Records from 1985 to 2018. Most recent: inspection, 10 August 2018.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 50
10 August 2018
Administrative Inspection
Administrative · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 6507026
6 December 2017
Hull Examination · Internal Structural Exam
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 6313191
19 June 2017
Annual Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 6180152
27 June 2016
Annual Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 5908554
18 November 2015
Hull Examination · Deficiency Check · Internal Structural Exam
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 5765748
4 August 2014
Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 4943472
22 February 2012
Administrative Inspection · Deficiency Check · Hull Examination · Examination of Repairs · Internal Structural Exam
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 4248705
29 July 2009
Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 3568414
11 August 2008
Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 3295579
29 February 2008
Examination of Repairs · Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 3156034
19 December 2007
Administrative Inspection
Administrative · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 3118112
3 July 2007
Administrative Inspection
Administrative · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 2982092
29 May 2007
Deficiency Check · Hull Examination · Internal Structural Exam
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 2944526
26 June 2006
Annual Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 2691767
4 May 2005
COI Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 2348914
2 May 2005
Hull Examination · Internal Structural Exam
Physical examination · MSFO LONG ISLAND · USCG Northeast District (CGD-NE) · Activity 2331902
1 July 2004
Annual Inspection
Physical examination · MSFO LONG ISLAND · USCG Northeast District (CGD-NE) · Activity 2109517
8 April 2003
MARPOL Annex V Examination · Annual Inspection
Physical examination · MSFO LONG ISLAND · USCG Northeast District (CGD-NE) · Activity 1769453
1 April 2003
Internal Structural Exam · Hull Examination
Physical examination · MSFO LONG ISLAND · USCG Northeast District (CGD-NE) · Activity 1764333
5 April 2002
Re-Inspection · MARPOL Annex V Examination
Physical examination · MSFO LONG ISLAND · USCG Northeast District (CGD-NE) · Activity 1601413
7 May 2001
Re-Inspection · MARPOL Annex V Examination
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1471044
19 April 2001
Hull Examination
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1412307
3 April 2000
MARPOL Annex V Examination · COI Inspection · Deficiency Check
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1421829
7 February 2000
Deficiency Check
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 815228
29 April 1999
Re-Inspection · Hull Examination · MARPOL Annex V Examination
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1442819
11 May 1998
MARPOL Annex V Examination · Re-Inspection
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 791180
15 May 1997
COI Inspection · Deficiency Check · MARPOL Annex V Examination
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 782308
1 April 1997
Deficiency Check · Hull Examination
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1364467
17 July 1996
MARPOL Annex V Examination · Deficiency Check · Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1090085
8 May 1996
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1421127
19 May 1995
Re-Inspection · MARPOL Annex V Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1189075
20 May 1994
COI Inspection · MARPOL Annex V Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1180891
21 March 1994
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1166563
29 June 1993
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1157741
4 August 1992
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1263960
7 March 1992
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 954931
21 May 1991
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1249160
20 March 1991
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1249723
21 May 1990
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1242413
1 March 1990
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1225401
8 May 1989
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1207270
17 November 1988
Hull Examination · Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1207103
19 May 1988
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1043506
14 March 1988
Deficiency Check · Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1351761
19 May 1987
Hull Examination · Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1029885
22 May 1986
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1300079
23 December 1985
Credit Drydock
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 997192
22 May 1985
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1288664
22 May 1985
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1288826
17 April 1985
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1289440
Communications › Alarms/Indicators › Bilge Alarm
Issued 27 June 2016
Resolved
Provide visual alert for engine room bilge alarm.
Due 11 July 2016
Resolved 30 June 2016
Construction/Loadline › Hull › Hull Plating
Issued 27 June 2016
Resolved
Possible pin hole leak in forepeak (stbd side). Haul to determine if leak is from plate, and provide repair proposal.
Due 6 July 2016
Resolved 30 June 2016
Resolution: There was a pin hole leak, and found wasted metal. Hull was cropped to good metal, and new plate fit in.
Lifesaving › Lifefloat › Floating Electric Waterlight
Issued 4 August 2014
Resolved
Line attached to waterlight must be at least 18'. 46 CFR 180.175
Due 11 August 2014
Resolved 6 August 2014
Navigation › Piloting/Steering › Magnetic Compass
Issued 4 August 2014
Resolved
Provide light for compass. Restricted to daylight operations.
