MAURY USCG vessel records Sign in
← All vessels

MARY D.

MARY D. is a 1997 passenger vessel (inspected). The Coast Guard has recorded 35 inspections since 1997, most recently in May 2026, along with 48 deficiencies and 1 casualty investigation in 2019.

Records from 1997 to 2026. Most recent: inspection, 20 May 2026.

Built
1997
Last inspected
20 May 2026
Documentation
Valid · documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

WCX7859
457282
Flag
UNITED STATES
367318730
Maury page id
psix-457282

Inspections, by type

…with no type recorded1
Years with a record 26 calendar years (1997–2026)
The 35 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.

Documentation record

Registered dimensions (L × B × D)50.0 ft × 19.0 ft × 7.0 ft
Registered tonnagegross 44 / net 35
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderINTRACOASTAL IRON WORKS · BOURG, LA, UNITED STATES · built 1997
Hull materialAluminum
PropulsionDiesel Reduction
Hull shapeShip
Hull configurationMonohull
Hailing portNEW ORLEANS, LA
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 30 December 2025 · expires 31 January 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it44 - Simplified, Gross Ton
35 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

Radio station licence

WCX7859MMSI 367318730 · active · voluntarily equipped · granted 25 August 2017, expires 7 October 2027
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspection history · 35

20 May 2026 Internal Structural Exam · COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8354582
23 July 2025 Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8157424
27 June 2023 Annual Inspection · Internal Structural Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7713976
18 August 2022 Drydock Exam · Internal Structural Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7517729
20 May 2022 Deficiency Check · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7430391
22 April 2021 Deficiency Check · COI Inspection · Internal Structural Exam · Examination of Repairs
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7170365
8 September 2020 Internal Structural Exam · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7044856
18 September 2019 Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6808929
3 March 2019 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6680265
29 November 2018 Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6584957
20 July 2017 Annual Inspection · Examination of Repairs · Drydock Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6211778
31 January 2017 In-Service Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6085690
8 June 2016 COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5896447
26 June 2014 Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4896919
23 July 2012 Annual Inspection · Drydock Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4357259
20 January 2011 Damage Survey
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3930695
21 July 2009 Deficiency Check · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3535419
20 April 2009 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3456561
8 July 2008 Annual Inspection · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3255867
6 July 2007 Hull Examination · Administrative Inspection · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2985487
9 May 2006 COI Inspection · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2644502
1 February 2005 Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2284745
5 November 2004 Annual Inspection
Physical examination · MIDET HARVEY CANAL DETAIL · USCG Heartland District (CGD-H) · Activity 2235253
10 December 2003 Deficiency Check
Physical examination · MIDET HARVEY CANAL DETAIL · USCG Heartland District (CGD-H) · Activity 1961724
4 December 2003 Annual Inspection
Physical examination · MIDET HARVEY CANAL DETAIL · USCG Heartland District (CGD-H) · Activity 1958765
19 December 2002 Administrative Inspection
Administrative · MIDET HARVEY CANAL DETAIL · USCG Heartland District (CGD-H) · Activity 1721031
30 October 2002 Hull Examination · Annual Inspection
Physical examination · MIDET HARVEY CANAL DETAIL · USCG Heartland District (CGD-H) · Activity 1667324
19 October 2001 Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1073758
27 August 2001 Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1382372
30 August 2000 COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1450515
8 December 1999 Re-Inspection · Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1378878
6 October 1998 Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1436122
22 May 1998 Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1126367
8 May 1998 Damage Survey
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1125097
23 July 1997 Initial Certification · Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1435963

