Inspection history · 43
18 June 2026
Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 8407896
7 May 2026
Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 8368585
24 April 2026
Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 8355434
1 March 2026
Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 8319684
30 January 2026
Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 8305401
15 May 2025
Annual Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 8136586
28 February 2025
Drydock Exam · Internal Structural Exam · Administrative Inspection · Examination of Repairs
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8094025
26 July 2024
Annual Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7967674
19 April 2024
Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7898366
18 April 2023
Internal Structural Exam · Annual Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7745918
7 April 2022
Annual Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7426491
14 April 2021
Annual Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7175272
26 October 2020
Drydock Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7082990
23 September 2020
Internal Structural Exam
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7063658
13 March 2020
MARPOL Annex I Examination · MTSA Verification · Annual Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6926165
5 June 2019
Periodic Inspection · Internal Structural Exam · MARPOL Annex I Examination · MARPOL Annex VI Survey
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6705841
2 March 2018
Damage Survey · Annual Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6364722
30 May 2017
MTSA Verification · MARPOL Annex I Examination · Annual Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6155570
13 April 2016
Internal Structural Exam · COI Inspection · Drydock Exam · Hull Examination
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 5853509
22 September 2015
Damage Survey
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 5725774
15 May 2015
Annual Inspection · MTSA Verification
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 5117325
20 March 2015
Administrative Inspection
Administrative · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 5104433
13 May 2014
Deficiency Check · Internal Structural Exam · MTSA/ISPS Verification · Annual Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 4847273
4 March 2014
In-Service Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 4810481
17 September 2013
MTSA Verification
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 4718837
7 May 2012
MARPOL Annex I Examination · Annual Inspection · MTSA/ISPS Verification
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 4304667
13 April 2010
Annual Inspection · MTSA Verification · MARPOL Annex I Examination
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 3715103
31 March 2009
Annual Inspection · Internal Structural Exam
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 3441519
11 June 2008
MTSA Verification · Annual Inspection · MARPOL Annex I Examination
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 3234036
14 June 2007
Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 2961169
11 June 2007
Annual Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 2957986
13 June 2006
Deficiency Check · Administrative Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 2678506
22 March 2006
COI Inspection · Hull Examination · MTSA Verification · Internal Structural Exam
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 2607563
21 March 2006
Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2606604
7 May 2003
Drydock Extension
Administrative · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1788579
10 March 2003
COI Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1755031
22 January 2003
Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1755056
1 April 2002
COI Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1599626
7 March 2001
Re-Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1439160
18 April 2000
COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1440319
6 April 2000
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1050095
20 April 1999
Re-Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 789984
15 April 1998
Initial Certification · Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1396898
Deck/Cargo › Holds/Tanks › Hatch Cover
Issued 2 March 2018
Resolved
3P,3S, 5P-5C, 6C, 7C-7STBD,2C MISSING STUDS AND BOLTS
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 April 2018
Resolved 12 April 2018
Construction/Loadline › Structures › Scuttle
Issued 2 March 2018
Resolved
NOTED BOLT WTD FWD WHERE NOT OPERATING PROPERLY
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 April 2018
Resolved 12 April 2018
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 2 March 2018
Resolved
NOTED 04 DECK RAIL ARE WASTED AT DECK WELD
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 April 2018
Resolved 12 April 2018
Operations/Management › Mandatory Ship Reporting Systems › Entry Report
Issued 20 March 2015
Resolved
M/V SIGNET TROJAN (IMO # 750435) and BARGE CHARLOTTE BRIDGE (ON # 1059125) arrived in the Port of Jacksonville with a Notice of Arrival (NOA) that incorrectly listed the information for 3 out of 7y crewmembers. Company failed to submit the proper information on both the original and updated NOAs.
Condition: Invalid
Due 20 March 2015
Resolved 20 March 2015
Resolution: Company submitted a corrected NOA.
