Records from 1984 to 1989. Most recent: inspection, 22 June 1989.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 8
22 June 1989
Administrative
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1351688
12 December 1988
Administrative
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1209814
17 August 1987
COI Inspection · Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1029463
19 August 1986
COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1005739
12 November 1985
COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1303169
12 November 1985
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1303171
24 January 1985
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 978081
5 November 1984
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1282726
Engineering
Issued 12 November 1985
Resolved
PROPERLY SUPPORT OVERBOARD DISCHARGE LINE JUST AHEAD OF THE STARBOARD ENGINE.
Condition: Unknown
Due 12 November 1985
Resolved 12 November 1985
Engineering
Issued 12 November 1985
Resolved
PROPERLY SUPPORT STARBOARD ENGINE OIL PRESSURE SENDING UNIT.
Condition: Unknown
Due 12 November 1985
Resolved 12 November 1985
Navigation
Issued 12 November 1985
Resolved
PROPERLY WIRE STERN LIGHT.
Condition: Unknown
Due 12 November 1985
Resolved 12 November 1985
Construction/Loadline
Issued 12 November 1985
Resolved
PLUG ALL CABLE AND WIRE HOLES IN WATERTIGHT BULKHEADS.
Condition: Unknown
Due 12 November 1985
Resolved 12 November 1985
Navigation
Issued 12 November 1985
Resolved
PROPERLY SUPPORT COPPER TUBING FOR STEERING AS IT RUNS THRU THE ENGINE COMPARTMENT.
Condition: Unknown
Due 12 November 1985
Resolved 12 November 1985
Engineering
Issued 12 November 1985
Resolved
ENSURE THAT ALL WATER LINES ARE DOUBLE CLAMPED.
Condition: Unknown
Due 12 November 1985
Resolved 12 November 1985
Engineering
Issued 12 November 1985
Resolved
REPLACE MISSING LAGGING ON STARBOARD ENGINE EXHAUST.
Condition: Unknown
Due 12 November 1985
Resolved 12 November 1985
Documentation
Issued 12 November 1985
Resolved
PROVE CURRENT DOCUMENTATION IS VALID ( NEW STICKER AND DOCUMENT ).
Condition: Unknown
Due 12 November 1985
Resolved 12 November 1985
Electrical
Issued 12 November 1985
Resolved
PROPERLY ROUTE AND HANG CABLES AND WIRES THRUOUT VESSEL.
Condition: Unknown
Due 12 November 1985
Resolved 12 November 1985
Electrical
Issued 12 November 1985
Resolved
REMOVE ALL UNSUSED WIRES THRUOUT VESSEL.
Condition: Unknown
Due 12 November 1985
Resolved 12 November 1985
Construction/Loadline
Issued 5 November 1984
Resolved
CROP AND RENEW HALF-ROUND BULWARK SUPPORTS PORT AND STARBOARD OVERHEAD WHERE WASTED.
Condition: Unknown
Due 5 November 1984
Resolved 5 November 1984
Construction/Loadline
Issued 5 November 1984
Resolved
CROP AND RENEW AFTER BULWARK SUPPORTS NO. 1 PORT AND NO. 1 STBD FROM AFT.
Condition: Unknown
Due 5 November 1984
Resolved 5 November 1984
Fire Fighting
Issued 5 November 1984
Resolved
HYDROSTATICALLY TEST AND SERVICE PORT AFT B-II FIRE EXTINGUISHER OR REPLACEFIRE EXTINGUISHER.
Condition: Unknown
Due 5 November 1984
Resolved 5 November 1984
Engineering
Issued 5 November 1984
Resolved
REALIGNMENT OR PORT STRUT REQUIRED.
Condition: Unknown
Due 5 November 1984
Resolved 5 November 1984
Construction/Loadline
Issued 5 November 1984
Resolved
REPAIR OR REPLACE BROKEN PORT LIGHT IN THE PORT HEAD.
Condition: Unknown
Due 5 November 1984
Resolved 5 November 1984
Engineering
Issued 5 November 1984
Resolved
REPAIR LEAK ON STARBOARD EXHAUST PIPE AT MUFFLER. DOUBLE HOSE CLAMPS REQUIRED.
Condition: Unknown
Due 5 November 1984
Resolved 5 November 1984
Construction/Loadline
Issued 5 November 1984
Resolved
REWORK FOREPEAK SCUTTLE AND PLACE IN OPERATING CONDITION.
Condition: Unknown
Due 5 November 1984
Resolved 5 November 1984
Construction/Loadline
Issued 5 November 1984
Resolved
PLUG ALL HOLES IN WATERTIGHT BULKHEADS WHERE CABLES RUNS HAVE BEEN REMOVED.
Condition: Unknown
Due 5 November 1984
Resolved 5 November 1984
Electrical
Issued 5 November 1984
Resolved
REPLACE ALL MISSING GUARD AND GLOBES ON LIGHT FIXTURES THROUGH-OUT THE VESSEL.
Condition: Unknown
Due 5 November 1984
Resolved 5 November 1984