MAURY USCG vessel records
← All vessels

OMI CHARGER

OMI CHARGER is a 1969 tank barge. The Coast Guard has recorded 96 inspections since 1982, most recently in July 1994, along with 77 deficiencies and 1 casualty investigation in 1993.

Records from 1982 to 1994. Most recent: inspection, 16 July 1994.

Built
1969
Last inspected
16 July 1994
Documentation
Not in the documentation file of 10 August 2026
Controls
None recorded without a removal date

Everything above is free. The detail below — the inspection history, the deficiency record, the casualty record and the documentation record — is Professional, $39 a month. Sign in.

This record may be incomplete: the most recent inspection recorded for this vessel was 32 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Barge class in Maury's sources begin in 1972.

Inspection record

Last inspected 16 July 1994
…with no type recorded63
Operational controls None recorded without a removal date
Years with a record 12 calendar years (1982–1994)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

6921311
Flag
UNITED STATES
Maury page id
psix-46387

Documentation record

Tonnage as PSIX records it20877 - Regulatory (Subpart C or D), Gross Ton
16420 - Regulatory (Subpart C or D), Net Ton
38485 - Dead Weight, Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Professional
Detail on this page

96 inspections, each with its date, unit and type; 77 deficiencies with the resolution recorded against each; 1 casualty investigation, with date and classification; the documentation record, as PSIX holds it. The counts in the summary above are the same counts, and they are free.

$39 a month or $299 a year, every vessel page, cancel any time. Founding rate $19.99 a month for life, for the first 200 subscribers. Plans Sign in

Maury does not score, rate or grade vessels, at any price.

Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 1972 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 96

16 July 1994 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1356582
2 February 1994 Administrative
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1163059
30 November 1993 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 666637
12 October 1993 Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 643521
9 October 1993 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 7196
9 October 1993 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 22174
9 October 1993 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 181290
9 October 1993 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 227260
9 October 1993 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 229226
9 October 1993 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 229820
7 October 1993 Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 451555
7 October 1993 Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 826471
7 October 1993 Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 827190
27 September 1993 Deficiency Check · Hull Examination
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1135745
24 March 1993 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 100895
21 March 1993 Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 509866
13 February 1993 Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1146243
10 February 1993 Examination of Repairs
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 839755
10 February 1993 Deficiency Check
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1148955
25 January 1993 Re-Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 841136
31 December 1992 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 221772
7 December 1992 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 492605
3 October 1992 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 453785
3 October 1992 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1258804
15 August 1992 Administrative
Administrative · MSO Mobile · USCG Heartland District (CGD-H) · Activity 948162
8 August 1992 Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 958012
30 July 1992 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1261719
15 July 1992 Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 352072
8 June 1992 Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 351268
27 April 1992 Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 956991
15 April 1992 Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 944893
13 March 1992 Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 462610
13 March 1992 Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 953037
16 January 1992 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 501420
21 December 1991 Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 347835
2 December 1991 Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1313567
29 November 1991 COI Inspection · Hull Examination
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1253239
6 November 1991 Administrative
Administrative · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1249531
20 September 1991 Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 526953
9 April 1991 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1241751
23 March 1991 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 499448
22 February 1991 Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 930553
18 February 1991 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 517109
8 February 1991 Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 485821
1 February 1991 Re-Inspection · Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 919638
31 August 1990 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1232179
17 July 1990 Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 510113
12 April 1990 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1241258
22 March 1990 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 916567
22 March 1990 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1241483
8 January 1990 Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 458907
4 November 1989 Deficiency Check
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1225711
26 October 1989 COI Inspection · Hull Examination
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1235397
29 June 1989 Type not recorded
No type recorded · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 532099
23 January 1989 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 892285
13 December 1988 Type not recorded
No type recorded · COTP HOUSTON · USCG Heartland District (CGD-H) · Activity 464985
11 September 1988 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1349566
10 September 1988 COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1195899
22 August 1988 Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 486183
15 August 1988 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1348425
3 June 1988 Deficiency Check
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1198960
28 May 1988 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1198746
9 May 1988 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1039195
25 March 1988 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 991783
11 February 1988 Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 534236
15 September 1987 Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1006193
28 August 1987 Deficiency Check
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1031520
18 August 1987 Type not recorded
No type recorded · COTP PHILADELPHIA · USCG East District (CGD-E) · Activity 504983
12 August 1987 Re-Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1029050
16 June 1987 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1308518
8 May 1987 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1328942
11 January 1987 Type not recorded
No type recorded · COTP NEW HAVEN · USCG Northeast District (CGD-NE) · Activity 438129
22 December 1986 Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1312647
8 December 1986 Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1023057
2 October 1986 Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1006750
11 September 1986 Deficiency Check
Physical examination · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1308307
5 September 1986 COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1272586
29 August 1986 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1023329
27 August 1986 Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1297531
11 August 1986 Type not recorded
No type recorded · COTP HOUSTON · USCG Heartland District (CGD-H) · Activity 310739
11 July 1986 Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 464698
14 January 1986 Deficiency Check · MARPOL Annex I Examination
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 995965
3 December 1985 Deficiency Check
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 986907
14 November 1985 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 997985
7 November 1985 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 483300
4 October 1985 Deficiency Check
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1295898
13 September 1985 Re-Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1298892
7 September 1985 Type not recorded
No type recorded · COTP HOUSTON · USCG Heartland District (CGD-H) · Activity 519943
30 March 1985 Type not recorded
No type recorded · COTP HOUSTON · USCG Heartland District (CGD-H) · Activity 513832
30 March 1985 Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1289731
23 March 1985 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 301052
11 February 1985 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1282233
8 October 1984 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 975083
28 September 1984 Type not recorded
No type recorded · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1283658
18 September 1984 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1282645
29 August 1982 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1276412

