Records from 1997 to 2011. Most recent: inspection, 3 February 2011.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Documentation › Safety/Response Plans/Programs › Vessel Response Plan
Issued 31 January 2011
No resolution recorded
Owner/operator failed to prepare and submit a nontank vessel response plan IAW 33 U.S.C. 1321(j)(5).
Condition: Invalid
Action required: 15 - Rectify deficiencies by next port
Communications › Radio Communications › EPIRB
Issued 28 April 2009
Resolved
*Item reported cleared via E-mail dated 1MAY09 and shall remain open until verified by CG Marine Inspector* Vessel’s EPIRB showing module error message for low power on 121.5 MHz transmitter locator beacon. EPIRB inoperable according to manufacturer for intended use on board. Replace or repair onboard EPIRB in order to restore operational readiness.
Action required: 705 - Other - as specified
Due 7 June 2010
Resolved 27 August 2009
Communications › Radio Communications › Satellite Communications Capability
Issued 28 April 2009
Resolved
*Item reported cleared via E-mail dated 1MAY09 and shall remain open until verified by CG Marine Inspector* Vessel’s INMARSAT C found not operating as required. Auto GPS position input to unit disconnected and manual input inoperative. Make permanent repairs in order to restore operational readiness as required prior to departure from port to the satisfaction of USCG.
Action required: 705 - Other - as specified
Due 7 June 2010
Resolved 27 August 2009
Lifesaving › Launching Appliances › Davit
Issued 28 April 2009
Resolved
*Item reported cleared via E-mail dated 23JULY09 and shall remain open until verified by CG Marine Inspector* Provide report of rescue boat davit, winch, release hook annual servicing, as carried out by manufacturer approved servicing agent in accordance with NVIC 04-07; within 30 days. May 28th, 2009. **Extended to July 31, 2009**
Action required: 705 - Other - as specified
Due 7 June 2010
Resolved 27 August 2009
Lifesaving › Rescue Boat › Markings
Issued 28 April 2009
Resolved
*Item reported cleared via E-mail dated 24JUNE09 and shall remain open until verified by CG Marine Inspector*Provide CG approval (series 160.056) for on board rescue boat, or replace with CG approved rescue boat as required by 46CFR133.135(a) within 30 days. May 28th, 2009**Extended to July 31, 2009**
Action required: 705 - Other - as specified
Due 7 June 2010
Resolved 27 August 2009
Lifesaving › Launching Appliances › Release Mechanism
Issued 28 April 2009
Resolved
*Item reported cleared via E-mail dated 23JULY09 and shall remain open until verified by CG Marine Inspector* Provide CG approval for rescue boat release hook and mark release hook as required within 30 days. May 28th, 2009 **Extended to July 31, 2009**
Action required: 705 - Other - as specified
Due 7 June 2010
Resolved 27 August 2009
Accommodation/Occupational Safety › Occupational Safety › Spark Producing Device
Issued 28 April 2009
Resolved
*Item reported cleared via E-mail dated 21MAY09 and shall remain open until verified by CG Marine Inspector* Make permanent repairs to on deck exhaust lagging, unsafe industrial equipment condition, stbd. side within 30 days. May 28th, 2009
Action required: 705 - Other - as specified
Due 7 June 2010
Resolved 27 August 2009
Resolution: Removed requirement. All equipment on deck removed.
Fire Fighting › Miscellaneous Items › Paint/Flammable Liquid Lockers
Issued 28 April 2009
Resolved
Provide ventilation closure for paint locker (CO2 protected space) port side, main deck within 30 days. May 28th, 2009
Action required: 705 - Other - as specified
Due 28 May 2009
Resolved 29 April 2009
Resolution: Ventilation closures fitted to both paint lockers, main deck port and stbd. side.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 28 April 2009
Resolved
*Item reported cleared via E-mail dated 23JUNE09 and shall remain open until verified by CG Marine Inspector*Provide two ring buoy lights for ring buoys located on bridge deck, port and stbd., found missing within 30 days. May 28th, 2009**Extended to June 15, 2009**
Action required: 705 - Other - as specified
Due 7 June 2010
Resolved 27 August 2009
Accommodation/Occupational Safety › Medical/First Aid › Hospital Space
Issued 28 April 2009
Resolved
*Item reported cleared via E-mail dated 21MAY09 and shall remain open until verified by CG Marine Inspector*On deck safety/chemical showers/eye wash stations found operable but with low pressure, unsafe industrial equipment condition. Make repairs in order to restore proper operational pressure within 30 days. May 28, 2009
Action required: 705 - Other - as specified
Due 7 June 2010
Resolved 27 August 2009
Resolution: Removed requirement. All equipment on deck removed.
