Records from 1985 to 1997. Most recent: inspection, 29 October 1997.
Inspection history · 72
29 October 1997
Administrative
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1116035
7 March 1997
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1407838
12 February 1997
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 156096
12 February 1997
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1374873
3 February 1997
Type not recorded
No type recorded · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 65641
5 January 1997
Damage Survey
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1455422
18 November 1996
Deficiency Check
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1176892
24 October 1996
COI Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1424290
3 October 1996
Deficiency Check
Physical examination · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 835431
14 September 1996
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 955477
30 July 1996
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 446795
11 March 1996
Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 124031
7 March 1996
Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1435733
22 December 1995
Re-Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1380373
13 October 1995
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 482426
27 June 1995
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 441472
11 March 1995
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 495121
10 November 1994
Hull Examination · COI Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1174973
16 September 1994
Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 12802
16 September 1994
Damage Survey
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1460736
12 September 1994
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 524922
18 August 1994
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 369486
17 April 1994
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 366158
19 March 1994
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 477009
10 March 1994
Re-Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1165222
7 February 1994
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 531340
1 November 1993
Damage Survey · Examination of Repairs
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1145981
31 October 1993
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 162742
24 September 1993
Administrative
Administrative · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1153706
30 August 1993
Administrative
Administrative · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1136568
16 August 1993
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 491250
13 May 1993
Deficiency Check
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 835864
5 May 1993
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 358011
21 April 1993
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1133370
16 March 1993
Administrative
Administrative · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1152278
14 February 1993
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 470718
20 January 1993
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 493920
10 January 1993
COI Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1138256
21 August 1992
Type not recorded
No type recorded · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 352592
30 July 1992
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 944302
28 June 1992
Type not recorded
No type recorded · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 525437
16 June 1992
Type not recorded
No type recorded · COTP LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 459902
27 April 1992
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 955101
10 April 1992
Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 350040
31 March 1992
Hull Examination · Re-Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1134294
17 October 1991
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 455979
6 September 1991
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 945594
30 August 1991
Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 938214
22 June 1991
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1244413
8 January 1991
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1219354
6 July 1990
Deficiency Check
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1239490
13 June 1990
Administrative
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1222723
21 March 1990
Re-Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1213280
24 September 1989
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1220461
17 September 1989
Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1351073
27 July 1989
Administrative
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1347212
25 April 1989
Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1206505
19 January 1989
COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1034635
8 December 1988
Administrative
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1207679
16 August 1988
Re-Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1352239
15 December 1987
Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1315939
3 September 1987
Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1314897
25 August 1987
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1034969
14 August 1987
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1337391
12 August 1987
Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1028933
21 March 1987
COI Inspection · Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1001156
11 March 1987
Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1021367
3 March 1987
Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1003996
29 January 1987
Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1001843
10 January 1987
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1308020
4 September 1986
COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1312474
19 August 1985
Re-Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 988757
Deck/Cargo
Issued 7 March 1997
Resolved
DEMONSTRATE PROPER OPERATION OF ANCHOR WINDLASS. (NOTE: BOTH ANCHORS ARE STILL CAPABLE OF BEING LET GO.)
Condition: Unknown
Due 17 March 1997
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Documentation
Issued 24 October 1996
Resolved
Update safety control plan with new location of safety lockers.
Condition: Unknown
Due 19 November 1996
Resolved 19 November 1996
Fire Fighting
Issued 24 October 1996
Resolved
Repair and demonstrate proper operation of emergency generator room louver.
Condition: Unknown
Due 24 October 1996
Resolved 24 October 1996
Accommodation/Occupational Safety
Issued 24 October 1996
Resolved
Demonstrate proper operation of relief valve for DC heater in the presence of a USCG inspector at next drydock.
Condition: Unknown
Due 31 March 1997
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Fire Fighting
Issued 24 October 1996
Resolved
Make permanent repairs to soft patched fire main in way of #3 center cargo tank NLT next drydock.
Condition: Unknown
Due 24 October 1996
Resolved 24 October 1996
Lifesaving
Issued 24 October 1996
Resolved
Provide emergency lightering equipment on board as per 33CFR157.400.