Deficiency record · 48

02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 23 July 2025 Resolved
The construction and arrangements of a vessel must allow the safe operation of the vessel IAW the terms of its COI giving consideration to provisions for a seaworthy hull. During inspection, the port rudder post was observed to be leaking and compromises watertightness in a critical hull penetration. Identify the source of the leakage and conduct appropriate repairs to restore watertight integrity. All work must be verified by the attending Coast Guard Marine Inspector. 46 CFR 177.100 701c
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 July 2025
Resolution: Based on the evidence provided and supporting documentation, the watertight integrity of the rudder post area has been restored.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 27 June 2023 Resolved
The owner/operator shall have the vessel ready for inspections of the hull structure and all accessible parts of the exterior and interior. In the lazarette, identified cracks in welds, structural members, transom, and bottom plate around the struts, rudder posts, and shaft tubes. These cracks resulted in active water intake. Drydock and survey vessel to identify all affects areas; conduct approved repairs.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 May 2024
Resolution: Welders repaired affected structures to the satisfaction of the attending [name withheld] penetrant NDT conducted and tested sat.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 27 June 2023 Resolved
The owner/operator shall have the vessel ready for inspections of the hull structure and all accessible parts of the exterior and interior. 04 pits measuring approximately 3/16" found in the lazarette in vicinity of bilge suction point. Crop and renew affected area.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 May 2024
Resolution: Welders repaired affected structures to the satisfaction of the attending [name withheld] penetrant NDT conducted and tested sat.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 27 June 2023 Resolved
Repairs to the hull that affect the safety of the vessel must not be made without the approval of the cognizant OCMI. In the lazarette, identified numerous existing unauthorized repairs which failed, resulting in active water intake. Crop and renew affected areas.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 May 2024
Resolution: Welders repaired affected structures to the satisfaction of the attending [name withheld] penetrant NDT conducted and tested sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 27 June 2023 Resolved
A vessel must be provided with a fixed self-priming bilge pump with a minimum capacity of 10 gallon per minute. Vessel operators were unable to operate bilge system due to unfamiliarity and possible pump malfunction. Conduct training and prove pump operation.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 July 2024
Resolution: Tested installed bilge system, All SAT.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 27 June 2023 Resolved
The vessel must be provided with individual bilge lines and bilge suctions for each watertight compartment. The bilge suction in the lazarette wasted and sheared at threads approximately 24" above suction and check valve. Repair and prove proper operation of the bilge suction.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 July 2024
Resolution: Verified Repairs.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 27 June 2023 Resolved
A bilge suction must be fitted with a suitable strainer having an open area not less than three times the area of the bilge pipe. The bilge suction in the engine room was clogged with debris. Clean and prove proper operation of the bilge suction.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 July 2024
Resolution: Verified cleaned and clear.
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 27 June 2023 Resolved
The owner/operator shall have the vessel ready for inspections of the hull structure and all accessible parts of the exterior and interior. In the forepeak, an inset on the port bow resulted in side shell cracking in numerous areas; unauthorized repairs used to mitigate the cracks have failed. Crop and renew affected areas.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 May 2024
Resolution: Welders repaired affected structures to the satisfaction of the attending [name withheld] penetrant NDT conducted and tested sat.
02 - Structural Conditions › N/A - No Subsystem › Bulkheads - cracking
Issued 27 June 2023 Resolved
The owner/operator shall have the vessel ready for inspections of the hull structure and all accessible parts of the exterior and interior. In the forepeak, numerous welds on the side longitudinals were cracked. Reweld.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 8 May 2024
Resolution: Welders repaired affected structures to the satisfaction of the attending [name withheld] penetrant NDT conducted and tested sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 27 June 2023 Resolved
The owner/operator shall have the vessel ready for inspections of the hull structure and all accessible parts of the exterior and interior. In the engine room, numerous structural members and the main engine mounts were found cracked. Conduct approved repairs.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 15 July 2024
Resolution: Verified repairs
02 - Structural Conditions › N/A - No Subsystem › Decks - cracking
Issued 27 June 2023 Resolved
