Records from 1982 to 2007. Most recent: inspection, 7 February 2007.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 52
7 February 2007
Administrative Inspection
Administrative · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 2984362
27 July 2006
Hull Examination · Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 2726379
3 April 2006
Annual Inspection · Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 2630511
1 April 2005
COI Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 2324328
24 June 2004
Annual Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 2113544
10 May 2004
Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 2063751
3 September 2003
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1895771
27 June 2003
Annual Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1839266
6 September 2002
Re-Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1672169
15 August 2002
Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1671137
8 March 2002
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1492348
6 June 2001
Re-Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1436584
6 September 2000
Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1399441
15 March 2000
COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1361364
10 May 1999
Administrative
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1101419
10 March 1999
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 883299
5 March 1999
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 801426
4 February 1999
Re-Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1365087
5 January 1999
Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1388692
16 January 1998
COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1427446
30 July 1997
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1116638
24 July 1997
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 781216
22 April 1997
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1093520
2 April 1997
Plan Review "T" Boat
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1459300
13 March 1997
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1100978
9 January 1997
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1101627
5 November 1996
Re-Inspection · Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1367952
22 October 1996
Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1427235
12 February 1996
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 757696
9 February 1996
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 203135
3 November 1995
Re-Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1421036
9 May 1995
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 890584
10 February 1995
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1150592
4 November 1994
Inclining Experiment · COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1377285
11 October 1994
Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1403823
24 June 1994
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1464527
23 June 1994
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1025075
9 June 1992
Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1405321
6 January 1992
Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 955285
4 June 1991
Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1242203
13 July 1990
COI Inspection · Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 930822
11 January 1990
Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 900730
5 December 1988
Hull Examination · COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1037733
5 April 1988
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1032545
14 December 1987
Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1008336
13 April 1987
Hull Examination
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1327482
25 November 1986
Re-Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1024810
18 October 1985
COI Inspection · Credit Drydock
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 985706
26 March 1985
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 981249
18 September 1984
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1283806
17 October 1983
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1274560
23 April 1982
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 968957
Engineering › Sea-water System (primary cooling) › Valve
Issued 27 July 2006
Resolved
Refurbish or replace both seized valves for seastrainers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 2 October 2006
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 27 July 2006
Resolved
Repair port aft cracked hand rail.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 2 October 2006
Engineering › Steering Gear System › Rudder
Issued 27 July 2006
Resolved
Repair stbd bent rudder.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 2 October 2006
Engineering › Fuel Oil Storage/Transfer System › Filter/Strainer
Issued 27 July 2006
Resolved
Renew leaking piping on engineroom racor.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 2 October 2006
Accommodation/Occupational Safety › Occupational Safety › Rubbish/Waste Materials
Issued 27 July 2006
Resolved
Clean aft Lazarette and anchor locker.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 2 October 2006
Engineering › Generator (propulsion/auxiliary-electric) › Winding
Issued 27 July 2006
Resolved
Provide evidence of generator operating hours are within manufacturers specifications. If over recondition or renew generator.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 2 October 2006
Lifesaving › Lifebuoys › Serviceable
Issued 3 April 2006
Resolved
Renew faded lifering and deteriorated line.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 April 2006
Lifesaving › Lifefloat › Serviceable
Issued 3 April 2006
Resolved
Renew or paint in manufacturer orange color, faded lifefloats.
Due 3 May 2006
Resolved 5 May 2006
Communications › Radio Communications › EPIRB
Issued 3 April 2006
Resolved
Register EPIRB with NOOA.
Due 3 May 2006
Resolved 5 May 2006
Personnel › Certificates/Documents/Licenses › License, Master
Issued 1 April 2005
Resolved
Providide masters license and evidence of CPR training.
Action required: 701 - Prior to carriage of passengers/cargo
Due 19 April 2005
Resolved 1 April 2005
Operations/Management › Passenger Operations › Safety Orientation
Issued 1 April 2005
Resolved
Provide operational P.A. system.
Action required: 701 - Prior to carriage of passengers/cargo
Due 19 April 2005
Resolved 1 April 2005
Documentation › Logs/Records › Transfer Equipment Test/Inspection Records
Issued 3 September 2003
Resolved
Provided welder certification.
Action required: 705 - Other - as specified
Due 10 September 2003
Resolved 2 August 2004
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 3 September 2003
Resolved
Renew all broken welds on aft section of the vessel.
