Records from 1999 to 2022. Most recent: inspection, 17 July 2022.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 17
17 July 2022
Type not recorded
No type recorded · Station Buffalo · USCG Great Lakes District (CGD-GL) · Activity 7509209
11 July 2016
Administrative Inspection
Administrative · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 5936835
5 August 2014
DAPI Audit · Annual Inspection · Deficiency Check · Administrative Inspection
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 4944832
8 December 2011
Administrative Inspection
Administrative · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 4204282
6 July 2011
DAPI Audit · Deficiency Check · Annual Inspection
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 4071701
1 April 2008
DAPI Audit · Drydock Exam · Annual Inspection
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 3175108
19 June 2007
Deficiency Check
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 2966955
21 May 2007
COI Inspection
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 2934048
6 June 2006
Annual Inspection · Re-Inspection
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 2673882
8 June 2005
Periodic Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 2434182
28 May 2004
Re-Inspection · Hull Examination
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 2080861
19 June 2003
Annual Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1820570
3 June 2002
COI Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1625488
30 July 2001
Administrative
Administrative · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1069790
18 July 2001
Re-Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1370295
29 June 2000
Re-Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1369754
8 June 1999
Initial Certification · Hull Examination · Plan Review "T" Boat
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1467615
Lifesaving › Lifefloat › Retroreflective Material
Issued 5 August 2014
Resolved
Renew retro tape on life float.
Action required: 705 - Other - as specified
Due 13 August 2014
Resolved 15 August 2014
Resolution: Witnessed satisfactory installation.
Lifesaving › Lifefloat › Paddle
Issued 5 August 2014
Resolved
Provide suitable paddles marked and secured within float.
Action required: 705 - Other - as specified
Due 13 August 2014
Resolved 15 August 2014
Resolution: Witnessed satisfactory installation.
Lifesaving › Lifefloat › Serviceable
Issued 5 August 2014
Resolved
Make repairs to life float IAW manufactures procedures with suitable material.
Action required: 705 - Other - as specified
Due 13 August 2014
Resolved 15 August 2014
Resolution: Witnessed satisfactory repairs. Due to numerous repairs suggested owner consider new installation in near future.
Lifesaving › Lifefloat › Serviceable
Issued 6 July 2011
Resolved
Make proper repairs to cracking on Lifefloat.
Action required: 705 - Other - as specified
Due 20 July 2011
Resolved 20 July 2011
Lifesaving › Lifefloat › Retroreflective Material
Issued 6 July 2011
Resolved
Renew retro tape on Lifefloat.
Action required: 705 - Other - as specified
Due 20 July 2011
Resolved 20 July 2011
Lifesaving › Lifefloat › Floating Electric Waterlight
Issued 6 July 2011
Resolved
Replace waterlight lanyard (18') with UV resistant polyprop. line.
Action required: 705 - Other - as specified
Due 20 July 2011
Resolved 20 July 2011
Lifesaving › Lifefloat › Paddle
Issued 6 July 2011
Resolved
Re-lash paddles to facilitate quick release.
Action required: 705 - Other - as specified
Due 20 July 2011
Resolved 20 July 2011
Engineering › Sea-water System (primary cooling) › Piping
Issued 6 July 2011
Resolved
Tighten fittings on generator strainer housing.
Action required: 705 - Other - as specified
Due 20 July 2011
Resolved 20 July 2011
Construction/Loadline › Hull › Bracket
Issued 6 July 2011
Resolved
Weld bracker on port rudder packing gland support.
Action required: 705 - Other - as specified
Due 20 July 2011
Resolved 20 July 2011
Construction/Loadline › Hull › Bottom Plating
Issued 1 April 2008
Resolved
C/R both the port and starboard side of bottom plating IWO keel, from 5 foot aft of the turn of bow aft to good metal. Inserted plates must rise a minimum of 12 inches from keel and be provided to good metal proven by gauge readings.
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 May 2008
Resolved 7 May 2008
Resolution: New plating inserted from 5 foot from turn of bow to 12 foot rising on both sides 12 inches with gauge reading taken prior to insert fit-up inspection. Completed satisfactory soapy water test on all welds.
Engineering › Bilge Water Management System › Valve
Issued 1 April 2008
Resolved
Install positive shut off valves for all bilge discharge lines and two additional lines installed less than 3 inches from water line.
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 May 2008
Resolved 7 May 2008
Resolution: Ball valves installed for all required lines.
Electrical › Electrical Distribution System (service) › Wiring
Issued 1 April 2008
Resolved
Correct wiring for fff system which runs aft along center line, wire rest on light fixture and unsupported for the entire length.