The owner/operator shall have the vessel ready for inspections of the hull structure and all accessible parts of the exterior and interior. Numerous cracks on the main deck were identified, including around railing, bow, port quarter, and the hatch coamings. Conduct survey to identify all damaged areas and conducted approved repairs.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 8 May 2024
Resolution: Welders repaired affected hatch surrounds to the satisfaction of the attending [name withheld] penetrant NDT conducted and tested sat.
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 27 June 2023 Resolved
Each watertight bulkhead must be of sufficient strength to be capable of remaining watertight with a head of water to the top of the bulkhead. Fwd ER bulkhead has bolt holes from an abandoned fire extinguisher bracket. Repair bulkhead.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 15 July 2024
Resolution: Verified repairs
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 27 June 2023 Resolved
A hatch on a vessel that operates only on protected waters must be either watertight or weathertight. Gaskets on engine room hatches have failed; preventing weathertightness. Renew gaskets.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 15 July 2024
Resolution: Verified new gaskets
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 27 June 2023 Resolved
Fire fighting and man overboard drills and training shall be logged; including date and general description of the scenario and training topics. Vessel failed to conducted monthly drills and document as required. Conduct drills and document correctly.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 15 July 2024
Resolution: Verified Log, all SAT.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 20 May 2022 Resolved
A vessel of at least 7.9 meters (26 feet) in length must be provided with individual bilge lines and bilge suctions for each watertight compartment, Upon examination the bilge pumping system was not able to pump accumulated water from the space aft of the collision bulkhead. Vessel representative attempted repair of the system by removing the strainer and restarting pump with no success. Owner/Operator to repair system and notify attending inspector for visual confirmation of proper operation. 46CFR182.510(a) 60c.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 20 May 2022
Resolved 1 July 2022
Resolution: Verified proper operation of bilge pump with owners rep.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 20 May 2022 Resolved
Where flexible nonmetallic hose is permitted for use in piping systems by this section, it must meet SAE J-1942 (incorporated by reference; see 46CFR175.600) or be specifically approved by the Commandant. MI observed severely deteriorated flexible nonmetallic fuel hose at the fuel tank in the aft steering space. Owner/Operator to replace all unsatisfactory fuel hoses with approved material. 46CFR182.720(e) 60c.
Action required: 60 - Rectify deficiencies prior to movement
Due 20 May 2022
Resolved 1 July 2022
Resolution: Verified hoses were replaced as required with owners rep.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 20 May 2022 Resolved
This part contains requirements for the design, construction, installation, and operation of propulsion and auxiliary machinery, piping and pressure systems, steering apparatus, and associated safety systems. Machinery and equipment installed on each vessel must be suitable for the vessel and its operation and for the purpose intended. All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing fire, explosion, machinery failure, and personnel injury. MI observed fuel leaking at the supply fitting before the port main engine primary fuel filter. Owner/Operator to repair leak and notify attending inspector of repairs. 46CFR182.100 60c.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 20 May 2022
Resolved 1 July 2022
Resolution: Verified integrity of the fuel system.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 20 May 2022 Resolved
Provision must be made for closing all supply duct cowls or scoops and exhaust duct discharge openings for a space protected by a fixed gas extinguishing system. All closure devices must be readily available and mounted in the vicinity of the vent. MI observed both aft engine room ventilation intakes unable to be closed off with provided plates due to lost and improper hardware. Owner/Operator to make repairs to all engine room supply intakes ensuring proper closing devices operate as designed. 46CFR182.465(h) 60c.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 20 May 2022
Resolved 1 July 2022
Resolution: Verified ventalation closure device was inplace and oprable.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 20 May 2022 Resolved
This part contains requirements for the design, construction, installation, and operation of propulsion and auxiliary machinery, piping and pressure systems, steering apparatus, and associated safety systems. Machinery and equipment installed on each vessel must be suitable for the vessel and its operation and for the purpose intended. All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing fire, explosion, machinery failure, and personnel injury. MI observed starboard sea chest piping leaking at the pipe nipple before the valve. Owner/Operator to make repairs and notify attending marine inspector of repairs. 46CFR182.100 16c.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 June 2022
Resolved 1 July 2022
Resolution: Verified all raw water piping was leak free.
05 - Radio Communications › N/A - No Subsystem › Operation/maintenance
