DEEP STIM is a 1997 offshore supply vessel. The Coast Guard has recorded 39 inspections since 1997, most recently in November 2018, along with 92 deficiencies — 1 with no resolution recorded — and 2 casualty investigations in 2016.

Records from 1997 to 2018. Most recent: inspection, 6 November 2018.

Built
1997
Last inspected
6 November 2018
Documentation
Valid · documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

9132258 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
WCX6477
456980
Flag
UNITED STATES
366738660
Maury page id
psix-456980

Inspections, by type

…with no type recorded3
Years with a record 19 calendar years (1997–2018)
The 39 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 8 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Offshore class in Maury's sources begin in 1978.

Documentation record

Registered dimensions (L × B × D)249.2 ft × 56.0 ft × 18.8 ft
Registered tonnagegross 2,876 / net 919
ITC dimensions (L × B × D)249.2 ft × 56.0 ft × 18.8 ft
ITC tonnagegross 2,876 / net 919
BuilderNORTH AMERICAN SHIPBUILDING · PASCAGOULA, MS, UNITED STATES · built 1997
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portGALLIANO, LA
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 24 February 2026 · expires 31 March 2027
Service, as the file records itOffshore Supply Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it919 - Convention (Subpart B), Net Ton
2496 - Dead Weight, Ton
2876 - Convention (Subpart B), Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

Radio station licence

WCX6477MMSI 366738660 · active · compulsorily equipped · granted 5 May 2017, expires 31 July 2027
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspection history · 39

6 November 2018 Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6575550
31 October 2017 Administrative Inspection
Administrative · Activities Europe · Activity 6333917
22 March 2017 MTSA/ISPS Verification · MARPOL Annex I Examination · Administrative Inspection · Examination of Repairs · Annual Inspection
Physical examination · Activities Europe · Activity 6109377
17 January 2017 Internal Structural Exam · Drydock Exam
Physical examination · Activities Europe · Activity 6071620
22 November 2016 Type not recorded
No type recorded · Activities Europe · Activity 6045655
14 November 2016 Examination of Repairs · Damage Survey
Physical examination · Activities Europe · Activity 6040294
25 July 2016 Administrative Inspection
Administrative · Activities Europe · Activity 5952104
12 March 2016 Type not recorded
No type recorded · Activities Europe · Activity 5834923
23 December 2015 Deficiency Check · Annual Inspection · MTSA/ISPS Verification · MARPOL Annex IV Survey · MARPOL Annex I Examination · MARPOL Annex V Examination
Physical examination · Activities Europe · Activity 5751568
22 May 2014 Type not recorded
No type recorded · Activities Europe · Activity 4864922
5 March 2014 MTSA/ISPS Verification · Annual Inspection
Physical examination · Activities Europe · Activity 4787525
15 February 2012 MTSA/ISPS Verification · Annual Inspection · DAPI Audit · MARPOL Annex I Examination
Physical examination · Activities Europe · Activity 4236494
6 February 2012 Internal Structural Exam · Drydock Exam
Physical examination · Activities Europe · Activity 4221945
5 December 2011 Drydock Extension
Administrative · Activities Europe · Activity 4201542
10 February 2011 Annual Inspection · DAPI Audit · MTSA Verification · Deficiency Check
Physical examination · Activities Europe · Activity 3945569
20 March 2009 Deficiency Check · Annual Inspection
Physical examination · Activities Europe · Activity 3436860
28 July 2008 Administrative Inspection
Administrative · Activities Europe · Activity 3281778
2 April 2008 Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 3245278
14 March 2008 Periodic Inspection
Physical examination · Activities Europe · Activity 3165377
6 January 2007 Annual Inspection · MTSA/ISPS Verification · Hull Examination
Physical examination · Activities Europe · Activity 2832698
14 February 2006 Administrative Inspection · Construction Oversight
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 2585033
9 January 2006 Re-Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 2563282
27 September 2005 Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2502146
6 January 2005 COI Inspection · MTSA Verification · Examination of Repairs · Hull Examination
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 2274100
15 January 2004 Re-Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 1985454
3 November 2003 Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 1979528
5 March 2003 Re-Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 1752862
7 October 2002 Cargo Tank Internal
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 1685878
22 March 2002 Re-Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 1495790
15 January 2002 Internal Structural Exam · Hull Examination · Cargo Tank Internal
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 1478158
1 February 2001 Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1058044
22 January 2001 Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1466187
1 May 2000 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 817090
4 January 2000 COI Inspection · Hull Examination · Inclining Experiment
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1369472
13 October 1998 Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1421566
28 April 1998 Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1124442
29 September 1997 Hull Examination · Initial Certification
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1437298
16 September 1997 Initial Construction-Excluding Oversight
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1117876
12 September 1997 Inclining Experiment
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 787075

Deficiency record · 92

Documentation › Certificates/Documents › NLS Certificate
Issued 31 October 2017 No resolution recorded
Demonstrate compliance with MARPOL Annex II and IMO Resolution A.673(16) for international carriage of Noxious Liquid Substance (NLS) cargoes. Carriage of cargoes will be contingent upon USCG inspection and demonstration of compliance.