Action required: 705 - Other - as specified
Due 11 August 2014
Resolved 6 August 2014
Construction/Loadline › Hull › Hull Plating
Issued 22 February 2012
Resolved
Conduct gauging of bottom plating and provide results to attending marine inspector. Provide a copy of the past report for comparison.
Action required: 705 - Other - as specified
Due 10 April 2012
Resolved 7 March 2012
Resolution: RPT provided.
Construction/Loadline › Hull › Transverse Frame
Issued 22 February 2012
Resolved
Replace transverse deep web in collision compartment.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 7 March 2012
Resolution: Frame inserted.
Construction/Loadline › Hull › Longitudinal Frame
Issued 22 February 2012
Resolved
Replace wasted longitudinal frames in collision compartment.
Action required: 705 - Other - as specified
Resolved 7 March 2012
Resolution: Frames renewed/inserted.
Construction/Loadline › Hull › Keel
Issued 22 February 2012
Resolved
Replace wasted sections of center verticle keel plate at both ends of compartment #2 from bhds to at least next frame from bhds. C&R to good metal and replace.
Action required: 705 - Other - as specified
Resolved 7 March 2012
Resolution: Completed.
Construction/Loadline › Hull › Longitudinal Frame
Issued 22 February 2012
Resolved
#3 compartment (fuel tank space) C&R to good metal 2nd &3rd stbd bottom frames from keel plus 2nd port bottm frame from keel.
Action required: 705 - Other - as specified
Resolved 7 March 2012
Resolution: Completed.
Engineering › Fuel Oil Storage/Transfer System › Vent Pipe
Issued 22 February 2012
Resolved
C&R wasted section of fuel tank vent pipe IWO deck penetration.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 7 March 2012
Resolution: Fill pipe replaced in kind.
Engineering › Fuel Oil Storage/Transfer System › Vent Pipe
Issued 22 February 2012
Resolved
Replace flame screen for fuel tank vent pipe.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 7 March 2012
Resolution: 30X30 mesh screen replaced.
Construction/Loadline › Hull › Longitudinal Frame
Issued 22 February 2012
Resolved
Engine Room: C&R stbd bottom longitudinal frame 1st inboard from chine & stbd side shell below air vent.
Action required: 705 - Other - as specified
Resolved 7 March 2012
Resolution: Completed.
Operations/Management › Bilge/Bilge System Management › Control of Oil Mixtures
Issued 22 February 2012
Resolved
Remove all oily waste & accumulated sludge from engine room bilges. Scrub it clean to expose the interior of the bottom plates and frames.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 7 March 2012
Resolution: Engine room bilge cleaned of slops.
Construction/Loadline › Hull › Keel
Issued 22 February 2012
Resolved
#5 compartment: C&R vertical keel plate. Minimum reach between transverse web frames.
Action required: 705 - Other - as specified
Resolved 7 March 2012
Resolution: Keel plate renewed from shell plate up.
Construction/Loadline › Hull › Longitudinal Frame
Issued 22 February 2012
Resolved
#5 compartment: C&R wated bottom frames
Action required: 705 - Other - as specified
Resolved 7 March 2012
Resolution: Two frames inseted below hatch & vents
Construction/Loadline › Structures › Superstructure
Issued 22 February 2012
Resolved
Joint between aluminum superstructure and steel hull is deteriorated and efforts to arrest the deterioration are not effective. Provide a plan to repair the joint at the next the next drydocking. Plan due NLT 1 October 2012.
Action required: 705 - Other - as specified
Due 1 October 2012
Resolved 18 November 2015
Resolution: Vessel has completed repairs to arrest corrosion b/t the disimilar metals.
Construction/Loadline › Structures › Superstructure
Issued 22 February 2012
Resolved
Replace broken pilothouse window.
Action required: 705 - Other - as specified
Resolved 7 March 2012
Resolution: Replaced w/ safety glass.
Communications › Alarms/Indicators › Bilge Alarm
Issued 29 July 2009
Resolved
Test bilge high water alarm.
Due 28 August 2009
Resolved 24 August 2009
Resolution: Tested & found sat. Power switches all re labeled.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 29 July 2009
Resolved
Demonstrate proper operation of all lighting.