Construction/Loadline › Structures › Manhole
Issued 28 May 2014
Resolved
Vessel is prohibited from cargo operations until all void covers are properly secured.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 28 May 2014
Resolved 28 May 2014
Construction/Loadline › Structures › Manhole
Issued 28 May 2014
Resolved
Renew void manhole cover studs & nuts as necessary throughout Barge
Condition: Improper Installation
Due 28 June 2014
Resolved 11 June 2014
Resolution: Completed.
Construction/Loadline › Hull › Bracket
Issued 13 May 2014
Resolved
Void 1 Starboard - Under deck longitudinal #4 and #5 welds missing on stiffeners.
Condition: Improper/Lack of Maintenance
Due 13 May 2014
Resolved 13 May 2014
Construction/Loadline › Hull › Stiffener
Issued 13 May 2014
Resolved
Void 2 Port - Repair cracked weld at inner bulkhead, bottom longitudinal in way of second vertical stiffener.
Condition: Damaged By Earlier Event
Due 13 May 2014
Resolved 13 May 2014
Construction/Loadline › Hull › Stiffener
Issued 13 May 2014
Resolved
Void 2 Center - Crop and renew 2 cracked flange plates in way of diahonal at underdeck stiffener as marked.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 May 2014
Resolved 20 May 2014
Construction/Loadline › Hull › Stiffener
Issued 13 May 2014
Resolved
Void 2 Center - Crop and renew 3 cracked weldments at watertight bulkhead inboard as marked. (Inner watertight bulkhead is compromised)
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 19 May 2014
Construction/Loadline › Hull › Weld
Issued 13 May 2014
Resolved
Void 2 Center - Gouge and reweld 5 diagonals as marked.
Condition: Damaged By Earlier Event
Due 13 June 2014
Resolved 19 May 2014
Construction/Loadline › Hull › Bracket
Issued 13 May 2014
Resolved
Void 2 Starboard - Crop and renew 4 cracked and fractured transverse flanges from aft bulkhead forward as marked.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 20 May 2014
Construction/Loadline › Hull › Stiffener
Issued 13 May 2014
Resolved
Void 2 Starboard - Cop and renew 3 cracked and fractured vertical flange stiffeners at inner bulkhead from aft bulkhead forward as marked.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 20 May 2014
Resolved 20 May 2014
Construction/Loadline › Hull › Weld
Issued 13 May 2014
Resolved
Void 2 starboard - Gouge and reweld fractured weld at the 5th transverse frame as marked.
Condition: Damaged By Earlier Event
Due 13 June 2014
Resolved 19 May 2014
Construction/Loadline › Hull › Weld
Issued 13 May 2014
Resolved
Void 3 Port - Gouge and reweld fractured weld on #3 side longitudinal at 2nd through 6th frame from aft hatch.
Condition: Damaged By Earlier Event
Due 13 June 2014
Resolved 11 June 2014
Resolution: Completed.
Construction/Loadline › Hull › Stiffener
Issued 13 May 2014
Resolved
Void 3 Port - Gouge and rewld fractured weld on #2 side longitudinal at 2nd frame from aft hatch.
Condition: Damaged By Earlier Event
Due 13 June 2014
Resolved 11 June 2014
Resolution: Completed.
Construction/Loadline › Hull › Weld
Issued 13 May 2014
Resolved
Void 4 Port - Gouge and reweld fractured weld on #2 side longitudinal at 2nd frame from forward hatch.
Condition: Damaged By Earlier Event
Due 13 June 2014
Resolved 11 June 2014
Resolution: Completed
Construction/Loadline › Hull › Side Shell
Issued 13 May 2014
Resolved
Void 8 Starboard - Make necessary repair to previous damage in starboard quarter as identified by ABS.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 20 May 2014
Construction/Loadline › Hull › Stiffener
Issued 13 May 2014
Resolved
Void 8 Starboard - Properly wrap weldment at the starboard aft vertical stiffener near bottom playing in way of ladder as marked.
