MAURY USCG vessel records Sign in
← All vessels

RUDEE ROCKET

RUDEE ROCKET is a 1997 passenger vessel (inspected). The Coast Guard has recorded 62 inspections since 1997, most recently in April 2026, along with 73 deficiencies and 1 casualty investigation in 2006.

Records from 1997 to 2026. Most recent: inspection, 21 April 2026.

Built
1997
Last inspected
21 April 2026
Documentation
Valid · documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

WDI4683
457803
Flag
UNITED STATES
367701010
Maury page id
psix-457803

Inspections, by type

…with no type recorded11
Years with a record 25 calendar years (1997–2026)
The 62 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.

Documentation record

Registered dimensions (L × B × D)64.7 ft × 18.2 ft × 6.0 ft
Registered tonnagegross 47 / net 37
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderOCEAN ROCKETS INC · TUCKAHOE, NJ, UNITED STATES · built 1997
Hull materialFRP (Fiberglass)
PropulsionDiesel Reduction
Hull shapeShip
Hull configurationMonohull
Hailing portVIRGINIA BEACH, VA
Trade endorsementsCoastwise, unrestricted, Fishery, Recreational
DocumentationValid · issued 15 November 2025 · expires 31 December 2026
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it47 - Simplified, Gross Ton
37 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

Radio station licence

WDI4683MMSI 367701010 · active · compulsorily equipped · granted 21 August 2025, expires 4 November 2035
WDC5887MMSI 367047990 · expired · compulsorily equipped · granted 7 June 2005, cancelled 8 August 2015
WCX5903MMSI not assigned · expired · compulsorily equipped · granted 8 July 1997, cancelled 8 September 2007 · licensed under a name not among this hull’s recorded names (not shown)
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspection history · 62

21 April 2026 Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8349912
7 April 2026 Internal Structural Exam · Drydock Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8344004
24 April 2025 Deficiency Check · Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8118093
7 May 2024 Annual Inspection · Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7908184
2 April 2024 Drydock Exam · Internal Structural Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7887110
17 April 2023 Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7666332
18 April 2022 Hull Examination · Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7433290
29 March 2022 Deficiency Check · COI Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7417054
20 April 2021 Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7177379
1 June 2020 Administrative Inspection · Deficiency Check · Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6963357
27 May 2020 Hull Examination · Internal Structural Exam · Administrative Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6957068
22 April 2019 Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6667335
30 April 2018 Hull Examination
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6400885
23 April 2018 Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6395925
14 April 2017 Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6124301
29 March 2017 COI Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6112302
2 May 2016 Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 5862115
12 April 2016 Hull Examination
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 5846857
26 March 2014 Hull Examination
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 4818174
23 May 2012 Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 4321772
6 May 2008 Drydock Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 3193921
9 April 2008 Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 3180404
23 April 2007 COI Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 2905861
25 October 2006 Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 2807654
2 October 2006 Administrative Inspection
Administrative · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 2791931
29 June 2006 Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 2695608
21 June 2006 Hull Examination
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 2685771
9 September 2005 Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 2488179
22 August 2005 Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 2464705
23 July 2004 Deficiency Check · Annual Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 2141480
20 July 2004 In-Service Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 2114757
13 April 2004 Hull Examination · Construction Oversight
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 2122469
23 March 2004 Damage Survey
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 2029485
22 July 2003 Deficiency Check · Damage Survey
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1853775
30 May 2003 Annual Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1803633
5 May 2003 Damage Survey
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1786722
27 September 2002 Damage Survey
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1681131
21 June 2002 In-Service Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1634431
21 May 2002 COI Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1630968
28 April 2002 Administrative Inspection
Administrative · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1610129
30 May 2001 Re-Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1389393
28 August 2000 Deficiency Check
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1386876
31 July 2000 Type not recorded
No type recorded · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 723399
15 November 1999 Hull Examination · COI Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1381732
25 September 1999 Type not recorded
No type recorded · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 94914
31 August 1999 Deficiency Check · Re-Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1469924
14 December 1998 Type not recorded
No type recorded · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 723400
9 November 1998 Type not recorded
No type recorded · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 723401
9 November 1998 Administrative
Administrative · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 803405
27 August 1998 Type not recorded
No type recorded · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 177190
25 August 1998 Re-Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1131876
13 August 1998 Damage Survey · Examination of Repairs
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 796252
8 August 1998 Type not recorded
No type recorded · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 100173
13 July 1998 Type not recorded
No type recorded · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 217429
7 April 1998 Plan Review "T" Boat
Administrative · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 786869
13 March 1998 Administrative
Administrative · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1105627
21 November 1997 Administrative
Administrative · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 773498
16 October 1997 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 777643
29 July 1997 Type not recorded
No type recorded · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 8597
1 July 1997 Deficiency Check · Initial Certification
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1375046
26 June 1997 Initial Construction-Excluding Oversight
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1364218
12 June 1997 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1112856