Fire Fighting › Portable CO2 Fire Extinguisher › Condition
Issued 28 April 2009
Resolved
*Item reported cleared via E-mail dated 01JULY09 and shall remain open until verified by CG Marine Inspector* Brackets, hoses, and fire extinguishers located on deck found wasted, broken, cracked, and in poor condition. Make permanent repairs or replace by June 30, 2009
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 7 June 2010
Resolved 27 August 2009
Resolution: Removed requirement. All equipment on deck removed.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 28 April 2009
Resolved
Aft ladder leading from catwalk to main deck found wasted and cracked at top stair. Make permanent repairs within 30 days. May 28, 2009
Action required: 705 - Other - as specified
Due 28 May 2009
Resolved 29 April 2009
Resolution: Repairs made and inspected by attending USCG Marine Inspector.
Lifesaving › Launching Appliances › Davit
Issued 28 April 2009
Resolved
*Item reported cleared via E-mail dated 23JULY09 and shall remain open until verified by CG Marine Inspector* Rescue boat davit pedestal slewing ring and hydraulic hoses found worn and not operating properly. Manufacturer approved servicer to make proper repairs in order to restore proper operation within 30 days. May 28, 2009**Extended to July 31, 2009**
Action required: 705 - Other - as specified
Due 7 June 2010
Resolved 27 August 2009
Electrical › Electrical Distribution System (service) › Wiring
Issued 28 April 2009
Resolved
Electrical junction box and loud speaker in way of fire station 20, stbd side main deck, found broken from its mountings and hanging by wires. Make permanent repairs within 30 days. May 28, 2009
Action required: 705 - Other - as specified
Due 28 May 2009
Resolved 29 April 2009
Resolution: Junction box and loud speaker remounted, inspected by CG marine inspector.
Deck/Cargo › Holds/Tanks › Ventilation Air Intake
Issued 28 April 2009
Resolved
Mud tank vent No. 1, main deck stbd. side, found with deck mount bolt and nut missing. Replace as required within 30 days. May 28, 2009
Action required: 705 - Other - as specified
Due 28 May 2009
Resolved 29 April 2009
Resolution: Bolt and nut replaced are required.
Fire Fighting › Firemans Outfit › Quantity
Issued 28 April 2009
Resolved
*Item reported cleared via E-mail dated 21MAY09 and shall remain open until verified by CG Marine Inspector*Two SCBAs, two firemen’s jackets, and two helmets required to be stowed in the bow thruster space, as indicated by Vessel’s fire plan, found missing. Place on station as required within 30 days. May 28, 2009
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 7 June 2010
Resolved 27 August 2009
Fire Fighting › Fixed Fire Detection System › Annual Inspection
Issued 28 April 2009
Resolved
*Item reported cleared via E-mail dated 21MAY09 and shall remain open until verified by CG Marine Inspector*Show proof of the Fire Detection system being serviced. June 30, 2009
Action required: 705 - Other - as specified
Due 30 June 2009
Resolved 27 August 2009
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 28 April 2009
Resolved
*Item reported cleared via E-mail dated 21MAY09 and shall remain open until verified by CG Marine Inspector*Show proof of the OWS content meter being calibrated or replaced. May 28, 2009
Action required: 705 - Other - as specified
Due 7 June 2010
Resolved 27 August 2009
Pollution Prevention/Response › Prevention Equipment › Bilge Monitor
Issued 28 April 2009
Resolved
*Item reported cleared via E-mail dated 28MAY09 and shall remain open until verified by CG Marine Inspector*Clean the engine room bilges. Propose modification to bilge suction and OWS suction that will correct the high problem with these suctions now in place. May 28, 2009
Action required: 705 - Other - as specified
Due 7 June 2010
Resolved 27 August 2009
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 28 April 2009
Resolved
*Item reported cleared via E-mail dated 23JUNE09 and shall remain open until verified by CG MI* Submit for approval a corrected fire control plan (46CFR131.945) which shows, for each deck the various fire-retardant bulkheads, the particulars for the fire-detection system (heat and smoke), and the separated two storage locations for the firemen’s outfits and SCBAs within 30 days. May 28, 2009
Action required: 705 - Other - as specified
Due 7 June 2010
Resolved 27 August 2009
Lifesaving › Inflatable Liferafts › Servicing
Issued 5 June 2008
Resolved
Ensure servicing completed of 16-person Zodiak liferaft (XDC5CL93J899) at USCG approved facility.
