Records from 2007 to 2025. Most recent: inspection, 7 July 2025.
11 - Life Saving Appliances › N/A - No Subsystem › Buoyant apparatus
Issued 3 September 2024
Resolved
Each buoyant apparatus must have a life line securely attached around the outside, festooned in bights no longer than 1 m (3 ft.), with a seine float in each bight, unless the line is of an inherently buoyant material and absorbs little or no water. The life line must be at least 10 mm (3/8 in.) diameter and have a breaking strength of at least 5400 N (1215 lb.). Vessel's installed buoyant apparatus' have worn and broken life lines.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 September 2024
Resolved 16 September 2024
Resolution: Life lines renewed.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 3 September 2024
Resolved
Provisions shall be made by means of plugs, covers, etc., to prevent the admission of air into a CO2 protected space. Vessel's engine room ventilation ducts along bulwarks do not have a means of closure.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 September 2024
Resolved 27 September 2024
Resolution: New engineroom ventilation covers provided.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 3 September 2024
Resolved
The following shall be verified by competent personnel at least annually using available documentation required in 4.4.2.14:
(1) Check and test the carbon dioxide system for operation.
(2)Check that there have been no changes to the size, type, and configuration of the hazard and system.
Vessel did not have record of annual servicing for 2024.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 September 2024
Resolved 4 September 2024
Resolution: Received tech report.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 3 September 2024
Resolved
Each natch exposed to the weather must be a watertight, except that the following hatches may be weather tight: 1) each hatch on a watertight trunk that extends at least 12 inches above the weather deck. Vessels hatch opening to lazarette is not watertight. Provide repair proposal to meet CFR requirements for hatch openings.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 September 2024
Resolved 16 September 2024
Resolution: Hatch made water tight.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 3 September 2024
Resolved
Each survival craft must be: Stowed so that when the vessel sinks the survival craft floats free. Vessel had Starlink antenna mounted to survival craft stowage piping which prevented a float free arrangement.
Action required: 10 - Deficiency Rectified
Due 3 September 2024
Resolved 3 September 2024
Resolution: Antenna removed during the course of the inspection. Deficiency entered for documentation purposes only.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 19 September 2023
Resolved
A fixed gas fire extinguishing system, which is capable of automatic discharge upon heat detection, may only be installed in a normally unoccupied space.
Installed fixed gas extinguishing system in engine room not capable of automatic discharge upon heat detection as designed.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 21 September 2023
Resolution: MI verified verified fixed extinguishing system now capable of automatic discharge.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance and inspections
Issued 19 September 2023
Resolved
For a life float—Approved under approval series 160.027 or other standard specified by the Commandant.
Vessel life float does not have a placard stating approval under 160.027.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 October 2023
Resolved 26 September 2023
Resolution: MI verified life floats in serviceable condition.
14 - Pollution Prevention › 144 - MARPOL Annex IV (Not Applicable to PSC Exams conducted in the U.S.) › Other (MARPOL Annex IV)
Issued 19 September 2023
Resolved
No person may operate any vessel equipped with installed toilet facilities unless it is equipped with padlocking the seacock in the closed position. MI observed sea cock not properly secured/locked.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 October 2023
Resolved 21 September 2023
Resolution: MI verified vessel overboard valve now locked.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 19 September 2023
Resolved
The number of penetrations in a watertight bulkhead must be minimized. A penetration in a watertight bulkhead must be as high and as far inboard in the bulkhead as practicable, and made watertight.
Hole in engine room watertight bulkhead contains wiring that is not watertight.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 October 2023
Resolved 21 September 2023
Resolution: MI attested to proper rectification of bulkhead penetrations.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 19 September 2023
Resolved
All escape hatches and other emergency exits used as means of escape must be marked on both sides in clearly legible letters at least 50 millimeters (2 inches) high: “EMERGENCY EXIT, KEEP CLEAR."
Forward escape hatch from berthing area not marked on both sides.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 October 2023
Resolved 21 September 2023
Resolution: MI attested to proper signage.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 23 June 2022
Resolved
During the examination all accessible parts of the vessel's underwater body and all through hull fittings, including the hull plating and planking, appendages, propellers, shafts, bearings, rudders, sea chests, sea valves, and sea strainers shall be made available for examination. During examination, rot was found throughout engine room. Provide repair proposal to include scraping, treating and/or replacement of effected areas. Upon approval of proposal complete repairs to the satisfaction of the attending USCG marine inspector.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 July 2022
Resolved 29 September 2022
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 12 July 2021
Resolved
46 CFR 180.71 (e) "Each life jacket carried on board the vessel must be marked in accordance with § 185.604 of this chapter."
MI identified 10 adult life jackets in need of new reflective material
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 July 2021
Resolved 6 June 2022
Resolution: Owner placed new reflected tape on 10 life jackets.