Condition: Damaged By Earlier Event
Due 13 June 2014
Resolved 20 May 2014
Construction/Loadline › Hull › Weld
Issued 13 May 2014
Resolved
Void 8 Center - Gouge and reweld cracked weldment at the third stifener in way of centerline vertical keel near first longitudinal plating.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 19 May 2014
Construction/Loadline › Hull › Stiffener
Issued 13 May 2014
Resolved
Void 8 Center - Crop and renew along third vertical flange stiffener at CVK near forward bulkhead.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 20 May 2014
Construction/Loadline › Hull › Longitudinal Frame
Issued 15 April 2009
Resolved
2 Center void: G&W the crack at the connection of FR 10 and the stbd bottom long 6
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 15 May 2009
Resolved 28 April 2009
Construction/Loadline › Hull › Longitudinal Frame
Issued 15 April 2009
Resolved
2 Center void: G&W the crack at the connection of FR 10 and the stbd bottom long 12
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 15 May 2009
Resolved 28 April 2009
Construction/Loadline › Hull › Longitudinal Frame
Issued 15 April 2009
Resolved
2 port void: G&W the crack at the connection of FR 7 and the stbd bottom long 1,2,3,4
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 15 May 2009
Resolved 28 April 2009
Construction/Loadline › Hull › Longitudinal Frame
Issued 15 April 2009
Resolved
2 port void: G&W the crack at the connection of FR 8 and the stbd bottom long 1
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 15 May 2009
Resolved 28 April 2009
Construction/Loadline › Hull › Longitudinal Frame
Issued 15 April 2009
Resolved
2 port void: G&W the crack at the connection of FR 8 and the inboard bulkhead stiffener
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 16 May 2009
Resolved 28 April 2009
Construction/Loadline › Hull › Longitudinal Frame
Issued 15 April 2009
Resolved
2 port void: G&W the crack at the connection of FR 8 and the stbd bottom long 1
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 15 May 2009
Resolved 28 April 2009
Construction/Loadline › Hull › Longitudinal Frame
Issued 15 April 2009
Resolved
2 port void: G&W the crack at the connection of FR 9 and the inboard bulkhead stiffener
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 16 May 2009
Resolved 28 April 2009
Construction/Loadline › Hull › Stiffener
Issued 15 April 2009
Resolved
2 port void: G&W the crack at the connection of the diagonal and the plate IWO the bottom FR 10 and the bottom long 6
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 15 May 2009
Resolved 28 April 2009
Construction/Loadline › Structures › Manhole
Issued 15 April 2009
Resolved
3 port void: Replace the missing stud on the void cover.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 15 May 2009
Resolved 28 April 2009
Construction/Loadline › Hull › Longitudinal Frame
Issued 15 April 2009
Resolved
3 stbd void: G&W the crack at the connection of FR 15 and the side shell IWO long 6
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 15 May 2009
Resolved 28 April 2009
Construction/Loadline › Structures › Manhole
Issued 15 April 2009
Resolved
5 port void: Replace the missing stud on the void cover.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 15 May 2009
Resolved 28 April 2009
Construction/Loadline › Hull › Longitudinal Frame
Issued 15 April 2009
Resolved
6 center void. G&W the crack at the connection of the diagonal and the overhead stiffener at center ling IWO the fwd bulkhead FR 32
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 15 May 2009
Resolved 28 April 2009
Construction/Loadline › Hull › Longitudinal Frame
Issued 15 April 2009
Resolved
7 center void. G&W the crack at the connection of the diagonal and CVK IWO the fwd bulkhead FR 39
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 15 May 2009
Resolved 28 April 2009
Construction/Loadline › Hull › Longitudinal Frame
Issued 1 April 2009
Resolved
Stbd #2 void. G&W the crack at the connection of the bottom FR #8 and the inboard bulkhead.
