Records from 1985 to 1995. Most recent: inspection, 13 June 1995.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 17
13 June 1995
Administrative
Administrative · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1187221
2 September 1993
Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1138592
3 August 1992
Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 946657
22 May 1992
COI Inspection · Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 953027
15 May 1992
Hull Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 951082
19 September 1990
Hull Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 912668
24 May 1990
Re-Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1252842
14 June 1989
Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 891287
25 May 1989
COI Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 970057
3 February 1989
Hull Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1200474
11 May 1988
Re-Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1040188
28 May 1987
Re-Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1317872
1 April 1987
Hull Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1021282
20 May 1986
COI Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1018521
31 January 1986
Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1297240
22 October 1985
Credit Drydock
Administrative · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1300734
4 April 1985
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 982142
Electrical
Issued 22 May 1992
Resolved
REPAIR ELECTRICAL BOX IN LAZARETTE.
Condition: Unknown
Due 22 May 1992
Resolved 26 May 1992
Construction/Loadline
Issued 22 May 1992
Resolved
REPAIR LEAK ON BILGE PUMP SEA WATER LINE.
Condition: Unknown
Due 22 May 1992
Resolved 22 May 1992
Construction/Loadline
Issued 22 May 1992
Resolved
REFASTEN STANCHIONS IN #2 COMPARTMENT.
Condition: Unknown
Due 22 May 1992
Resolved 26 May 1992
Construction/Loadline
Issued 22 May 1992
Resolved
CAULK PLANK PORT SIDE #2 COMPARTMENT.
Condition: Unknown
Due 22 May 1992
Resolved 26 May 1992
Construction/Loadline
Issued 22 May 1992
Resolved
INSTALL PLUG IN VALVE STBD. SIDE ENGINE ROOM.
Condition: Unknown
Due 22 May 1992
Resolved 26 May 1992
Accommodation/Occupational Safety
Issued 22 May 1992
Resolved
SECURE DECK BOX ON STERN.
Condition: Unknown
Due 22 May 1992
Resolved 22 May 1992
Accommodation/Occupational Safety
Issued 22 May 1992
Resolved
REPAIR FORWARD LADDER.
Condition: Unknown
Due 22 May 1992
Resolved 22 May 1992
Lifesaving
Issued 22 May 1992
Resolved
PROVIDE SIX ORANGE SMOKE SIGNALS.
Condition: Unknown
Due 22 May 1992
Resolved 26 May 1992
Lifesaving
Issued 22 May 1992
Resolved
PROVIDE 2 ADDITIONAL WATERLIGHTS.
Condition: Unknown
Due 22 May 1992
Resolved 26 May 1992
Construction/Loadline
Issued 22 May 1992
Resolved
DETERMINE CAUSE OF DECK HOUSE MOVEMENT AND CORRECT SAME.
Condition: Unknown
Due 30 September 1992
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Electrical
Issued 22 May 1992
Resolved
PROVIDE 2 OPERABLE FLASHLIGHTS.
Condition: Unknown
Due 22 May 1992
Resolved 26 May 1992
Construction/Loadline
Issued 22 May 1992
Resolved
REFASTEN ALL CROSS MEMBERS IN FOREPEAK.
Condition: Unknown
Due 22 May 1992
Resolved 26 May 1992
Construction/Loadline
Issued 15 May 1992
Resolved
COMPLETE TO OUTSTANDING WORKLIST ITEMS NO'S 3,19,21,22.
Condition: Unknown
Due 22 May 1992
Resolved 22 May 1992
Construction/Loadline
Issued 15 May 1992
Resolved
MAKE ALL SUBDIVISION BULKHEADS WATERTIGHT. THE VESSEL IS RESTRICTED TO 49 MAXIMUM PASSENGERS UNTIL THIS REQUIREMENT IS SATISFIED.
Condition: Unknown
Due 15 May 1995
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Engineering
Issued 14 June 1989
Resolved
REPAIR EXHAUST LEAKS IN COMPARTMENT JUST AFT OF ENGINEROOM WHERE EXHAUST PENETRATED ENGINE ROOM AFT BULKHEAD.
Condition: Unknown
Due 14 June 1989
Resolved 14 June 1989
Construction/Loadline
Issued 14 June 1989
Resolved
REPAIR HOLES IN MAIN DECK JUST AFT OF DECKHOUSE
Condition: Unknown
Due 14 June 1989
Resolved 14 June 1989
Engineering
Issued 14 June 1989
Resolved
REPAIR OR TIGHTEN AS NECESSARY BOTH RUDDER PACKING GLANDS
Condition: Unknown
Due 14 June 1989
Resolved 14 June 1989
Construction/Loadline
Issued 14 June 1989
Resolved
REPAIR LEAK IN FOREPEAK COMPARTMENT AT CHINE AT 2ND FRAME FORWARD OF COLLISION BULKHEAD PORTSIDE.
Condition: Unknown
Due 14 June 1989
Resolved 14 June 1989
Construction/Loadline
Issued 14 June 1989
Resolved
REPAIR LEAK IN FOREPEAK COMPARTMENT PORTSIDE AT STEM APPROX. 2.5 FEET ABOVE CHINE.
