Records from 1982 to 2008. Most recent: inspection, 3 March 2008.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 31
3 March 2008
Administrative Inspection
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3157301
9 September 1995
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 878597
2 July 1993
Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1141730
2 July 1993
COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1356300
29 July 1992
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 959195
20 December 1991
Administrative
Administrative · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1269303
16 December 1991
Deficiency Check
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 950081
11 December 1991
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 527190
14 November 1991
Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1254122
26 September 1991
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1252359
21 July 1991
COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1353189
13 May 1991
Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1239751
15 March 1991
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1236925
15 February 1991
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 924950
19 September 1990
Deficiency Check
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1214244
13 September 1990
Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 928485
9 September 1990
Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1226384
12 July 1989
COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1043248
4 April 1988
Hull Examination
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 992537
30 January 1988
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1018685
15 June 1987
COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1311641
20 February 1986
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 987585
9 December 1985
Examination of Repairs
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1302290
8 October 1985
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1294203
15 July 1985
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 980143
23 May 1985
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 984305
21 March 1985
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 980055
8 February 1985
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1288812
8 February 1984
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 972456
14 October 1982
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 966844
7 October 1982
Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1272553
Lifesaving
Issued 2 July 1993
Resolved
PROVIDE PYROTECHNICS, FOOD AND WATER FOR BOTH LIFEBOATS.
Condition: Unknown
Due 2 July 1995
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Lifesaving
Issued 2 July 1993
Resolved
CONDUCT SATISFACTORY FIRE AND BOAT DRILL.
Condition: Unknown
Due 2 July 1995
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Lifesaving
Issued 2 July 1993
Resolved
PROVIDE PYROTECHNICS FOR BRIDGE.
Condition: Unknown
Due 2 July 1995
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Electrical
Issued 16 December 1991
Resolved
Replace emergency generator prime mover due to fracture in water jacket. Until replacement, maintain temporary repair, as installed, to prevent lossof cooling water.
Condition: Unknown
Due 16 December 1991
Resolved 16 December 1991
Engineering
Issued 26 September 1991
Resolved
UPON RETURN TO THE FIRST U.S. PORT, CONDUCT A HYDROSTATIC PRESSURE TEST AT 1.5 MAWP ON THE SECTION OF SOOT BLOWER PIPE RENEWED AT ASRY, BAHRAIN ON THEPORT BOILER JUST FWD OF THE CONTROL CONSOLE. TEST TO BE CONDUCTED IN PRESENCE OF A COAST GUARD INSPECTOR.
Condition: Unknown
Due 26 September 1991
Resolved 26 September 1991
Engineering
Issued 26 September 1991
Resolved
RENEW THE NON METALLIC EXPANSION JOINT FOR THE MAIN CONDENSOR OVERBOARD & PROVIDE DOCUMENTATION ON THE INSTL DATES FOR THE NON-METALLIC EXPANSION JOINTS FOR THE FWD PUMP ROOM EMERGENCY FIRE PUMP SUCTION AND DISCHARGE, THEMAIN CIRCULATING PUMP SUCTION & THE MAIN CONDENSOR EMERGENCY DISCHARGE.
Condition: Unknown
Due 26 September 1991
Resolved 26 September 1991
Electrical
Issued 26 September 1991
Resolved
UPON RETURN TO THE FIRS U.S.PORT REPL THE WATER JACKET HEAD ON THE EMER GENDUR ANY OPER OF THE EMER GEN THE EMER GEN IS 2 BE MANNED 2 CHCK FOR COOLINGWATER LKS ON THE AFT SIDE OF THE ENG WATER JACKET IN WAY OF THE METAL PATCHPRIOR TO DEPT FR BAHRAIN RUN GEN UNDER LD FOR 4HRS TO CHCK METAL PATCH REP.
Condition: Unknown
Due 26 September 1991
Resolved 26 September 1991
Construction/Loadline
Issued 21 July 1991
Resolved
REMOVE OWS DISCHARGE PIPING CONNECTION TO MAIN SEA CHEST VENT PIPING. RELOCATE TO A MORE SUITABLE/ACCEPTABLE LOCATION.