Deficiency record · 77

Deck/Cargo
Issued 7 October 1993 Resolved
PRIOR TO NEXT LOADING MAKE THE FOLLOWING BUTTERWORTH OPENINGS VAPOR TIGHT:_x001C_#1 STBD CARGO TANK, #1,3,4 INBOARD. #2 STBD CARGO TANK, #4 OUTBOARD. _x001C_ #3 STBD CARGO TANK, #4 OUTBOARD. #4 STBD CARGO TANK, #1 OUTBOARD.
Condition: Unknown
Due 21 October 1993
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Deck/Cargo
Issued 7 October 1993 Resolved
PRIOR TO NEXT LOADING MAKE END FLANGES ON CROSS DECK CONNECTION OVER #4 CARGO TANK VAPOR TIGHT.
Condition: Unknown
Due 21 October 1993
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Deck/Cargo
Issued 7 October 1993 Resolved
PRIOR TO NEXT LOADING MAKE FLANGE CONNECTION ON #5 STBD CARGO TANK, CLOSED GUAGING FITTING VAPOR TIGHT.
Condition: Unknown
Due 21 October 1993
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Engineering
Issued 10 February 1993 Resolved
The port boiler superheater safety valve is to be replaced and it's operation proven to the satisfaction of a Coast Guard Marine Inspector._x001C_ This safety valve is to be replaced prior to leaving the next port of call,Texas City, Tx.
Condition: Unknown
Due 10 February 1993
Resolved 10 February 1993
Lifesaving
Issued 27 April 1992 Resolved
MAKE PERMANENT REPAIR TO THE PORT LIFEBOAT WINCH ASSEMBLY OR RENEW. ANY REPAIRS SHALL BE REPAIRED BY OR UNDER THE CLOSE SUPERVISION OF SCHAT- WATERCRAFT MARINE SERVICE DIVISION FARMINGDALE, N.J.
Condition: Unknown
Due 27 April 1992
Resolved 27 April 1992
Accommodation/Occupational Safety
Issued 13 March 1992 Resolved
REPAIR HANDRAILS IN PUMP ROOM AT THE NEXT GAS FEEING.
Condition: Unknown
Due 13 March 1992
Resolved 13 March 1992
Deck/Cargo
Issued 13 March 1992 Resolved
REPAIR HOLE IN CARGO SUCTION PIPE TO NO. 4 CARGO PUMP IN PUMP ROOM AT NEXT GAS FEEING.
Condition: Unknown
Due 13 March 1992
Resolved 13 March 1992
Deck/Cargo
Issued 13 March 1992 Resolved
REPAIR NO.4S CARGO DOME COVER FRACTURE.
Condition: Unknown
Due 13 March 1992
Resolved 13 March 1992
Deck/Cargo
Issued 29 November 1991 Resolved
PROVE PROPER OPERATION AND VAPOR TIGHTNESS OF ALL CARGO PUMPS._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 29 November 1991
Resolved 29 November 1991
Deck/Cargo
Issued 29 November 1991 Resolved
MAKE PERMANENT REPAIRS TO THE 14" #4 CARGO LINE FORWARD OF THE #4 PUMP._x001C_ _x001C_
Condition: Unknown
Due 29 November 1991
Resolved 29 November 1991
Lifesaving
Issued 29 November 1991 Resolved
SUBMIT FOR APPROVAL THE REPAIR PROPOSAL OF THE PORT AND STARBOARD LIFEBOAT DAVIT ARMS AND THE PORT LIFEBOAT WINCH. _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 29 November 1991
Resolved 29 November 1991
Construction/Loadline
Issued 29 November 1991 Resolved