Action required: 705 - Other - as specified
Deck/Cargo › Cargo Stowage › General
Issued 18 April 2017 Resolved
Properly secure oil tank next to POD blender
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 18 May 2017
Resolved 23 April 2017
Resolution: Cleared via e-mail
Engineering › Pressure Vessel › Support
Issued 18 April 2017 Resolved
Properly mount heat exchanger on POD blender
Due 18 May 2017
Resolved 22 April 2017
Resolution: Cleared via e-mail
Electrical › Electrical Distribution System (service) › Wiring
Issued 18 April 2017 Resolved
Properly secure and enclose all loose end wires and wire connections/splices located throughout the PCM
Due 18 May 2017
Resolved 17 May 2017
Resolution: Cleared via e-mail from DEEP STIM dtd 17May2017
Electrical › Electrical Distribution System (service) › Metallic Enclosure/Frame
Issued 18 April 2017 Resolved
Speaker missing cover plate for electrical connection in PCM
Due 18 May 2017
Resolved 24 April 2017
Resolution: Cleared via e-mail
Communications › Public Address System › Loudspeaker
Issued 18 April 2017 Resolved
Prove proper operation of public address system in PCM
Due 18 May 2017
Resolved 24 April 2017
Resolution: Cleared via e-mail
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 18 April 2017 Resolved
Provide data plates for all electric motors installed in well-stimulation complex as required by 46 CFR 129.320
Due 1 August 2017
Resolved 28 July 2017
Resolution: Cleared via e-mail; mitigating action taken by vessel: Manufacturer-provided binder with required motor information to be accessible at all times in cargo spaces
Fire Fighting › Combustible Materials › Paints/Varnishes/Other Finishes
Issued 18 April 2017 Resolved
Remove flammable paint from hazardous zones and properly stow in paint locker
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 April 2017
Resolution: Cleared via e-mail dtd 19Apr2017 from [name withheld]/MMD [withheld]
Construction/Loadline › Structures › Transverse Bulkhead
Issued 18 April 2017 Resolved
Seal piping connections in aft bulkhead of pump room and through acid mixing space
Due 18 May 2017
Resolved 24 April 2017
Resolution: Cleared via e-mail
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 18 April 2017 Resolved
Provide protective guards for rotating machinery (i.e., pump shafts in acid mixing space)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 April 2017
Resolution: Cleared via e-mail
Electrical › Electrical Distribution System (service) › Switchboard
Issued 18 April 2017 Resolved
Provide non-conductive mat for rear of main switchboard in pump room
Due 18 June 2017
Resolved 16 June 2017
Resolution: Resolved via e-mail
Engineering › Pressure Vessel › Relief Valve
Issued 18 April 2017 Resolved
Provide proof of setting and proper test of relief valve for water heater in machinery space
Due 28 May 2017
Resolved 2 June 2017
Resolution: Cleared via e-mail from ECO rep [name withheld] dtd 2Jun2017
Communications › Alarms/Indicators › Fire Alarm
Issued 18 April 2017 Resolved
Prove proper operation of audible fire alarm in main engine room
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 April 2017
Resolution: Cleared via e-mail dtd 19Apr2017 from [name withheld]/MMD [withheld]
Documentation › Logs/Records › Cargo Record Book (NLS)
Issued 18 April 2017 Resolved
Demonstrate compliance with Cargo Record Book recordkeeping IAW 46 CFR 125.125(c)(3)
Due 18 May 2017
Resolved 17 May 2017
Resolution: Cleared via e-mail from DEEP STIM dtd 17May2017
Personnel › Certificates/Documents/Licenses › License, Master
Issued 18 April 2017 Resolved
Provide licensed vessel captain with proper endorsements to operate vessels (i.e., ARPA-equipped vessel endorsement)
Due 18 May 2017
Resolved 19 April 2017
Resolution: Cleared via e-mail dtd 19Apr2017 from [name withheld]/MMD [withheld]
Engineering › Diesel Engine (auxiliary) › Emergency shutdown
Issued 18 April 2017 Resolved
Provide servicing technician report of safety shutdowns/alarms for internal combustion engines located in pump room
Due 18 June 2017
Resolved 17 June 2017
Resolution: Resolved via email
Construction/Loadline › Structures › Transverse Bulkhead
Issued 18 April 2017 Resolved
Plug pipe penetration (former air line) through aft bulkhead of PCM
Due 18 May 2017
Resolved 24 April 2017
Resolution: Cleared via e-mail
Construction/Loadline › Hull › Bottom Plating
Issued 14 November 2016 Resolved
Provide permenant repairs to #4 void where temp repair is located.