Condition: Unknown
Due 19 November 1996
Resolved 19 November 1996
Lifesaving
Issued 24 October 1996
Resolved
Provide four complete emergency outfits on board.
Condition: Unknown
Due 19 November 1996
Resolved 19 November 1996
Deck/Cargo
Issued 24 October 1996
Resolved
Test cargo P/V valves and P/V breakers and provide certification of test toUS Coast Guard NLT next drydock. 33CFR156.170
Condition: Unknown
Due 31 March 1997
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Accommodation/Occupational Safety
Issued 24 October 1996
Resolved
Conduct internal inspection of DC heater in presence of a USCG inspector atnext drydock.
Condition: Unknown
Due 31 March 1997
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Lifesaving
Issued 14 September 1996
Resolved
Complete installation of Port Lifeboat by 01OCT96. Until such time as installation is complete keep two 20 man inflatable liferafts on board and properly installed as temporary replacements.
Condition: Unknown
Due 14 September 1996
Resolved 14 September 1996
Electrical
Issued 7 March 1996
Resolved
TEST THE EMERGENCY GENERATOR AUTOSTART AND UNDER LOAD. THE SHIP IS NOT TO GET UNDERWAY UNTIL THE GENERATOR IS TESTED AND THE LICENSED SHIP'S OFFICERSDEMONSTRATE THEIR ABILITY TO USE THIS EQUIPMENT.
Condition: Unknown
Due 8 March 1996
Resolved 8 March 1996
Construction/Loadline
Issued 16 September 1994
Resolved
EFFECT PERMANENT REPAIRS TO THE 4'X4'X6" SIDESHELL INSET, AND ADJACENT STRUCTURAL MEMBERS. PORT SIDE FRAME 16 IN STEERING COMPARTMENT. INSET BETWEEN THE PORT PORTABLE WATER TANK AND PORT PEAK TANK. _x001C_ _x001C_
Condition: Unknown
Due 16 September 1994
Resolved 16 September 1994
Lifesaving
Issued 21 April 1993
Resolved
MAKE PERMANENT REPAIRS TO AND REINSTALL PORT LIFEBOAT. IN THE INTERIM, THEVESSEL IS PERMITTED TO MAKE DOMESTIC COASTWISE VOYAGES ONLY AND WITH TWO INFLATABLE LIFERAFTS (1-25 MAN, 1-20 MAN) INSTALLED IN LIEU OF THE MISSING LIFEBOAT._x001C_
Condition: Unknown
Due 21 April 1993
Resolved 21 April 1993
Lifesaving
Issued 31 March 1992
Resolved
DEMONSTATE PROPER OPERATION OF ALL LIFEBOAT DAVIT LIMIT SWITCHES TO THE SATISFACTION OF THE ATTENDING COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 8 June 1992
Resolved 8 June 1992
Engineering
Issued 31 March 1992
Resolved
PROVE PROPER OPERATION OF BOTH SUPERHEATER STEAM TEMPERATURE GUAGES ON THE MAIN BOARD TO THE SATISFACTION OF THE ATTENDING COAST GUARD MARINE INSPECTOR
Condition: Unknown
Due 31 March 1992
Resolved 31 March 1992
Fire Fighting
Issued 8 January 1991
Resolved
PROVE PROPER OPERATION OF COMBUSTIBLE GAS INDICATOR.
Condition: Unknown
Due 8 January 1991
Resolved 8 January 1991
Engineering
Issued 8 January 1991
Resolved
PROVE OPERATION OF PORT STEAM DRUMS TEMPERATURE GAUGE.
Condition: Unknown
Due 8 January 1991
Resolved 8 January 1991
Lifesaving
Issued 8 January 1991
Resolved
INSTALL SATISFACTORY FLOAT FREE ARRANGEMENT FOR BOTH LIFERAFTS ABOARD VESSEL.
Condition: Unknown
Due 8 January 1991
Resolved 8 January 1991
Lifesaving
Issued 8 January 1991
Resolved
PROVE PROPER OPERATION OF LIMIT SWITCH ON FORWARD DAVIT FOR STARBOARD LIFEBOAT.