Deficiency record · 73

07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 21 April 2026 Resolved
On a vessel of not more than 19.8 meters (65 feet) in length carrying more than 49 passengers, and on a vessel of more than 19.8 meters (65 feet) in length, the minimum capacity of the fire pump must be 189 liters (50 gallons) per minute at a pressure of not less than 414 kPa (60 psi) at the pump outlet. The pump outlet must be fitted with a pressure gauge. MI observed pressure gauge reading 30 PSI. 46 CFR 181.300(b)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 29 April 2026
Resolution: Recviced picture of new guage installed and reading 60 PSI.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 24 April 2025 Resolved
On a vessel of not more than 65-ft in length carrying more than 49 passengers, and on a vessel of more than 65-ft, the minimum capacity of the fire pump must be 50 gallons per minute at a pressure of not less than 60psi at the pump outlet. The pressure gauge only reached 40psi. (46 CFR 181.300(a)(iii)(b))
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 May 2025
Resolved 20 June 2025
Resolution: Received objective evidence that a working gauge was installed on the pump.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 7 May 2024 Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing fire, and personnel injury. Marine Inspector observed the throttle cable from the main control station to the starboard main engine to be chaffed through the outer protective sheath and the metal core is slightly worn and rusted. 46 CFR 182.100
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 June 2024
Resolved 9 May 2024
Resolution: O/O replaced throttle cables in kind and performed satisfactory tests in the presence of the attending CGMI.
10 - Safety of Navigation › N/A - No Subsystem › Nautical publications
Issued 29 March 2022 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 April 2022
Resolved 5 April 2022
Resolution: Vessel has acquired all nautical publications.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 29 March 2022 Resolved
The OCMI may require that a vessel and its equipment undergo any additional test or inspection deemed reasonable and necessary to determine that the vessel and its equipment are suitable for the service in which they are to be employed. Wooden "L" brackets connecting vertical frames to ceiling joists in void number 01 and 02 are wasted. Repair at next dry dock to the satisfaction of the marine inspector. Marine inspector to verify condition of framing once "L" brackets are removed and before repair is made. 46.CFR176.840
Action required: 705 - Other - as specified
Due 31 May 2022
Resolved 28 June 2022
Resolution: Gussets repaired in kind.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 20 April 2021 Resolved
Packing glands on both port and stbd tailshaft were leaking excessively.
Action required: 10 - Deficiency Rectified
Due 20 April 2021
Resolved 20 April 2021
Resolution: Operator tightened glands.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 1 June 2020 Resolved
Fire Safety - 46CFR182.465h Provision must be made for closing all supply duct cowls and scoops. Snaps on covering waisted.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 1 June 2020
Resolved 1 June 2020
Resolution: Crew replaced snaps and verified coverings operated.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 1 June 2020 Resolved
Fire Safety- 46CFR181.300b, Fire pump must have 60 PSI at the pump outlet. Vessel has 30 PSI at pump.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 June 2020