PERMANENT REPAIRS ARE REQUIRED TO THE PORT AND STBD SADDLE TANKS. PRESENT GUAGINGS TO DETAIL AMOUNT OF PLATE WASTAGE AND RENEWAL. THE SADDLE TANKS ARE TO REMAIN DRY AND NOT UTILIZED UNTIL PERMANENT REPAIRS ARE COMPLETED ATTHE NEXT CREDIT DRYDOCK, BUT NO LATER THAN 30NOV94.
Condition: Unknown
Due 29 November 1991
Resolved 29 November 1991
Electrical
Issued 1 February 1991 Resolved
RENEW NON-CONDUCTIVE ELECTRICAL MATTING IN FRONT OF EMERGENCY GENERATOR SWITCHBOARD.
Condition: Unknown
Due 1 February 1991
Resolved 1 February 1991
Engineering
Issued 1 February 1991 Resolved
PROVE PROPER OPERATION OF OVERSPEED TRIP ON #1 S/S GENERATOR.
Condition: Unknown
Due 1 February 1991
Resolved 1 February 1991
Deck/Cargo
Issued 1 February 1991 Resolved
PROVE PROPER OPERATION OF ALL CARGO PUMP OVERSPEED TRIPS.
Condition: Unknown
Due 1 February 1991
Resolved 1 February 1991
Electrical
Issued 1 February 1991 Resolved
PROVE PROPER OPERATION OF EMERGENCY GENERATOR WHILE UNDER LOAD.
Condition: Unknown
Due 1 February 1991
Resolved 1 February 1991
Fire Fighting
Issued 1 February 1991 Resolved
SHOW PROPER OPERATION OF FIRE DAMPER SUPPLY (03-42-1).
Condition: Unknown
Due 1 February 1991
Resolved 1 February 1991
Deck/Cargo
Issued 1 February 1991 Resolved
PROVE PROPER OPERATION OF ALL INERT GAS SYSTEM TROUBLE ALARM LIGHTS & LAMPS.
Condition: Unknown
Due 1 February 1991
Resolved 1 February 1991
Construction/Loadline
Issued 1 February 1991 Resolved
REPLACE GASKETS TO PAINT LOCKER AND PUMP ROOM DOORS.
Condition: Unknown
Due 1 February 1991
Resolved 1 February 1991
Lifesaving
Issued 12 April 1990 Resolved
OTHER PERSONS IN CREW REDUCED TO 11 AND TOTAL PERSONS REDUCED TO 38 BASED ON SAFE WOKING LOAD OF NEWLY INSTALLED LIFEBOAT FALLS HAVING A SAFETY FACTOR OF 5 VERSUS 6.
Condition: Unknown
Due 12 April 1990
Resolved 12 April 1990
Lifesaving
Issued 22 March 1990 Resolved
MAKE PERMANENT REPAIRS TO STBD LIFE BOAT "A" STRAKE FWD STBD
Condition: Unknown
Due 22 March 1990
Resolved 22 March 1990
Lifesaving
Issued 22 March 1990 Resolved
REPLACE EXHAUST LINE, THWART BOLTS, FWD 2 THARTS,STRAKES P A-1,S A-2,ATF P/S UNDER ENG., GRABRAILS,FLOATATION TANKS,AND FUEL TANK
Condition: Unknown
Due 22 March 1990
Resolved 22 March 1990
Deck/Cargo
Issued 26 October 1989 Resolved
U.T. ANCHOR WINCH FOUNDATIONS THEN CROP & RENEW ALL AREAS WHICH HAVE MORE THAN 25 PERCENT WASTAGE.
Condition: Unknown
Due 26 October 1989
Resolved 26 October 1989
Electrical
Issued 26 October 1989 Resolved
PRIOR TO 22DEC89, COMPLY WITH ALL ASPECTS OF G-MSC-2 LETTER, SERIAL NUMBER EC-90473, DATED 29SEP89, TO THE SATISFACTION OF THE COGNIZANT OCMI.
Condition: Unknown
Due 26 October 1989
Resolved 26 October 1989
Unknown
Issued 10 September 1988 Resolved
OPEN OR REMOVE MOUNTINGS FOR PORT AND STARBOARD BOILERS FOR CREDIT.
Condition: Unknown
Due 10 September 1988