Action required: 705 - Other - as specified
Due 5 February 2017
Resolved 16 April 2017
Resolution: Cleared during annual inspection
Unknown
Issued 14 November 2016 Resolved
Provide class report attesting to the condition of void space #4 and adjecent spaces.
Action required: 17 - Rectify deficiencies prior to departure
Due 5 February 2017
Resolved 29 November 2016
Resolution: Completed
Unknown
Issued 14 November 2016 Resolved
Provide class report approving temp repair to the #4 void hull plating that is holed.
Action required: 17 - Rectify deficiencies prior to departure
Due 5 February 2017
Resolved 29 November 2016
Resolution: Completed
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 2 February 2016 Resolved
The current Fire Control Plan (FCP) was reviewed and approved by the ABS. In accordance with 46 CFR 127.110, the FCP shall be approved by the cognizant OCMI for review and approval by the attending CG Marine Inspector no later than the next scheduled annual inspection.
Action required: 705 - Other - as specified
Due 6 November 2016
Resolved 16 April 2017
Resolution: Cleared during annual inspection
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 25 January 2016 Resolved
Reposition stern light to provide 135 degrees visibility in accordance with the International Navigation Rules.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 25 March 2016
Resolved 24 March 2016
Electrical › Electrical Distribution System (service) › Wiring
Issued 25 January 2016 Resolved
Properly route cables through RocTech blocks IWO PCM and Pump rooms.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 25 March 2016
Resolved 24 March 2016
Fire Fighting › Structural - A Class Divisions › Fire Doors
Issued 25 January 2016 Resolved
Replace fire door on Acid Room.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 25 March 2016
Resolved 24 March 2016
Communications › Alarms/Indicators › Fire Alarm
Issued 25 January 2016 Resolved
Properly mount heat and smoke detectors IWO Pump Room.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 25 February 2016
Resolved 24 March 2016
Accommodation/Occupational Safety › Ventilation › General
Issued 5 March 2014 Resolved
1. Fixed gas fire systems shall contain interlocks with the mechanical ventilation to ensure an adequate gas supply to suppress a fire. During test of "pump room" CO2 system, mechanical ventilation and fire dampers did not operate as designed.
Due 5 March 2014
Resolved 5 March 2014
Resolution: A faulty pressure switch was replaced and system tested SAT by attending MI. Corrected on the spot.
Accommodation/Occupational Safety › Ventilation › General
Issued 5 March 2014 Resolved
2. Mechanical ventilation for machinery spaces shall be capable of being closed from outside the space. Starboard/outboard/aft damper on supply fan ("mushroom") to pump room is not operating properly due to faulty solenoid. Repair/demonstrate proper operation. 4/3/14 - 30 day extension granted
Due 5 June 2014
Resolved 12 September 2014
Resolution: Ventilation faulty selenoid was repaired.
Accommodation/Occupational Safety › Ventilation › General
Issued 5 March 2014 Resolved
3. Mechanical ventilation for machinery shall be capable of being closed from outside the space. Automatic actuators did not close some louvers as designed upon action of installed CO2 system. Repair and demonstrate proper operation of all louvers on aft pumproom bulkhead.
Due 5 April 2014
Resolved 22 March 2014
Resolution: Received email from Captain that ventilation louvers have been repaired and tested sat.