Condition: Unknown
Due 21 July 1991
Resolved 21 July 1991
Construction/Loadline
Issued 21 July 1991
Resolved
DO NOT USE VESSEL'S OWS UNTIL COMPLETION OF REQUIREMENTS #1 AND #2. PUMP_x001C_ OILY BILGE INTO COLLECTION/HOLDING TANK._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 21 July 1991
Resolved 21 July 1991
Construction/Loadline
Issued 21 July 1991
Resolved
SUBMIT PLANS TO THE OCMI FOR APPROVAL BEFORE COMMENCING WORK REQUIRED PER _x001C_REQUIREMENT 1.
Condition: Unknown
Due 21 July 1991
Resolved 21 July 1991
Lifesaving
Issued 15 February 1991
Resolved
END FOR END BOTH LIFEBOATS FALLS OR PROVICE [name withheld] WITH _x001C_ DOCUMENTATION OF ACCEPTABLE DATRE OF END FOR ENDING.
Condition: Unknown
Due 15 February 1991
Resolved 15 February 1991
Documentation
Issued 15 February 1991
Resolved
PROVIDE CG APPROVED ENGINEROOM AUTOMATION TESTING PROCEDURES REDUCED MANN-ING OF MACHINERY SPACE NOT PERMITTED UNTIL THESE PROCEDURES ARE TESTED TO _x001C_THE SATISFACTION OF AN ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 15 February 1991
Resolved 15 February 1991
Unknown
Issued 9 September 1990
Resolved
REPAIR AND PROVE BY OPERATIONAL TEST, THE MANUAL SHIP'SWHISTLE CONTROL PRIOR TO SAILING ON A FOREIGN VOYAGE.
Condition: Unknown
Due 9 September 1990
Resolved 9 September 1990
Unknown
Issued 9 September 1990
Resolved
SUBMIT AND/OR PROVIDE APPROVED PLANS FOR RECENTLY INSTALLED AC SYSTEM FOR BRIDGE SHOWING ELECTRICAL SHUTDOWNS AND FIRE DAMPERS.
Condition: Unknown
Due 9 September 1990
Resolved 9 September 1990
Unknown
Issued 9 September 1990
Resolved
MAKE READY FOR INSPECTION FORWARD BULLGEAR JOURNAL AND MAIN THRUST BEARINGSPRIOR TO SAILING FOR FOREIGN VOYAGE.
Condition: Unknown
Due 9 September 1990
Resolved 9 September 1990
Unknown
Issued 9 September 1990
Resolved
PROVE OPERATION OF THE RADIO DIRECTION FINDER.
Condition: Unknown
Due 9 September 1990
Resolved 9 September 1990
Unknown
Issued 9 September 1990
Resolved
RENEW AS NEEDED ALL CARGO HATCH GASKETS.
Condition: Unknown
Due 9 September 1990
Resolved 9 September 1990
Unknown
Issued 9 September 1990
Resolved
OBTAIN ON BOARD A CURRENT COMPASS DEVIATION TABLE.
Condition: Unknown
Due 9 September 1990
Resolved 9 September 1990
Unknown
Issued 9 September 1990
Resolved
FIND AND REPAIR ALL GROUNDS PRIOR TO LEAVING FOR FOREIGN VOYAGE.
Condition: Unknown
Due 9 September 1990
Resolved 9 September 1990
Unknown
Issued 9 September 1990
Resolved
REPAIR AND PROVE OPERATION OF GENERATORS BY PARALLELING BOTH SHIP'S TURBINEGENERATORS AND HAVING THEM EQUALLY SHARE THE LOAD PRIOR TO SAILING FOR FOREIGN VOYAGE.
Condition: Unknown
Due 9 September 1990
Resolved 9 September 1990
Unknown
Issued 9 September 1990
Resolved
REPAIR SOUND POWERED TELEPHONE AND PROVE OPERATION FROM EVERY STATION.
Condition: Unknown
Due 9 September 1990
Resolved 9 September 1990
Unknown
Issued 9 September 1990
Resolved
REPAIR LEAKS IN HYDRAULICS OF REMOTE CONTROLLED WATERTIGHT DOOR IN STARBOARD BOX GIRDER TUNNEL PRIOR TO SAILING ON A FOREIGN VOYAGE.
Condition: Unknown
Due 9 September 1990
Resolved 9 September 1990
Unknown
Issued 9 September 1990
Resolved
REPAIR AND PROVE OPERATION OF ENGINEROOM AUTOMATION AND PILOT HOUSE CONTROL
Condition: Unknown
Due 9 September 1990
Resolved 9 September 1990
Unknown
Issued 9 September 1990
Resolved
REPAIR MOORING CONTROLS ON BOW AND AFT CONTROLS ON O-1 DECK.