Resolved 2 June 2020
Resolution: Crew replaced impeller and installed new gage in system. Inspectors verified pressure at 60 PSI.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Controls
Issued 29 March 2017 Resolved
Fireboy pre-engineering extinguishing system is required to have manual actuation outside of space.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 14 April 2017
Resolution: Vessel owner provided Hiller Systems servicing report for engine room pre-engineered fixed fire fighting system.
Communications › Radio Communications › EPIRB
Issued 12 October 2006 Resolved
Provide evidence of current EPIRB registration.
Action required: 705 - Other - as specified
Due 12 November 2006
Resolved 24 October 2006
Resolution: Vessel operator provided current registration.
Documentation › Certificates/Documents › FCC SSL
Issued 12 October 2006 Resolved
Provide copy of current FCC radio safety certificate.
Action required: 705 - Other - as specified
Due 12 November 2006
Resolved 24 October 2006
Resolution: Vessel operator provided current safety certificate.
Fire Fighting › Fire Main › Pressure
Issued 12 October 2006 Resolved
Provide means to indicate fire pump output pressure meets 50 gpm (60 psi).
Action required: 705 - Other - as specified
Due 12 November 2006
Resolved 23 April 2007
Resolution: Acceptable pressure gage installed on output side of fire pump.
Navigation › Piloting/Steering › Tide/Tidal Current Tables
Issued 22 August 2005 Resolved
Provide tide tables onboard vessel IAW 46CFR184.420
Due 5 September 2005
Resolved 23 August 2005
Resolution: Tide tables placed onboard the vessel.
Navigation › Piloting/Steering › Tide/Tidal Current Tables
Issued 22 August 2005 Resolved
Provide tidal current tables onboard vessel IAW 46CFR184.420
Due 5 September 2005
Resolved 23 August 2005
Resolution: Tidal current tables placed onboard the vessel.
Engineering › Fuel Oil Service System › Valve, Control
Issued 22 August 2005 Resolved
Label fuel shut off valves IAW 46CFR185.608
Due 5 September 2005
Resolved 9 September 2005
Resolution: Fuel shut off valves labeled.
Lifesaving › Inflatable Liferafts › Hydrostatic Release Unit
Issued 22 August 2005 Resolved
Hydrostatic releases for both inflatable life rafts are expired and require replacement IAW 46CFR180.130(b). Vessel restricted from carriage of passengers.
Due 5 September 2005
Resolved 23 August 2005
Resolution: New hydrostatic releases installed on both inflatable life rafts. Passenger restriction removed.
Pollution Prevention/Response › Prevention Equipment › Bilge Monitor
Issued 22 August 2005 Resolved
Repair bilge high level alarms to provide audible and visual alarm at operating station IAW 46CFR182.530. Vessel restricted from carriage of passengers.
Due 5 September 2005
Resolved 23 August 2005
Resolution: Bilge high level alarms repaired, audible and visual alarms at operating station working. Passenger restriction removed.
Navigation › Piloting/Steering › Marine Charts
Issued 22 August 2005 Resolved
Provide current marine chart for operating area IAW 46CFR184.420.
Due 5 September 2005
Resolved 9 September 2005
Resolution: Marine chart for area of operation provided.
Lifesaving › Lifejacket/PFD (General) › Lights
Issued 20 July 2004 Resolved
Proper install approve lights for each lifejacket IAW 46CFR180.75(a).
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 27 July 2004
Resolved 23 July 2004
Resolution: Each lifejacket was fitted with approved light.
Navigation › Collision/Grounding Avoidance › Radar
Issued 20 July 2004 Resolved
Install and prove proper operation of radar IAW 46 CFR 184.404. Passenger count is reduced to 49 until complete.
