Inspection history · 16
11 March 2026
COI Inspection · MSP Select Additional Oversight – Risk Assessment
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8319347
18 November 2025
Internal Structural Exam · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8270476
26 March 2025
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8099428
22 February 2024
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7867907
9 November 2023
Internal Structural Exam · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7822738
13 July 2023
Administrative Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7742949
12 May 2023
In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7703946
24 March 2023
MTSA Verification · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7655423
11 March 2022
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7410255
10 February 2022
Drydock Exam · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7393953
16 March 2021
MTSA Verification · COI Inspection · Administrative Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7157023
13 February 2020
Annual Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6908096
12 November 2019
Internal Structural Exam · Hull Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6854236
8 February 2019
MTSA Verification · Deficiency Check · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6622244
25 January 2019
Annual Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6614882
15 October 2017
COI Inspection · Drydock Exam · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6307664
01 - Certificates & Documentation › 012 - Crew Certificates › Certificates for master and officers
Issued 22 February 2024
Resolved
The Coast Guard will issue a medical certificate to a mariner meeting the medical and physical standards for merchant mariners. Captain was unable to provide a valid medical certificate during inspection. Provide valid medical certificate to the satisfaction of the attending marine inspector.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 March 2024
Resolved 26 February 2024
Resolution: Attending Marine Inspector verified the application for MMC. Awaiting medical certificate in mail.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 22 February 2024
Resolved
At each initial and subsequent inspection for certification of a vessel, the owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspections of machinery, fuel, and piping systems. During the inspection of the main propulsion engine, inspector noticed excessive oil leaking from the engines valve cover. Make repairs to the engine in accordance with manufactures specification.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 26 February 2024
Resolution: Attending marine inspector witnessed satisfactory operation of vessel's main propulsion engine.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 24 March 2023
Resolved
The construction and arrangement of a vessel must allow the safe operation of the vessel in accordance
with the terms of its Certificate of Inspection
Three windows were broken and must be replaced.
46 CFR 116.100(a), 16c
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 April 2023
Resolved 13 July 2023
Resolution: Vessel provided evidence of windows being repaired.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 24 March 2023
Resolved
Electrical equipment on a vessel must be installed and maintained to: (a) Provide services necessary for safety under normal and emergency conditions;(b) Protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by or originating in electrical equipment, and electrical shock.
46 CFR 120.200(a), 10c
Cable connections on auxiliary generator were not secure.
Action required: 10 - Deficiency Rectified
Resolved 24 March 2023
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 24 March 2023
Resolved
Each life jacket ... ring life buoy must be marked in clearly legible block capital letters with the vessel's name.
Ring buoy was not marked with vessel name.
46 CFR 122.604(b), 10c
Action required: 10 - Deficiency Rectified
Resolved 24 March 2023
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 13 February 2020
Resolved
Each life jacket kept in a stowage container must be readily available. Each child size life jacket must be separated from adult life jackets so the child life jackets are not mistaken for adult life jackets. Life jacket stowage containers on upper deck were not affixed to the deck. Child life jackets were not separated from adult life jackets. Provide satisfactory pictures of corrections within 7 days.
Action required: 705 - Other - as specified
Due 20 February 2020
Resolved 21 February 2020
09 - Working and Living Conditions › 092 - Working Conditions › Safe means of access
Issued 13 February 2020
Resolved
All escape hatches used as a means of escape must be marked on both sides in clearly legible letters at least 2 inches high: "EMERGENCY EXIT, KEEP CLEAR". Aft escape hatch topside marking was faded, bottomside marking was not 2 inches high. Provide satisfactory pictures of corrections within 7 days.
Action required: 705 - Other - as specified
Due 20 February 2020
Resolved 21 February 2020
Resolution: Received satisfactory pictures of corrections.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 13 February 2020
Resolved
All electrical installations shall be to the satisfaction of the Officer in Charge, Marine Inspections. Light housing in marine sanitation device space was not permanently attached, aft flag pole junction box was broken, distribution panels in pilothouse and engine room were missing dead covers, a dead end wire was found in the engine room aft bulkhead overhead in the vicinity of fixed CO2 piping. Provide satisfactory pictures of corrections within 7 days.
Action required: 705 - Other - as specified
Due 20 February 2020
Resolved 21 February 2020
Resolution: Received satisfactory pictures of corrections.