Condition: Unknown
Due 8 January 1991
Resolved 8 January 1991
Fire Fighting
Issued 8 January 1991
Resolved
PROVIDE FOAM ANALYSIS REPORT TO NYCMI.
Condition: Unknown
Due 8 January 1991
Resolved 8 January 1991
Electrical
Issued 8 January 1991
Resolved
REPLACE HANDLE MISSING ON AFTER WARPING WINCH.
Condition: Unknown
Due 8 January 1991
Resolved 8 January 1991
Electrical
Issued 8 January 1991
Resolved
REMOVE PIPE PATCH ON SALT WATER COOLING LINE FOR FORWARD SHIPS SERVICE GENERATOR AND MAKE PERMANENT REPAIRS.
Condition: Unknown
Due 8 January 1991
Resolved 8 January 1991
Engineering
Issued 8 January 1991
Resolved
INSTALL CHEMICAL FEED PUMP AT PERMANENT INSTALLATION.
Condition: Unknown
Due 8 January 1991
Resolved 8 January 1991
Accommodation/Occupational Safety
Issued 8 January 1991
Resolved
MAKE REPAIRS TO LEAKING PIPE BENEATH DECK AT FORWARD EVAPORATOR.
Condition: Unknown
Due 8 January 1991
Resolved 8 January 1991
Electrical
Issued 8 January 1991
Resolved
REPLACE WIRE SPLICED SERVICING CIRCUIT BREAKER INTERLOCK SWITCH FOR FORWARDSHIPS SERVICE TURBINE GENERATOR WITH NEW CABLE.
Condition: Unknown
Due 8 January 1991
Resolved 8 January 1991
Electrical
Issued 8 January 1991
Resolved
REPLACE CABLE SPLICED IN OVERHEAD ABOVE MAIN SHIPS SERVICE GENERATOR.
Condition: Unknown
Due 8 January 1991
Resolved 8 January 1991
Engineering
Issued 8 January 1991
Resolved
PROVE OPERATION OF LONDERSATE DRAIN TANK HIGH WATER SWITCH.
Condition: Unknown
Due 8 January 1991
Resolved 8 January 1991
Fire Fighting
Issued 8 January 1991
Resolved
PROVE ALL SCBA BOTTLES FOR EMERGENCY OUTFITS HAVE HAD PROPER HYDROTEST.
Condition: Unknown
Due 8 January 1991
Resolved 8 January 1991
Engineering
Issued 21 March 1990
Resolved
REPAIR OR REPLACE ELECTRIC RECIPROCATING BILGE PUMP.
Condition: Unknown
Due 21 March 1990
Resolved 21 March 1990
Engineering
Issued 21 March 1990
Resolved
PROVE PROPER OPERATION OF BILGE ALARMS IN SHAFTALLEY, ENGINEROOM, AND PUMP ROOM.
Condition: Unknown
Due 21 March 1990
Resolved 21 March 1990
Engineering
Issued 21 March 1990
Resolved
PROVE PROPER OPERATION OF MASTER FUEL OIL SOLENOID VALVE ON STBD BOILER AFTER DELAYING INITIAL LIGHTOFF FOR 15 SECONDS (ITEM II.A. OF APPROVED AUTOMATION TEST PROCEDURE.)
Condition: Unknown
Due 21 March 1990
Resolved 21 March 1990
Construction/Loadline
Issued 21 March 1990
Resolved
REPLACE PLASTIC SEA VALVES ON EACH SEA CHEST WITH VALVES THAT MEET THE REQUIREMENTS OF 46 CFR 56.50-95(C).
Condition: Unknown
Due 21 March 1990
Resolved 21 March 1990
Engineering
Issued 17 September 1989
Resolved
MAKE PORT AND STBD BOILERS AVAILABLE FOR SETTINGT AND SEALING SAFETY VALVES
Condition: Unknown
Due 17 September 1989
Resolved 17 September 1989
Engineering
Issued 17 September 1989
Resolved
RENEW #1 & #2 MAIN PUMP SUCTION NON METALLIC EXPANSION JOINTS CONDESOR.