Action required: 705 - Other - as specified
Due 27 July 2004
Resolved 23 July 2004
Resolution: Tested proper operation of newly installed radar. All Satisfactory.
Documentation › Certificates/Documents › Cargo Ship Safety Equipment Certificate
Issued 20 July 2004 Resolved
Provide proof of servicing of radio equipment IAW 46 CFR 80.903.
Action required: 705 - Other - as specified
Due 20 July 2004
Resolved 23 July 2004
Resolution: Vessel owner provided current FCC Radio Safety Certificate.
Engineering › Diesel Engine (propulsion-reduction gear)
Issued 30 May 2003 Resolved
FABRICATE GUARDS FOR BOTH MDEs BELT PULLEYS ON FWD END OF ENGINES. GUARDS MUST COVER ENTIRE BELT SYSTEM.
Due 12 July 2003
Resolved 19 July 2003
Engineering › Reduction Gearing/Clutches
Issued 30 May 2003 Resolved
TRANSMISSION SHIFT CABLES MUST HAVE FIRE RETARDENT HOLDING CLIPS, PREFERABLY METAL AND NOT JUST PLASTIC WIRE TIES.
Due 12 July 2003
Resolved 19 July 2003
Engineering › Bilge Water Management System
Issued 30 May 2003 Resolved
LABEL BILGE SUCTION VALVES IN ENGINEROOM FOR COMPARTMENTS SERVED. LEGACY COMPONENT DESC: Valve
Due 12 July 2003
Resolved 19 July 2003
Construction/Loadline › Structures › Transverse Bulkhead
Issued 5 May 2003 Resolved
Completely remove the entire saturated lower portions of both the intermediate and watertight bulkhead (WTB) and replace both bulkheads as original.
Condition: Design Flaw
Due 6 June 2003
Resolved 6 June 2003
Construction/Loadline › Hull › Transverse Frame
Issued 5 May 2003 Resolved
Completely remove and replace the entire stbd side, overhead, transverse deck frame, located just aft of the #2 WTB.
Condition: Improper/Lack of Maintenance
Due 6 June 2003
Resolved 6 June 2003
Construction/Loadline › Hull › Stringer
Issued 5 May 2003 Resolved
Completely remove or properly sister the stbd side, overhead, third transverse deck frame, located just fwd of the engine room WTB. A sistered repair will be deemed "temporary only" and will require a permanent repair prior to 01JAN04. LEGACY COMPONENT DESC: Transverse Frame
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 January 2004
Resolved 1 July 2004
Resolution: Replaced deck.
Construction/Loadline › Hull › Longitudinal Frame
Issued 5 May 2003 Resolved
Completely remove and replace the entire port side, overhead, main longitudinal deck frame, located just fwd of the #2 WTB.
Condition: Improper/Lack of Maintenance
Due 6 June 2003
Resolved 6 June 2003
Construction/Loadline › Hull › Stiffener
Issued 5 May 2003 Resolved
Completely remove and replace all forward and aft overhead cripple members (eight total) on both the intermediate and watertight bulkheads.
Condition: Improper/Lack of Maintenance
Due 6 June 2003
Resolved 6 June 2003
Construction/Loadline › Hull › Side Shell
Issued 5 May 2003 Resolved
Make proper repairs to all exposed wooden portions of both the port and stbd bow spray shields.
Condition: Improper/Lack of Maintenance
Due 6 June 2003
Resolved 6 June 2003
Construction/Loadline › Hull › Hull Plating
Issued 5 May 2003 Resolved
Determine source of the hull water leak in the vicinity of the stbd side spray shield and submit proposal for permanent repairs.
Condition: Improper Installation
Due 6 June 2003
Resolved 6 June 2003
Construction/Loadline › Hull › Stringer
Issued 5 May 2003 Resolved
Prior to 01JAN04, submit a repair proposal for repair or replacement of the main deck including structural support members. LEGACY COMPONENT DESC: Longitudinal Frame
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 January 2004
Resolved 1 July 2004