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 12 July 2021
Resolved
46 CFR 180.68: Oceans, coastwise, limited coastwise, and Great Lakes routes. A vessel on an oceans, coastwise, limited coastwise, or Great Lakes route must carry -
(1) Six hand red flare distress signals approved in accordance with § 160.021 in subchapter Q of this chapter, and (2) Six hand orange smoke distress signals approved in accordance with § 160.037 in subchapter Q of this chapter, or other standard specified by the Commandant.
[name withheld] missing flares.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 July 2021
Resolved 6 June 2022
Resolution: Vessel showed all required flares.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 12 July 2021
Resolved
46 CFR 185.606 Escape hatches and emergency exits.
All escape hatches and other emergency exits used as means of escape must be marked on both sides in clearly legible letters at least 50 millimeters (2 inches) high: “EMERGENCY EXIT, KEEP CLEAR”, unless such markings are deemed unnecessary by the cognizant [name withheld] id and required vsl owner to label emergency escape hatch with the lettering "Emergency Exit/Keep Clear".
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 July 2021
Resolved 4 January 2022
Resolution: Emergency escape hatch has been labeled with Emergency Exit sign.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 23 July 2020
Resolved
Make through hull valves available for inspection.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 July 2020
Resolution: Vessel made valves available.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 23 July 2020
Resolved
Remove combustible rubbish containers from accomodation spaces.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 August 2020
Resolution: Vessel replaced rubbish containers with metal ones.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 15 July 2020
Resolved
Engine room batteries have wing nuts connecting leads to the terminals. Vessel needs to remove wing nuts and provide permanent type of fastener.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 July 2020
Resolved 17 July 2020
Resolution: Removed wing nuts and installed permanent fastener (nut with nylon).
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 15 July 2020
Resolved
Watertight bulkheads are not water or vapor tight. piping and cables passing through the bulkhead have air gaps around them. Air gaps around these cables and popping need to be sealed to provide water and vapor tight of that space.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 July 2020
Resolved 29 July 2020
Resolution: All airgaps around cabbies and piping have been filled. Along with all other holes from old wiring and or removed hardware that penetrated the bulkhead to support brackets.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 15 July 2020
Resolved
Life ring does not have adequate marking on it. Marking are faded and not visible. Provide vessel's name on life rings.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 July 2020
Resolved 17 July 2020
Resolution: Vessel provided legible lettering stating vessel's name on the life ring.
11 - Life Saving Appliances › N/A - No Subsystem › Rigid liferafts
Issued 15 July 2020
Resolved
Life rafts are missing person count and vessel's name. Vessel needs to provide correct markings person capacity for each life raft and provide the vessel's name.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 July 2020
Resolved 17 July 2020
Resolution: Vessel proved and provided markings of passenger count and vessels name on its life rafts
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 11 May 2020
Resolved
Due to COVID-19 circumstances beyond the control of the vessel, the vessel is unable to meet the time frame required by 46 CFR 176.600(c)(1). Vessel is allowed 90 days to continue operations in accordance with the COI, and is required to make itself available for inspection prior to 09AUG2020.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 9 August 2020
Resolved 15 July 2020
Resolution: Conducted COI renewal
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 17 May 2018
Resolved
Renew bow deck rails starting at super structure going forward.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 June 2018
Resolved 10 August 2020
Resolution: Vessel renewed and reinstalled bow rail.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 17 May 2018
Resolved
Conduct post credit dry dock checkride.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Due 26 June 2018
Resolved 5 August 2020
Resolution: Vessel conducted post drydock checkride.
01 - Certificates & Documentation › 011 - Ships Certificates › USCG Certificate of Documentation (COD)
Issued 17 May 2018
Resolved
Provide current COD.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Due 12 June 2018
Resolved 28 July 2020
Resolution: Vessel provided current COD.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 17 May 2018
Resolved
Conduct overdue annual inspection.
Action required: 701 - Prior to carriage of passengers/cargo
Due 26 June 2018
Resolved 28 July 2020
Resolution: Inspection conducted.
Lifesaving › Lifefloat › Painter
Issued 27 February 2018
Resolved
Painter not installed properly
Action required: 701 - Prior to carriage of passengers/cargo
Due 5 March 2018
Resolved 2 March 2018
Resolution: Installed properly
Lifesaving › Lifefloat › Floating Electric Waterlight
Issued 27 February 2018
Resolved
Not installed properly
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 2 March 2018
Resolution: Installed properly
Engineering › Bilge Water Management System › Valve
Issued 27 February 2018
Resolved
Install one way non return valve on discharge hose
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 2 March 2018
Resolution: Installed
Documentation › Certificates/Documents › Certificate of Inspection
Issued 13 December 2017
Resolved
Conduct Annual Inspection
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 March 2018
Resolved 2 March 2018
Engineering › Bilge Water Management System › Pump
Issued 6 July 2016
Resolved
Provide line diagrams of bilge piping and pumping arrangement as well as all associated wiring.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 6 August 2016
Resolved 3 August 2016
Resolution: Provided diagram of bilge pump central control system; approval letter uploaded.