Due 30 November 2008
Resolved 28 April 2009
Resolution: Zodiak liferaft removed from vessel, new USCG liferaft placed on station.
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 25 April 2008
Resolved
REPLACE ALL GRAB LINES ON ALL RING BUOYS AFT OF THE PILOT HOUSE AND/OR REPLACE BUOYS.
Due 25 May 2008
Resolved 27 June 2008
Resolution: Rcvd e-mail from Captain of the vsl attesting to properly resolving this CG-835.
Construction/Loadline › Penetrations › Gasket
Issued 25 April 2008
Resolved
REPLACE DAMAGED HATCH GASKET ON PCM HATCH.
Due 25 May 2008
Resolved 2 June 2008
Accommodation/Occupational Safety › Occupational Safety › Portable Electric Equipment/Appliances
Issued 25 April 2008
Resolved
REMOVE AND/OR PROPERLY TERMINATE EXPOSED WIRES ABOVE PILOT HOUSE, GALLEY, AND NEAR MESSDECK TV.
Due 25 May 2008
Resolved 2 June 2008
Accommodation/Occupational Safety › Other Accommodation Spaces › Open Deck Space
Issued 25 April 2008
Resolved
PROPERLY LABEL ALL EYE WASH STATIONS ON DECK.
Due 25 May 2008
Resolved 2 June 2008
Accommodation/Occupational Safety › Occupational Safety › Portable Electric Equipment/Appliances
Issued 25 April 2008
Resolved
CLEAN ALL DECK LIGHT COVERS TO ENSURE PROPER DECK ILLUMINATION. (SCHIL DECK)
Due 25 May 2008
Resolved 2 June 2008
Electrical › Electric Generation Source (service) › Conductor
Issued 25 April 2008
Resolved
REPLACE INOP RPM GAUGE ON #1 SSDG.
Due 25 May 2008
Resolved 2 June 2008
Engineering › Diesel Engine (propulsion-direct drive) › Governor
Issued 25 April 2008
Resolved
PROVE PROPER OPERATION OF THE PORT MDE OVERSPEED TRIP.
Due 25 May 2008
Resolved 2 June 2008
Engineering › Diesel Engine (propulsion-direct drive) › Valve
Issued 25 April 2008
Resolved
PROPERLY ADJUST BMDE LOW LUBE OIL SHUTDOWNS.
Due 25 May 2008
Resolved 2 June 2008
Accommodation/Occupational Safety › Other Accommodation Spaces › Laundry
Issued 25 April 2008
Resolved
MAKE LAUNDRY ROOM PORTABLE FIRE EXTINGUISHER EASILY ACCESSIBLE.
Due 25 May 2008
Resolved 2 June 2008
Fire Fighting › Semiportable CO2 Fire Extinguishers › Service
Issued 25 April 2008
Resolved
PROPERLY SERVICE (I.E., WEIGH, CHECK HYDRO DATE) ENGINE ROOM SEMI PORTABLE FIRE EXTINGUISHER.