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 5 March 2014 Resolved
Oily water separators shall automatically stop the flow of overboard discharge when the effluent is over 15ppm. During functional check, Oil Content Meter (OCM) was found to be inoperable. All bilge water to be retained on board and discharged ashore until repaired and tested satisfactorily.
Due 5 April 2014
Resolved 16 March 2014
Resolution: Received email from captain that OWS has been repaired and tested sat.
Deck/Cargo › Cargo Stowage › General
Issued 5 March 2014 Resolved
6. NLS Cargoes must be authorized for carriage on the vessel's COI. Vessel routinely carries Hydrochloric Acid 33% Solution in bulk in independent deck tanks. COI only authorizes carriage of a 15% concentration of the same solution. Subit request to carry higher concentration to USCG ENG-5.
Due 5 April 2014
Resolved 26 March 2014
Resolution: CG-ENG-5 and MSC review complete, new CAA issued.
Navigation › Collision/Grounding Avoidance › Echo-sounding Device
Issued 5 March 2014 Resolved
Vessel shall be fitted with echo depth sounder (EDS) capable of recording. At time of inspection, EDS was inoperable due to a faulty transducer. This requirement to be addressed at next drydock.
Action required: 705 - Other - as specified
Resolved 12 September 2014
Resolution: The fault with the echo depth sounder was fixed.
Communications › Alarms/Indicators › Autopilot Alarm
Issued 5 March 2014 Resolved
8. Cargo ships greater than 500 GRT and upwards but less than 3000 GRT shall have Bridge Navigation Watch System (BNWAS) installed NLT first survey after 01JUL13. Install and demonstrate proper operation of BNWAS.
Due 5 April 2014
Resolved 11 March 2014
Resolution: Received email statement from Master than BNWAS now installed/operational.
Electrical › Electrical Distribution System (service) › Switchboard
Issued 5 March 2014 Resolved
Switchboards shall be provided with non-conductive handrails and drip sheilds. Switchboard for pump room controls and automation ("MCC" Switchboard) did not have drip sheild or handrails.
Due 5 April 2014
Resolved 2 April 2014
Resolution: Received email from captain that drip shield and handrails have been installed.
Electrical › Electrical Distribution System (service) › Switchboard
Issued 5 March 2014 Resolved
The working area in front of switchboards shall be provided with non-conductive matting or grates on the deck. During inspection there was no non-conductive matting on the deck for the switchboard located in the "mixing" room/pump room.
Due 5 April 2014
Resolved 5 April 2014
Resolution: This item was corrected on the spot and witnessed by attending MI.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 5 March 2014 Resolved
Electrical equipment shall be designed and installed to minimize risk of hazard to personnel. During exam motor controller/junction box for MCC compressor was found to be damaged incl: exposed wiring, faulty latches and damaged control panel. Repair to minimize electrical hazard.
Due 5 April 2014
Resolved 5 March 2014
Resolution: Corrected on the spot and witnessed by attending MI.
Fire Fighting › Structural - A Class Divisions › Doors
Issued 5 March 2014 Resolved
Stairways shall be protected by self-closing fire doors. During exam, fire door between galley/mess area to stair did not close and latch properly.
Due 5 April 2014
Resolved 5 March 2014
Resolution: Door was adjusted and tested satisfactorily by attending MI.
Electrical › Electrical Distribution System (service) › Circuit Breaker
Issued 5 March 2014 Resolved
Bus tie breaker for SSDG #3 does not automatically reset after tripping. Repair and demonstrate proper operation of breaker.
Due 5 April 2014
Resolved 11 March 2014
Resolution: Received email statement from master that circuit breaker has been replaced and tested sat.
Engineering › Compressed Air System (start air) › Valve
Issued 5 March 2014 Resolved
Air receivers shall be equipped with pressure relief valves that prevent the pressure from rising above MAWP. During inspection, the pressure relief valve on the port main air receiver did to relieve as desinged and when attempting to hand-lift the valve, the handle broke free. Replace pressure relief valve with calibrated valve and demonstrate proper operation.
Due 5 April 2014
Resolved 5 March 2014
Resolution: Received statement from master that new pressure relieve valve installed and tested sat.