Action required: 705 - Other - as specified
Due 10 September 2003
Resolved 24 June 2004
Resolution: All broken welds on aft section were re-new
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 27 June 2003
Resolved
Repair port aftrailing (fractured at welds)
Condition: Unknown
Due 4 July 2003
Resolved 24 June 2004
Resolution: port aftrailing were welded
Accommodation/Occupational Safety › Occupational Safety
Issued 27 June 2003
Resolved
Repair passenger seat fix supports w/ deck, last two seating accommodations starboard side. LEGACY COMPONENT DESC: Passenger seats
Condition: Unknown
Due 4 July 2003
Resolved 3 September 2003
Resolution: Passenger seats were welded
Electrical › Lighting (service)
Issued 27 June 2003
Resolved
Repair light at the forward (cabin) passenger accommodations, last light portside. LEGACY COMPONENT DESC: Lighting Fixture
Due 4 July 2003
Resolved 3 September 2003
Resolution: Light was fixed at cabin
Documentation › Certificates/Documents
Issued 27 June 2003
Resolved
Provide evidence of the FCC Station License. LEGACY COMPONENT DESC: FCC Station License
Due 11 July 2003
Resolved 3 September 2003
Resolution: Evidence was provided for the FCC Station License
Operations/Management › Drills/Instruction
Issued 27 June 2003
Resolved
Post Lifejacket Donning Placards at the passenger acconnodations. LEGACY COMPONENT DESC: Lifejacket Donning Placard
Due 4 July 2003
Resolved 3 September 2003
Resolution: Placards were posted at passengers accomodations.
Engineering › Bilge Water Management System
Issued 27 June 2003
Resolved
Clean Engine Room Bilges. LEGACY COMPONENT DESC: Clean Engine Room Bilges
Due 4 July 2003
Resolved 3 September 2003
Resolution: Engine Room Bilges were cleaned
Electrical › Lighting (emergency)
Issued 6 September 2002
Resolved
Provide the two required battery lantern or flashlights. LEGACY COMPONENT DESC: Battery Operated Lantern
Due 6 October 2002
Resolved 3 October 2002
Lifesaving › Buoyant Apparatus
Issued 6 September 2002
Resolved
Repair the small holes in both lifefloats.
Due 6 October 2002
Resolved 6 September 2002
Engineering › Fuel Oil Service System
Issued 6 September 2002
Resolved
Label both port and starboard emergency fuel stop and its direction of use. LEGACY COMPONENT DESC: Valve
Due 6 October 2002
Resolved 3 October 2002
Accommodation/Occupational Safety › Occupational Safety
Issued 6 September 2002
Resolved
Repair aft port railing gate to ensure it fits properly while the vessel in underway with passengers onboard. LEGACY COMPONENT DESC: Deck Rail
Due 6 October 2002
Resolved 3 October 2002
Accommodation/Occupational Safety › Occupational Safety
Issued 6 September 2002
Resolved
Install protective guards over both port and starboard MDE shafts. LEGACY COMPONENT DESC: Guards for Exposed Hazards
Due 6 October 2002
Resolved 3 October 2002
Construction/Loadline › Penetrations
Issued 6 September 2002
Resolved
Re-fit both main engine deck hatches to ensure that they close airtight. LEGACY COMPONENT DESC: Gasket
Due 6 October 2002
Resolved 3 October 2002
Stability › Watertight Integrity
Issued 6 September 2002
Resolved
Install the missing deck hatch bolt for the aft steering compartment deck hatch.
Due 6 October 2002
Resolved 3 October 2002
Construction/Loadline › Structures
Issued 6 September 2002
Resolved
Finishing filling and sealing the thru-holes in the forward engine room bulkhead. LEGACY COMPONENT DESC: Transverse Bulkhead
Due 6 October 2002
Resolved 3 October 2002
Accommodation/Occupational Safety › Other Accommodation Spaces
Issued 6 September 2002
Resolved
Install the missing bolt on the passenger seating over the starboard engine room hatch. LEGACY COMPONENT DESC: Open Deck Space
Due 6 October 2002
Resolved 3 October 2002
Communications › Internal Communications System
Issued 6 September 2002
Resolved
Until the replacement of the internal communications loudhailer. A crewmember must position themsleves to advise all passengers of safety anouncments and any directions form the master of the vessel.