Condition: Unknown
Due 17 September 1989
Resolved 17 September 1989
Engineering
Issued 17 September 1989
Resolved
CONDUCT SATISFACTORY OPERATIONAL TESTS OF TURGING MACHINERY AND FIRE/BILGE PUMPS.
Condition: Unknown
Due 17 September 1989
Resolved 17 September 1989
Navigation
Issued 17 September 1989
Resolved
CONDUCT SATISFACTORY STREERING GEAR TEST.
Condition: Unknown
Due 17 September 1989
Resolved 17 September 1989
Electrical
Issued 19 January 1989
Resolved
REPAIR AND DEMONSTRATE PROPER OPERATION OF THE STBD MACHINERY SPACE EXHAUSTFAN AND REMOTE STOP.
Condition: Unknown
Due 19 January 1989
Resolved 19 January 1989
Deck/Cargo
Issued 19 January 1989
Resolved
REPAIR/REPLACE TACHOMETER FOR #3 CARGO PUMP IN THE PUMP ROOM.
Condition: Unknown
Due 19 January 1989
Resolved 19 January 1989
Deck/Cargo
Issued 19 January 1989
Resolved
REMOVE RED HAND PATCH ON #1 MAIN CARGO LINE JUST FORWARD OF PUMP ROOM STBD SIDE UNDER CROSS WALK AND MAKE PERMANENT REPAIRS.
Condition: Unknown
Due 19 January 1989
Resolved 19 January 1989
Accommodation/Occupational Safety
Issued 19 January 1989
Resolved
REPAIR MISSING AND WASTED DECK RAILS AND HAND RAILS AS NEEDED.
Condition: Unknown
Due 19 January 1989
Resolved 19 January 1989
Deck/Cargo
Issued 19 January 1989
Resolved
REMOVE RED HAND PATCH ON #5 PORT P/V VALVE VENT PIPE AND MAKE PERMANENT REPAIRS.
Condition: Unknown
Due 19 January 1989
Resolved 19 January 1989
Deck/Cargo
Issued 19 January 1989
Resolved
CONDUCT HYDRO TEST OF CARGO PIPING AND HOSES.
Condition: Unknown
Due 19 January 1989
Resolved 19 January 1989
Deck/Cargo
Issued 19 January 1989
Resolved
REPAIR OR REPLACE LOUVER FOR #2 PORT P/V VALVE.
Condition: Unknown
Due 19 January 1989
Resolved 19 January 1989
Deck/Cargo
Issued 19 January 1989
Resolved
REMOVE RED HAND PATCH ON #5 CENTER STRIPPING AND DISCHARGE LINE UNDER DRESSER COUPLING IN THE PUMP ROOM AND MAKE PERMANENT REPAIRS.
Condition: Unknown
Due 19 January 1989
Resolved 19 January 1989
Construction/Loadline
Issued 19 January 1989
Resolved
REPAIR VENTS AND WATERTIGHT DOOR FOR BOSN LOCKER.
Condition: Unknown
Due 19 January 1989
Resolved 19 January 1989
Construction/Loadline
Issued 19 January 1989
Resolved
REPAIR GOOSENECK VENT MAIN DECK STBD SIDE OF HOUSE BALLAST TANK.
Condition: Unknown
Due 19 January 1989
Resolved 19 January 1989
Lifesaving
Issued 19 January 1989
Resolved
REPLACE EXPANDED METAL GUARDS ON PORT AND STBD LIFEBOAT DAVITS.
Condition: Unknown
Due 19 January 1989
Resolved 19 January 1989
Accommodation/Occupational Safety
Issued 19 January 1989
Resolved
REPLACE WASTED HINGES ON PORT SIDE VENT ON FORECASTLE.
Condition: Unknown
Due 19 January 1989
Resolved 19 January 1989
Engineering
Issued 19 January 1989
Resolved
REPAIR AND DEMONSTRATE PROPER OPERATION OF PORT BOILER HIGH WATER ALARM.