Due 28 August 2009
Resolved 24 August 2009
Engineering › Bilge Water Management System › Manifold
Issued 29 July 2009
Resolved
Prove operation of bilge pumping system.
Due 28 August 2009
Resolved 24 August 2009
Resolution: Tested and found satisfactory.
Accommodation/Occupational Safety › Ventilation › General
Issued 29 July 2009
Resolved
Replace damaged machine space vent cowls.
Action required: 705 - Other - as specified
Due 28 August 2009
Resolved 24 August 2009
Resolution: New pipe cowls fitted.
Operations/Management › Bilge/Bilge System Management › Control of Oil Mixtures
Issued 29 July 2009
Resolved
Engine room bilge has excess oil. The drip pan for the port shaft tube gland seal is full of oily water mixture.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 28 August 2009
Resolved 24 August 2009
Resolution: Bilge cleaned but this has been a repeat problem and needs more monitoring.
Construction/Loadline › Hull › Sheerstrake
Issued 29 July 2009
Resolved
Replace worn sections of rubrails at next drydocking.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 30 April 2010
Resolved 19 April 2010
Resolution: Schedule 80 split pipe fitted to stbd rub rail from transom to forward house access door.
Electrical › Lighting (service) › Lighting Fixture
Issued 11 August 2008
Resolved
Repair deck lighting. Globes and fixtures damaged by cargo operations. Worst of fixtures replaced during exam. Remaining fixtures temporarily repaired and made serviceable. Operator ordered new fixtures to replace remaining temp repaired fixtures. 8.26.08; New fixtures aboard but not installed yet.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 30 August 2008
Resolved 20 November 2008
Resolution: Repaired at an earlier unknown date.
Construction/Loadline › Structures › Deck Plating
Issued 11 August 2008
Resolved
Reweld midship deck house overhead & complete closure of accessway in overhead used to sevice engines via lifting equipment. Accessway bolted but gasket not fitted and several bolts missing.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 30 August 2008
Resolved 20 November 2008
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 11 August 2008
Resolved
Replace broken window glass. 8.26.08; New glass aboard but not installed yet. Glass renewed but when examined 11.20.08 found additional glass damage done by cargo handlers loading the vessel. Vessel in winter lay-up and will be fixed prior to next operating season.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 15 April 2009
Resolved 28 November 2008
Engineering › Diesel Engine (propulsion-reduction gear) › Piston
Issued 11 August 2008
Resolved
Port & Stbd MDE's R&R with complete overhauls after excessive internal damaged caused by a crewmember mixing up the location of the cooling water & lube oil fill pipes. Antifreeze / water mix was poured into the lube oil sumps and engines were operated w/ inadequate & contaminated oil. repair conducted by operator prior to this inspection.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 11 August 2008
Resolved 11 August 2008
Resolution: Examined engine installation & witnessed operation. Found satisfactory.
Operations/Management › Bilge/Bilge System Management › Control of Oil Mixtures
Issued 11 August 2008
Resolved
Clean oily waste & antifreeze from machine space bilge.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 22 August 2008
Resolved 26 August 2008
Resolution: Cleaned.
Operations/Management › Bilge/Bilge System Management › Control of Excess Water
Issued 11 August 2008
Resolved
Remove debris from bilges // welding rods, old exhaust pipe insullation, & dirt.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 August 2008
Resolved 11 August 2008
Resolution: Cleaned date of inspection.
Construction/Loadline › Structures › Manhole
Issued 11 August 2008
Resolved
Provide securing chain or cable for deck access hatches. Repair hinge securing strap on fwd hatch.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 22 August 2008
Resolved 26 August 2008
Resolution: All replaced and/or repaired.
Construction/Loadline › Structures › Door
Issued 11 August 2008
Resolved
Repair loose guard over slide track for fwd stbd sliding door for cabin access.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 30 August 2008
Resolved 20 November 2008
Lifesaving › Buoyant Apparatus › Serviceable
Issued 11 August 2008
Resolved
Repair small puncture hole in plastic floatation foam of B/A.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 30 September 2008
Resolved 30 September 2008
Construction/Loadline › Penetrations › Pipe Flange
Issued 29 February 2008
Resolved
Repair P & S MDE exhaust pipe penetrations through transom.