Due 6 October 2002
Resolved 3 October 2002
Engineering › Diesel Engine (propulsion-direct drive)
Issued 6 September 2002
Resolved
Repair the oil leak on the port main engine from the engine tachometer sending unit.
Due 6 October 2002
Resolved 3 October 2002
Electrical
Issued 6 June 2001
Resolved
Remove dead electrical end on the steering motor compartment, portside.
Condition: Unknown
Due 1 July 2001
Resolved 22 February 2002
Resolution: Wires removed
Navigation
Issued 6 June 2001
Resolved
Provide and post Emergency broadcast placard on bridge.
Condition: Unknown
Due 8 June 2001
Resolved 22 February 2002
Resolution: Placard posted
Engineering
Issued 6 June 2001
Resolved
Replace fuel lines, aft bulkhead, Engine room.
Condition: Unknown
Due 1 July 2001
Resolved 22 February 2002
Resolution: Fuel lines were renewed
Engineering
Issued 6 June 2001
Resolved
Repair fuel leak on starboard side shutoff valve.
Condition: Unknown
Due 1 July 2001
Resolved 22 February 2002
Resolution: Valve was replaced
Accommodation/Occupational Safety
Issued 6 June 2001
Resolved
Repair rail stanchion on bow starboard side.
Condition: Unknown
Due 22 February 2002
Resolved 22 February 2002
Resolution: Bow rail was welded
Navigation
Issued 6 June 2001
Resolved
Provide the aplicable sections of the following pubs; CG Light list, Tide Tables, and Tidal Current Tables.
Condition: Unknown
Due 1 July 2001
Resolved 22 February 2002
Resolution: Charts and publications were viewed onboard
Navigation
Issued 6 June 2001
Resolved
Provide "emergency exit, keep clear" placard, inside passenger accommodations.
Condition: Unknown
Due 8 June 2001
Resolved 22 February 2002
Resolution: Placards were posted
Documentation
Issued 6 June 2001
Resolved
Provide evidence of the FCC Station License
Condition: Unknown
Due 8 June 2001
Resolved 6 September 2002
Engineering
Issued 6 September 2000
Resolved
Send repair proposal for stbd generator discharge crack.
Condition: Unknown
Due 7 September 2000
Resolved 17 November 2000
Electrical
Issued 6 September 2000
Resolved
Submit repair proposal for overloaded generator.
Condition: Unknown
Due 31 January 2001
Resolved 1 February 2001
Engineering
Issued 6 September 2000
Resolved
Remove all overboard sea valves for inspection.
Condition: Unknown
Due 7 September 2000
Resolved 17 November 2000
Engineering
Issued 6 September 2000
Resolved
Renew all corroded engine cooling water piping.
Condition: Unknown
Due 7 September 2000
Resolved 17 November 2000
Engineering
Issued 6 September 2000
Resolved
Clean all intake grate free of marine groth.
Condition: Unknown
Due 8 November 2000
Resolved 9 November 2000
Fire Fighting
Issued 6 September 2000
Resolved
Replace all corroded fire extinguisher brackets.
Condition: Unknown
Due 8 November 2000
Resolved 9 November 2000
Electrical
Issued 6 September 2000
Resolved
Repair or remove corroded raritan sewage control box in engineroom.
Condition: Unknown
Due 8 November 2000
Resolved 9 November 2000
Engineering
Issued 6 September 2000
Resolved
Reinstall missing port engine/ realign port engine.
Condition: Unknown
Due 31 January 2001
Resolved 1 February 2001
Engineering
Issued 6 September 2000
Resolved
Renew all hull and shaft zincs.
Condition: Unknown
Due 8 November 2000
Resolved 9 November 2000
Engineering
Issued 6 September 2000
Resolved
Renew all cutless bearings.