Due 25 May 2008
Resolved 5 June 2008
Resolution: Capt provided servicing report for semi portable extinguisher.
Lifesaving › Inflatable Liferafts › Servicing
Issued 20 June 2007
Resolved
Provide evidence that the life rafts 16DK+F160402 (Viking) and XDC5C1935899 (Zodiac) were last serviced by a Coast Guard and Manufacturer authorized servicing station - or - perform the Necessary Additional Pressure tests at a Coast Guard and Manufacturer authorized servicing station before placing those life rafts back in service on board the Galaxie.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 June 2007
Fire Fighting › Fixed Fire Detection System › Heat Detectors
Issued 2 June 2007
Resolved
Replace heat detector in the galley.
Due 2 August 2007
Resolved 16 July 2007
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 2 June 2007
Resolved
Repair all deck lighting.
Due 2 August 2007
Resolved 16 July 2007
Engineering › Diesel Engine (auxiliary) › Piping (exhaust)
Issued 2 June 2007
Resolved
Replace lagging on generators' exhaust.
Due 2 August 2007
Resolved 16 July 2007
Electrical › Electric Generation Source (emergency) › Grounding Conductor
Issued 2 June 2007
Resolved
Properly secure emergency lighting batteries.
Due 2 August 2007
Resolved 16 July 2007
Electrical › Electrical Distribution System (service) › Outlet Box
Issued 2 June 2007
Resolved
Properly label breakers in electrical panels.
Due 2 August 2007
Resolved 16 July 2007
Fire Fighting › Combustible Materials › Paints/Varnishes/Other Finishes
Issued 2 June 2007
Resolved
Repair all paint locker doors so that they close and seal properly. Received email from Master stating that CG-835 has been completed. Extended due date to correspond with annual window due date.
Due 7 June 2008
Resolved 25 April 2008
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 2 June 2007
Resolved
Schulumberger - housekeeping needs to be complete, all hoses, etc must be properly stowed. All bottles must be properly secured in rack. Eyewash stations need to be working. Properly secure all electrical wiring.
Due 2 August 2007
Resolved 16 July 2007
Operations/Management › Equipment Service/Testing › EPIRB
Issued 7 March 2006
Resolved
Replace EPIRB or fix the strobe light. Received email from master that it's replaced with new unit, extended due date to its next annual when it can be verified.
Condition: Improper/Lack of Maintenance
Due 7 June 2007
Resolved 2 September 2006
Resolution: EPIRB replaced.
Engineering › Fuel Oil Service System › Filter
Issued 7 March 2006
Resolved
Replace missing metal guard bowl for stbd main engine RAYCOR fuel filter. Received email from master that it's replaced, extended due date to its next annual when it can be verified.
Condition: Unknown
Due 7 June 2007
Resolved 2 September 2006
Resolution: Missing RAYCOR metal guard bowl replaced.
Construction/Loadline › Structures › Machinery Space Opening
Issued 7 March 2006
Resolved
Re-adjust forward and starboard engine room watertight doors prior to departure.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 March 2007
Engineering › Lubricating Oil Service System › Valve, Control
Issued 7 March 2006
Resolved
Replace or repair oil sensor for port MDE low lube oil shutdown and prove proper operation. Received email from master that they had tested sat on 16 May 2006, extended due date to its next annual when it can be verified.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 7 June 2007
Resolved 2 June 2007
Engineering › Diesel Engine (auxiliary) › Governor
Issued 7 March 2006
Resolved
Prove proper operation of # 2 SSDG overspeed shutdown.
Condition: Improper/Lack of Maintenance
Due 7 May 2006
Resolved 8 March 2006
Resolution: Witnessed proper operation during follow-up visit the next day.
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 7 March 2006
Resolved
Provide alarm for the oily water separator as required by MARPOL Regulation 16(5). Received email from master on it's compliance on 5/18/06, extended due date to its next annual when it can be verified.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 7 June 2007
Resolved 2 September 2006
Resolution: Alarm for OWS is within compliance.