Condition: Unknown
Due 19 January 1989
Resolved 19 January 1989
Electrical
Issued 19 January 1989
Resolved
REPAIR #2 SSTG REVERSE POWER RELAY AND LOW LUBE OIL ALARM.
Condition: Unknown
Due 19 January 1989
Resolved 19 January 1989
Navigation
Issued 19 January 1989
Resolved
REPAIR THE IOYRON ARPA RADAR.
Condition: Unknown
Due 19 January 1989
Resolved 19 January 1989
Navigation
Issued 19 January 1989
Resolved
REPAIR THE D999 FATHOMETER REPEATER.
Condition: Unknown
Due 19 January 1989
Resolved 19 January 1989
Navigation
Issued 19 January 1989
Resolved
PROVIDE UPDATED RADIO DIRECTIONAL FINDER DEVIATION TABLE.
Condition: Unknown
Due 19 January 1989
Resolved 19 January 1989
Lifesaving
Issued 19 January 1989
Resolved
REPLACE PORT 20 MAN LIFERAFT STOWAGE BRACKET ON PORT SIDE 02 DECK.
Condition: Unknown
Due 19 January 1989
Resolved 19 January 1989
Engineering
Issued 19 January 1989
Resolved
REPAIR AND DEMONSTRATE PROPER OPERATION ON #2 BURNER FLAME FAILURE ALARM ONSTBD BOILER.
Condition: Unknown
Due 19 January 1989
Resolved 19 January 1989
Electrical
Issued 19 January 1989
Resolved
REPAIR AND DEMONSTRATE PROPER OPERATION OF THE OILY WATER SEPARATOR.
Condition: Unknown
Due 19 January 1989
Resolved 19 January 1989
Lifesaving
Issued 19 January 1989
Resolved
REMOVE RED HAND AND MAKE PERMANENT REPAIRS TO #1 LIFEBOAT STBD SIDE IN WAY OF SEAM PORTSIDE OF LIFEBOAT JUST FORWARD OF ENGINE BOX.
Condition: Unknown
Due 19 January 1989
Resolved 19 January 1989
Lifesaving
Issued 19 January 1989
Resolved
REPAIR LIMIT SWITCHES FOR PORT AND STBD LIFEBOATS AND PROVE SATISFACTORY OPERATION.
Condition: Unknown
Due 19 January 1989
Resolved 19 January 1989
Engineering
Issued 19 January 1989
Resolved
INSPECTION OF PORT AND STBD BOILERS, DC HEATER, PRESSURE VESSELS ARE TO BE COMPLETED AT NEXT DRYDOCK.
Condition: Unknown
Due 19 January 1989
Resolved 19 January 1989
Engineering
Issued 16 August 1988
Resolved
REMOVE SOFT PATCH AND MAKE PERMANENT REPAIR TO FUEL OIL SUCTION LINE NEAR SHAFT ALLEY WATERTIGHT DOOR.
Condition: Unknown
Due 16 August 1988
Resolved 16 August 1988
Deck/Cargo
Issued 16 August 1988
Resolved
MAKE PERMANENT REPAIRS TO #1 STRIPPING PUMP SUCTION LINE.
Condition: Unknown
Due 16 August 1988
Resolved 16 August 1988
Construction/Loadline
Issued 16 August 1988
Resolved
REMOVE DOUBLER AND MAKE PERMANENT REPAIRS TO ENGINE ROOM PORT SIDE SEA CHEST.
Condition: Unknown
Due 16 August 1988
Resolved 16 August 1988
Construction/Loadline
Issued 16 August 1988
Resolved
ALIGN SALT WATER PIPING TO MANIFOLD ON LOWER PORT SIDE OF ENGINE ROOM WITH SPOOL PIECE ON SEA CHEST IN WAY OF RUBBER EXPANSION JOINT.
Condition: Unknown
Due 16 August 1988
Resolved 16 August 1988
Engineering
Issued 16 August 1988
Resolved
RENEW WASTED EVAPORATOR FEED PIPING.