Condition: Unknown
Due 8 November 2000
Resolved 9 November 2000
Documentation
Issued 15 March 2000
Resolved
PROVIDE A VALID FCC SAFETY RADIO CERTIFICATE ON VESSEL PRIOR TO 15APR2000. (VESSEL HAS COMPLETED INSPECTION AND RESOLVED OUTSTANDING ITEMS ISSUED BY FCC AND NEEDS TO SCHEDULE A FOLLOW-UP EXAM WITH FCC)_x001C_
Condition: Unknown
Due 15 March 2000
Resolved 15 March 2000
Documentation
Issued 15 March 2000
Resolved
POST ALL PAGES OF CERTIFICATE OF INSPECTION ON VESSEL. CORRECT PRIOR TO 15APR2000._x001C_
Condition: Unknown
Due 15 March 2000
Resolved 15 March 2000
Lifesaving
Issued 15 March 2000
Resolved
PROVIDE A HYDRO STATIC RELEASE FOR THE 406 MHZ EPIRB. CORRECT PRIOR TO 01APR2000. (VESSEL HAS EPIRB AND MOUNT, BUT THE MOUNT IS NOT FOR INSPECTED VESSEL) _x001C_
Condition: Unknown
Due 23 March 2000
Resolved 23 March 2000
Navigation
Issued 15 March 2000
Resolved
PROVIDE UPDATED CHART OF VESSEL'S AREA OF OPERATION. CORRECT PRIOR TO 01APR2000._x001C_
Condition: Unknown
Due 23 March 2000
Resolved 23 March 2000
Navigation
Issued 15 March 2000
Resolved
PROVIDE BELL REQUIRED BY 33CFR86. CORRECT PRIOR TO 15APR2000._x001C_
Condition: Unknown
Due 15 March 2000
Resolved 15 March 2000
Documentation
Issued 15 March 2000
Resolved
PROVIDE MEANS FOR PASSENGER COUNT REQUIRED BY 46CFR185.510. CORRECT PRIOR TO 15APR2000._x001C_
Condition: Unknown
Due 15 April 2000
Resolved 22 February 2002
Resolution: Reviewed company policy on passenger count-all sat
Engineering
Issued 4 February 1999
Resolved
STBD SIDE ENGINE FUEL INTAKE AND RETURN FUEL HOSES TO BE PROPERLY SUPPORTEDAS TO PREVENT CHAFING.
Condition: Unknown
Due 5 March 1999
Resolved 5 March 1999
Engineering
Issued 4 February 1999
Resolved
CORRECT STBD SIDE ENGINE FUEL RETURN HOSE NOTED SMALL FUEL LEAK AT FITTING CONNECTION.
Condition: Unknown
Due 5 March 1999
Resolved 5 March 1999
Lifesaving
Issued 4 February 1999
Resolved
CONDUCT FIRE AND ABANDON SHIP DERILL TO THE SATISFACTION OF ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 4 February 1999
Resolved 4 February 1999
Lifesaving
Issued 4 February 1999
Resolved
REPLACE HYDROSTATIC RELEASE FOR VESSELS EPIRB.
Condition: Unknown
Due 5 March 1999
Resolved 5 March 1999
Lifesaving
Issued 4 February 1999
Resolved
PROVIDE DETACHABLE LINK FOR VESSEL RING BUOY STARBOARD SIDE.
Condition: Unknown
Due 5 March 1999
Resolved 5 March 1999
Engineering
Issued 4 February 1999
Resolved
PROVIDE DRIP PAN FOR GENERATOR FUEL FILTER.
Condition: Unknown
Due 5 March 1999
Resolved 5 March 1999
Construction/Loadline
Issued 4 February 1999
Resolved
CROP AND RENEW BILGE SECTIONS LOCATED AT ENGINE ROOM UNDER PIPING
Condition: Unknown
Due 5 March 1999
Resolved 5 March 1999
Engineering
Issued 4 February 1999
Resolved
PROVIDE DOUBLE CLAMPS FOR GENERATOR COOLING WATER RETURN RUBBER HOSE AT BOTH ENDS.
Condition: Unknown
Due 5 February 1999
Resolved 5 March 1999
Engineering
Issued 4 February 1999
Resolved
INSTALL PORT SIDE FUEL RETURN HOSE TO ORIGINAL SPECIFICATIONS HOSE IS 6 INCHES LONG.