Lifesaving › Line-Throwing Appliances › Projectiles
Issued 5 March 2014 Resolved
Vessels shall be equipped with line throwing appliance with four projectile charges. During inspection one of the charges was found to be expired.
Due 5 April 2014
Resolved 5 March 2014
Resolution: Corrected on the spot.
Operations/Management › Bilge/Bilge System Management › Control of Oil Mixtures
Issued 5 March 2014 Resolved
The condition of the ship and equipment shall be maintained to ensure the vessel is fit for sea. Remove oil from bilges in way of tunnel thruster prime mover.
Due 5 April 2014
Resolved 5 March 2014
Resolution: Corrected on the spot.
Documentation › Logs/Records › Logbook (official)
Issued 15 February 2012 Resolved
Official log book not kept IAW 46 USC 113. Ensure all applicable entries are made from this point on. Compliance to be verified by USCG Marine Inspector at next annual inspection.
Action required: 705 - Other - as specified
Resolved 27 January 2013
Resolution: Conducted review of Official Logbook and found entries required by 46 CFR 131.620 were being logged.
Engineering › Thrusters › Motor
Issued 10 February 2011 Resolved
The port thruster steering motor in Emergency Steering mode was creeping approx. 10 degrees every 5 seconds.
Due 10 March 2011
Resolved 6 March 2011
Resolution: [name withheld] confirmed that the vessel technician has fixed the creeping of the port thruster in the emergency mode.
Fire Fighting › Ventilation Systems › Ducts
Issued 10 February 2011 Resolved
Prove proper operation of the stbd side engine room ventilation fire damper.
Due 11 February 2011
Resolved 11 February 2011
Fire Fighting › Ventilation Systems › Operating Controls
Issued 10 February 2011 Resolved
Prove proper operation of the EDG CO2 ventilation shutdown pressure switch.
Due 25 February 2011
Resolved 11 February 2011
Deck/Cargo › Cargo Stowage › General
Issued 5 October 2009 Resolved
Found acid tank (SN: 0211-5), port side, aft deck, temporarily installed. Permanently install this tank per ABS approved plan dated 24 Apr 09 prior to departure from scheduled drydock in October 2009. In the interim, place add'l securing devices to both sides of the tank.
Due 31 October 2009
Resolved 11 February 2011
Deck/Cargo › Cargo Stowage › General
Issued 5 October 2009 Resolved
Provide written documentation that all Intermediate bulk containers (IBC's) have met the test and inspection requirements of 49 CFR 180.352 and mark the IBC's to reflect these tests and inspections.
Action required: 705 - Other - as specified
Due 5 November 2009
Resolved 7 January 2010
Resolution: [name withheld] is satisfied with the documentation provided.
Deck/Cargo › Cargo Stowage › General
Issued 5 October 2009 Resolved
**Cleared by email 29 Oct 09. Will verify at next attendance.** Dunnage and brace Class 5 hazmat stowed within metal locker to prevent movement in any direction per 49 CFR 176.69.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 January 2010
Resolution: [name withheld] satisfied with stowage arrangement.
Deck/Cargo › Cargo Stowage › General
Issued 5 October 2009 Resolved
Obtain personal protective equipment recommended by MSDS to assure personal safety. Necessary equipment includes butyl rubber gloves, full face respirator organic vapor cartridge dust/mist prefilters.
Due 19 October 2009
Resolved 7 December 2009
Resolution: cleared
Deck/Cargo › Cargo Stowage › General
Issued 5 October 2009 Resolved
**Cleared by email 29 Oct 09, will remain open and verified during next attendance.** Review and adhere to 49 CFR Table 172.101 Column 10B stowage requirements for all hazmat regulated under 49 CFR 100-185.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 5 December 2009
Resolution: cleared
Deck/Cargo › Cargo Stowage › General
Issued 5 October 2009 Resolved
**Extended 30 days to 5 Dec 09. Develop and provide a copy of vessel policy to ensure periodic testing and examination requirements for permanently attached bulk tanks per 46 CFR 64, by 5 Nov 09.
Due 5 December 2009
Resolved 7 December 2009
Resolution: cleared
Deck/Cargo › Cargo Stowage › General
Issued 7 April 2009 Resolved
Refer to Activity number 3436860 for details of CG 835.
Due 1 May 2009
Resolved 5 October 2009
Resolution: cleared during hazmat compliance verification see Activity 3436860.