Condition: Unknown
Due 16 August 1988
Resolved 16 August 1988
Engineering
Issued 16 August 1988
Resolved
REPAIR STEAM LEAK IN STEAM RETURN LINE ABOVE MAIN FEED PUMPS.
Condition: Unknown
Due 16 August 1988
Resolved 16 August 1988
Lifesaving
Issued 21 March 1987
Resolved
PROVIDE A SOLAS LIFESAVING TRAINING MANUAL AS REQUIRED BY SOLAS 1983 AMENDMENTS.
Condition: Unknown
Due 21 March 1987
Resolved 21 March 1987
Lifesaving
Issued 29 January 1987
Resolved
UNTIL SUCH TIME AS PERMANENT REPAIRS ARE MADE TO BOTH LIFEBOATS THE VESSEL MUST CARRY SUFFICIENT LIFERAFTS FOR TOTAL CAPACITY FOR 46 PERSONS. ALL RAFTS TO BE USCG APPROVED W/ RACK, WEAKLINK & HYDRSTATIC RELEASE TO BE PROVIDED PRIOR TO 01MAR87. UNTIL RAFTS ARE ABOARD VESSEL IS (CONT'D)
Condition: Unknown
Due 29 January 1987
Resolved 29 January 1987
Lifesaving
Issued 29 January 1987
Resolved
STRIP BOTH LIFEBOATS TO BARE HULL FOR INSPECTION. MAKE PERMANENT REPAIRS TOHOLED SHELL PLATING. REPAIRS TO BE MADE AT APPROVED SERVICING FACILITY. TO BE COMPLETED AT NEXT DDX OR BEFORE 01APR87 WHICH EVER IS EARLIER.
Condition: Unknown
Due 29 January 1987
Resolved 29 January 1987
Deck/Cargo
Issued 29 January 1987
Resolved
HOLED PV PIPING TANKS #1P, #1S, #2S, #4C, #4S, #5S.
Condition: Unknown
Due 29 January 1987
Resolved 29 January 1987
Deck/Cargo
Issued 29 January 1987
Resolved
FRACTURE OF OUTER CARGO DOME COVER GASKET CHANNEL HOLDS NO. 1P, C & S, 2 C & S, 3 P & C, 4 C & S, 5 P & S. REPLACE ALUMINUM CARGO DOME COVER WITH STEEL EQUIVALENT.
Condition: Unknown
Due 29 January 1987
Resolved 29 January 1987
Lifesaving
Issued 4 September 1986
Resolved
PROVIDE THE FOLLOWING LIFEBOAT EQUIPMENT FOR #1 LIFEBOAT: 2 CG-APPROVED SMOKE DISTRESS SIGNALS, 25 CANS OF MILK. #2 LIFEBOAT: FIRST AID KIT, 2 CG- APPROVED SMOKE DISTRESS SIGNALS, 6 CANS OF MILK.
Condition: Unknown
Due 4 September 1986
Resolved 4 September 1986
Lifesaving
Issued 4 September 1986
Resolved
EFFECT PERMANENT REPAIRS TO SIDESHELL OF #2 LIFEBOAT ON PORT SIDE AFT NEXT TO STERN FRAME.
Condition: Unknown
Due 4 September 1986
Resolved 4 September 1986
Lifesaving
Issued 4 September 1986
Resolved
PROVIDE 2 HYDRAULIC RELEASES FOR BOTH LIFERAFTS ON BOARD THAT HAVE BEEN SERVICED AND TESTED WITHIN THE PAST TWELVE MONTHS.
Condition: Unknown
Due 4 September 1986
Resolved 4 September 1986
Lifesaving
Issued 4 September 1986
Resolved
PROVIDE 4 ADDITIONAL EXPOSURE SUITS ON BOARD TO BRING TOTAL TO 45.
Condition: Unknown
Due 4 September 1986
Resolved 4 September 1986
Lifesaving
Issued 4 September 1986
Resolved
PROVIDE 4 UNEXPIRED ROCKETS FOR LINE THROWING APPARATUS.