Condition: Unknown
Due 14 June 1989
Resolved 14 June 1989
Construction/Loadline
Issued 14 June 1989
Resolved
REPAIR LEAKS ALONG CHINE PORT SIDE #2 COMPARTMENT IN FRAME BAYS #1 AND #3 COUNDING FROM COLLISION BULKHEAD.
Condition: Unknown
Due 14 June 1989
Resolved 14 June 1989
Construction/Loadline
Issued 14 June 1989
Resolved
REPAIR LEAKAGE AT BUTT BLOCK IN #2 COMPARTMENT PORT SIDE IN FRAME BAY #9 COUNTING FROM COLLISION BULKHEAD.
Condition: Unknown
Due 14 June 1989
Resolved 14 June 1989
Construction/Loadline
Issued 14 June 1989
Resolved
REPAIR LEAKS ALONG CHINE #2 COMPARTMENT STBD SIDE IN FRAME BAYS #5, 6, & #7COUNTING FROM COLLISION BULKHEAD.
Condition: Unknown
Due 14 June 1989
Resolved 14 June 1989
Electrical
Issued 25 May 1989
Resolved
PROVE OPERATION OF INSTALLED FIXED LIGHTING IN COMPARTMENT #2.
Condition: Unknown
Due 25 May 1989
Resolved 25 May 1989
Electrical
Issued 25 May 1989
Resolved
IMNSTALL APPROVED FIXED LIGHTING IN COMPARTMENTS #1,#4 AND #5.
Condition: Unknown
Due 25 May 1989
Resolved 25 May 1989
Engineering
Issued 25 May 1989
Resolved
CONDUCT A SEA TRIAL IN THE PRESENCE OF A COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 25 May 1989
Resolved 25 May 1989
Construction/Loadline
Issued 3 February 1989
Resolved
CROP ROTTED WOOD FROM STARBOARD, OUTBOARD ENGINE SUPPORT.
Condition: Unknown
Due 3 February 1989
Resolved 3 February 1989
Construction/Loadline
Issued 3 February 1989
Resolved
VESSEL IS TO BE TAKEN OUT OF PASSENGERS SERVICE BY 1700, 24JAN89 TO BE DRYDOCKED AGAIN FOR CREDIT. REQUIRED REPAIRS TO INCLUDE REPAIR/RE-CAULKING OF STARBOARD CHINE THROUGHOUT LENGTH OF VESSEL, REATTACHMENT OF THE DECK TOTHE HULL IN ALL AREAS; CLOSING OF ALL OPENINGS INTO HULL FROM MAIN DECK.
Condition: Unknown
Due 3 February 1989
Resolved 3 February 1989
Construction/Loadline
Issued 3 February 1989
Resolved
SISTER OR RE-NEW #6 UNDER DECK BEAM IN COMPARTMENT #2 AFT OF FORWARD BULKHEAD, STARBOARD OF CENTERLINE.
Condition: Unknown
Due 3 February 1989
Resolved 3 February 1989
Construction/Loadline
Issued 22 October 1985
Resolved
REPAIR DAMAGED AREA NEXT TO STEM ON PORT BOW.
Condition: Unknown
Due 22 October 1985
Resolved 22 October 1985
Navigation
Issued 22 October 1985
Resolved
EFFECT SUITABLE REPAIRS TO STARBOARD STEERING QUADRANT SHAFT AND KEYWAY.
Condition: Unknown
Due 22 October 1985
Resolved 22 October 1985
Construction/Loadline
Issued 22 October 1985
Resolved
SCRAPE AND TREAT WOOD FUZZY IN ENGINEROOM.
Condition: Unknown
Due 22 October 1985
Resolved 22 October 1985
Navigation
Issued 22 October 1985
Resolved
RENEW STEERING LINKAGE PILLOW BLOCK BEARING ABOVE STB. REDUCTION GEAR.
Condition: Unknown
Due 22 October 1985
Resolved 22 October 1985
Construction/Loadline
Issued 22 October 1985
Resolved
RESECURE VERTICAL SUPPORTS ON OUTBOARD SIDES OF FORWARD ENDS OF BOTH MAIN ENGINES.
Condition: Unknown
Due 22 October 1985
Resolved 22 October 1985
Engineering
Issued 22 October 1985
Resolved
RENEW EXHAUST PIPES ON BOTH MAIN ENGINES FROM ENGINES TO STERN.
Condition: Unknown
Due 22 October 1985
Resolved 22 October 1985
Unknown
Issued 22 October 1985
Resolved
INSURE ALL STRAINERS AND CHECK VALVES ARE REPLACED ON ALL BILGE SYSTEM PICKUP TUBES.
Condition: Unknown
Due 22 October 1985
Resolved 22 October 1985
Electrical
Issued 22 October 1985
Resolved
RENEW ELECTRICAL PANEL BOX FOR SANITARY SYSTEM LOCATED STB SIDE OF ENGINEROOM.
Condition: Unknown
Due 22 October 1985
Resolved 22 October 1985
Construction/Loadline
Issued 4 April 1985
Resolved
THE SEA STRAINER FOR THE FLUSHING WATER IS LEAKING AND THE VALVE UNDER IT WON'T COMPLETELY SHUT OFF THE FLOW. THE LEAK IS SMALL AND PERMISSION WAS GIVIN TO REPAIR IT DURING THE NEXT DRYDOCK.
Condition: Unknown
Due 4 April 1985
Resolved 4 April 1985