Deck/Cargo › Cargo Stowage › General
Issued 7 April 2009 Resolved
See Activity 3436860 for details of CG 835.
Due 1 May 2009
Resolved 5 October 2009
Resolution: Cleared during hazmat compliance verification, see Activity 3436860.
Deck/Cargo › Marine Portable Tanks › Base
Issued 7 April 2009 Resolved
See Activity 3436860 for details of CG 835.
Due 1 May 2009
Resolved 5 October 2009
Resolution: Cleared during hazmat compliance verification. See Activity 3436860.
Deck/Cargo › Marine Portable Tanks › Base
Issued 7 April 2009 Resolved
See Activity 3436860 for details of CG 835.
Due 1 May 2009
Resolved 5 October 2009
Resolution: Cleared during hazmat compliance verification. See Activity 3436860.
Deck/Cargo › Marine Portable Tanks › Pipe Connection
Issued 7 April 2009 Resolved
See Activity 3436860 for details of CG 835.
Due 1 May 2009
Resolved 5 October 2009
Resolution: Cleared during hazmat compliance verification. See Activity 3436860.
Accommodation/Occupational Safety › Occupational Safety › Portable Electric Equipment/Appliances
Issued 7 April 2009 Resolved
See Activity 3436860 for details of CG 835. Obtain portable oxygen, combustible gas, CO meter and calibration kit. Kits been received. Company working on getting test gas. (5/6/09).
Due 1 May 2009
Resolved 11 February 2011
Communications › Alarms/Indicators › Fire Alarm
Issued 7 April 2009 Resolved
Prove proper operation of two fire alarm pull switches in PCM room including "fire to general alarm roll over alarm. The two switches near the port and starboard door.
Due 1 May 2009
Resolved 8 April 2009
Resolution: Alarm pull boxes replaced, re-programmed. Roll over alarm operated normally.
Communications › Alarms/Indicators › Fire Alarm
Issued 7 April 2009 Resolved
Prove proper operation of fire pull box near aft door of pump room. Reset key broken off inside pull box.
Due 1 May 2009
Resolved 8 April 2009
Resolution: Pull box replaced, operated normally.
Communications › Alarms/Indicators › Fire Alarm
Issued 7 April 2009 Resolved
Prove proper operation of fwd fire alarm pull switch in pump room including "fire to general alarm roll over alarm".
Due 1 May 2009
Resolved 8 April 2009
Resolution: Pull box repaired, re-programmed, roll over alarm operated normally.
Communications › Alarms/Indicators › General Alarm
Issued 7 April 2009 Resolved
Prove proper operation of general alarm horn in PCM room.
Due 1 May 2009
Resolved 8 April 2009
Resolution: GA horn repaired, operated normally.
Electrical › Electric Supply System (service) › Cable
Issued 7 April 2009 Resolved
Provide boundry protection for wire penetrations in laundry room bulkhead.
Due 1 May 2009
Resolved 8 April 2009
Resolution: Bountry penetration fitted for proper protection against fire.
Engineering › Diesel Engine (auxiliary) › Injector (fuel injection)
Issued 7 April 2009 Resolved
Repair oil leaks to fuel actuators on all three ship service generators.
Due 1 May 2009
Resolved 8 April 2009
Resolution: Oil seals replaced.
Lifesaving › Rescue Boat Equipment › Searchlight
Issued 7 April 2009 Resolved
Provide search light fitted for new electrical source onboard rescue boat.
Due 1 May 2009
Resolved 8 April 2009
Resolution: New rescue boat search light placed with rescue boat equipment.
Accommodation/Occupational Safety › Ventilation › General
Issued 7 April 2009 Resolved
Prove proper operation of supply blower dampers for pump room. Several dampers do not close properly, retract pin motors do not operate.
Due 1 May 2009
Resolved 5 October 2009
Resolution: Cleared during hazmat complaince verification. See Activity 3436860.
Lifesaving › Line-Throwing Appliances › Lines
Issued 14 March 2008 Resolved
Add one Coast Guard approved line throwing gun. Received email from Master stating that CG-835 has been completed. Extended due date to correspond with annual window due date.
Action required: 705 - Other - as specified
Due 13 April 2009
Resolved 7 April 2009
Resolution: Verified complete 4/7/09.