Deck/Cargo › Ballast › Tank
Issued 18 April 2005
Resolved
Gouge and weld 5 fractured stiffeners and transverse stiffener in #4S ballast tank
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 13 June 2005
Resolved 11 May 2005
Resolution: Corrected
Deck/Cargo › Ballast › Tank
Issued 18 April 2005
Resolved
Mechanical clean wasted areas and paint in ballast tanks 2,3, 4p, 4S.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 June 2005
Resolved 11 May 2005
Resolution: Corrected
Construction/Loadline › Penetrations › Valve Flange
Issued 18 April 2005
Resolved
Renew 6" butterfly sea valve.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 June 2005
Resolved 11 May 2005
Resolution: Corrected
Stability › Watertight Integrity › Weathertight Enclosure
Issued 18 April 2005
Resolved
Replace Engine room hatch gaskets
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 June 2005
Resolved 11 May 2005
Resolution: Corrected
Deck/Cargo › Cargo Stowage › General
Issued 18 April 2005
Resolved
Replace #2port mud tank vent flame screen
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 June 2005
Resolved 11 May 2005
Resolution: Corrected
Engineering › Bilge Water Management System › Not Operational
Issued 18 April 2005
Resolved
Clean debris from bilges in Bow thruster space to engine room including tunnel
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 June 2005
Resolved 11 May 2005
Resolution: Corrected
Lifesaving › Launching Appliances › Davit
Issued 18 April 2005
Resolved
Load test rescue boat davit to max safe working load. & show proof of end for end or new install date.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 June 2005
Resolved 11 May 2005
Resolution: Completed
Deck/Cargo › Cargo Stowage › General
Issued 18 April 2005
Resolved
Before changing to present on deck equipment provide proposal to change lightship or proof of less than lightship change as outlined by MSC Technical note 04-95.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 June 2005
Resolved 6 June 2005
Resolution: No change in deck equipment at this time.
Stability › Incline Test › General
Issued 18 April 2005
Resolved
Update deck layout in stability letter. Items addressed via e-mail, completed deck plan to be presented to attending Marine Inspector for verification at next exam.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 March 2006
Resolved 7 March 2006
Stability › Freeing Ports › General
Issued 18 April 2005
Resolved
Free up main deck freeing ports
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 June 2005
Resolved 11 May 2005
Resolution: Corrected
Engineering › Pressure Vessel › Relief Valve
Issued 18 April 2005
Resolved
Renew pressure tank in way of #3cat pump, Tank is wasted beyond repair limits
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 June 2005
Resolved 11 May 2005
Resolution: Tank removed.
Engineering › Pressure Vessel › Marking and Stamping
Issued 18 April 2005
Resolved
Provide Hydrostatic test for all pressure vessels on main deck and renew relief valves. IAW 46 CFR 61.10. Provide list of all vessel to incorporate on COI. Item reported cleared via e-mail Item will remain open until cleared by next attending Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 March 2006
Resolved 7 March 2006
Electrical › Electrical Distribution System (service) › Junction Box
Issued 18 April 2005
Resolved
Renew Electrical control box for cooling pump in way of stbd deck locker.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 June 2005
Resolved 11 May 2005
Resolution: replaced
Electrical › Electrical Distribution System (service) › Outlet Box
Issued 18 April 2005
Resolved
Renew all electrical receptacles in galley, remove receptacle behind deep fat fryer. Receptacles are full of dust and grease posing a fire hazard..