Issued 20 May 2022 Resolved
A vessel is inspected for compliance with the standards required by this subchapter. Machinery, equipment, materials, and arrangements not covered by standards in this subchapter may be inspected in accordance with standards acceptable to the cognizant OCMI as good marine practice. MI observed the VHF antenna broken off at the base and attached to the mast with a plastic electrical tie wrap. Owner/Operator to replace the antenna with acceptable replacement and provide notification to attending marine inspector of repairs. 46CFR176.800(a) 16c.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 June 2022
Resolved 1 July 2022
Resolution: Verified replacement antenna was installed and functioning.
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 22 April 2021 Resolved
Repairs or alterations to the hull that affect the safety of the vessel must not be made without the approval of the cognizant OCMI. Vessel must submit a repair proposal for the cracking and clad weld in the steering compartment around the port strut, to the satisfaction of the attending marine inspector prior to starting repairs.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 29 April 2021
Resolved 20 May 2021
Resolution: Witnessed satisfactory dye pen testing of repairs.
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 22 April 2021 Resolved
The construction and arrangement of a vessel must allow the safe operation of the vessel in accordance with the terms of its Certificate of Inspection giving consideration to provisions for a seaworthy hull. Inspector discovered cracking in the hull at the port strut post in the steering compartment leaking water through the hull into the space. Crop and renew hull plating around the port strut post to the satisfaction of the attending marine inspector.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 29 April 2021
Resolved 20 May 2021
Resolution: Witnessed satisfactory dye pen testing of repairs.
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 22 April 2021 Resolved
A bilge pipe piercing the collision bulkhead must be fitted with a screw-down valve located on the forward side of the collision bulkhead and operable from the weather deck. MI observed the valve was stripped and inoperable. 46 CFR 182.510(d) 60c
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 21 May 2021
Resolution: Recieved pictures and video of the valve replaced and operating properly
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 22 April 2021 Resolved
The construction and arrangement of a vessel must allow the safe operation of the vessel in accordance with the terms of its Certificate of Inspection. MI observed the following structural damage: 1. Starboard aft gunwale in the steering gear compartment was not watertight and water was leaking into the space. 2. Cracked welds on the port rudder post 3. Forward compartment had various structural damage along the starboard bow 46 CFR 177.100 16c
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 21 May 2021
Resolution: Received pictures from the vessel rep showing that the proper repairs were made.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 29 November 2018 Resolved
Port engine onboard exhaust lagging was loose and the last 1’ of piping before water inlet was damaged. Repair or replace to satisfaction of attending marine inspector. 46 CFR 182.425(b)(3) 10c
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 29 November 2018
Resolved 29 November 2018
Resolution: Lagging and piping were replaced and repaired to satisfaction of CG Marine Inspector.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 29 November 2018 Resolved
Port engine exhaust couplings were loose and hose clamps were missing. Repair exhaust couplings and replace hose clamps to satisfaction of attending marine inspector. 46 CFR 182.410(d)(1) 10c
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 29 November 2018
Resolved 29 November 2018
Resolution: Couplings were tightened and hose clamps were replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 29 November 2018 Resolved
Port and starboard engine mounting bolts were loose. Tighten or replace to satisfaction of attending marine inspector. 46 CFR 176.800(a) 10c
Action required: 10 - Deficiency Rectified
Due 29 November 2018
Resolved 29 November 2018
Resolution: Port and starboard engine mounting bolts were tightened.
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 29 November 2018 Resolved
Second void space has cracked and missing welds on the starboard side upper aft corner. Reweld and make repairs to satisfaction of attending marine inspector. 46 CFR 176.800(a) 10c
Action required: 10 - Deficiency Rectified
Due 29 November 2018
Resolved 29 November 2018
Resolution: Crew rewelded damaged welds to satisfaction of CG Marine Inspector.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 29 November 2018 Resolved
Bilge pick up tube located in steering space has severe chaffing from to mounting clamp. Replace affected piping to satisfaction of attending marine inspector. 46 CFR 182.500(a) 10c
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 29 November 2018
Resolved 29 November 2018
Resolution: Affected piping was replaced to satisfaction of CG Marine Inspector.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 29 November 2018 Resolved
Port battery has loose terminals. Tighten terminals and repair to satisfaction of attending marine inspector. 46 CFR 183.350(d) 10c
Action required: 10 - Deficiency Rectified
Due 29 November 2018
Resolved 29 November 2018
