← All vessels
GREAT HAPPY
GREAT HAPPY is a 1996 freight ship. The Coast Guard has recorded 11 inspections since 1997, most recently in July 2011, along with 9 deficiencies and 4 operational controls.
Records from 1997 to 2011. Most recent: inspection, 8 July 2011.
- Built
- 1996
- Last inspected
- 8 July 2011
- Documentation
- Not in the documentation file of 10 September 2026
- Deficiencies
- 9 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
9136474 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
VRVF7
458926
Flag
HONG KONG
—
Maury page id
psix-458926
Inspections, by type
The 11 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
This record may be incomplete: the most recent inspection recorded for this vessel was 15 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Bulk Carrier class in Maury's sources begin in 1981.
Documentation record
Tonnage as PSIX records it26094 - Convention (Subpart B), Gross Ton
14871 - Convention (Subpart B), Net Ton
45248 - Dead Weight, Ton
14871 - Convention (Subpart B), Net Ton
45248 - Dead Weight, Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Radio station licence
No FCC ship-station licence is recorded against this Official Number in the file of
6 September 2026. That is a fact about the licence file, not about the radio.
Inspection history · 11
8 July 2011
Deficiency Check · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4074577
11 February 2011
PII Safety Exam · ISPS II Exam
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 3943334
21 January 2010
ISPS II Exam · Administrative Inspection · PII Safety Exam · Ballast Water Examination
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 3667169
9 February 2006
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2582764
24 January 2006
Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2572472
22 November 2005
Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 2538929
17 October 2005
Deficiency Check · Ballast Water Examination · ISPS II Exam · PII Safety Exam
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 2515893
13 May 2003
Annual Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1794895
30 April 2003
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1783863
27 April 2003
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1783352
16 October 1997
Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 408849
Deficiency record · 9
Engineering › Fuel Oil Service System › Piping
Issued 11 February 2011
Resolved
1420- Cleanliness of engine room - Provision shall be made to facilitate cleaning, inspection and maintenance of main propulsion. Excessive oil near oil purifiers, and in the containments. Also oil was being contained in numerous catch cans. SOLAS (04 cons ed) Ch II-1 Reg 26.7 . To be rectified prior to next US port after sailing foreign to the satisfaction of the Coast Guard.
Communications › Radio Communications › Radiotelephone Transceiver (2-4 MHz)
Issued 11 February 2011
Resolved
1623- MF/HF radio installation - Every ship operating in Sea Areas A1, A2, and A3 shall be provided with an MF radio capable of transmitting and receiving for distress and safety purposes. MF radio inop. SOLAS (04cons ed) Ch IV Reg 10.1.2 . To be rectified prior to next US port after sailing foreign to the satisfaction of the Coast Guard.
Documentation › Logs/Records › Garbage Recordkeeping
Issued 17 October 2005
Resolved
The garbage plan is not ship specific. Authorized items which are burned in the incinerator have not been identified. The items that are burned are not being recorded in the garbage log in addition the separation of garbage is not being followed throughout the vessel.
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type II
Issued 17 October 2005
Resolved
The marine sanitation device is not being maintained in accordance with the manufacturer's requirements. Daily, weekly and monthly test and inspections have not been carried out.
Electrical › Electric Generation Source (service) › Grounding Conductor
Issued 17 October 2005
Resolved
There isn't any non-conducting matting anywhere on the vessel. The matting that is on board is for floor protection only.
Lifesaving › Lifeboat Equipment › Food Ration
Issued 17 October 2005
Resolved
Several of the food rations have lost the vacuum seal.
Engineering › Bilge Water Management System › Piping
Issued 17 October 2005
Resolved
The bilge suction line has two soft patches on it. Neither the Master nor Chief Engineer had notified the company DPA of these as required by the ship's SMS manual. The Classification Society Representative must inspect these prior to the vessel's departure.
Engineering › Sea-water System (primary cooling) › Piping
Issued 17 October 2005
Resolved
The main engine cooling line had a soft patch on it, a welded plug on it and was leaking at another location. Neither the Master nor Chief Engineer had notified the company DPA of these as required by the ship's SMS manual. The Classification Society Representative must inspect these prior to the vessel's departure.
Engineering › Fuel Oil Service System › Piping
Issued 17 October 2005
Resolved
The heating pipe for the heavy fuel tank under the main engine has a cement patch on it. According to the C/E this pipe is no longer used. However, there isn't any documentation on board to support this. Neither the Master nor Chief Engineer had notified the company DPA of these as required by the ship's SMS manual. A condition of Class was issued, repairs must be done at next dry-dock.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.