Records from 2004 to 2025. Most recent: inspection, 25 February 2025.
Everything above is free. The detail below — the inspection history, the deficiency record, the casualty record and the documentation record — is Professional, $39 a month. Sign in.
02 - Structural Conditions › N/A - No Subsystem › Enhanced survey programme (ESP)
Issued 25 February 2025
No resolution recorded
The construction and arrangement of a vessel must allow the safe operation of the vessel ... giving consideration to provisions for a seaworthy hull... and necessary facilities for passengers and crew. MI observed a cracked weld on transverse frame in lazzarette, port side near bottom of fuel tank. Repair prior to next credit drydock. (46 CFR 177.100)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
02 - Structural Conditions › N/A - No Subsystem › Enhanced survey programme (ESP)
Issued 25 February 2025
No resolution recorded
The construction and arrangement of a vessel must allow the safe operation of the vessel ... giving consideration to provisions for a seaworthy hull... and necessary facilities for passengers and crew. MI observed a cracked weld in overhead on port side, within the space 2 frames aft of collision bulkhead. Repair prior to next credit dry dock. (46 CFR 177.100)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 25 February 2025
Resolved
Each vessel must be equipped with at least two operable portable battery lights. One of these lights must be located at the operating station and the other at the access to the propulsion machinery space. Observed that the engine room flashlight was inoperable. (46 CFR 183.430)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 March 2025
Resolved 10 March 2025
Resolution: Received satisfactory photos of flashlights.
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 10 October 2023
Resolved
At each initial and subsequent inspection for certification of a vessel, the owner or managing operator shall be prepared to have the vessel ready for inspections of the hull structure. Passenger cabin void: starboard side aftermost portion of sideshell, 2 longitudinal stringers up from chine has signs of water weepage and several pits right beneath stringer. Identify remaining thickness and provide repair proposal at credit drydock.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 17 November 2023
Resolution: Verified water weepage source is not from sideshell wastage.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 10 October 2023
Resolved
At each initial and subsequent inspection for certification of a vessel, the owner or managing operator shall be prepared to have the vessel ready for inspections of the hull structure. Passenger cabin void: Port side from aft bulkhead between air duct and sideshell, between first two transverse stringers there is pitting on sideshell. Piting is along plate that is outboard of ducting leading up 3 to 4 longitudinal frames. Provide ultrasonic thickness measurement of pitted area at credit drydock.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 17 November 2023
Resolution: Verified repair to pitting.
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 10 October 2023
Resolved
At each initial and subsequent inspection for certification of a vessel, the owner or managing operator shall be prepared to have the vessel ready for inspections of the hull structure. Passenger cabin void: Starboard side 3 longitudinal stringers from center – larger frame that sits on top of stringer is fractured on outboard weld where it ties into transverse frame. Repair at next credit drydock.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 13 November 2023
Resolution: Verified weld repair.
02 - Structural Conditions › N/A - No Subsystem › Decks - cracking
Issued 10 October 2023
Resolved
At each initial and subsequent inspection for certification of a vessel, the owner or managing operator shall be prepared to have the vessel ready for inspections of the hull structure. Fractured weld at forward most overhead stringer along centerline in forepeak. Repair at next credit drydock.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 17 November 2023
Resolution: Verified weld repair.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 10 October 2023
Resolved
At each initial and subsequent inspection for certification of a vessel, the owner or managing operator shall be prepared to have the vessel ready for inspections of the hull structure including the following: inspection of all railings and bulwarks and their attachment to the hull structure. Aft 1/3 of weather deck rails have wastage/holes in various spots which require repair by next credit drydock.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 13 November 2023
Resolution: Verified repairs to railing.
08 - Alarms › N/A - No Subsystem › Machinery controls alarm
Issued 10 October 2023
Resolved
On a vessel of at least 7.9 meters (26 feet) in length, a visual and audible alarm must be provided at the operating station to indicate a high-water level in each of the following normally unmanned spaces: A space with a through-hull fitting below the deepest load waterline, such as a lazarette. Vessel lazarette high level bilge alarm not mounted to vessel which will impede the ability to alarm. Vessel to mount high level alarm to the satisfaction of the attending marine inspector.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 November 2023
Resolved 25 October 2023
Resolution: Verified mounting of bilge alarm.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 10 October 2023
Resolved
Shutoff valves, installed so as to close against the fuel flow, must be fitted in the fuel supply lines, one at the tank connection and one at the engine end of the fuel line to stop fuel flow when servicing accessories. Port aft void shutoff valve linkage rod is worn in two spots where a break may occur. Vessel to replace linkage rod to the satisfaction of the attending marine inspector.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 November 2023
Resolved 27 November 2023
Resolution: Received photo for replacement reach rod.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 10 October 2023
Resolved
Electrical equipment on a vessel must be installed and maintained to provide services necessary for safety under normal and emergency conditions and minimize accidental personnel contact with energized parts. Engine room forward centerline overhead light missing protective guard. Vessel to replace guard to the satisfaction of the marine inspector.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 November 2023
Resolved 13 December 2023
Resolution: Accepted photo for guard.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 10 October 2023
Resolved
Portable fire extinguishers shall be installed and located to the satisfaction of the Officer in Charge, Marine Inspection. Engine room portable fire extinguisher is mounted to a bracket that is not secured. Secure extinguisher and bracket to the satisfaction of the attending marine inspector.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 November 2023
Resolved 25 October 2023
Resolution: Verified bracket is mounted to the deck.