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 June 2005
Resolved 11 May 2005
Resolution: replaced
Fire Fighting › Firemans Outfit › Self-Contained Breathing Apparatus
Issued 18 April 2005
Resolved
Remove all expire SCBA bottles and provide 2 full fireman's outfits as required by COI
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 June 2005
Resolved 11 May 2005
Resolution: replaced
Engineering › Lubricating Oil Service System › Piping
Issued 18 April 2005
Resolved
Renew/Repair L/O elbow to Stbd MDE (fwd engine to oil pump iwo temp gauge)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 June 2005
Resolved 11 May 2005
Resolution: Repaired
Engineering › Freshwater System (jacketwater cooling) › Storage Tank
Issued 18 April 2005
Resolved
Renew/replace elbow for J/W to expansion tank in overhead in vicinity of item #16
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 June 2005
Resolved 11 May 2005
Resolution: Repaired
Engineering › Freshwater System (jacketwater cooling) › Storage Tank
Issued 18 April 2005
Resolved
Renew/repair Stbd expansion tank for MDE
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 June 2005
Resolved 11 May 2005
Resolution: Repaired
Deck/Cargo › Ballast › Piping
Issued 18 April 2005
Resolved
Remove temporary PVC pipe in engine room from ballast tank discharge line to bilges
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 13 June 2005
Resolved 11 May 2005
Resolution: Removed
Deck/Cargo › Marine Portable Tanks › Inspection Opening
Issued 18 April 2005
Resolved
Provide proof of required MPT testing as outline in 46 CFR 64.77-83 or carryout required testing. [name withheld] as required of testing date and product in tank. Maintain a log of tanks on board and associated maintenance for ISM system. Rcvd e-mail stating new tanks purchased and testing incorperated into SMS, to be verified by next attending Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 March 2006
Resolved 7 March 2006
Documentation › Certificates/Documents › Certificate of Inspection
Issued 18 April 2005
Resolved
Update chemicals listed on COI with chemical used on board. Update is to be submitted in writing to the marine safety center as outlined in 46CFR 125.110 and 46CFR 127.120. Rcvd e-mail stating list sent to MSC to be verified by next attendeing Marine Inspector. Letter sited but company is still working on approval from MSC, extended due date for sixty days.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 13 May 2007
Resolved 20 December 2006
Resolution: Received classification of NLS cargoes onboard from MSC and CG-3PSO-3.
Pollution Prevention/Response › Prevention Equipment › Bilge Monitor
Issued 18 April 2005
Resolved
Provide proof that new OWS is Coast Guard approved equipment
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 June 2005
Resolved 6 June 2005
Resolution: corrected
Engineering › Pressure Vessel › Relief Valve
Issued 18 April 2005
Resolved
Have dry bulk relief valves pressure tested and include in annual maintenance system. Rcvd e-mail stating item completed to be verified by next attending Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 March 2006
Resolved 7 March 2006
Lifesaving › Lifebuoys › Quantity
Issued 16 June 2004
Resolved
REPLACE NON-CG APPROVED LIFE RINGS WITH CG APPROVED. Received email that it's completed, extended due date to its next annual when it can be verified by an inspector.
Action required: 705 - Other - as specified
Due 13 March 2005
Resolved 18 April 2005
Resolution: Corrected
Lifesaving › Launching Appliances › Lines
Issued 16 June 2004
Resolved
ENSURE LINE THROWING GUN HAS A TOTAL OF 4 CARTRIDGES OF LINE AS PER 46 CFR 133.170. Received email that it's completed, extended due date to its next annual when it can be verified by an inspector.
Action required: 705 - Other - as specified
Due 13 March 2005
Resolved 18 April 2005
Resolution: corrrected
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Transfer Hose
Issued 16 June 2004
Resolved
ENSURE HOSES USED FOR TRANSFER OF HAZMAT ARE HYDROSTATICALLY TESTED AS PER 33 CFR 156.120 (j), 155.800 and 154.500(f). Received email that it's completed, extended due date to its next annual when it can be verified by an inspector.
Action required: 705 - Other - as specified
Due 13 March 2005
Resolved 7 March 2006
Engineering › Fuel Oil Storage/Transfer System › Hose
Issued 16 June 2004
Resolved
NON METALLIC FLEXIBLE FUEL HOSES USED FOR ENGINES ON BACK DECK CAN NOT EXCEED 30 INCHES IN LENGTH AS PER 46 CFR 56.60-25 (b)(2)
Action required: 705 - Other - as specified
Due 1 August 2004
Resolved 7 March 2006
Engineering › Lubricating Oil Storage/Transfer System › Piping
Issued 16 June 2004
Resolved
REMOVE SOFT PATCH AND REPAIR AS NECESSARY; LUBE OIL PIPE, STBD EMERGENCY ESCAPE HATCH, JUST AFTER PENETRATION. Received email that it's completed, extended due date to its next annual when it can be verified by an inspector.