Action required: 705 - Other - as specified
Due 31 March 2008
Resolved 4 April 2008
Resolution: Replaced mufflers and exhaust piping for P & S MDE from flange aft of fwd bhd of aft compt through transom.
Construction/Loadline › Hull › Hull Plating
Issued 29 February 2008
Resolved
Repair holed section of port stern qtr about 6" below gunnel.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 31 March 2008
Resolved 4 April 2008
Resolution: Repaired sat.
Construction/Loadline › Hull › Hull Plating
Issued 29 February 2008
Resolved
Crop & renew wasted shell plate on transom.
Action required: 705 - Other - as specified
Due 31 March 2008
Resolved 4 April 2008
Resolution: Middle half height wise of transom replated w/ 1/4" plate IWO both exhaust pipe penetrations.
Engineering › Diesel Engine (propulsion-reduction gear) › Silencer (exhaust)
Issued 29 February 2008
Resolved
Renew wasted P & S MDE exhaust silencer & associated wasted piping in aft compt.
Action required: 705 - Other - as specified
Due 31 March 2008
Resolved 4 April 2008
Resolution: Renewed from flange at fwd bhd of aft compt to transom. Dry exhaust penetration of transom raised 1'''' higher after reconfiguration of mufflers to move piping above waterline to keep piping dry.
Engineering › Shafting/Propeller Arrangements › Propeller (fixed pitch)
Issued 29 February 2008
Resolved
Repair or replace both props.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 31 March 2008
Resolved 4 April 2008
Resolution: Both props reconditioned sat.
Engineering › Shafting/Propeller Arrangements › Strut Bearing
Issued 29 February 2008
Resolved
Strut bearing worn P & S.
Action required: 705 - Other - as specified
Due 4 April 2008
Resolved 4 April 2008
Resolution: R & R.
Engineering › Shafting/Propeller Arrangements › Stern Tube Bearing
Issued 29 February 2008
Resolved
Stbd shaft tube bearing.
Action required: 705 - Other - as specified
Due 4 April 2008
Resolved 4 April 2008
Resolution: Bearing renewed w/ tube.
Engineering › Shafting/Propeller Arrangements › Stern Tube
Issued 29 February 2008
Resolved
Make permanent repair to Stbd Shaft tube.
Action required: 705 - Other - as specified
Due 4 April 2008
Resolved 4 April 2008
Resolution: Stbd shaft tube and associated bottom plating Cropped & Renewed in kind.
Construction/Loadline › Structures › Deck Plating
Issued 29 May 2007
Resolved
C&R wasted frames & decking in forepeak.
Condition: Improper/Lack of Maintenance
Due 1 July 2007
Resolved 18 June 2007
Engineering › Shafting/Propeller Arrangements › Stern Tube
Issued 29 May 2007
Resolved
CORRECTED BY OWNER PRIOR TO EXAM: Stbd stern tube R&R.
Condition: Improper/Lack of Maintenance
Due 29 May 2007
Resolved 29 May 2007
Lifesaving › Lifebuoys › Serviceable
Issued 1 July 2004
Resolved
Replace ringbouy and stencil new name.
Due 13 July 2004
Resolved 15 July 2004
Lifesaving › Buoyant Apparatus › Floating Electric Waterlight
Issued 1 July 2004
Resolved
Re-stencil bouyant apparatus and mount waterlight.
Due 13 July 2004
Resolved 15 July 2004
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 1 July 2004
Resolved
Provide safety rails aft prior to operating.
Due 23 July 2004
Resolved 8 September 2004
Documentation › Logs/Records › Logbook/Record (unofficial)
Issued 1 July 2004
Resolved
Provide new logs for trash, drills, radio, etc..
Due 13 July 2004
Resolved 15 July 2004
Documentation › Manuals/Policy Documentation › Emergency Instructions
Issued 1 July 2004
Resolved
Provide emergency instruction list.
Due 13 July 2004
Resolved 15 July 2004
Operations/Management › Drills/Instruction
Issued 8 April 2003
Resolved
Drills not conducted due to weather. Conduct drills with crew prior to operation. Conduct drills for CG LEGACY COMPONENT DESC: Fire
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 19 May 2003
Resolved 19 May 2003
Accommodation/Occupational Safety › Medical/First Aid
Issued 5 April 2002
Resolved
First Aid Kit missing/expired items. LEGACY COMPONENT DESC: Medicine Chest
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 5 May 2002
Resolved 13 April 2002
Resolution: Received ltr from Captain, item corrected.