Stability › Watertight Integrity › General
Issued 15 June 2016
Resolved
Prove operation of hull penetration shutoff valve for mask cleaning water pump suction in lazarette.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 16 July 2016
Resolved 18 October 2016
Resolution: Replace valve with new operational valve.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 15 June 2016
Resolved
Install masthead light with proper arc of visibility.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 16 July 2016
Resolved 18 August 2016
Resolution: Masthead light installed w/ proper arc of visibility.
Engineering › Bilge Water Management System › Pump
Issued 15 June 2016
Resolved
Install means to centrally control individual bilge pumps with visual indication
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 16 July 2016
Resolved 18 August 2016
Resolution: Central control properly installed.
Electrical › Electrical Distribution System (service) › Wiring
Issued 15 June 2016
Resolved
Install UL listed boat or marine wiring in place of extension cord in aft bunk room
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 16 July 2016
Resolved 18 August 2016
Resolution: Proper marine wiring installed.
Engineering › Bilge Water Management System › Hose
Issued 15 June 2016
Resolved
Repair bilge discharge hoses in lazarette currently showing temporary duck tape patches.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 16 July 2016
Resolved 18 August 2016
Resolution: New hose installed.
Engineering › Bilge Water Management System › Valve
Issued 15 June 2016
Resolved
Install shutoff valves on bilge hose discharge shell penetrations.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 16 July 2016
Resolved 18 August 2016
Resolution: Shutoffs installed in accessible locations.
Stability › Watertight Integrity › General
Issued 15 June 2016
Resolved
Remove and plug deck penetrations in lazarette overhead.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 16 July 2016
Resolved 18 August 2016
Resolution: Penetration plugged.
Stability › Weathertight Integrity › General
Issued 15 June 2016
Resolved
Repair port lights in main cabin.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 22 July 2016
Resolved 18 August 2016
Resolution: Port lights repaired.
Electrical › Electrical Distribution System (service) › Wiring
Issued 15 June 2016
Resolved
Remove dead-end wires in lazarette and pilot house console.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 16 July 2016
Resolved 18 August 2016
Resolution: Dead-end wiring removed.
Documentation › Logs/Records › Logbook (official)
Issued 15 June 2016
Resolved
Provide proof of passenger count embark & disembark in ship's log.
Condition: Invalid
Action required: 705 - Other - as specified
Due 16 July 2016
Resolved 18 August 2016
Resolution: Proper logs kept.
Operations/Management › Equipment Service/Testing › EPIRB
Issued 15 June 2016
Resolved
Provide proof of NOAA EPIRB registration
Condition: Invalid
Action required: 705 - Other - as specified
Due 16 July 2016
Resolved 18 August 2016
Resolution: Registration proved.
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 15 June 2016
Resolved
Provide proper storage of child size lifevests, segregated from adult size.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 16 July 2016
Resolved 18 August 2016
Resolution: Life vest stowage in compliance.
Documentation › Markings/Placards › Lifejacket Placard
Issued 15 June 2016
Resolved
Provide donning instructions placard for all types of life vests used onboard.
Condition: Invalid
Action required: 705 - Other - as specified
Due 16 July 2016
Resolved 18 August 2016
Resolution: Placard displayed for all lifevest types.
Navigation › Piloting/Steering › Magnetic Compass
Issued 15 June 2016
Resolved
Prove proper operation of compass light.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 16 July 2016
Resolved 18 August 2016
Resolution: Light installed.
Engineering › Fuel Oil Service System › Valve
Issued 15 June 2016
Resolved
Repair flame shielding for emergency fuel shut off valve handles.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 16 July 2016
Resolved 18 October 2016
Resolution: Flame shielding repaired.
Engineering › Fuel Oil Service System › Valve
Issued 15 June 2016
Resolved
Prove proper operation of stbd middle and port forward fuel shut off valves remotely.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 16 July 2016
Resolved 18 October 2016
Resolution: Repaired reach Rods. All fuel shut-off valve work as designed.
Electrical › Electrical Distribution System (service) › Wiring
Issued 15 June 2016
Resolved
Remove wire nuts and properly connect wires in engine room: port/outboard of port genset, bilge pump wires in fwd engine room and aft cabin, and in ceiling of engine room above port genset. No wire nuts to be used onboard.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 16 July 2016
Resolved 18 October 2016
Resolution: All wire nuts were replaced throughout engine room and aft cabin.