Condition: Unknown
Due 9 September 1990
Resolved 9 September 1990
Unknown
Issued 9 September 1990
Resolved
REPAIR EVAPORATORS PRIOR TO SAILING ON A FOREIGN VOYAGE.
Condition: Unknown
Due 9 September 1990
Resolved 9 September 1990
Unknown
Issued 9 September 1990
Resolved
REPAIR LIGHTS THROUGHOUT VESSEL INCLUDING BULBS, GUARDS, GLOBES AND FIXTURES.
Condition: Unknown
Due 9 September 1990
Resolved 9 September 1990
Unknown
Issued 9 September 1990
Resolved
REPAIR STEERING GEAR TO REMAIN ON DESIRED ANGLE AND KEEP FROM DRIFTING.
Condition: Unknown
Due 9 September 1990
Resolved 9 September 1990
Unknown
Issued 9 September 1990
Resolved
REPAIR OR RENEW FIRE DAMPERS BOTH PORT AND STARBOARD FOR ENGINE ROOM VENTILATION.
Condition: Unknown
Due 9 September 1990
Resolved 9 September 1990
Unknown
Issued 9 September 1990
Resolved
REPAIR AND PROVE OPERATION OF OVERSPEED DEVICE FOR EMERGENCY DIESEL GENERATOR.
Condition: Unknown
Due 9 September 1990
Resolved 9 September 1990
Unknown
Issued 9 September 1990
Resolved
REPAIR SHUTDOWN FOR EMERGENCY DIESEL GENERATOR UPON ACTIVATION OF FIXED CO2FIRE FIGHTING SYSTEM AND PROVE OPERATION.
Condition: Unknown
Due 9 September 1990
Resolved 9 September 1990
Unknown
Issued 9 September 1990
Resolved
REPAIR ALL INDICATOR LIGHTS AND GUAGES THROUGH OUT ENGINE ROOM.
Condition: Unknown
Due 9 September 1990
Resolved 9 September 1990
Unknown
Issued 9 September 1990
Resolved
REPAIR LOOSE HAND HOLD ON PORT SIDE OF PORT LIFE BOAT.
Condition: Unknown
Due 9 September 1990
Resolved 9 September 1990
Unknown
Issued 9 September 1990
Resolved
REMOVE PRESENT MSDS AND INSTALL TYPE II COAST GUARD APPROVED UNITS OR MEET 33 CFR 159.7(C)(2).
Condition: Unknown
Due 9 September 1990
Resolved 9 September 1990
Unknown
Issued 9 September 1990
Resolved
REPAIR AND PROVE OPERATION OF ALL FUEL OIL SOLINOID VALVES FOR BOTH BOILERSPRIOR TO LEAVING FOR FOREIGN VOYAGE.
Condition: Unknown
Due 9 September 1990
Resolved 9 September 1990
Unknown
Issued 9 September 1990
Resolved
OBTAIN CARGO SHIP SAFETY RADIOTELEGRAPHY CERTIFICATE PRIOR TO 13SEP90 IN ACCORDANCE WITH FCC EXTENSION.
Condition: Unknown
Due 9 September 1990
Resolved 9 September 1990
Unknown
Issued 9 September 1990
Resolved
REPLACE ALL MISSING BOLTS IN PORT LIGHTS THROUGH OUT VESSEL.
Condition: Unknown
Due 9 September 1990
Resolved 9 September 1990
Unknown
Issued 9 September 1990
Resolved
MAKE CENTER WINDOW WIPER ON BRIDGE OPERATIONAL.
Condition: Unknown
Due 9 September 1990
Resolved 9 September 1990
Unknown
Issued 9 September 1990
Resolved
RECONDITION BOTH LIFEBOATS BY REMOVING AND RENEWING ALL DETERIATION WOOD.
Condition: Unknown
Due 9 September 1990
Resolved 9 September 1990
Unknown
Issued 8 February 1985
Resolved
THE FOLLOWING DEFICIENCY PERTAINS TO DEL VALLE, DN516600.
Condition: Unknown
Due 8 February 1985
Resolved 8 February 1985
Construction/Loadline
Issued 8 February 1985
Resolved
PRESENT VESSEL FOR INTERNAL EXAM OF HULL TO COMPPLETE DRYDOCK INSPECTION.
Condition: Unknown
Due 8 February 1985
Resolved 8 February 1985