HAPPY BEAR is a 1997 tank ship. The Coast Guard has recorded 22 inspections since 2008, most recently in March 2019, along with 11 deficiencies and 8 operational controls.

Records from 2008 to 2019. Most recent: inspection, 4 March 2019.

Built
1997
Last inspected
4 March 2019
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

9131096 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
458915
Flag
ISLE OF MAN
—
Maury page id
psix-458915

Inspections, by type

…with no type recorded5
Years with a record 5 calendar years (2008–2019)
The 22 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 7 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 1980.

Documentation record

Tonnage as PSIX records it5420 - Convention (Subpart B), Gross Ton
2019 - Convention (Subpart B), Net Ton
10620 - Displacement, Ton
7246 - Dead Weight, Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

Inspection history · 22

4 March 2019 ISPS II Exam · Deficiency Check · Ballast Water Examination · COC-GAS Renew
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6632046
4 March 2019 Special
Type not classified · Liquefied Gas Carrier National Center of Expertise · Activity 6727702
20 October 2014 ISPS II Exam · Ballast Water Examination · COC-GAS Renew
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5008700
7 December 2010 ISPS II Exam
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3907066
26 November 2010 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3899176
19 September 2010 Deficiency Check
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3864800
16 September 2010 Administrative Inspection
Administrative · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3851429
14 September 2010 Administrative Inspection
Administrative · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3849569
19 March 2010 Administrative Inspection
Administrative · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3698985
1 July 2009 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3519926
28 April 2009 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3463334
27 April 2009 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3462558
16 April 2009 Damage Survey
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3454073
26 February 2009 Administrative Inspection
Administrative · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3424324
29 January 2009 Administrative Inspection
Administrative · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3402173
15 October 2008 Deficiency Check · Administrative Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3345207
2 October 2008 Deficiency Check
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3337481
8 September 2008 Deficiency Check
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3321794
26 August 2008 Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3309501
22 August 2008 Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3305937
15 August 2008 ISPS II Exam
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3287866
23 May 2008 ISPS II Exam · COC-GAS Renew
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 3216359

Deficiency record · 11

06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 4 March 2019 Resolved
Gas detection equipment should be so designed that it may readily be tested. Testing and calibration should be carried out at regular intervals. Suitable equipment and span gas for this purpose should be carried on board during calibration. Found vessel not using proper calibration gas. Vessel did not have correct calibration gas on board. 74SOLAS(2014) VII/13.1 IGC(1993) 13.6.6
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 4 March 2019
Resolved 5 March 2019
Resolution: Received class report attesting to the supply of proper span gas and satisfactory calibration of fixed gas detection system.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 4 March 2019 Resolved
A high Pressure alarm should be provided on the navigation bridge. The alarms should be activated before the set pressures are reached. During exam, vessel was not able to demonstrate high pressure alarms due to faulty equipment. 74SOLAS(2014) VII.13.1 IGC(1993) 13.4.1
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 4 March 2019
Resolved 5 March 2019
Resolution: Received class report attesting to the supply of proper pressure alarm testing equipment and satisfactory testing of all pressure alarms.
Fire Fighting › Nozzles › Condition
Issued 30 October 2014 Resolved
On ships carrying flammable or toxic products, a water spray system for cooling, fire prevention, and crew protection should be installed to cover the boundaries of the superstructure facing the cargo area. During testing of deck water spray, PSCO observed multiple clogged nozzles on port side of superstructed causing inadequate coverage. Must repair to satisfaction of CG.
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 15 February 2015
Resolution: Witnessed satisfactory testing of the deck water spray.
Fire Fighting › Structural Fire Protection - General › Hull Construction
Issued 30 October 2014 Resolved
All pipes, valves, nozzles, and other fittings in the deck water spray system should be resistant to corrosion by seawater. During testing of the deck water spray, PSCO observed hole in deck water spray line near #2 cargo pump on #1 tank top. Additionally PSCO observed 10+ completely clogged nozzles and 10+ partially clogged nozzles. Must fix to saftisfaction of CG.
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 15 February 2015
Resolution: Witnessed satisfactory testing of the deck water spray.
Communications › Alarms/Indicators › Engine RPM Gauge/Indicator
Issued 26 November 2010 Resolved
The RPM Indicator was reported not operational
Action required: 17 - Rectify deficiencies prior to departure
Due 26 November 2010
Resolved 29 November 2010
Resolution: Received, reviewed and accepted tech report stating the RPM Indicator was replaced, tested and found satisfactory.
Navigation › Collision/Grounding Avoidance › Echo-sounding Device
Issued 16 September 2010 Resolved
Inbound LOD granted for inoperable Depth Sounder
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 September 2010
Resolution: Received tech report from Mackey Marine for echo depth sounder stating item was fixed and is in good working order.
Navigation › Collision/Grounding Avoidance › Echo-sounding Device
Issued 14 September 2010 Resolved
Vessel received an outbound LOD for their inoperable echo depth sounder.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 19 September 2010
Resolution: Received tech report from [name withheld], Echo Depth Sounder is fully operational.
Navigation › Collision/Grounding Avoidance › Radar
Issued 19 March 2010 Resolved
M/T Pacificgas's Furuno Radar FAR-28355 performance monitor not working.
Action required: 17 - Rectify deficiencies prior to departure
Due 21 March 2010
Resolved 20 March 2010
Resolution: Techinician report states that the PM-50 was defective and was replaced and tested with the captain.
Deck/Cargo › Mooring/Anchoring › Anchor
Issued 16 April 2009 Resolved
Upon arrival to the anchorage the vessel did not have a port anchor. Master stated the anchor and 4 lengths of cable were lost in Mexico. To be corrected to the satisfaction of class.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 April 2009
Resolution: Received class report attesting to satisfactory replacement of the anchor 7 lengths of chain.
Navigation › Collision/Grounding Avoidance › Radar
Issued 8 September 2008 Resolved
Inbound: 08SEP2008 The vessel was granted a Letter of Deviation to enter the Port of Corpus Christi with an inoperable Secondary Radar System. The following restrictions are required: daylight transit, tug assist
Action required: 17 - Rectify deficiencies prior to departure
Resolved 2 October 2008
Resolution: Vessel is a Gas ship not Tank and therefore not required to have a secondary radar.
Documentation › Safety/Response Plans/Programs › Vessel Response Plan
Issued 22 August 2008 Resolved
Owner/Operator has not received required authorization to operate on the navigable waters of the U. S. Nontank Vessel Response Plans is under review per compliance with 33 USC 1321 (j)(5) but does not currently have an active Interim Operating Authorization Letter.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 26 August 2008
Resolved 16 October 2008
Resolution: The online Vessel Response Plan database shows the status as "Interim ops".

Ownership record