Records from 1997 to 2011. Most recent: operational control imposed, 19 September 2011.
Inspection history · 24
18 September 2011
Deficiency Check · In-Service Inspection · ISM Exam
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 4148239
18 September 2011
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 4149288
14 September 2011
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 4145032
12 September 2011
ISPS II Exam · PII Safety Exam · Ballast Water Examination · Administrative Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 4143340
1 October 2007
Type not recorded
No type recorded · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 3067293
18 September 2007
NPV Safety Exam · ISPS II Exam
Physical examination · Marine Safety Unit New Bedford · USCG Northeast District (CGD-NE) · Activity 3060324
11 October 2006
Ballast Water Examination · MARPOL Annex V Examination · NPV Safety Exam · ISPS II Exam · MARPOL Annex I Examination
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2797889
6 October 2006
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2795362
17 January 2006
PII Safety Exam · ISPS II Exam
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 2567835
17 March 2005
Deficiency Check
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 2312961
11 November 2004
Type not recorded
No type recorded · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 2239315
10 November 2004
MARPOL Annex I Examination · MARPOL Annex V Examination · Random ISPS/MTSA/PSC · Ballast Water Examination
Physical examination · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 2239026
8 June 2004
MTSA/ISPS Verification · Security Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 2093223
3 June 2004
Annual Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 2088359
29 March 2004
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 2033532
3 July 2003
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1834784
29 April 2003
Annual Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1782862
26 February 2002
Annual Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1488315
9 December 2001
Deficiency Check
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 296187
24 January 2001
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 286584
24 January 2001
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 287596
28 January 2000
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 274259
19 March 1999
Type not recorded
No type recorded · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 426558
24 November 1997
Type not recorded
No type recorded · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 410117
Engineering › Fuel Oil Service System › Piping
Issued 20 September 2011
Resolved
The main source of electrical power shall consist of at least two generating sets. The number 1 and number 2 generators do not function as designed. Vessel will supply report that generators operate at rated load of 435 KW.
Specific Cite: SOLAS 74 (2009 Cons.) II-1/41.1.1
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 September 2011
Resolution: Vessel was attended by class and found to be satisfactory. A class report has been, received attesting to the repairs.
Engineering › Generator (propulsion/auxiliary-electric) › Bus
Issued 18 September 2011
No resolution recorded
VSL has 02 disel generators rated at 435kW each. Both Generators could not achieve 435kW. Deficiency was issued for both Generators to function as designed with an achievable maximum load of 435kW per generator prior to return to the United States after sailing foreign.
Action required: 15 - Rectify deficiencies by next port
Navigation › Collision/Grounding Avoidance › Radar
Issued 11 October 2006
Resolved
THE VESSEL WAS GRANTED A DEVIATION TO ENTER THE PORT FOR A INOPERATIVE STANDARD X BAND RADAR AND AT THE TIME OF THE INSPECTION THE RADAR WAS STILL INOPERATIVE. PROVIDE TECHNICIAN'S REPORT ATTESTING TO THE PROPER OPERATION OF THE RADAR.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 October 2006
Resolution: Received report from Radio Holland: All control are functioning normal. Reset the TX time to zero for new magnetron. The radar is fully operational.
Lifesaving › Lifeboat Equipment › Food Ration
Issued 26 February 2002
Resolved
Insufficient food rations in lifeboat. Vacuum seal had been broken on most/all food rations.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 26 February 2002
Resolution: Vessel ordered more food rations and provided receipt to MSO San Francisco.
Accommodation/Occupational Safety
Issued 24 January 2001
Resolved
MAKE PROPER REPAIRS TO SELF CLOSING DOOR MECHANISMS (3 TOTAL) PRIOR TO RETURN FROM SAILING FOREIGN. SOLAS CH. II-2, REG. 47
Condition: Unknown
Due 10 December 2001
Resolved 10 December 2001
Navigation
Issued 19 March 1999
Resolved
Provide a copy of the U.S. Inland Nav Rules on board vessel.
Condition: Unknown
Due 22 March 1999
Resolved 23 March 1999
Navigation
Issued 19 March 1999
Resolved
Provide a copy of the current tide tables for the U.S.
Condition: Unknown
Due 18 April 1999
Resolved 23 March 1999
Lifesaving
Issued 19 March 1999
Resolved
Provide a hydrostatic release for all life rafts on board. All expired in Jan of 99.
Condition: Unknown
Due 22 March 1999
Resolved 23 March 1999
Accommodation/Occupational Safety
Issued 19 March 1999
Resolved
Provide electrical matting on the deck infront of electrical pannel in the emergency generator room.
Condition: Unknown
Due 22 March 1999
Resolved 23 March 1999