MAURY USCG vessel records
← All vessels

NEW YORK

NEW YORK is a 1970 tank barge. The Coast Guard has recorded 122 inspections since 1984, most recently in July 2005, along with 166 deficiencies.

Records from 1984 to 2005. Most recent: inspection, 6 July 2005.

Built
1970
Last inspected
6 July 2005
Documentation
Not in the documentation file of 10 August 2026
Controls
None recorded without a removal date

This record may be incomplete: the most recent inspection recorded for this vessel was 21 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Barge class in Maury's sources begin in 1972.

Inspection record

Last inspected 6 July 2005
…with no type recorded53
Operational controls None recorded without a removal date
Years with a record 22 calendar years (1984–2005)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

Flag
MARSHALL ISLANDS
Maury page id
psix-46480

Documentation record

Tonnage as PSIX records it12752 - Convention (Subpart B), Gross Ton
14187 - Regulatory (Subpart C or D), Gross Ton
12156 - Convention (Subpart B), Net Ton
14187 - Regulatory (Subpart C or D), Net Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 1972 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspected as a tow unit · 3

Inspection history · 122

6 July 2005 Administrative Inspection
Administrative · Marine Safety Center (MSC) · Activity 2416885
23 September 2004 Administrative Inspection
Administrative · Marine Safety Center (MSC) · Activity 2202936
10 September 2004 Administrative Inspection
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 2192579
12 March 2004 Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 2023544
12 March 2004 Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2023547
12 February 2004 Type not recorded
No type recorded · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 2007910
11 December 2003 Damage Survey
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1966359
25 November 2003 Administrative Inspection · MARPOL Annex I Examination · In-Service Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1955084
23 September 2003 Administrative Inspection
Administrative · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1911025
11 July 2003 Administrative Inspection · Construction Oversight
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1843275
21 June 2002 Re-Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1633069
25 January 2002 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1481497
7 August 2001 Damage Survey
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1069414
15 July 2001 COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1072877
15 July 2001 COI Inspection · Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1406952
29 May 2001 Hull Examination
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1379450
22 June 2000 Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 821762
22 June 2000 Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1471019
26 February 2000 Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 539600
24 February 2000 Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 67697
24 February 2000 Damage Survey
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1379010
19 October 1999 Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1420207
13 October 1999 Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1397257
7 July 1999 Damage Survey
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1095574
27 June 1999 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1375827
25 June 1999 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 14779
10 March 1999 COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1408264
5 August 1998 Deficiency Check
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1131590
20 May 1998 Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 470720
7 May 1998 Re-Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1394969
15 August 1997 Hull Examination · Deficiency Check
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1458450
21 April 1997 Deficiency Check
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1093407
4 April 1997 Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1093874
13 March 1997 COI Inspection · Damage Survey · Deficiency Check
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1464013
5 March 1997 Damage Survey
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1416458
12 February 1997 Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1106401
4 February 1997 Type not recorded
No type recorded · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 1101100
21 January 1997 Examination of Repairs
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1416424
16 January 1997 Permit to Proceed
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1460928
6 November 1996 Type not recorded
No type recorded · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 517586
21 May 1996 Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 37615
2 February 1996 Re-Inspection · Damage Survey
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1359035
9 January 1996 Administrative
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1190453
18 October 1995 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 882071
13 October 1995 Administrative
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1357439
13 October 1995 Hull Examination
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1453166
6 July 1995 Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1192362
12 April 1995 Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 15956
28 March 1995 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 60865
28 March 1995 COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1458217
13 February 1995 Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 470296
16 November 1994 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 35266
3 July 1994 Type not recorded
No type recorded · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 530592
1 June 1994 Deficiency Check · Re-Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1171689
22 January 1994 Type not recorded
No type recorded · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 478974
21 November 1993 Type not recorded
No type recorded · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 513820
1 October 1993 Administrative
Administrative · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 845879
28 June 1993 Type not recorded
No type recorded · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 453557
3 June 1993 Type not recorded
No type recorded · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 528306
14 May 1993 Administrative
Administrative · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 836368
26 April 1993 Deficiency Check
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 832780
22 April 1993 Deficiency Check
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1134986
14 April 1993 COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1356275
25 February 1993 Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1147500
11 February 1993 Type not recorded
No type recorded · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1142433
22 January 1993 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 445533
4 January 1993 Administrative
Administrative · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1142820
24 December 1992 Damage Survey
Physical examination · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 1472657
23 December 1992 Type not recorded
No type recorded · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 70066
15 December 1992 Deficiency Check
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 829915
23 November 1992 Hull Examination
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1139472
27 October 1992 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1263361
23 September 1992 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 934744
19 September 1992 Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 3092
19 August 1992 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 941151
30 July 1992 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 486870
28 July 1992 Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 960592
3 July 1992 Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 955317
8 June 1992 Type not recorded
No type recorded · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 444803
4 March 1992 Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 961620
26 February 1992 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 501993
24 September 1991 Type not recorded
No type recorded · COTP LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 537440
1 May 1991 COI Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 919220
31 December 1990 Type not recorded
No type recorded · COTP LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 451563
20 August 1990 Deficiency Check · Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 905740
2 August 1990 Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1226586
9 July 1990 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1231687
5 July 1990 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1242256
9 May 1989 COI Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1030948
13 February 1989 Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 476229
25 January 1989 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 966737
19 January 1989 Administrative
Administrative · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1352887
10 January 1989 Damage Survey
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 888196
16 December 1988 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1339971
13 July 1988 Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1339487
27 April 1988 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 499765
27 January 1988 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1016267
24 December 1987 Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1320028
27 November 1987 Damage Survey
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1026492
27 July 1987 Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1331408
14 July 1987 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 525133
26 May 1987 Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1025494
21 May 1987 Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1332906
8 May 1987 COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1021067
12 March 1987 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1322056
19 February 1987 Damage Survey
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1016220
14 December 1986 Type not recorded
No type recorded · COTP PHILADELPHIA · USCG East District (CGD-E) · Activity 486324
12 October 1986 Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 512973
8 October 1986 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 488651
7 July 1986 Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1310904
17 June 1986 Type not recorded
No type recorded · COTP PHILADELPHIA · USCG East District (CGD-E) · Activity 491344
28 April 1986 Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 986925
11 April 1986 Type not recorded
No type recorded · COTP HOUSTON · USCG Heartland District (CGD-H) · Activity 480498
31 October 1985 Type not recorded
No type recorded · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 488997
18 June 1985 Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1291085
4 May 1985 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1288964
19 December 1984 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 498211
28 September 1984 Type not recorded
No type recorded · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 536553
10 September 1984 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 975868
9 July 1984 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1281420
12 June 1984 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 974197
15 May 1984 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 973975

