September 2007
Resolved 19 September 2007
Resolution: Water light repaired.
Lifesaving › Lifebuoys › Stowage
Issued 6 September 2007
Resolved
Add a clip to the line from the waterlight to the Lifebuoy.
Action required: 701 - Prior to carriage of passengers/cargo
Due 28 September 2007
Resolved 19 September 2007
Resolution: Repairs made.
Engineering › Compressed Air System (start air) › Valve
Issued 6 September 2007
Resolved
Provide a relief valve below 135 psi for the two air receivers.
Action required: 705 - Other - as specified
Due 28 September 2007
Resolved 19 September 2007
Resolution: New relief valve installed.
Lifesaving › Rescue Boat › Carriage Requirement
Issued 19 February 2007
Resolved
Provide acceptable rescue platform
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 February 2007
Resolution: Platform placed onboard
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 19 February 2007
Resolved
Provide floatable water light for ring buoy. Prior to operating at night
Condition: Improper/Lack of Maintenance
Due 19 February 2007
Resolved 19 February 2007
Engineering › Diesel Engine (auxiliary) › Gear/Clutch Starter (electric)
Issued 19 February 2007
Resolved
Provide proper battery box for starting batteries.
Condition: Improper/Lack of Maintenance
Due 19 February 2007
Resolved 19 February 2007
Resolution: New boxes installed
Electrical › Electric Generation Source (service) › Overcurrent Device
Issued 19 February 2007
Resolved
Remove portable battery charger from the engine room.
Condition: Placed in Improper Service
Due 19 February 2007
Resolved 19 February 2007
Accommodation/Occupational Safety › Washroom/Toilet › Toilet
Issued 19 February 2007
Resolved
Renew leaking toilet discharge hose.
Condition: Improper/Lack of Maintenance
Due 19 February 2007
Resolved 19 February 2007
Lifesaving › Lifefloat › Float-free Link
Issued 19 February 2007
Resolved
Install weak link on starboard life float. Vessel limited to 11 POB until completed.
Condition: Improper/Lack of Maintenance
Due 19 February 2007
Resolved 19 February 2007
Engineering › Fuel Oil Service System › Piping
Issued 19 February 2007
Resolved
Repair fuel leaks on generator prime mover.
Condition: Improper/Lack of Maintenance
Due 19 February 2007
Resolved 19 February 2007
Engineering › Sea-water System (primary cooling) › Piping
Issued 19 February 2007
Resolved
Provide metallic piping for both main engine salt water cooling discharge pipes between the ovbd discharge valve and the hull.
Condition: Placed in Improper Service
Due 19 February 2007
Resolved 19 February 2007
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 19 February 2007
Resolved
Install machinery guards on Generator rotating equipment.
Condition: Improper/Lack of Maintenance
Due 19 February 2007
Resolved 19 February 2007
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 19 February 2007
Resolved
Repair exhaust leaks in lazarette.
Condition: Improper/Lack of Maintenance
Due 19 February 2007
Resolved 19 February 2007
Lifesaving › Embarkation Appliances/Stations › Steps
Issued 12 June 2003
Resolved
Repair rescue ladder NLT 30 days
Due 30 July 2006
Resolved 3 November 2006
Fire Fighting
Issued 28 May 1993
Resolved
PROVIDE ANNUAL SERVICING REPORT FOR FIRE EXTINGUISHERS ONBOARD.
Condition: Unknown
Due 16 June 1993
Resolved 16 June 1993
Lifesaving
Issued 28 May 1993
Resolved
REPAIR OR REPLACE 5 INOPERABLE PERSONAL FLOTATION DEVICE (PFD) LIGHTS. ALSO, REPAIR OR REATTACH NEW RETROREFLECTIVE TAPE ON 2 PFD'S.
Condition: Unknown
Due 16 June 1993
Resolved 16 June 1993
Engineering
Issued 28 May 1993
Resolved
PROVIDE ADEQUATE LAGGING, WHERE DETIORATED, ON BOTH MAIN ENGINE EXHAUST.
Condition: Unknown
Due 16 June 1993
Resolved 16 June 1993
Construction/Loadline
Issued 28 May 1993
Resolved
PROVIDE WEATHERTIGHT SEAL (GASKET) FOR FORWARD HATCH.
Condition: Unknown
Due 16 June 1993
Resolved 16 June 1993
Construction/Loadline
Issued 28 May 1993
Resolved
PROPERLY REMOVE EXCESSIVE OIL ACCUMULATION IN MACHINERY SPACE BILGES.
Condition: Unknown
Due 16 June 1993
Resolved 16 June 1993
Electrical
Issued 28 May 1993
Resolved
DETERMINE SOURCE AND CORRECT OIL LEAK FROM GENERATOR.
Condition: Unknown
Due 16 June 1993
Resolved 16 June 1993
Navigation
Issued 28 May 1993
Resolved
UPON COMPLETION OF STEERING GEAR MOTOR REPAIR, DEMONSTRATE PROPER OPERATIONOF MOTOR AND STEERING GEAR TO THE SATISFACTION OF A USCG MARINE INSPECTOR.
Condition: Unknown
Due 16 June 1993
Resolved 16 June 1993
Lifesaving
Issued 28 May 1993
Resolved
PROVIDE ONBOARD, 2 ADDITIONAL HAND HELD RED AND 5 ADITIONAL ORANGE DISTRESSSIGNALS.
Condition: Unknown
Due 16 June 1993
Resolved 16 June 1993
Engineering
Issued 12 November 1991
Resolved
MAKE PERMANENT REPAIRS TO BOTH MAIN DIESEL ENGINE WET EXHAUST TO ELIMINATE WATER LEAKAGE INTO ENGINE ROOM.
Condition: Unknown
Due 12 November 1991
Resolved 12 November 1991
Engineering
Issued 6 May 1991
Resolved
MAKE PERMANENT REPAIRS TO EMERGENCY FUEL OIL SHUTOFF REACH ROD AND PROVE PROPER OPERATION OF THE SHUTOFF.
Condition: Unknown
Due 6 May 1991
Resolved 6 May 1991
Documentation
Issued 4 May 1990
Resolved
SHOW PROOF OF CURRENT FCC CERTIFICATE.
Condition: Unknown
Due 4 May 1990
Resolved 4 May 1990
Unknown
Issued 4 May 1990
Resolved
INSTALL A BILGE ALARM SYSTEM FOR THE FORWARD PEAK VOID.
Condition: Unknown
Due 4 May 1990
Resolved 4 May 1990