Condition: Unknown
Due 4 September 1986
Resolved 4 September 1986
Fire Fighting
Issued 4 September 1986
Resolved
PROVIDE CURRENT CERTIFICATE OF SERVICING AND TESTING FOR PAINT LOCKER FIXEDCO2 SYSTEM AND SEMI-PORTABLE AND PORTABLE FIRE EXTINGUISHING SYSTEMS.
Condition: Unknown
Due 4 September 1986
Resolved 4 September 1986
Navigation
Issued 4 September 1986
Resolved
REPAIR OR REPLACE MISSING AND BROKEN FIXTURES ON VESSEL'S CHRISTMAS TREE.
Condition: Unknown
Due 4 September 1986
Resolved 4 September 1986
Deck/Cargo
Issued 4 September 1986
Resolved
GAS FREE AND MAKE ALL CARGO TANKS AVAILABLE FOR INTERNAL INSPECTION.
Condition: Unknown
Due 4 September 1986
Resolved 4 September 1986
Documentation
Issued 4 September 1986
Resolved
PROVIDE CURRENT SOLAS RADIO TELEGRAPH CERTIFICATE ON BOARD.
Condition: Unknown
Due 4 September 1986
Resolved 4 September 1986
Engineering
Issued 4 September 1986
Resolved
DC HEATER/DEAIREATOR TO BE OPENED FOR INTERNAL EXAMINATION TO THE SATISFACTION OF THE MARINE INSPECTOR.
Condition: Unknown
Due 4 September 1986
Resolved 4 September 1986
Deck/Cargo
Issued 4 September 1986
Resolved
REPAIR OR REPLACE BILGE PUMP AND DEMONSTRATE TO THE SATISFACTION OF A CG MARINE INSPECTOR.
Condition: Unknown
Due 4 September 1986
Resolved 4 September 1986
Unknown
Issued 4 September 1986
Resolved
REPAIR OR REPLACE PIPING FROM SEACHEST VALVE TO EVAPORATOR VALVE. LINE PRESENTLY REPAIRED WITH RED HAND. REPAIRS OR REPLACEMENTS TO BE AS ORIGINAL AND TO THE SATISFACTION OF CG MARINE INSPECTOR.
Condition: Unknown
Due 4 September 1986
Resolved 4 September 1986
Deck/Cargo
Issued 4 September 1986
Resolved
REPAIR OR REPLACE BILGE PUMP STRAINER PRESENTLY PATCHED WITH RED HAND.
Condition: Unknown
Due 4 September 1986
Resolved 4 September 1986
Unknown
Issued 4 September 1986
Resolved
REMOVE OR REPLACE DETERIORATED GAS CYLINDERS STORED ON STERN OF VSL.
Condition: Unknown
Due 4 September 1986
Resolved 4 September 1986
Engineering
Issued 4 September 1986
Resolved
REPAIR AS ORIGINAL PORT & STBD BOILER SUPERHEATER CENTER SUPPORT. VSL IS TOPROVIDE DRAWING FOR ORIGINAL DETAILS OF SUPPORT. BUCKLING OF INBOARD WALL OF SUPERHEATER VESTABULE STBD BOILER TO BE EVALUATED FOR REPAIRS. GAS BAFFLE STBD BOILER REPAIR AS REQUIRED.
Condition: Unknown
Due 4 September 1986
Resolved 4 September 1986
Engineering
Issued 4 September 1986
Resolved
REPAIR OR REPLACE STBD BOILER SUPERHEATER SAFETY VALVE. REPAIR TO BE MADE BY MANF. OR AN APPROVED FACILITY BY THE [name withheld] TO BE WITNESSED BY A CG MARINE INSPECTOR.
Condition: Unknown
Due 4 September 1986
Resolved 4 September 1986
Engineering
Issued 4 September 1986
Resolved
REPAIR AND DEMONSTRATE PROPER OPERATION OF THROTTLE VALVE OVER TRAVLE AS PER AUTOMATION PROCEDURE.