05 - Radio Communications › N/A - No Subsystem › Functional requirements
Issued 10 October 2023
Resolved
The vessel must comply with the applicable requirements for any radio and Electronic Position Indicating Radio beacon (EPIRB) installations, including the requirements for a station license and installation certificates to be issued by the Federal Communications Commission, as set forth in 47 CFR part 80. Vessel radios were unable to produce the MMSI. Vessel must program their DSC radios with the MMSI to the satisfaction of the attending Marine Inspector.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 November 2023
Resolved 25 October 2023
Resolution: Verified radio displaying proper MMSI.
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboat inventory
Issued 10 October 2023
Resolved
Each paddle must be of at least 1,220 millimeters (4 feet) in length, lashed to the life float to which it belongs and buoyant. All three life floats were found to not have lashed paddles. Lash all six paddles to their designated life float to satisfaction of the Marine Inspector.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 November 2023
Resolved 25 October 2023
Resolution: Verified paddles lashed to life float.
11 - Life Saving Appliances › N/A - No Subsystem › Buoyant apparatus
Issued 10 October 2023
Resolved
Each rescue boat and ring life buoy must be marked with Type II retroreflective material approved in accordance with 46 CFR 164.018 or other standard specified by the Commandant. Vessel was missing required retroreflective material on both sides of the FWD Life ring. Mate was able to add the retroreflective material to both sides, while marine inspectors were still on the vessel.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 10 October 2023
Resolution: POC replaced reflective tape on the life buoy while on board the vessel.
05 - Radio Communications › N/A - No Subsystem › VHF EPIRB
Issued 9 January 2023
Resolved
Each vessel that operates on the high seas, or that operates beyond three miles from the coastline of the Great Lakes, must have on board a FCC Type Accepted Category 1, 406 MHz EPIRB, installed to automatically float free and activate. Hydrostatic Release Unit has expired. Replace with new. Until resolved, vessel limited to operating within 3nm of of coastline. 46 CFR 180.64
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 January 2023
Resolved 20 January 2023
Resolution: New HRU installed. All sat.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 9 January 2023
Resolved
Except as otherwise provided in this section, machinery and fuel tank spaces shall be separated from accommodation spaces by...vapor tight bulkheads of double diagonal wood, marine plywood, steel plate, or equivalent construction. Marine Inspector found several areas where paneling was missing between fuel tank space and accommodation space. Make vapor tight to the satisfaction of the attending Marine Inspector. 46 CFR 182.35-1(a) "Old T"
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 February 2023
Resolved 20 January 2023
Resolution: Verified all panels closed allowing no vapor into cabin. All sat.
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 15 December 2021
Resolved
At each inspection for certification, the marine inspector shall examine all accessible parts of the interior of the hull. Following fractured welds were found in the lazarette: Forward vertical port 1st frame where it meets the deck, overhead behind ladder, 2nd & 3rd longitudinal frames overhead on starboard side (4 fractured welds), starboard exhaust inboard tied into aft bulkhead, forward bulkhead starboard in front of fuel tank.
46 CFR 176.25-5 (a)(1)(OLD T)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 January 2022
Resolved 13 February 2022
Resolution: Witnessed satisfactory welding in lazarette space.
09 - Working and Living Conditions › 091 - Living Conditions › Drainage
Issued 15 December 2021
Resolved
A weathertight door with permanent watertight coamings that comply with the height requirements in Table 171.124 must be provided for each opening located in a deck that gives access into the hull. The stern door into the vessel's accommodation space had a coaming height of 4 inches, not meeting the standards for a vessel on a partially protected route.