Condition: Unknown
Due 5 March 1999
Resolved 5 March 1999
Navigation
Issued 16 January 1998
Resolved
PAINT RUNNING LIGHT SIDE SCREENS FLAT BLACK
Condition: Unknown
Due 16 January 1998
Resolved 16 January 1998
Lifesaving
Issued 16 January 1998
Resolved
PROVIDE CG APPROVED FIRST AID KIT
Condition: Unknown
Due 16 January 1998
Resolved 16 January 1998
Engineering
Issued 16 January 1998
Resolved
INSTALL MISSING BOLT IN SHAFT COUPLING
Condition: Unknown
Due 16 January 1998
Resolved 16 January 1998
Navigation
Issued 16 January 1998
Resolved
REPAIR LEAKING HYDRAULIC SEAL ON STEERING RAM
Condition: Unknown
Due 16 January 1998
Resolved 16 January 1998
Unknown
Issued 2 April 1997
Resolved
PROVIDE DETAILS PLANS FOR ELECTRICAL SYSTEM AND BILGE PIPING SYSTEM MODIFICATIONS, IAW 46 CFR SUBCHAPTER "T", TO THIS OFFICE NO LATER THAN 16APR97.
Condition: Unknown
Due 30 July 1997
Resolved 28 July 1998
Lifesaving
Issued 9 January 1997
Resolved
MAKE STBD LIFEFLOAT WATERLIGHT OPERABLE.
Condition: Unknown
Due 9 January 1997
Resolved 23 January 1997
Engineering
Issued 9 January 1997
Resolved
REMOVE FUEL FROM STEERING ROOM BILGE AND REPAIR PORT FUEL TANK FILL HOSE.
Condition: Unknown
Due 9 January 1997
Resolved 23 January 1997
Construction/Loadline
Issued 5 November 1996
Resolved
INSTALL STUFFING TUBE ON BILGE WIRE, STEERING ROOM FORWARD BULKHEAD.
Condition: Unknown
Due 5 December 1996
Resolved 24 January 1997
Documentation
Issued 5 November 1996
Resolved
OBTIAN ENDORSEMENT TO CERTIFICATE OF DOCUMENTATION.
Condition: Unknown
Due 5 December 1996
Resolved 23 January 1997
Documentation
Issued 5 November 1996
Resolved
IMPLEMENT EMPLOYEE ASSISTANCE CHEMICAL TESTING PROGRAM AS PER 46 C.F.R. PARTS 4 & 16.
Condition: Unknown
Due 5 December 1996
Resolved 24 January 1997
Construction/Loadline
Issued 5 November 1996
Resolved
REPAIR DOGS ON AFT CABIN WATER TIGHT DOOR.
Condition: Unknown
Due 5 December 1996
Resolved 24 January 1997
Documentation
Issued 5 November 1996
Resolved
OBTAIN FCC STATION LICENSE.
Condition: Unknown
Due 5 November 1996
Resolved 5 November 1996
Engineering
Issued 5 November 1996
Resolved
REPAIR STBD EMERGENCY FUEL CUT-OFF VALVE LINKAGE WHERE CORRODED.
Condition: Unknown
Due 6 November 1996
Resolved 7 November 1996
Lifesaving
Issued 5 November 1996
Resolved
HYDROTEST EPIRB FLOAT FREE DEVICE.
Condition: Unknown
Due 7 November 1996
Resolved 7 November 1996
Accommodation/Occupational Safety
Issued 5 November 1996
Resolved
REPAIR RAIL AT PASSENGER ACCESS ON STBD SIDE AND AFT TO SWIM PLATFORM.
Condition: Unknown
Due 5 December 1996
Resolved 24 January 1997
Documentation
Issued 5 November 1996
Resolved
INSTALL POLLUTION PLACARD IN ENGINE ROOM.
Condition: Unknown
Due 5 December 1996
Resolved 24 January 1997
Engineering
Issued 5 November 1996
Resolved
PROVIDE FLAME IMPINGMENT BOWLS ON FUEL FILTERS.
Condition: Unknown
Due 5 December 1996
Resolved 24 January 1997
Electrical
Issued 5 November 1996
Resolved
REMOVE ALL UNUSED WIRES UNDER CONSOLE.
Condition: Unknown
Due 5 December 1996
Resolved 24 January 1997
Accommodation/Occupational Safety
Issued 5 November 1996
Resolved
REMOVE ALL UNUSED TUBING UNDER CONSOLE.
Condition: Unknown
Due 5 December 1996
Resolved 24 January 1997
Electrical
Issued 5 November 1996
Resolved
INSTALL GLOBE ON LIGHT IN FORWARD CABIN.