Electrical › Electric Generation Source (service) › Switch
Issued 15 June 2016
Resolved
Prove gensets cannot simultaneously supply power to power panel.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 16 July 2016
Resolved 18 August 2016
Resolution: Toggle bar installed to ensure proper configuration of power supply.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 15 June 2016
Resolved
Install machinery guards on spinning belts on gensets.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 16 July 2016
Resolved 18 October 2016
Resolution: Machinery guards were put in place.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 15 June 2016
Resolved
Make fwd bulkhead of engine room watertight.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 16 July 2016
Resolved 18 August 2016
Resolution: Fwd bulkhead made watertight.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 15 June 2016
Resolved
Install metallic penetrations with valves for hose penetration of forward bulkhead of engine room.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 16 July 2016
Resolved 18 August 2016
Resolution: Metallic valves installed at bkhd penetration.
Engineering › Bilge Water Management System › Interface Detector
Issued 15 June 2016
Resolved
Remove all oil and water from engine room bilge.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 16 July 2016
Resolved 18 August 2016
Resolution: Water & oil removed.
Electrical › Lighting (service) › Lighting Fixture
Issued 15 June 2016
Resolved
Repair light fixture housing in engine room.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 16 July 2016
Resolved 18 August 2016
Resolution: Light fixture repaired.
Fire Fighting › Fixed Fire Detection System › Smoke Detectors
Issued 15 June 2016
Resolved
Provide operational smoke detector in passenger compartment.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 June 2016
Resolved 15 June 2016
Resolution: Replaced w/ new detector.
Navigation › Piloting/Steering › Marine Charts
Issued 15 June 2016
Resolved
Provide updated charts onboard.
Condition: Invalid
Action required: 705 - Other - as specified
Due 15 June 2016
Resolved 15 June 2016
Resolution: New charts provided onboard.
Navigation › Piloting/Steering › US Coast Pilot
Issued 15 June 2016
Resolved
Provide current Coast Pilot onboard.
Condition: Invalid
Action required: 705 - Other - as specified
Due 15 June 2016
Resolved 15 June 2016
Resolution: Coast Pilot provided onboard.
Navigation › Piloting/Steering › Tide/Tidal Current Tables
Issued 15 June 2016
Resolved
Provide current tide/current tables onboard.
Condition: Invalid
Action required: 705 - Other - as specified
Due 15 June 2016
Resolved 15 June 2016
Resolution: Current tide/current tables provided.
Navigation › Piloting/Steering › Coast Guard Light List
Issued 15 June 2016
Resolved
Provide current light list onboard.
Condition: Invalid
Action required: 705 - Other - as specified
Due 15 June 2016
Resolved 15 June 2016
Resolution: Light list provided onboard.
Lifesaving › Lifefloat › Floating Electric Waterlight
Issued 15 June 2016
Resolved
Replace dead batteries in 3 floating electric waterlights.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 June 2016
Resolved 15 June 2016
Resolution: Batteries replaced.
Lifesaving › Lifefloat › Serviceable
Issued 15 June 2016
Resolved
Remove excess unserviceable life float.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 June 2016
Resolved 15 June 2016
Resolution: Unserviceable life float removed.
Lifesaving › Lifejacket/PFD (Type II) › Quantity
Issued 15 June 2016
Resolved
Remove or properly mark/segregate improper PFD types found aboard.
Condition: Invalid
Action required: 705 - Other - as specified
Due 15 June 2016
Resolved 15 June 2016
Resolution: Improper PFD types removed.
Lifesaving › Lifefloat › Float Free
Issued 15 June 2016
Resolved
Life floats tethered to vessel in manner preventing automatic float-free. Tether between life floats too short. Painter clipped to life float grabline.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 15 June 2016
Resolved 15 June 2016
Resolution: Short tether removed to all proper float free operation. Line between life floats lengthened. Painter spliced around life float body.
Lifesaving › Lifejacket/PFD (General) › Lights
Issued 15 June 2016
Resolved
Multiple lights inoperable on PFDs.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 June 2016
Resolved 15 June 2016
Resolution: Lights replaced with new, fully charged lights.
Engineering › Bilge Water Management System › Pump
Issued 15 June 2016
Resolved
Rewire electric submerged pump system to provide centralized control of all required pumps.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 6 August 2016
Resolved 18 August 2016
Resolution: Centralized control provided.
Construction/Loadline › Hull › Hull Plating
Issued 8 June 2016
Resolved
Remove and treat wood rot as marked in the anchor locker, port deck amidships, compressor room, engine room, and lazarette.
Action required: 705 - Other - as specified
Due 8 July 2016
Resolved 7 July 2016