46 CFR 171.124 (d) (OLD T)
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 January 2022
Resolved 8 February 2022
Resolution: Visually inspected new class I watertight door.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 15 December 2021
Resolved
On a vessel of at least 26ft in length, a visual and audible alarm must be provided at the operating station to indicate a high water level in a space with a through-hull fitting below the deepest load waterline, such as a lazarette. The vessel's visual bilge high level alarm in lazarette was inoperable.
46 CFR 182.530(a)(1)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 January 2022
Resolved 8 February 2022
Resolution: Successfully tested the bilge high level alarm.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 15 December 2021
Resolved
Each survival craft must be secured to the vessel by a painter with a float-free link permanently attached to the vessel. The painter line for the aft lifefloat is not properly secured to the vessel.
46 CFR 180.130 (a)(1)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 January 2022
Resolved 8 February 2022
Resolution: Painterline is now permanently secured to the vessel.
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 15 December 2021
Resolved
The discharge ends of vent pipes shall be fitted with removable flame screens or flame arresters. The flame screens shall consist of a single screen of corrosion resistant wire of at least 30x30 mesh. The vessel's fuel tank vent pipes did not have the appropriate mesh sizing for the flame screens.
46 CFR 182.20-35 (d) (OLD T)
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 January 2022
Resolved 23 February 2022
Resolution: Received photos of the installed flame screen.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 15 December 2021
Resolved
As appropriate for the intended voyage, a vessel must carry adequate and up-to-date charts and U.S. Coast Pilot. The vessel is carrying outdated paper charts and U.S. Coast Pilot.
46 CFR 184.420
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 January 2022
Resolved 8 February 2022
Resolution: MIs verified paper charts.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 8 March 2021
Resolved
A hatch exposed to the weather must be watertight... Lazzarete hatch was found to be leaking through coaming screw holes.
-46 CFR 179.360
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 March 2021
Resolution: Repaired leak correcting small leak through screw hole of coaming.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 8 March 2021
Resolved
On a vessel at least 26 feet in length, a visual and audible alarm must be provided at the operation station... Vessel was identified to have silence toggles for each bilge protected space.
-46 CFR 182.530
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 April 2021
Resolved 15 March 2021
Resolution: Received video from operator disabeling silence function on bilge panel.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Scuppers, inlets and discharges
Issued 15 October 2019
Resolved
At each initial and subsequent inspection for certification of a vessel, the owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspections of the hull structure and its appurtenances, including the following: Inspection and operation of all watertight closures in the hull, decks, and bulkheads including through hull fittings and sea valves. Vessel's port side midship gray water drain valve was seized in the open position. Prove proper actuation of the gray water valve.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 18 October 2019
Resolution: Valve was maintained and now is able to actuate.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 14 March 2019
Resolved
Endorsements on Certificates of Documentation are valid for one year. Prior to the expiration of that year, the owner of a vessel must apply for renewal. The vessel's current Certificate of Documentation is expired. The vessel submitted an application for renewal on January 25, 2019. Provide proof of current Certificate of Documentation upon receipt to the satisfaction of the Marine Inspector.
46 CFR 67.163
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 April 2019
Resolved 19 April 2019
Resolution: Recieved up-to-date COD.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 14 March 2019
Resolved
The bilge suctions shall be fitted with suitable strainers having an open area not less than three times the area of the bilge pipe. The bilge suction in the Forepeak Compartment does not have an installed strainer. Install strainer IAW 46CFR182.25-5 (OLD T) to the satisfaction of the Marine Inspector.
46 CFR 182.25-5
"OLD T"
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 April 2019
Resolved 14 March 2019
Resolution: Recieved photograph from operator of correct bilge strainer installed.
Engineering › Bilge Water Management System › Piping
Issued 9 April 2018
Resolved
Replace nonmettalic hose in piping for forepeak strainer with piping IAW Sub F. 46CFR182.40-5(b) Old 'T'
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 May 2018
Resolved 1 May 2018
Engineering › Bilge Water Management System › Pump
Issued 19 January 2017
Resolved
Provide proof of operational bilge alarm in lazarette space. Alarm currently inoperative. 46 CFR 182.530
Action required: 705 - Other - as specified
Due 20 February 2017
Resolved 16 February 2017
Resolution: Recieved video attesting proper repair of the bilge high water level alarm
Operations/Management › Navigation Safety › Carriage of Charts and Publications
Issued 3 March 2016
Resolved
Procure updated navigation chart, Coast Pilot, and Light List.
Action required: 705 - Other - as specified
Due 10 March 2016
Resolved 15 March 2016
Resolution: Recieved receipt for the updated navigation charts and pubs. Def cleared.