Action required: 705 - Other - as specified
Due 13 March 2005
Resolved 18 April 2005
Resolution: corrected
Engineering › Diesel Engine (propulsion/auxiliary-electric) › Governor
Issued 16 June 2004
Resolved
REPLACE BOTH SHIP SERVICE DIESEL GENERATOR (RPM) TACHOMETERS
Action required: 705 - Other - as specified
Due 1 August 2004
Resolved 18 April 2005
Resolution: Corrected
Engineering › Diesel Engine (propulsion/auxiliary-electric) › Overspeed Device
Issued 16 June 2004
Resolved
PROVE PROPER OPERATION OF BOTH SHIP SERVICE DIESEL GENERATOR OVERSPEED SHUTDOWN TO THE SATISFACTION OF THE ATTENDING CG MARINE INSPECTOR. Received email that it's completed by technician, extended due date to its next annual when it can be verified by an inspector.
Action required: 705 - Other - as specified
Due 13 March 2005
Resolved 11 May 2005
Resolution: Corrected
Engineering › Lubricating Oil Service System › Gauge
Issued 16 June 2004
Resolved
PROVE PROPER OPERATION OF BOTH MAIN DIESEL ENGINES AND SHIP SERVICE GENERATORS. Received email that it's completed by class, extended due date to its next annual when it can be verified by an inspector.
Action required: 705 - Other - as specified
Due 13 March 2005
Resolved 11 May 2005
Resolution: Corrected
Pollution Prevention/Response › Prevention Equipment › Standard Discharge Connection
Issued 16 June 2004
Resolved
ENSURE STANDARD DISCHARGE CONNECTION FOR OIL WASTE IS ON BOARD AS PER IOPP CERTIFICATE AND 33 CFR 155.430. Received email that it's completed, extended due date to its next annual when it can be verified by an inspector.
Action required: 705 - Other - as specified
Due 13 March 2005
Resolved 11 May 2005
Resolution: Corrected
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 16 June 2004
Resolved
PROVE PROPER OPERATION OF OILY WATER SEPARATOR TO THE SATISFACTION OF ATTENDING CG MARINE INSPECTOR PRIOR TO PLACING BACK IN SERVICE
Action required: 705 - Other - as specified
Due 1 August 2004
Resolved 11 May 2005
Resolution: Corrected
Pollution Prevention/Response › Prevention Equipment › Sewage System Piping
Issued 16 June 2004
Resolved
REMOVE SOFT PATCH AND MAKE NECESSARY REPAIRS TO SEWAGE PUMP DISCHARGE LINE. Received email that it's completed, extended due date to its next annual when it can be verified by an inspector.
Action required: 705 - Other - as specified
Due 13 March 2005
Resolved 18 April 2005
Resolution: Corrected
Deck/Cargo › Holds/Tanks › Valve, Pressure Vacuum Relief
Issued 16 June 2004
Resolved
REPLACE OR PROVE PROPER OPERATION OF ALL AIR RECEIVERS AND DRY BULK TANK RELIEF VALVES TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR. Received email that it's completed, extended due date to its next annual when it can be verified by an inspector.
Action required: 705 - Other - as specified
Due 13 March 2005
Resolved 18 April 2005
Resolution: Corrected
Communications › Alarms/Indicators
Issued 19 June 2003
Resolved
3. Repair wiring harness for the #2 S/S generator and prove proper operation of the alarms and safety devices.
Condition: Unknown
Action required: 705 - Other - as specified
Due 19 July 2003
Resolved 23 October 2003
Resolution: Received notification from Master item corrected 23 October 2003. Verify at next visit to vessel.