09 - Working and Living Conditions › 092 - Working Conditions › Structural features (ship)
Issued 13 February 2020
Resolved
Machinery, equipment, materials, and arrangements not covered by standards in this subchapter may be inspected in accordance with standards acceptable to the cognizant OCMI as good marine practice. Two windows on the bridge and 1 window on the aft starboard side passenger accommodation space were cracked. Provide satisfactory pictures of replacement window.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 March 2020
Resolved 23 July 2020
Resolution: Received satisfactory pictures attesting to repair.
07 - Fire Safety › N/A - No Subsystem › Fire control plan
Issued 8 February 2019
Resolved
Fire control plan is required to provide specific information listed in 46 CFR 116.530. The fire control plan was missing areas of refuge, embarkation stations, escape routes, compartment titles, hazard classification of spaces, and structural protection boundaries. Vessel must update fire control plan and be approved by attending marine inspector.
Action required: 705 - Other - as specified
Due 15 February 2019
Resolved 15 March 2019
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 8 February 2019
Resolved
Vessel must prepare an evacuation plan in accordance with 46 CFR 116.520.
Action required: 705 - Other - as specified
Due 15 February 2019
Resolved 15 March 2019
01 - Certificates & Documentation › 012 - Crew Certificates › Evidence of Basic Training
Issued 25 January 2019
Resolved
Master or managing operator shall instruct each crew member duties to perform in an emergency. Master and crew unfamiliar with components of the fixed fire suppression system and overall operation. Through training, Master and crew must prove ability to test all operational equipment to attending Marine Inspector prior to carrying passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 February 2019
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 25 January 2019
Resolved
Penetrations in A-Class fire control boundaries must be constructed to prevent the passage of flame and smoke. Throughout the vessel, there are cable runs that penetrate bulkheads that are not sealed properly. Vessel must seal all penetrations through fire control boundaries prior to carrying passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 February 2019
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 25 January 2019
Resolved
All personnel involved with safety sensitive positions are subject to drug testing. Master is not enrolled in vessel's DAPI program.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 February 2019
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 25 January 2019
Resolved
Rails must be installed on all decks accessible to passengers or crew. Several rail courses, located on the top deck, are broken.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 February 2019
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 25 January 2019
Resolved
Due to the lack of crew training on board, Master and crew must perform sea trials and conduct a fire, MOB, and security drill in the presence of attending MI prior to carrying passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 February 2019
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 25 January 2019
Resolved
Each life jacket shall be marked with the vessels name. Several life jackets were stenciled with the wrong vessel name. Vessel must verify all lifejackets are properly marked.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 February 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 25 January 2019
Resolved
Each individual bilge suction shall be fitted with a suitable bilge strainer having an open area of not less than 3 times at of the suction pipe. All of the bilge strainers have an opening in the bottom rendering the strainer useless.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 February 2019
07 - Fire Safety › N/A - No Subsystem › Fire control plan
Issued 25 January 2019
Resolved
A fire control plan must be posted on the vessel in a location that is accessible and visible to all passengers. Fire control plan was not on board.
Action required: 705 - Other - as specified
Due 15 February 2019
Resolved 8 February 2019
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 25 January 2019
Resolved
Tubular gauge glasses, if fitted, must be of heat resistent material, adequately protected from mechanical damage. The tubular gauge sight glasses on both diesel fuel tanks are made of plastic, which is not heat resistent material.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 February 2019
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 25 January 2019
Resolved
All fire hazards must be corrected. The fuel supply line for the generator is leaking fuel and the sight glass on the port fuel tank is leaking fuel.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 February 2019
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 25 January 2019
Resolved
Fuel shutoff valves must be installed in the fuel supply lines to stop fuel flow. The fuel shutoff valves are 90 degree quarter turn ball valves. When asked to operate the shutoff valves, the valves only close about 45 degrees. Vessel must provide means to close the valves 90 degrees.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 February 2019
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 25 January 2019
Resolved
Upon walking up to the pier where the vessel was moored, there was immediate concern with embarkation and disembarkation of passengers. In its current state, the vessel was being slammed back and forth repeatedly due to the amount of traffic creating wake. Vessel must provide a safer means of embarking and disembarking passengers to the satisfaction of an attending marine inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 February 2019
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 25 January 2019
Resolved
All observed unsafe practices must be corrected. Vessel must secure 02 free standing CO2 cyclinders located in vessels soda space.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 February 2019
01 - Certificates & Documentation › 012 - Crew Certificates › Evidence of Basic Training
Issued 25 January 2019
Resolved
The vessel Master must hold a FCC Marine Operators Permit (MROP) at a minimum if the vessel has a radiotelephone (VHF). Master did not have a MROP. Vessel Master is restricted to 1000 ft from shore.
Action required: 705 - Other - as specified
Resolved 13 February 2020