Condition: Unknown
Due 4 September 1986
Resolved 4 September 1986
Engineering
Issued 4 September 1986
Resolved
REPAIR AND DEMONSTRATE AUTO ROTATION AS PER AUTOMATION PROCEDURE.
Condition: Unknown
Due 4 September 1986
Resolved 4 September 1986
Engineering
Issued 4 September 1986
Resolved
REPAIR AND DEMONSTRATE THROTTLE VALVE TRAVEL AND RESPONSE AS PER AUTOMATIONPROCEDURE.
Condition: Unknown
Due 4 September 1986
Resolved 4 September 1986
Fire Fighting
Issued 4 September 1986
Resolved
REPAIR OR REPLACE DISCHARGE PIPING TO FIRE PUMP LOCATED IN SHAFT ALLEY. REPAIRS ARE TO BE MADE AS ORIGINAL AND SYSTEM TO BE HYDRO TESTED TO 1 1/2 TIMES MAWP OF SYSTEM IN PRESENCE OF CG MARINE INSPECTIOR.
Condition: Unknown
Due 4 September 1986
Resolved 4 September 1986
Electrical
Issued 4 September 1986
Resolved
PROVIDE MEANS OF TESTING EMERGENCY GENERATOR LOW LUBE OIL SHUTDOWN TO THE SATISFACTION OF CG MARINE INSPECTOR.
Condition: Unknown
Due 4 September 1986
Resolved 4 September 1986
Unknown
Issued 4 September 1986
Resolved
PROVIDE MEANS OF TESTING RELIEF VALVE TO P/V DECK AIR RECEIVER AND DEMONSTRATE TO THE SATISFACTION OF A CG MARINE INSPECTOR.
Condition: Unknown
Due 4 September 1986
Resolved 4 September 1986
Engineering
Issued 4 September 1986
Resolved
REPAIR AND DEMONSTRATE PROPER OPERATION OF FORCE DRAFT FAN TO STBD BOILER.
Condition: Unknown
Due 4 September 1986
Resolved 4 September 1986
Engineering
Issued 4 September 1986
Resolved
REPAIR AND DEMONSTRATE TURNING GEAR INTERLOCK OF MAIN PROPULSION.
Condition: Unknown
Due 4 September 1986
Resolved 4 September 1986
Engineering
Issued 4 September 1986
Resolved
REPAIR INDICATOR ON CONSOLE FOR LOSS OF LUBE OIL TRIP.
Condition: Unknown
Due 4 September 1986
Resolved 4 September 1986
Engineering
Issued 4 September 1986
Resolved
ADJUST ENGINE RECORDER FOR PROPER RECORDING OF RPM.
Condition: Unknown
Due 4 September 1986
Resolved 4 September 1986
Engineering
Issued 4 September 1986
Resolved
REPAIR OR REPLACE SUPERHEATER SAFETY RELIEF VALVE FOR PORT BOILER. REPAIR TO BE MADE BY MANFG OR AN APPROVED FACILITY BY THE [name withheld] OF VALVE TO BE WITNESSED & VALVE SEALED BY CG MARINE INSPECTOR.
Condition: Unknown
Due 4 September 1986
Resolved 4 September 1986
Deck/Cargo
Issued 19 August 1985
Resolved
PROVIDE FOR A HYDROSTATIC TEST OF ON DECK CARGO PIPING SYSTEM PRIOR TO 19OCT85.
Condition: Unknown
Due 19 August 1985
Resolved 19 August 1985
Electrical
Issued 19 August 1985
Resolved
REPAIR/REPLACE MISSING AND BROKEN FIXTURES ON VESSEL'S CHRISTMAS TREE PRIORTO 31AUG85.
Condition: Unknown
Due 19 August 1985
Resolved 19 August 1985
Lifesaving
Issued 19 August 1985
Resolved
PROVIDE FOR ANNUAL SERVICING OF VESSEL'S INFL LIFE RAFTS OR REPLACE WITH CURRENTLY INSPECTED RAFTS PRIOR TO 31AUG85.
Condition: Unknown
Due 19 August 1985
Resolved 19 August 1985