Engineering › Fuel Oil Storage/Transfer System › Valve
Issued 14 March 2008 Resolved
Label the emergency fuel shut off and collision bulkhead bilge valves stations in a contrasting color to the deck and bulkhead. Make the T-wrenches for both readily identifiable. Received email dated 03/24/2008 that item has been completed. Extended due date to correspond with end of annual window due date.
Action required: 705 - Other - as specified
Due 13 April 2009
Resolved 7 April 2009
Resolution: Verified complete 4/7/09.
Navigation › Collision/Grounding Avoidance › Radar
Issued 14 March 2008 Resolved
Repair the inoperable radar. Received email from Master stating that CG-835 has been completed. Extended due date to correspond with annual window due date.
Action required: 705 - Other - as specified
Due 13 April 2009
Resolved 7 April 2009
Resolution: Verified operation 4/7/09.
Electrical › Lighting (emergency) › Battery Operated Lantern
Issued 14 March 2008 Resolved
Repair the emergency light in the emergency generator room.
Action required: 705 - Other - as specified
Due 15 April 2008
Resolved 25 March 2008
Navigation › Piloting/Steering › Notices to Navigation
Issued 14 March 2008 Resolved
Provide 2008 editions for the following nautical publications: Admiralty List of Radio Signals, Maritime Radio Stations, GMDSS, Meteorological Observation Stations, Pilot VTS and Port Operations, Tide and Current Tables. Received email from Master stating that CG-835 has been completed. Extended due date to correspond with annual window due date.
Action required: 705 - Other - as specified
Due 13 April 2009
Resolved 7 April 2009
Resolution: Verified pubs onboard 4/7/09.
Communications › Alarms/Indicators › General Alarm
Issued 14 March 2008 Resolved
Repair the General Alarm audible and visible indicators in the forward and aft PCM room. Received email from Master stating that CG-835 has been completed. Extended due date to correspond with annual window due date.
Action required: 705 - Other - as specified
Due 13 April 2009
Resolved 8 April 2009
Resolution: Found inop during 2009 annual. Repaired before conclusion of 2009 annual. Cleared.
Communications › Alarms/Indicators › Fire Alarm
Issued 14 March 2008 Resolved
Demonstrate the proper operation of the Fire to General Alarm “roll over” function using the manual pull alarms in the forward and aft PCM room. Received email from Master stating that CG-835 has been completed. Extended due date to correspond with annual window due date.
Action required: 705 - Other - as specified
Due 13 April 2009
Resolved 7 April 2009
Resolution: Found inop during 2009 annual exam. Repairs were completed before the conclusion of 2009 inspection. Cleared.
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 8 January 2007 Resolved
Prove working operation of the Oily Water Separator.
Due 8 February 2007
Resolved 8 January 2007
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 6 January 2007 Resolved
Complete house keeping in way of deck: containment plugs, transfer hoses, 5 gallon jugs stacked outside of containment, dry stores, labels on tank, testing of tanks, and fittings on tanks. Ensure all chemicals are in proper storage containers, that are working properly.
Due 8 February 2007
Resolved 8 January 2007
Fire Fighting › Semiportable Chemical-Foam Fire Extinguishers › Number
Issued 9 January 2006 Resolved
Prior to filling or discharging portable tanks, provide 450lbs of dry chemical via B-V.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 9 February 2006
Resolved 17 January 2006
Resolution: 450lbs provided via 3 B-V''s.
Deck/Cargo › Ballast › Valves
Issued 9 January 2006 Resolved
Make repairs to #3 Ballast actuator.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 9 February 2006
Resolved 17 January 2006
Resolution: Ballast valve actuator renewed and tested sat.
Electrical › Electric Supply System (service)
Issued 5 March 2003 Resolved
Remove 2 extension cords located in pilothouse. LEGACY COMPONENT DESC: Extension cords
Action required: 17 - Rectify deficiencies prior to departure
Due 5 April 2003
Resolved 5 March 2003
Communications › Visual Communication
Issued 5 March 2003 Resolved
Remount call light located in z-drive room. LEGACY COMPONENT DESC: Signaling Lamp
Action required: 17 - Rectify deficiencies prior to departure
Due 5 April 2003
Resolved 5 March 2003
Stability › Watertight Integrity
Issued 5 March 2003 Resolved
Renew gasket on 2 watertight doors on main deck. LEGACY COMPONENT DESC: Watertight door
Action required: 17 - Rectify deficiencies prior to departure
Due 5 April 2003
Resolved 5 March 2003
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Flame Screens
Issued 5 March 2003 Resolved
Renew flame screen on fuel oil and liquid mud deck vents.