Navigation › Collision/Grounding Avoidance
Issued 5 April 2002
Resolved
Stern light inop. Repair/renew. Vsl restricted to day light ops. LEGACY COMPONENT DESC: Navigation Lights
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 5 May 2002
Resolved 13 April 2002
Resolution: Received ltr from Captain, item corrected.
Operations/Management › Drills/Instruction
Issued 5 April 2002
Resolved
No record of drills, conduct drills prior to operating. LEGACY COMPONENT DESC: Man Overboard Recovery
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 5 May 2002
Resolved 13 April 2002
Resolution: Received ltr from Captain that vsl will log and conduct drills.
Construction/Loadline
Issued 19 April 2001
Resolved
FWD HATCH TO FWD PEAK DECK WASTED. DECK LONG STBD SIDE WASTED. CROP OUT HATCH & DECK TO GOOD METAL INSERT DECK INSTALL NEW HATCH.
Condition: Unknown
Due 15 June 2001
Resolved 15 June 2001
Engineering
Issued 19 April 2001
Resolved
EXPANSION JOINTS FOR BOTH EXHAUST CRACKED. REPAIR/RENEW
Condition: Unknown
Due 15 June 2001
Resolved 15 June 2001
Construction/Loadline
Issued 19 April 2001
Resolved
AFT DECK AROUND HATCH TO AFTER STEERING WASTED. REPAIR/RENEW
Condition: Unknown
Due 15 June 2001
Resolved 15 June 2001
Lifesaving
Issued 3 April 2000
Resolved
PROPERLY INSTALL B/A WEAKLINK.
Condition: Unknown
Due 14 April 2000
Resolved 13 April 2000
Lifesaving
Issued 3 April 2000
Resolved
PROVIDE 23 TYPE I ADULT PFDs AND 11 TYPE I CHILDRENS PFDs.
Condition: Unknown
Due 14 April 2000
Resolved 13 April 2000
Lifesaving
Issued 29 April 1999
Resolved
INSTALL A QUICK DISCONNECT CLIP ON LANYARD SERVING FLOATING WATERLIGHT ON RING BUOY.
Condition: Unknown
Due 29 April 1999
Resolved 30 April 1999
Lifesaving
Issued 29 April 1999
Resolved
PROVIDE AND INSTALL FLOAT FREE LINK SERVING B/A.
Condition: Unknown
Due 30 April 1999
Resolved 30 April 1999
Lifesaving
Issued 29 April 1999
Resolved
SHOW COMPLIANCE W/CG DRUG TESTING REGS.
Condition: Unknown
Due 30 April 1999
Resolved 30 April 1999
Lifesaving
Issued 29 April 1999
Resolved
SHOW PROOF OF LOGGED TRAINING AND DRILLS, AND GARBAGE LOG.
Condition: Unknown
Due 30 April 1999
Resolved 30 April 1999
Lifesaving
Issued 29 April 1999
Resolved
PROVIDE AND INSTALL HEAVING LINE ON RING BUOY. NO PASSENGERS FOR HIRE UNTIL CLEARED.
Condition: Unknown
Due 29 April 1999
Resolved 30 April 1999
Construction/Loadline
Issued 29 April 1999
Resolved
CHIP ALL AREAS OF RUST IN ALL COMPTS. AND MAKE AVAILABLE FOR INSPECTION. ALSO, ALL CORNERS ON MAIN DECK. (ANYWHERE PAINT IS PUSHING UP PAINT).
Condition: Unknown
Due 6 May 1999
Resolved 18 May 1999
Construction/Loadline
Issued 29 April 1999
Resolved
MAKE REPAIRS TO ALL AREAS OF MAIN DECK UNDER WOODEN DECKING AND ALL BELOW DECK AREAS WHERE WASTED. NOTE-VESSEL OPERATES ON A RIVERS ROUTE-DEFS NOT OF AN URGENT NATURE AT THIS TIME.