Resolved 10 September 1988
Unknown
Issued 10 September 1988 Resolved
REPAIR AND CONDUCT OPERATIONAL TEST OF REMOTE SHUTDOWN IN CARGO PUMP ROOM.
Condition: Unknown
Due 10 September 1988
Resolved 10 September 1988
Unknown
Issued 10 September 1988 Resolved
REPAIR AND CONDUCT OPERATIONAL TEST OF THE OVERSPEED DEVICES FOR THE FOLLOWING; A)#2 CARGO PUMP TURBINE, B)STARBOARD STRIPPING PUMP TURBINE, C)PORT STRIPPING PUMP TURBINE, D)#4 CARGO PUMP TURBINE.
Condition: Unknown
Due 10 September 1988
Resolved 10 September 1988
Electrical
Issued 25 March 1988 Resolved
DISSASSEMBLE FOR INSPECTION THE MAIN STEAM VALVE, THROTTLE VALVE AND GOVENOR ASSEMBLY IN THE PRESENCE OF A COAST GUARD MARINE INSPECTOR
Condition: Unknown
Due 25 March 1988
Resolved 25 March 1988
Electrical
Issued 25 March 1988 Resolved
AFFECT REPAIRS TO ANY SHIPBOARD SYSTEMS FOUND DAMAGED OR OTHERWISE NOT FUNCTIONING PROPERLY AS A RESULT OF THE TESTS AND EXAMINATIONS CONDUCTED UNDER ITEM #2 OF THIS CG-835 PRIOR TO LEAVING CORPUS CHRISTI TX
Condition: Unknown
Due 25 March 1988
Resolved 25 March 1988
Electrical
Issued 25 March 1988 Resolved
PROVIDE AND TEMPORARILY INSTALL IN ACCORDANCE 46 CFR SUBCHAPTER J, 1 (ONE) SHIPS SERVICE GENERATOR IN AN ACCEPTABLE LOCATION ON BOARD THE VESSEL TO SERVE AS A STANDBY GENERATOR UNTIL ITEM 1 OF THIS CG-835 IS COMPLETED. THISITEM SHALL BE COMPLETED PRIOR TO DEPARTING CORPUS CHRISTI TX
Condition: Unknown
Due 25 March 1988
Resolved 25 March 1988
Electrical
Issued 25 March 1988 Resolved
REMOVE #2 MAIN SHIPS SERVICE GENERATOR AND REINSTALL WITH SUITABLE REPLACEMENT IN ACCORDANCE WITH 46 CFR SUBCHAPTER J THIS ITEM TO BE COMPLETED UNDER THE COGNIZANCE OF A COAST GUARD OFFICER IN CHARGE MARINE INSPECTION
Condition: Unknown
Due 25 March 1988
Resolved 25 March 1988
Electrical
Issued 25 March 1988 Resolved
EXAMINE AND CONDUCT OPERATIONAL TESTS OF ALL SHIPBOARD SYSTEMS AS NECESSARYTHAT WERE OR MAY HAVE BEEN AFFECTED BY THE MAIN SHIPS SERVICE GENERATOR CASUALITY OF 25MAR88 TO ENSURE THAT THEY ARE FUNCTIONING PROPERLY PRIOR TO DEPARTING CORPUS CHRISTI TX
Condition: Unknown
Due 25 March 1988
Resolved 25 March 1988
Lifesaving
Issued 12 August 1987 Resolved
REPAIR PORT LIFEBOAT DAVIT LIMIT SWITCH.
Condition: Unknown
Due 12 August 1987
Resolved 12 August 1987
Construction/Loadline
Issued 12 August 1987 Resolved
REPLACE SCREENS ON EMERGENCY BATTERY LOCKER VENTS. FREE UP VENT LOUVER.
Condition: Unknown
Due 12 August 1987
Resolved 12 August 1987
Deck/Cargo
Issued 12 August 1987 Resolved
REMOVE DISCONNECTED GUAGE LINE CONDUIT IN PUMPROOM TRUNK LEADING TO CARGO PUMPS.
Condition: Unknown
Due 12 August 1987
Resolved 12 August 1987
Lifesaving
Issued 12 August 1987 Resolved
REPLACE BOTH EMBARKATION LADDERS DUE TO MARGINAL CONDITION OF CHAINS.
Condition: Unknown
Due 12 August 1987
