Records from 1981 to 1993. Most recent: inspection, 15 June 1993.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 23
15 June 1993
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 689558
8 February 1993
Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 828762
26 June 1992
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 47371
12 June 1992
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 957105
12 June 1992
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1268524
15 April 1992
Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 957586
5 April 1991
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1231748
1 April 1991
COI Inspection · Hull Examination
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 927892
30 March 1990
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 909329
20 March 1990
Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 910676
17 April 1989
COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 890167
2 May 1988
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1342984
19 February 1988
Re-Inspection · Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1038106
2 April 1987
COI Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1022380
9 June 1986
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 989116
18 April 1986
Re-Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 988711
12 January 1986
Credit Drydock
Administrative · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 996564
18 April 1985
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 987672
12 April 1985
Credit Drydock
Administrative · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 997808
19 September 1984
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1282242
13 April 1984
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 973575
10 May 1983
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 967481
16 March 1981
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 969081
Engineering
Issued 15 April 1992
Resolved
PROVE PROPER OPERATION TO THE SATISFACTION OF THE ATTENDING COAST GUARD INSPECTOR THE SHIP SERVICE BOILER RELIEF VALVE SETTING. RELIEF VALVE SETTING MUST BE 15 PSI OR LOWER. IF UNABLE TO ACCOMPLISH THIS YOU MUST HAVEBOILER OPENED UP FOR INTERNAL FIRETUBE/WATERSIDE INSPECTION AS REQUIRED.
Condition: Unknown
Due 15 April 1992
Resolved 15 April 1992
Electrical
Issued 15 April 1992
Resolved
UPON COMPLETION OF OVERHAUL TO THE #3 SHIP SERVICE GENERATOR DEMONSTRATE TOTHE SATIFACTION OF THE ATENDING COAST GUARD INSPECTOR THE PROPER OPERATION OF THE OVERSPEED TRIP AND APPROPRIATE SHUTDOWN DEVICES AND ALARMS.
Condition: Unknown
Due 15 April 1992
Resolved 15 April 1992
Unknown
Issued 1 April 1991
Resolved
CONDUCT FIRE AND BOAT DRILL IN THE PRESENCE OF A COAST GUARD MARINE INSPECTOR
Condition: Unknown
Due 1 April 1991
Resolved 1 April 1991
Construction/Loadline
Issued 20 March 1990
Resolved
PAINT LOCKER NEEDS TO BE CONTINUOUSLY WELDED AND EXPLOSION PROOF FIXTURES INSTALLED
Condition: Unknown
Due 20 March 1990
Resolved 20 March 1990
Construction/Loadline
Issued 20 March 1990
Resolved
PROVIDE BEWARE OF TAIL ROTOR SIGN FOR HELO DECK.
Condition: Unknown
Due 20 March 1990
Resolved 20 March 1990
Construction/Loadline
Issued 20 March 1990
Resolved
PAINT OUTSIDE EDGE (12") OF HELO DECK WITH CONTRASTING COLOR.
Condition: Unknown
Due 20 March 1990
Resolved 20 March 1990
Electrical
Issued 20 March 1990
Resolved
MAKE STARBOARD GENERATOR EXHAUST FAN OPERATIONAL.
Condition: Unknown
Due 20 March 1990
Resolved 20 March 1990
Accommodation/Occupational Safety
Issued 17 April 1989
Resolved
MAKE AVAILABLE FOR COAST GUARD INSPECTION THE FIRESIDES AND WATERSIDES OF THE WAY-WOLFF LOW PRESSURE STEAM BOILER.
Condition: Unknown
Due 17 April 1989
Resolved 17 April 1989
Engineering
Issued 17 April 1989
Resolved
MAKE PERMANENT REPAIRS TO THE LOW LUBE OIL ALARM/SHUT-DOWN ON THE EMERGENCYDIESEL GENERATOR.
Condition: Unknown
Due 17 April 1989
Resolved 17 April 1989
Engineering
Issued 17 April 1989
Resolved
INSTALL A REMOTE SHUT-OFF VALVE FOR THE SUCTION LINE FROM THE DIESEL FUEL DAY TANK TO THE EMERGENCY DIESEL GENERATOR.
Condition: Unknown
Due 17 April 1989
Resolved 17 April 1989
Lifesaving
Issued 2 April 1987
Resolved
PRIOR TO GETTING UNDERWAY. CONDUCT FIRE AND BOAT DRILL IN THE PRESENCE OF COAST GUARD MARINE INSPECTORS.
Condition: Unknown
Due 2 April 1987
Resolved 2 April 1987