Condition: Unknown
Due 29 April 1999
Resolved 29 April 1999
Navigation
Issued 29 April 1999
Resolved
TIGHTEN BOLT AND INSTALL COTTER PIN ON PORT RUDDER CONNECTION.
Condition: Unknown
Due 29 April 1999
Resolved 30 April 1999
Construction/Loadline
Issued 29 April 1999
Resolved
PROVE OPERATION OF BILGE LEVEL ALARMS IN E/R AND LAZ.
Condition: Unknown
Due 29 April 1999
Resolved 30 April 1999
Lifesaving
Issued 29 April 1999
Resolved
RENEW GRABLINES ON B/A.
Condition: Unknown
Due 29 April 1999
Resolved 30 April 1999
Lifesaving
Issued 11 May 1998
Resolved
PROVIDE PROOF OF AN ADEQUATE DRUG AND ALCOHOL SCREENING PROGRAM.
Condition: Unknown
Due 16 July 1998
Resolved 16 July 1998
Lifesaving
Issued 15 May 1997
Resolved
PROVIDE A SATISFACTORY DRUG AND ALCOHOL TESTING PROGRAM.
Condition: Unknown
Due 4 December 1997
Resolved 4 December 1997
Lifesaving
Issued 15 May 1997
Resolved
PROVIDE 2 CHILD PFDS. MAX PERSONS LIMITED TO 140.
Condition: Unknown
Due 4 December 1997
Resolved 4 December 1997
Documentation
Issued 17 July 1996
Resolved
PROVIDE ORIGINAL OF FCC CERT.
Condition: Unknown
Due 22 July 1996
Resolved 22 July 1996
Lifesaving
Issued 17 July 1996
Resolved
PROVIDE 32 ADULT PFDS / TOTAL PERSONS ALLOWED REDUCED TO 121.
Condition: Unknown
Due 22 July 1996
Resolved 22 July 1996
Construction/Loadline
Issued 8 May 1996
Resolved
IN COMPARTMENT AFT OF PILOT HOUS, CROP AND RENEW TRANSVERSE WEB FRAMES WHERE THEY MEET THE MAIN DECK.
Condition: Unknown
Due 8 May 1996
Resolved 8 May 1996
Construction/Loadline
Issued 8 May 1996
Resolved
REPLACE GASKET ON FORE PEAK SCUTTLE ON MAIN DECK AND PLUG HOLE.
Condition: Unknown
Due 9 May 1996
Resolved 16 May 1996
Construction/Loadline
Issued 8 May 1996
Resolved
CROP AND RENEW FOR PEAK SCUTTLE (BACK TO GOOD METAL) AND REWELD DECK_x001C_ FRAMES.
Condition: Unknown
Due 8 May 1996
Resolved 8 May 1996
Construction/Loadline
Issued 8 May 1996
Resolved
IN FUEL TANK COMPARTMENT CROP AND RENEW BOTTOM PLATE UNDER FUEL TANK (APPROX 4X8FT) AND REPLACE TRANSVERSE WEB FRAMES WHERE NECESSARY.
Condition: Unknown
Due 8 May 1996
Resolved 8 May 1996
Construction/Loadline
Issued 8 May 1996
Resolved
CROP AND RENEW APPROX 4IN AT NR 1 STBD LONG (FROM KEEL) AT FWD BULK HEAD.
Condition: Unknown
Due 8 May 1996
Resolved 8 May 1996
Construction/Loadline
Issued 8 May 1996
Resolved
CROP AND RENEW APPROX 1 FOOT AT SECOND TRANSVERSE WEB FRAME BETWEEN CENTER VERTICAL KEEL AND NR 1 PORT LONG.
Condition: Unknown
Due 8 May 1996
Resolved 8 May 1996
Construction/Loadline
Issued 8 May 1996
Resolved
IN COMPARTMENT AFT OF ENGINEROOM REWELD BROKEN WELDS ALONG LONG 5 AND 6 (APPROX 4FT)
Condition: Unknown
Due 8 May 1996
Resolved 8 May 1996
Construction/Loadline
Issued 8 May 1996
Resolved
CROP AND RENEW TO GOOD METAL (APPROX 1FT RADIUS) AROUND EACH EXHAUST TUBE
Condition: Unknown
Due 8 May 1996
Resolved 8 May 1996
Construction/Loadline
Issued 8 May 1996
Resolved
ON PORT AND STBD BOW AT STEP IN/CHINE ABOVE THE WAVE/SPRAY SHIELD CROP AND RENEW (APPROX 3FT)
Condition: Unknown
Due 8 May 1996
Resolved 8 May 1996
Construction/Loadline
Issued 8 May 1996
Resolved
CONDUCT BELT GUAGING APPROX EVERY 5 FT OVER LENGTH OF VSL WITH READINGS SPACED APPROX EVERY 2-3FT.