Resolved 12 August 1987
Deck/Cargo
Issued 12 August 1987 Resolved
INSTALL INSULATION ON VERTICAL STEAM LINE IN PUMP ROOM TRUNK.
Condition: Unknown
Due 12 August 1987
Resolved 12 August 1987
Unknown
Issued 22 December 1986 Resolved
PROVIDE THE COAST GUARD WITH A COPY OF THE ABS REPORT CONCERNING THE FINAL INSPECTION AND TESTING OF THE RUDDER AND THE OVERSPEED TEST OF BOTH SHIP'S SERVICE GENERATORS.
Condition: Unknown
Due 22 December 1986
Resolved 22 December 1986
Engineering
Issued 22 December 1986 Resolved
PORT BOILER SUPERHEATER HEADER TO E OPENED FOR INSPECTION IN WAY OF REPAIR AT DESUPERHEATER NOZZLE AT NEXT BIANNUAL INSPECTION.
Condition: Unknown
Due 22 December 1986
Resolved 22 December 1986
Construction/Loadline
Issued 22 December 1986 Resolved
PROVIDE ABS APPROVED DRAWING FOR THRU HULL PENETRATION FOR LUBE OIL COOLER.
Condition: Unknown
Due 22 December 1986
Resolved 22 December 1986
Engineering
Issued 22 December 1986 Resolved
PROVE WITH TECHNICAL DATA FROM FOREIGN MANUFACTURER THAT THE NEW BUTTERFLY VALVES INSTALLED WITH NEW LUBE OIL COOLER MEET THE REQUIREMENTS SET FORTH IN 46 CFR 56.20.
Condition: Unknown
Due 22 December 1986
Resolved 22 December 1986
Engineering
Issued 11 September 1986 Resolved
IN STBD BOILER FIRESIDE, REPLACE BOTH BURNER ARCHES, THE BRICKWORK AT THE SUPERHEATER VESTIBULE MANWAY, AND ANY OTHER BRICKWORK REPAIRS REQUIRED BY THE ATTENDING CG INSPECTOR. THIS REQUIREMENT TO BE COMPLETED AT THE NEXT DRYDOCKING BUT NLT 31DEC86.
Condition: Unknown
Due 11 September 1986
Resolved 11 September 1986
Engineering
Issued 11 September 1986 Resolved
MAKE PERMANENT REPAIRS TO PORT AND STBD BOILER AUTOMATION PURGE SYSTEMS AND DEMONSTRATE PROPER OPERATION OF THE SAME IN ACCORDANCE WITH APPROVED AUTOMATION TEST PROCEDURES, SECTION II,A.(A).
Condition: Unknown
Due 11 September 1986
Resolved 11 September 1986
Navigation
Issued 5 September 1986 Resolved
COMPLY WITH COLREGS ON NAVIGATION LIGHT SEPARATION.
Condition: Unknown
Due 5 September 1986
Resolved 5 September 1986
Deck/Cargo
Issued 5 September 1986 Resolved
MAKE THE REMOTE SHUTDOWN FOR THE CARGO PUMP EMERGENCY SHUTDOWN READILY ACCESSIBLE AND LABLE PROPERLY.
Condition: Unknown
Due 5 September 1986
Resolved 5 September 1986
Lifesaving
Issued 5 September 1986 Resolved
RECONDITION THE PROPELLER ON THE PORT LIFEBOAT.
Condition: Unknown
Due 5 September 1986
Resolved 5 September 1986
Deck/Cargo
Issued 5 September 1986 Resolved
CONDUCT A HYDROSTATIC TEST OF ALL CARGO PIPING AT 150% MAWP
Condition: Unknown
Due 5 September 1986
Resolved 5 September 1986
Engineering
Issued 5 September 1986 Resolved
TEST THE RELIEF VALVE ON THE DC HEATER.
Condition: Unknown
Due 5 September 1986
Resolved 5 September 1986
Engineering
Issued 5 September 1986 Resolved
TEST ALL BOILER ROOM REMOTE SHUTDOWNS.