Action required: 705 - Other - as specified
Due 24 June 2008
Resolved 24 June 2008
Resolution: Wire re-routed away from light and properly supported. Corrected prior to my departure.
Electrical › Lighting (service) › Lighting Fixture
Issued 1 April 2008
Resolved
The installed engine room light fixture must be installed IAW 46 CFR 183.410. Remove screw supported porcelain fixtures and install approved assemblies.
Action required: 705 - Other - as specified
Due 24 July 2008
Resolved 2 June 2009
Resolution: Lights removed from within space.
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 21 May 2007
Resolved
attach lifeline to ring buoy vice grab line of ring buoy within 30 days
Due 21 May 2007
Resolved 21 May 2007
Resolution: corrected prior to the completion of the inspection
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 21 May 2007
Resolved
replace required first aid kit items within 30 days
Due 21 June 2007
Resolved 20 June 2007
Resolution: First aid items replaced appropriately in first-aid kit.
Engineering › Bilge Water Management System › Pump
Issued 6 June 2006
Resolved
Properly secure bilge pumps in forward compartment and in engine room.
Action required: 705 - Other - as specified
Due 6 June 2006
Resolved 6 June 2006
Resolution: Pumps properly mounted within bilge.
Lifesaving › Lifeboat Equipment
Issued 28 May 2004
Resolved
Replace expired battery in EPIRB.
Due 7 June 2004
Resolved 8 June 2004
Fire Fighting › Portable CO2 Fire Extinguisher
Issued 28 May 2004
Resolved
Conduct Hydro test on two B-II extinguishers. LEGACY COMPONENT DESC: Service
Due 7 June 2004
Resolved 8 June 2004
Electrical › Lighting (service)
Issued 28 May 2004
Resolved
Remove/replace solid core electrical wire for engine room lights.
Due 28 June 2004
Resolved 8 June 2004
Engineering › Diesel Engine (propulsion/auxiliary-electric)
Issued 19 June 2003
Resolved
Replace newly installed "Global" flexible fuel lines with flexible fuel lines that meet SAE standard J-1942.
Due 19 July 2003
Resolved 2 July 2003
Navigation › Piloting/Steering › Inland Navigation Rules
Issued 3 June 2002
Resolved
Obtain current inland navigation rules.
Condition: Unknown
Due 30 June 2002
Resolved 5 June 2002
Lifesaving › Hand Flares › Quantity
Issued 3 June 2002
Resolved
Provide 3 orange day smoke flares.
Condition: Unknown
Due 30 June 2002
Resolved 5 June 2002
Engineering › Bilge Water Management System › Strainer
Issued 3 June 2002
Resolved
Clean forward bilge strainer.
Condition: Improper/Lack of Maintenance
Due 30 June 2002
Resolved 5 June 2002
Navigation
Issued 3 June 2002
Resolved
Replace bow mooring lines. LEGACY COMPONENT DESC: Mooring lines
Condition: Unknown
Due 30 June 2002
Resolved 12 June 2002
Construction/Loadline › Structures › Superstructure
Issued 3 June 2002
Resolved
Replace bridge window starboard side using safety glass as required.
Condition: Unknown
Due 30 June 2002
Resolved 5 June 2002
Construction/Loadline › Hull
Issued 3 June 2002
Resolved
Repair glass in starboard port light.
Condition: Unknown
Due 30 June 2002
Resolved 5 June 2002
Documentation › Markings/Placards › Oil Discharge Placard
Issued 3 June 2002
Resolved
Provide oil pollution placard.
Condition: Unknown
Due 30 June 2002
Resolved 5 June 2002
Construction/Loadline › Hull
Issued 3 June 2002
Resolved
Prior to next operating season install a hinged dead light cover on Port Light in accordance with 46 CFR 179.350(b).
Condition: Unknown
Due 1 October 2002
Resolved 19 June 2003
Accommodation/Occupational Safety
Issued 29 June 2000
Resolved
DISABLE OVERBOARD DISCHARGE CAPABILITY OF MARINE SANITATION DEVICE
Condition: Unknown
Due 29 June 2000
Resolved 29 June 2000
Electrical
Issued 29 June 2000
Resolved
INSTALL COVERS ON BATTERIES IN ENGINE ROOM
Condition: Unknown
Due 29 June 2000
Resolved 29 June 2000
Electrical
Issued 29 June 2000
Resolved
repair 2 broken light fixtures (110 volt AC) in engine room
Condition: Unknown
Due 29 June 2000
Resolved 29 June 2000