Resolution: Replace deck as per orginial approved plans.
Construction/Loadline › Hull › Stringer
Issued 5 May 2003 Resolved
Prior to 01JAN04, submit a repair proposal for the temporary repair that was performed on the water saturated longitudinal hull stringers located just forward of the engineroom bulkhead. LEGACY COMPONENT DESC: Longitudinal Frame
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 January 2004
Resolved 1 July 2004
Resolution: Replaced deck as per orginial approved plans.
Construction/Loadline › Penetrations › Weld
Issued 5 May 2003 Resolved
Complete aluminum welding repairs on the vessel's rails and transom platform.
Condition: Unknown
Due 6 June 2003
Resolved 6 June 2003
Construction/Loadline › Hull
Issued 15 October 2002 Resolved
Submitt plans for approval to repair damage to fiberglass on port side and bow stem. Plan shall include preperation, materials and lay-up schedule/procedure. LEGACY COMPONENT DESC: Side Shell
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 11 July 2003
Construction/Loadline › Hull
Issued 15 October 2002 Resolved
Complete repairs to damaged port side and bow as approved by this office and to the satisfaction of Marine Inspector. LEGACY COMPONENT DESC: Side Shell
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 11 July 2003
Construction/Loadline › Structures
Issued 30 September 2002 Resolved
1. Prior to carrying passengers, provide this office with a structural review and repair proposal, from a certified naval engineer or architect, on the vessel's interior bulkhead and frame damage. Make the appropriate repairs as approved to the satisfaction of the attending marine inspector. LEGACY COMPONENT DESC: Transverse Bulkhead
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 11 July 2003
Construction/Loadline › Structures
Issued 21 June 2002 Resolved
PLEXIGLASS WIND BLOCKERS ARE NOT SECURE IN CHANNELS PROVIDED DUE TO MISSING OR WORN SREWS/BOLTS. OPERATOR TO PROPERLY SECURE CHANNELS AND PLEXIGLAS PANELS TO THE SATISFACTION OF THE MARINE INSPECTOR. LEGACY COMPONENT DESC: Transverse Bulkhead
Condition: Improper/Lack of Maintenance
Due 3 July 2002
Resolved 2 July 2002
Construction/Loadline › Structures
Issued 21 June 2002 Resolved
PORT SIDE FIBERGLASS TRANSVERSE BULKHEAD SEPERATING AT DECK CONNECTION POINT OUTBOARD. STBD SIDE SHOWING SIMILAR SIGNS. OPERATOR TO PROVIDE PLANS FOR REPAIR TO MSO TOLEDO. LEGACY COMPONENT DESC: Transverse Bulkhead
Due 3 July 2002
Resolved 23 August 2002
Resolution: OPERATOR FINALLY SUBMITTED PLAN TO FIX PROBLEM. PLAN ENTERED INTO VESSEL FILE.
Construction/Loadline › Hull
Issued 21 May 2002 Resolved
Complete repair in accordance with approved plans to port hull & stringer in #2 void on port side. LEGACY COMPONENT DESC: Stringer
Due 21 June 2002
Resolved 11 July 2003
Engineering › Steering Gear System › Rudder
Issued 21 May 2002 Resolved
Loose port side rudder mounts.
Due 14 June 2002
Resolved 14 June 2002
Resolution: Mounts secured on the spot.
Construction/Loadline › Penetrations › Pipe Flange
Issued 21 May 2002 Resolved
Both main engine sea suction valves leak at outlet nipple. There is no way to tightned this as all the piping is brazed in place. Owner to submit plans to make proper repairs. Owner to make immediate temp repairs to operate through weekend.
Condition: Design Flaw
Due 1 June 2002
Resolved 30 May 2002
Resolution: Owner installed new flex coupling in raw water line on both engines. Tightened loose connections all sat.
Construction/Loadline
Issued 30 May 2001 Resolved
MAKE REPAIRS TO THREE SCREW HOLES STBD SIDE ENGINEROOM AFT.
Condition: Unknown
Due 13 June 2001