Condition: Unknown
Due 5 September 1986
Resolved 5 September 1986
Navigation
Issued 5 September 1986 Resolved
INSTALL NON-SKID GRATING AND HAND RAILS IN THE STEERING COMPT. TO COMPLY WITH NEW SOLAS REGULATIONS.
Condition: Unknown
Due 5 September 1986
Resolved 5 September 1986
Navigation
Issued 5 September 1986 Resolved
PROVIDE A SAFE MEANS OF ENGAGING THE TRICK WHEEL IN THE AFT STEERING COMPT.
Condition: Unknown
Due 5 September 1986
Resolved 5 September 1986
Unknown
Issued 5 September 1986 Resolved
REMOVE OIL DRUMS AND RUBBER HOSES FROM THE DE-OILER AND PERMANENTLY PIPE THE DRAINS INTO WASTE OIL TANK.
Condition: Unknown
Due 5 September 1986
Resolved 5 September 1986
Engineering
Issued 5 September 1986 Resolved
MAKE PERMANENT REPAIRS TO THE SUPERHEATER HEADER IN WAY OF THE DESUPER- HEATER INLET PIPE AT THE NEXT DRYDOCK OR NO LATER THAN 30DEC86
Condition: Unknown
Due 5 September 1986
Resolved 5 September 1986
Engineering
Issued 5 September 1986 Resolved
CONDUCT ALL BOILER AUTOMATION TESTS ON BOTH BOILERS.
Condition: Unknown
Due 5 September 1986
Resolved 5 September 1986
Engineering
Issued 5 September 1986 Resolved
CONDUCT A FIRESIDE AND WATERSIDE EXAM ON THE STBD BOILER.
Condition: Unknown
Due 5 September 1986
Resolved 5 September 1986
Engineering
Issued 5 September 1986 Resolved
MAKE DC HEATER AVAILABLE FOR AND INTERNAL INSPECTION.
Condition: Unknown
Due 5 September 1986
Resolved 5 September 1986
Fire Fighting
Issued 5 September 1986 Resolved
PROVIDE A COPY OF THE FOAM ANALYSIS TO MSO PORT ARTHUR, TEXAS.
Condition: Unknown
Due 5 September 1986
Resolved 5 September 1986
Navigation
Issued 5 September 1986 Resolved
PROVIDE AT THE MACHINERY ROOM CONTROL PANEL A SEPARATE ALARM FOR THE STEERING GEAR SUMP LEVEL AND SINGLE PHASE FOR PORT AND STBD UNITS.
Condition: Unknown
Due 5 September 1986
Resolved 5 September 1986
Lifesaving
Issued 5 September 1986 Resolved
PROVIDE COVERS FOR BOTH LIFEBOATS.
Condition: Unknown
Due 5 September 1986
Resolved 5 September 1986
Lifesaving
Issued 5 September 1986 Resolved
RENEW THE FALLS ON BOTH LIFEBOATS AND WEIGHT TEST. RELEASE STBD LIFEBOAT.
Condition: Unknown
Due 5 September 1986
Resolved 5 September 1986
Lifesaving
Issued 5 September 1986 Resolved
TEST THE LIMIT SWITCHES ON BOTH LIFEBOATS.
Condition: Unknown
Due 5 September 1986
Resolved 5 September 1986
Construction/Loadline
Issued 5 September 1986 Resolved
RENEW OND/OR REFIT ALL THE WATERTIGHT DOORS ON THE WEATHER DECK.
Condition: Unknown
Due 5 September 1986
Resolved 5 September 1986
Construction/Loadline
Issued 5 September 1986 Resolved
REPLACE THE WEATHER TIGHT DOOR ON THE FAN ROOM.
Condition: Unknown
Due 5 September 1986
Resolved 5 September 1986
Documentation
Issued 11 August 1986 Resolved