Condition: Unknown
Due 8 May 1996
Resolved 8 May 1996
Construction/Loadline
Issued 8 May 1996
Resolved
CLEAN ENGINE ROOM BILGES
Condition: Unknown
Due 9 May 1996
Resolved 16 May 1996
Construction/Loadline
Issued 1 March 1990
Resolved
RENEWED BOTTOM LONGS AND TRANSVERSE FRAME IN WAY OF SHAFT TUBES. C & R BOT-TOM LONGS AT AFT END OF FUEL TANK AND ON PORT SIDE IN # 2 COMPT. C & R BOT-TOM LONGS AT LOWEST SECTION OF FOREPEAK.
Condition: Unknown
Due 1 March 1990
Resolved 1 March 1990
Construction/Loadline
Issued 17 November 1988
Resolved
PROVIDE ADEQUATE CHAIN FOR FORWARD HATCH.
Condition: Unknown
Due 17 November 1988
Resolved 17 November 1988
Engineering
Issued 17 November 1988
Resolved
RECLAMP COUPLING ON BILGE PIPING UNDER FUEL TANK AND COMPARTMENT #2.
Condition: Unknown
Due 17 November 1988
Resolved 17 November 1988
Construction/Loadline
Issued 17 November 1988
Resolved
C & R BOTTOM LONG #2 COMPARTMENT FORWARD OF #2 FRAME #1 PORT LONG.
Condition: Unknown
Due 17 November 1988
Resolved 17 November 1988
Construction/Loadline
Issued 17 November 1988
Resolved
C & R 3 BULKHEAD STIFFENERS ON #4 BULKHEAD BELOW PORT BATTERY BOX.
Condition: Unknown
Due 17 November 1988
Resolved 17 November 1988
Construction/Loadline
Issued 17 November 1988
Resolved
V & WELD #6 STARBOARD BOTTOM LONG IN #5 COMPARTMENT IN WAY OF FORWARD BULKHEAD.
Condition: Unknown
Due 17 November 1988
Resolved 17 November 1988
Construction/Loadline
Issued 17 November 1988
Resolved
PLUB HOLES IN #2 AND #4 TRANSVERSE BULKHEAD.
Condition: Unknown
Due 17 November 1988
Resolved 17 November 1988
Engineering
Issued 17 November 1988
Resolved
RENEW WASTED BILGE STRAINERS ON SUCTIONS IN COMPARTMENTS FOREPEADK, #5 AND #6.
Condition: Unknown
Due 17 November 1988
Resolved 17 November 1988
Construction/Loadline
Issued 17 November 1988
Resolved
C & R WASTED LOWER SECTION OF #2 TRANS BULKHEAD..
Condition: Unknown
Due 17 November 1988
Resolved 17 November 1988
Construction/Loadline
Issued 17 November 1988
Resolved
C & R BOTTOM TRANS FRAME #2 COMPARTMENT.
Condition: Unknown
Due 17 November 1988
Resolved 17 November 1988
Construction/Loadline
Issued 17 November 1988
Resolved
C & R BOTTOM LONGS #2 COMPARTMENT FORWARD OF #1 FRAME #1 AND #6 STARBOARD.
Condition: Unknown
Due 17 November 1988
Resolved 17 November 1988
Construction/Loadline
Issued 17 November 1988
Resolved
C & R #1 STARBOARD TRANS SIDE FRAME #2 COMPARTMENT.
Condition: Unknown
Due 17 November 1988
Resolved 17 November 1988
Construction/Loadline
Issued 19 May 1987
Resolved
PROVIDE GAUGING FOR BOTTOM PLATING IN AFT COMP.
Condition: Unknown
Due 19 May 1987
Resolved 19 May 1987