Resolved 18 July 2001
Construction/Loadline
Issued 30 May 2001 Resolved
CROP AND RENEW ALL ROTTEN/WET WOOD IN STEERING SPACE.
Condition: Unknown
Due 11 July 2001
Resolved 18 July 2001
Navigation
Issued 30 May 2001 Resolved
COMPLETE REPAIRS TO PORT & STBD RUDDER POST THROUGH HULL FITTINGS TO FIRM UP AND STOP LEAKAGE.
Condition: Unknown
Due 13 June 2001
Resolved 26 June 2001
Accommodation/Occupational Safety
Issued 28 August 2000 Resolved
Make welded repairs to all cracked & fractured piping utilized to support the passenger deck Bimini top prior to 01SEP00, Labor Day weekend_x001C_ operation.
Condition: Unknown
Due 1 September 2000
Resolved 11 September 2000
Construction/Loadline
Issued 28 August 2000 Resolved
Make welded repairs to all cracked and fractured welds in engine room to include deck support brackets and engine mount for STBD engine.
Condition: Unknown
Due 11 September 2000
Resolved 15 September 2000
Construction/Loadline
Issued 28 August 2000 Resolved
CO2 mid-space blkd fractured iwo newly repaired long hull stringer. Provide repair proposal for perm repairs to [name withheld] & effect perm repairs prior to 28SEP00.
Condition: Unknown
Due 28 September 2000
Resolved 15 September 2000
Construction/Loadline
Issued 28 August 2000 Resolved
CO2 mid-space blhd fractured iwo newly repaired long hull stringer. Make temporary repairs prior to 01SEP00, Labor Day weekend operations.
Condition: Unknown
Due 1 September 2000
Resolved 11 September 2000
Documentation
Issued 15 November 1999 Resolved
Vessel was operated as a passenger ferry between 02 and 24JUL00 on an expired Certificate of Inspection. COI expired 01JUL00.
Condition: Unknown
Due 25 July 2000
Resolved 27 July 2000
Construction/Loadline
Issued 15 November 1999 Resolved
Make vessel available for internal exam 30 days after repairs to fractured webs in compartment forward of engine room.
Condition: Unknown
Due 15 November 1999
Resolved 15 November 1999
Engineering
Issued 15 November 1999 Resolved
PROVE PROPER OPERATION OF STARBOARD MAIN DIESEL ENGINE ELECTRONIC SHUTDOWN FROM OPERATING STATION
Condition: Unknown
Due 31 July 2000
Resolved 31 July 2000
Construction/Loadline
Issued 31 August 1999 Resolved
show proper operation of bilge pumps automatic light indicators on the bridge.
Condition: Unknown
Due 31 August 1999
Resolved 31 August 1999
Fire Fighting
Issued 31 August 1999 Resolved
Repair broken supply line on fixed CO2 FF System prior to carrying passengers.
Condition: Unknown
Due 1 September 1999
Resolved 1 September 1999
Fire Fighting
Issued 31 August 1999 Resolved
Show proper evidence of annual servicing for fixed CO2 FF System prior to carrying passengers.
Condition: Unknown
Due 1 September 1999
Resolved 1 September 1999
Electrical
Issued 31 August 1999 Resolved
Remove all pre-existing wires from vessel for entertainment center._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 31 August 1999
Resolved 31 August 1999
Construction/Loadline
Issued 31 August 1999 Resolved
Repair and show proper operation of fresh water thru hull valve in aft steering compartment prior to carrying passengers.
Condition: Unknown
Due 1 September 1999
Resolved 1 September 1999
Lifesaving
Issued 31 August 1999 Resolved
Repair life float tears (2).
Condition: Unknown
Due 31 August 1999
Resolved 31 August 1999
Navigation
Issued 31 August 1999 Resolved
Repair STBD rudder post mounting plate bolts and tighten packing nut/bushing. Port rudder post mounting bolts need to be tightened prior tocarrying passengers.
Condition: Unknown
Due 1 September 1999
Resolved 1 September 1999
Engineering
Issued 31 August 1999 Resolved