Condition: Unknown
Due 5 December 1996
Resolved 24 January 1997
Engineering
Issued 5 November 1996
Resolved
DOUBLE CLAMP FUEL HOSE AT BOTH TANK FILLS.
Condition: Unknown
Due 5 December 1996
Resolved 24 January 1997
Engineering
Issued 5 November 1996
Resolved
REINSTALL GROUND BOND ON FUEL TANKS.
Condition: Unknown
Due 6 November 1996
Resolved 7 November 1996
Electrical
Issued 22 October 1996
Resolved
PROVIDE SCHEMATIC DRWG FOR WIRING.
Condition: Unknown
Due 4 November 1996
Resolved 24 January 1997
Construction/Loadline
Issued 22 October 1996
Resolved
PROVIDE PIPE SYSTEM DRAWING FOR BILGE PUMP SYSTEMS.
Condition: Unknown
Due 4 November 1996
Resolved 24 January 1997
Construction/Loadline
Issued 22 October 1996
Resolved
INSERT CHECK VALVE BETWEEN THE BILGE SYSTEM STRAINERS AND THE BILGE SYSTEM MANIFOLD TO PREVENT PROGRESSIVE FLOODING.
Condition: Unknown
Due 22 October 1996
Resolved 22 October 1996
Lifesaving
Issued 22 October 1996
Resolved
WIRE CLOSE VALVE IN PIPE LEADING TO FOREPEAK.
Condition: Unknown
Due 4 November 1996
Resolved 24 January 1997
Construction/Loadline
Issued 22 October 1996
Resolved
PROVIDE COPY OF THROUGH HULL METAL GUAGING REPORT.
Condition: Unknown
Due 22 October 1996
Resolved 22 October 1996
Construction/Loadline
Issued 22 October 1996
Resolved
MAKE WATERTIGHT PORT & STBD AFT DECK HATCHES, REFASTEN AND SEAL
Condition: Unknown
Due 4 November 1996
Resolved 7 November 1996
Engineering
Issued 22 October 1996
Resolved
REPLACE STBD, FWD, INBOARD ENG MOUNT BUSHING.
Condition: Unknown
Due 4 November 1996
Resolved 7 November 1996
Engineering
Issued 22 October 1996
Resolved
RELABLE REMOTE FUEL SHUT-OFFS ON MAIN DECK.
Condition: Unknown
Due 4 November 1996
Resolved 24 January 1997
Engineering
Issued 22 October 1996
Resolved
PROVIDE PAPERWORK FOR REBUILT PROPELLORS.
Condition: Unknown
Due 4 November 1996
Resolved 7 November 1996
Lifesaving
Issued 4 November 1994
Resolved
INSTALL CORRECT TYPE AND SIZE WEAK LINK FOR 2, 15-PERSON LIFE FLOATS.
Condition: Unknown
Due 4 November 1994
Resolved 4 November 1994
Engineering
Issued 4 November 1994
Resolved
EXTEND STARBOARD ENGINE ROOM EXHAUST DUCT TO NEAR BILGE IN ACCORDANCE WITH 46 CFR 182.20-45.
Condition: Unknown
Due 7 November 1994
Resolved 9 November 1994
Engineering
Issued 4 November 1994
Resolved
INSTALL MACHINERY GUARD AROUND BILGE/FIRE PUMP PULLEY, BELT AND CRANKSHAFT.
Condition: Unknown
Due 7 November 1994
Resolved 9 November 1994
Lifesaving
Issued 4 November 1994
Resolved
PROCURE AND INSTALL 5 ADDITIONAL DAY/ORANGE SMOKE DISTRESS SIGNALS.
Condition: Unknown
Due 7 November 1994
Resolved 9 November 1994
Engineering
Issued 4 November 1994
Resolved
REATTACH ALL FOUR MAIN DIESEL ENGINE EXHAUST BRACKETS TO INCLUDE PROVISION TO PREVENT ELECTROLYSIS.
Condition: Unknown
Due 7 November 1994
Resolved 9 November 1994
Engineering
Issued 4 November 1994
Resolved
LINE BATTERY BOXES WITH LEAD, FIBERGLASS OR OTHER ACID RESISTANT MATERIAL.
Condition: Unknown
Due 7 November 1994
Resolved 9 November 1994
Navigation
Issued 4 November 1994
Resolved
PROVIDE BRACKET FOR HYDRAULIC HOSE OVER TOP OF PORT MAIN DIESEL ENGINE.