Action required: 17 - Rectify deficiencies prior to departure
Due 5 April 2003
Resolved 5 March 2003
Lifesaving › Rescue Boat Equipment
Issued 5 March 2003 Resolved
Fill up gasoline tanks in rescue boat. LEGACY COMPONENT DESC: fuel
Action required: 17 - Rectify deficiencies prior to departure
Due 5 April 2003
Resolved 5 March 2003
Communications › Internal Communications System
Issued 22 March 2002 Resolved
DEMONSTRATE PROPER OPERATION OF THE "Z" DRIVE ROOM SOUND POWERED PHONE VISUAL AND/OR AUDIBLE CALL INDICATOR UNDER EMERGENCY POWER LEGACY COMPONENT DESC: Sound-powered Telephone
Condition: Improper Installation
Due 22 March 2002
Resolved 22 March 2002
Documentation › Certificates/Documents
Issued 22 March 2002 Resolved
PROVIDE AND POST CERTIFICATE OF ALT. COMPLIANCE FOR NAV LIGHT PLACEMENT LEGACY COMPONENT DESC: CERT OF ALT COMPLIANCE
Due 22 March 2002
Resolved 22 March 2002
Lifesaving › Rescue Boat
Issued 22 March 2002 Resolved
END FOR END RESCUE BOAT DAVIT CABLE LEGACY COMPONENT DESC: DAVIT CABLE
Condition: Improper/Lack of Maintenance
Due 22 March 2002
Resolved 22 March 2002
Navigation › Piloting/Steering › Tide/Tidal Current Tables
Issued 22 March 2002 Resolved
PROVIDE UP TO DATE TIDAL CURRENTS AND TIDE TABLES.
Condition: Placed in Improper Service
Due 22 March 2002
Resolved 22 March 2002
Lifesaving
Issued 4 January 2000 Resolved
Prior to sailing, _x001C_ Repair tear in bow inflatable chamber on resuce boat._x001C_
Condition: Unknown
Due 5 January 2000
Resolved 17 January 2000
Deck/Cargo
Issued 4 January 2000 Resolved
Provide test data on two HCL tanks on port aft, maid deck. Last hydro and lining inspection.
Condition: Unknown
Due 8 February 2000
Resolved 9 February 2000
Electrical
Issued 4 January 2000 Resolved
Provide approved plans for modifications made to liquid mud/gel system electric motors on pumps # & #2. Pumps changed from 150hp to 200hp.
Condition: Unknown
Due 4 January 2000
Resolved 4 January 2000
Electrical
Issued 4 January 2000 Resolved
Provide new load analysis to show changes in electrical load on ship's generators (3) and switchboard._x001C_ Change of liquid mud/gel system pumps from 150 to 200 hp._x001C_ see IDENT 001
Condition: Unknown
Due 4 January 2000
Resolved 4 January 2000
Lifesaving
Issued 29 September 1997 Resolved
In accordance with Title 46 Code of federal Regulations subpart 113.25- 9(c), install loudspeaker type system or a general alarm electronic transducer in all cabins.
Condition: Unknown
Due 29 September 1997
Resolved 29 September 1997
Navigation
Issued 29 September 1997 Resolved
In accordance with Title 33 Code of Federal Regulations subpart 164.35, install required equipment and provide naviagtion/maneuvering data ie..gyrocompass, recording depth sounding device, turning data, thruster speed tables etc...
Condition: Unknown
Due 29 September 1997
Resolved 29 September 1997
Electrical
Issued 29 September 1997 Resolved
Demonstrate GMDSS and NECO systems under emergency power ie..battery back up and under emergency generator power.
Condition: Unknown
Due 29 September 1997
Resolved 29 September 1997
Lifesaving
Issued 29 September 1997 Resolved
Install sufficient shaft guards over shafts down port and starboard shaft alleys to prevent hands/clothing from being placed on shafts.
Condition: Unknown
Due 29 September 1997
Resolved 29 September 1997

Casualty record · 2

12 March 2016Routine · role: Involved in a Marine Casualty · activity 5834923
22 November 2016Routine · role: Involved in a Marine Casualty · activity 6045655
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.