Condition: Unknown
Action required: 705 - Other - as specified
Due 1 May 2009
Resolved 28 April 2009
Construction/Loadline › Hull › Longitudinal Frame
Issued 1 April 2009
Resolved
Stbd #2 void. G&W the crack at the connection of the bottom FR #8 and the bottom long #6
Condition: Unknown
Action required: 705 - Other - as specified
Due 1 May 2009
Resolved 28 April 2009
Construction/Loadline › Hull › Longitudinal Frame
Issued 1 April 2009
Resolved
Stbd #2 void. G&W the crack at the connection of the bottom FR #9 and the inboard bulkhead stiffener.
Condition: Unknown
Action required: 705 - Other - as specified
Due 1 May 2009
Resolved 28 April 2009
Construction/Loadline › Hull › Longitudinal Frame
Issued 1 April 2009
Resolved
Stbd #2 void. G&W the crack at the connection of the bottom FR #8 and the bottom long #1
Condition: Unknown
Action required: 705 - Other - as specified
Due 1 May 2009
Resolved 28 April 2009
Construction/Loadline › Hull › Keel Plate
Issued 1 April 2009
Resolved
#2 center. Weld the ladder rug. The #6 from the top on the fwd side.
Condition: Unknown
Action required: 705 - Other - as specified
Due 1 May 2009
Resolved 28 April 2009
Construction/Loadline › Hull › Longitudinal Frame
Issued 1 April 2009
Resolved
#2 center. G&W the crack at the connection of the bottom FR #6 flange to the port bulkhead.
Condition: Unknown
Action required: 705 - Other - as specified
Due 1 May 2009
Resolved 28 April 2009
Construction/Loadline › Hull › Longitudinal Frame
Issued 1 April 2009
Resolved
#2 center. G&W the crack at the connection of the bottom FR #6 flange to the stbdbulkhead.
Condition: Unknown
Action required: 705 - Other - as specified
Due 1 May 2009
Resolved 1 April 2009
Construction/Loadline › Hull › Longitudinal Frame
Issued 1 April 2009
Resolved
#2 center. Weld the connection of the diagonal to the overhead FR #6 on the port side.
Condition: Unknown
Action required: 705 - Other - as specified
Due 1 May 2009
Resolved 28 April 2009
Construction/Loadline › Hull › Longitudinal Frame
Issued 1 April 2009
Resolved
#2 center. C&R bottom FR #7 IWO stbd bottom long #13 and #14 as marked.
Condition: Unknown
Action required: 705 - Other - as specified
Due 1 May 2009
Resolved 28 April 2009
Construction/Loadline › Hull › Longitudinal Frame
Issued 1 April 2009
Resolved
#2 center. C&R bottom FR #8 IWO stbd bottom long #13 and #14 as marked.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 May 2009
Resolved 28 April 2009
Construction/Loadline › Hull › Longitudinal Frame
Issued 1 April 2009
Resolved
2 Center void: G&W the crack at the connection of FR 8 and the stbd bottom long 6
Condition: Unknown
Action required: 705 - Other - as specified
Due 15 May 2009
Resolved 28 April 2009
Construction/Loadline › Hull › Longitudinal Frame
Issued 1 April 2009
Resolved
2 Center void: G&W the crack at the connection of FR 9 flange to the port bottom long 6
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 15 May 2009
Resolved 28 April 2009
Construction/Loadline › Structures › Door
Issued 11 June 2007
Resolved
Port fwd door is wasted. Replace prior to getting underway.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 13 June 2007
Resolution: Door was replaced.
Accommodation/Occupational Safety › Occupational Safety › Lifeline
Issued 11 June 2007
Resolved
Several areas of the life lines were wasted. Replace as needed.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 13 June 2007
Resolution: Life lines were replaced as needed.
Construction/Loadline › Markings › Load Line Mark
Issued 9 April 2002
Resolved
NEEDS TO BE PAINTED
Condition: Unknown
Due 9 April 2002
Resolved 9 April 2002
Resolution: Painted while inspector present