Condition: Unknown
Due 7 November 1994
Resolved 9 November 1994
Engineering
Issued 4 November 1994
Resolved
INSTALL PROPER PIPE CLAMP FOR PORT MAIN DIESEL ENGINE RAW WATER DISCHARGE PIPE.
Condition: Unknown
Due 7 November 1994
Resolved 9 November 1994
Construction/Loadline
Issued 4 November 1994
Resolved
INSTALL APPROVED MARINE HOSE AND DOUBLE CLAMPS WITH ANTI-SIPHON LOOP FOR ALL ELECTRIC BILGE PUMPS.
Condition: Unknown
Due 7 November 1994
Resolved 9 November 1994
Lifesaving
Issued 4 November 1994
Resolved
MASTER AND CREW TO CONDUCT A MINIMUM OF 3 MAN OVERBOARD DRILLS PER WEEK OVER NEXT 30 DAYS, AND LOG SAME IN THE OFFICIAL VESSEL LOG. UPON COMPLETIONOF TRAINING CONDUCT DRILL IN THE PRESENSE OF A COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 12 December 1994
Resolved 12 December 1994
Accommodation/Occupational Safety
Issued 4 November 1994
Resolved
PROVE PROPER OPERATION OF BOTH SHIP SERVICE AIR COMPRESSORS, CONTROLS AND SAFETY DEVICES.
Condition: Unknown
Due 7 November 1994
Resolved 10 November 1994
Lifesaving
Issued 4 November 1994
Resolved
RELOCATE 20 UNSTOWED ADULT LIFE PRESERVERS TO PROPERLY MARKED STOWAGE PRIORTO SAILING WITH MORE THAN 28 PASSENGERS.
Condition: Unknown
Due 12 December 1994
Resolved 12 December 1994
Electrical
Issued 4 November 1994
Resolved
REMOVE DEAD-ENDED WIRE FROM MID-SHIP BILGE AT FORWARD AIR CONDITIONING DUCTWORK.
Condition: Unknown
Due 7 November 1994
Resolved 9 November 1994
Construction/Loadline
Issued 4 November 1994
Resolved
CAP OR PLUG GATE VALVE AT SIDE SHELL, PORT SIDE, AFT OF SINK OVERBOARD.
Condition: Unknown
Due 7 November 1994
Resolved 10 November 1994
Construction/Loadline
Issued 4 November 1994
Resolved
INSTALL STRAINER AT AFT MID-SHIP BILGE SUCTION LINE.
Condition: Unknown
Due 7 November 1994
Resolved 10 November 1994
Electrical
Issued 4 November 1994
Resolved
PROPERLY LABLE ELECTRICAL BOXES FOR AIR CONDITIONING SYSTEM.
Condition: Unknown
Due 7 November 1994
Resolved 10 November 1994
Engineering
Issued 4 November 1994
Resolved
RELOCATE BOTH AIR TANK PRESSURE GAUGES TO UPPER HALF OF TANK.
Condition: Unknown
Due 7 November 1994
Resolved 10 November 1994
Accommodation/Occupational Safety
Issued 4 November 1994
Resolved
CLOSE AND LOCK SEWAGE SYSTEM OVERBOARD DISCHARGE VALVE.
Condition: Unknown
Due 7 November 1994
Resolved 10 November 1994
Construction/Loadline
Issued 4 November 1994
Resolved
PROPERLY SEAL AND SECURE 2-WIRE STUFFING TUBE, STARBOARD SIDE, AFTER MID- SHIP BILGE BULKHEAD.
Condition: Unknown
Due 7 November 1994
Resolved 10 November 1994
Electrical
Issued 4 November 1994
Resolved
REMOVE DEAD-ENDED BLACK WIRE FROM STBD SIDE, MID-SHIP BILGE, ALONG SIDE MORSE CONTROL CABLE.
Condition: Unknown
Due 7 November 1994
Resolved 10 November 1994
Electrical
Issued 4 November 1994
Resolved
PROVIDE THE COAST GUARD OCMI WITH A COPY OF THE VESSEL'S WIRING DIAGRAM SHOWING THE RECENT MODIFICATIONS.
Condition: Unknown
Due 4 November 1994
Resolved 4 November 1994