Pollution Prevention/Response › Prevention Equipment
Issued 19 June 2003
Resolved
4. Prove proper operation of the oily water separator alarm. LEGACY COMPONENT DESC: Oily Water Separator (15 ppm)
Action required: 705 - Other - as specified
Due 19 July 2003
Resolved 23 October 2003
Resolution: Received notification from Master item corrected 23 October 2003. Verify at next visit to vessel.
Communications › Alarms/Indicators
Issued 19 June 2003
Resolved
5. Prove proper operation of the low lube oil shut downs for the port and starboard main engines.
Action required: 705 - Other - as specified
Due 19 July 2003
Resolved 23 October 2003
Resolution: Received notification from Master item corrected 23 October 2003. Verify at next visit to vessel.
Communications › Alarms/Indicators
Issued 19 June 2003
Resolved
6. Provide a general alarm bell audible on the main deck in the vicinity of the rescue boat starboard side. LEGACY COMPONENT DESC: General Alarm
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 19 July 2003
Resolved 12 August 2003
Resolution: alarm bell satisfactory cleared requirement
Communications › Alarms/Indicators
Issued 19 June 2003
Resolved
7. Trouble shoot repair and prove proper operation of the bow thruster heat detector. LEGACY COMPONENT DESC: Fire Alarm
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 19 July 2003
Resolved 23 October 2003
Resolution: Received notification from Master item corrected 23 October 2003. Verify at next visit to vessel.
Deck/Cargo › Cargo Transfer/Lightering (liquid)
Issued 17 May 2002
Resolved
DEMONSTRATE SATISFACTORY OPERATION OF NO. 1P LIQUID MID TANK REMOTE CUT OUT ACCUATOR. LEGACY COMPONENT DESC: Emergency Shut-down
Due 27 May 2002
Resolved 23 May 2002
Electrical › Electric Generation Source (service)
Issued 17 May 2002
Resolved
DEMONSTRATE SATISFACTORY OPERATION OF NO.1 SSDG OVERSPEED.
Due 27 May 2002
Resolved 23 May 2002
Electrical
Issued 15 December 1998
Resolved
REPAIR S/S GENERATOR REVERSE CURRENT RELAYS AND TEST TO SATISFACTION OF ATTENDING CG MARINE INSPECTOR.
Condition: Unknown
Due 15 January 1999
Resolved 8 January 1999
Construction/Loadline
Issued 15 December 1998
Resolved
MAKE WIRE PENETRATIONS ON AFT END OF SUPERSTRUCTURE MAIN DECK, WEATHER TIGHT.
Condition: Unknown
Due 15 January 1999
Resolved 8 January 1999
Documentation
Issued 20 November 1997
Resolved
PROVIDE ON BOARD VESSEL CORRECTED FUEL/LIQUID MUD TRANSFER PROCEDURES PRIORTO NEXT TRANSFER.
Condition: Unknown
Due 20 December 1997
Resolved 19 December 1997
Deck/Cargo
Issued 20 November 1997
Resolved
PROVIDE REMOTE SHUTOFF SYSTEM FOR VALVES SUBJECT TO TANK HEAD PRESSURE AT EACH OF SIX (6) LIQUID MUD CARGO TANKS TO THE SATISFACTION OF THE ATTENDINGUSCG MARINE INSPECTOR.
Condition: Unknown
Due 20 November 1997
Resolved 20 November 1997
Documentation
Issued 20 November 1997
Resolved
PROVIDE PROPERLY APPROVED PLANS FOR PROPOSED INSTALLATION OF PNEUMATICALLY CONTROLLED SYSTEM OF REMOTE SHUTDOWN ISOLATION VALVES FOR LIQUID MUD TANKS.
Condition: Unknown
Due 20 November 1997
Resolved 20 November 1997
Deck/Cargo
Issued 20 November 1997
Resolved
PROVIDE EVIDENCE OF APPROVAL BY USCG COMDT G-MOS-3 FOR CARRIAGE OF PROPOSEDLIST OF CHEMICALS INCLUDING QUANTITIES FOR USE IN THE WELL FRACTURING BUSINESS OF THIS VESSEL.
Condition: Unknown
Due 20 November 1997
Resolved 20 November 1997