Reinstall belt guard on port main engine.
Condition: Unknown
Due 1 September 1999
Resolved 9 September 1999
Lifesaving
Issued 31 August 1999 Resolved
Remount and replace in kind 4 screws for the EPIRB. Remount EPIRB in spacethat will allow it to float free prior to carrying passengers.
Condition: Unknown
Due 1 September 1999
Resolved 1 September 1999
Construction/Loadline
Issued 31 August 1999 Resolved
Effect repair to thru hull hole on STBD quarter prior to carrying passengers.
Condition: Unknown
Due 1 September 1999
Resolved 1 September 1999
Unknown
Issued 9 November 1998 Resolved
46 CFR 4.06-60 mandates the submittal of a CG-2692B and chemical test results on individuals involved in a serious marine incident (SMI). This casualty meets the criteria of being a SMI. Chem testing & CG-2692B submittal was completed, but only after being instructed by CG investigator
Condition: Unknown
Due 9 November 1998
Resolved 9 November 1998
Unknown
Issued 9 November 1998 Resolved
OPERATOR DID NOT IMMEDIATELY NOTIFY THE COAST GUARD OF A MARINE CASUALTY
Condition: Unknown
Due 9 November 1998
Resolved 9 November 1998
Construction/Loadline
Issued 25 August 1998 Resolved
REPAIR/REPLACE AUDIBLE/VISUAL ALARM SYSTEM FOR THE BILGE HIGH LEVEL ALARM, ALARMS ARE INOP. TEST FOR USCG INSPECTOR.
Condition: Unknown
Due 8 September 1998
Resolved 10 September 1998
Construction/Loadline
Issued 1 July 1997 Resolved
PROVIDE PROOF THAT THE FIBERGLASS RESIN USED IN THE CONSTRUCTIONMEETS THE REQUIREMENTS FOR FLAME SPREAD SPECIFIEED IN ASTM-E-84 AS REQUIRED BY 46 CFR177.410(b). IF THE RESIN DOES NOT MEET ASTM-E-84 YOU WILL HAVE 30 DAYS IN WHICH TO MEET THE REQUIREMENTS OF 46 CFR 177.410(c)(4).
Condition: Unknown
Due 19 September 1997
Resolved 19 September 1997
Fire Fighting
Issued 1 July 1997 Resolved
INSTALL A CO2 DISCHARGE VISUAL INDICATOR & AUDIBLE INDICATOR AT CONTROL STATION PER 46 CFR 181.420(B)(1)(2). IF ENGINE ROOM SIREN CAN BE HEARD AT OPERATING STATION DISREGARD AUDIBLE PORTION OF THIS REQUIREMENT.
Condition: Unknown
Due 1 September 1997
Resolved 19 September 1997
Fire Fighting
Issued 1 July 1997 Resolved
PLACE ON BOARD VESSEL 01-USCG APPROVED A-II FIRE EXTINGUISHER FOR THE ACCOMODATION SPACE PER 46 CFR 181.500(a) & TBL 181.500(a) PORTABLE REQUIREMENTS ARE: 1, B-I; 1, B-II & 1, A-II.
Condition: Unknown
Due 18 August 1997
Resolved 19 September 1997
Engineering
Issued 1 July 1997 Resolved
PROVE PROPER OPERATION OF EMERGENCY ENGINE SHUTDOWNS ON FLYING BRIDGE.
Condition: Unknown
Due 1 August 1997
Resolved 19 September 1997
Construction/Loadline
Issued 1 July 1997 Resolved
INSTALL BILGE HIGH LEVEL VISUAL ALARM INDICATOR AT OPERATING STATION PER _x001C_ 46 CFR 182.530(a), AUDIBLE IS SAT.
Condition: Unknown
Due 1 September 1997
Resolved 19 September 1997
Construction/Loadline
Issued 1 July 1997 Resolved
INSTALL VISUAL INDICATOR AT OPERATING STATION TO INDICATE WHEN ELECTRIC/AUTO BILGE PUMPS ARE OPERATING PER 46 CFR 182.530(c). _x001C_ _x001C_
Condition: Unknown
Due 1 September 1997
Resolved 19 September 1997
Fire Fighting
Issued 1 July 1997 Resolved
INSTALL MEANS TO REMOTELY OPERATE FIRE PUMP FROM VESSEL OPERATING STATION PER 46 CFR 181.300(e).
Condition: Unknown
Due 25 September 1997
Resolved 29 September 1997
Fire Fighting
Issued 1 July 1997 Resolved
PROVIDE VENTILLATION COVERS FOR CO2 PROTECTED SPACE (ENG/FUEL SPACE), PER 46 CFR 182.465(h).
Condition: Unknown
Due 18 August 1997
Resolved 19 September 1997

Casualty record · 1

29 June 2006Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 2 injured · activity 2695608
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.