Resolution: Port battery terminals were tightened to satisfaction of CG Marine Inspector.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 29 November 2018 Resolved
Port and starboard battery boxes have metal covers that are chaffing on the cables. Repair to the satisfaction of the attending marine inspector. 46 CFR 183.350(e) 10c
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 29 November 2018
Resolved 29 November 2018
Resolution: Vessel rep added rubber material between the cables and the metal covers to eliminate future chaffing.
Construction/Loadline › Hull › Bottom Plating
Issued 20 July 2017 Resolved
provide repair proposal for por aft wasted hull material, to include integral keel cooler.
Action required: 705 - Other - as specified
Due 20 August 2017
Resolved 19 September 2017
Resolution: Satisfactorily inspected repairs to the hull and keel cooler.
Construction/Loadline › Hull › Strut/Cross Tie
Issued 20 July 2017 Resolved
gouge out weld crack on interior stbd strut backing, reweld.
Action required: 705 - Other - as specified
Due 20 August 2017
Resolved 19 September 2017
Resolution: Inspected satisfactory repairs to the stbd strut backing.
Personnel › Manning/Qualifications › Minimum Safe Manning
Issued 31 January 2017 Resolved
Vessel operating without a deckhand onboard as required by Certificate of Inspection issued 08Jun2016.
Action required: 701 - Prior to carriage of passengers/cargo
Due 31 January 2017
Resolved 31 January 2017
Resolution: Added required crewmember.
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 8 June 2016 Resolved
Cracked weld on exhaust piping, port side lazarette, where piping is welded to forward bulkhead.
Action required: 705 - Other - as specified
Due 8 July 2016
Resolved 9 June 2016
Resolution: Checked repair. Weld on exhaust tube all sat.
Engineering › Diesel Engine (propulsion-direct drive) › Piping (exhaust)
Issued 8 June 2016 Resolved
Replace flexible tubing from cooling system to exhaust. Hoses are kinked. Fix leak on flexible tube for exhaust supply cooling.
Action required: 705 - Other - as specified
Due 8 July 2016
Resolved 9 June 2016
Resolution: Flexible cooling lines were replaced. Leak on flex hose cooling supply line was fitted with a new bracket and new flex tubing. Ran port engine and witnessed no leaks.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Automatic Heat Detectors
Issued 21 July 2009 Resolved
Vsl has installed CO2 system but does not have required fire detection system or auto actuation of CO2 as required by 46 CFR 181.400 c.
Due 4 August 2009
Resolved 28 August 2009
Resolution: install 1500 cf. Fire Buoy system
Electrical › Lighting (service) › Lighting Fixture
Issued 8 July 2008 Resolved
Reposition mast head light and anchor light to ensure visibility as per Navrules. Do not conduct night time operations until proven to the satisfaction of attending marine inspector.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 22 July 2008
Resolved 10 July 2008
Resolution: Resolved to satisfaction of attending Marine Inspector.
Electrical › Electric Generation Source (service)
Issued 4 December 2003 Resolved
Seal or discard naked ground wire running inside the Portside Battery Box. LEGACY COMPONENT DESC: Grounding Conductor
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 4 January 2004
Resolved 10 December 2003
Accommodation/Occupational Safety › Medical/First Aid
Issued 4 December 2003 Resolved
Replace all expired contents (Iodine, Eyewash, Burn Cream, etc) in First Aid box. LEGACY COMPONENT DESC: Medicine Chest
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 4 January 2004
Resolved 10 December 2003
Deck/Cargo › Holds/Tanks
Issued 4 December 2003 Resolved
Remove excess water from forward and fore peak compartments. LEGACY COMPONENT DESC: Cargo Tank Drainage
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 4 January 2004
Resolved 10 December 2003
Fire Fighting › Ventilation Systems
Issued 23 September 2002 Resolved
Install ventilation sercuing device for engine supply air ducting. LEGACY COMPONENT DESC: Duct Hatches
Due 9 October 2002
Resolved 30 October 2002
Engineering
Issued 8 December 1999 Resolved
MAKE PERMANENT REPAIRS TO FUEL TANK CRACKED MOUNTING WELDS. UPPER 4 CORNERWELDS TO LONGITUDINAL FRAMES.
Condition: Unknown
Due 8 January 2000
Resolved 10 December 1999
Construction/Loadline
Issued 8 December 1999 Resolved
INSTALL APPROPRIATE SIZED BILGE STRAINERS IN ALL COMPARTMENTS.
Condition: Unknown
Due 8 January 2000
Resolved 10 December 1999
Construction/Loadline
Issued 8 May 1998 Resolved
VESSEL TO MAKE PERMANENT REPAIRS TO BOTH STRUT WINGS AND RUDDER TUBES WHERETHEY CONNECT TO HULL AND ARE CRACKING. NO DOUBLERS WERE INSTALLED DURING NEW CONSTRUCTION, CAUSING THIS PROBLEM. VESSEL TO PROCEED TO GRAN BOIS TO EFFECT REPAIRS.
Condition: Unknown
Due 8 May 1998
Resolved 8 May 1998
Documentation
Issued 23 July 1997 Resolved
PROVIDE PROOF OF FIXED FIRE EXTINGUISHING SYSTEM PLAN APPROVAL.
Condition: Unknown
Due 23 June 1998
Resolved 30 March 1998
Documentation
Issued 23 July 1997 Resolved
Conduct simplified stability test as reference vsl for remaining sister vessels to be constructed out of Intracoastal Iron Works.
Condition: Unknown
Due 20 March 1998
Resolved 20 March 1998
Construction/Loadline
Issued 23 July 1997 Resolved
INSTALL HIGH LEVEL BILGE ALARMS IN ALL SPACES WITH THROUGH HULL FITTING BELOW THE WATERLINE IAW 46 CFR 182.530.
Condition: Unknown
Due 23 July 1997
Resolved 23 July 1997

Casualty record · 1

3 March 2019Routine · role: Involved in a Marine Casualty · activity 6680265
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.