33CFR151.25(D) DISCHARGE THROUGH OILY WATER SEPARATOR WAS NOT LOGGED IN APPROPRIATE OIL RECORD BOOK.
Condition: Unknown
Due 11 August 1986
Resolved 11 August 1986
Documentation
Issued 11 August 1986 Resolved
33CFR151.25(A) ONLY ONE(1) OIL RECORD BOOK ONBOARD. VESSEL REQUIRED TO HAVE TWO(2) ONBOARD.
Condition: Unknown
Due 11 August 1986
Resolved 11 August 1986
Engineering
Issued 14 November 1985 Resolved
REPAIR OR RENEW LEAKING DC HEATER RELIEF VALVE.
Condition: Unknown
Due 14 November 1985
Resolved 14 November 1985
Lifesaving
Issued 13 September 1985 Resolved
PROVIDE WEARING/DONNING INSTRUCTIONS FOR LIFE PRESERVERS IN CREW AREA.
Condition: Unknown
Due 13 September 1985
Resolved 13 September 1985
Fire Fighting
Issued 13 September 1985 Resolved
STENCIL VESSELS NAME ON ALL FIRE HOSES.
Condition: Unknown
Due 13 September 1985
Resolved 13 September 1985
Lifesaving
Issued 13 September 1985 Resolved
CONDUCT TEST OF LINE THROWING GUN AND PLACE ENTRY IN VESSELS OFFICIAL LOG.
Condition: Unknown
Due 13 September 1985
Resolved 13 September 1985
Electrical
Issued 13 September 1985 Resolved
REPLACE GLOBES AND GUARDS IN PORT BOW FOCSLE AREA.
Condition: Unknown
Due 13 September 1985
Resolved 13 September 1985
Electrical
Issued 13 September 1985 Resolved
REPLACE LIGHT SWITCH IN PORT BOW FOSCLE.
Condition: Unknown
Due 13 September 1985
Resolved 13 September 1985
Lifesaving
Issued 28 September 1984 Resolved
VSL TO MAKE REPAIRS TO STBD LIFEBOAT ENGINE AND PROVE SAT OP TO COGNIZANT [name withheld] IN GULF OF MEXICO LOADING PORT BUT IN NO CASE NO LATER THAN 10 OCT84
Condition: Unknown
Due 28 September 1984
Resolved 28 September 1984
Unknown
Issued 18 September 1984 Resolved
CONDUCT UNDERWAY TESTS WITH THE STARBOARD LIFEBOAT IN THE PRESENCE OF A U.S. COAST GUARD INSPECTOR.
Condition: Unknown
Due 18 September 1984
Resolved 18 September 1984
Lifesaving
Issued 18 September 1984 Resolved
MAKE REPAIRS AND CONDUCT TESTS ON THE STARBOARD LIFEBOAT AS FOLLOWS:
Condition: Unknown
Due 18 September 1984
Resolved 18 September 1984
Unknown
Issued 18 September 1984 Resolved
PROVIDE PROPER CLEARANCE FOR THE RUDDER AROUND THE PROPELLER.
Condition: Unknown
Due 18 September 1984
Resolved 18 September 1984
Unknown
Issued 18 September 1984 Resolved
ADJUST THE CLUTCH AND GEAR SHIFT SO THAT THE ENGINE STARTS WITH THE PRO- PELLER SHAFT DISENGAGED.
Condition: Unknown
Due 18 September 1984
Resolved 18 September 1984
Unknown
Issued 18 September 1984 Resolved
REPLACE THE SALT WATER DISCHARGE HOSE WITH AN APPROVED TYPE HOSE.
Condition: Unknown
Due 18 September 1984
Resolved 18 September 1984

Casualty record · 1

9 October 1993Major Marine Casualty · role: Involved in a Marine Casualty · serious marine incident, as classified · 3 dead · 7 injured · activity 22174
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.