Deficiency record · 166

Construction/Loadline › Hull › Bottom Plating
Issued 11 December 2003 Resolved
Provide a temporary patch for the 1.25" diameter hole, located in the forepeak, on the port side.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 December 2003
Resolved 12 December 2003
Resolution: Barge operator repaired hole with a temporary patch. The patch included clad welding of the hole, followed by a concrete box patch, which was applied to the inside.
Construction/Loadline › Hull › Bottom Plating
Issued 11 December 2003 Resolved
Provide repair proposal for 1.25" diameter hole, located in the forepeak, port side.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 13 December 2003
Resolved 12 December 2003
Resolution: Proposal was presented to the attending marine inspector, prior to conducting temporary repairs.
Operations/Management
Issued 11 July 2003 Resolved
DRAW UP AND POST FIRE AND SAFETY PLAN.
Condition: Unknown
Due 12 September 2003
Resolved 21 August 2003
Lifesaving › Embarkation Appliances/Stations
Issued 11 July 2003 Resolved
INSTALL PROPER EMERGENCY LIGHTS FOR TEMPORARY QUARTERS AND PORT AND STARBOARD LIFERAFT LAUNCH AREAS.
Condition: Unknown
Due 20 August 2003
Resolved 17 August 2003
Construction/Loadline
Issued 7 August 2001 Resolved
CARRY OUT TEMPORARY REPAIRS PRIOR TO DEPARTING THE MISSISSIPPI RIVER AS RECOMMENDED BY ABS DAMAGE SURVEY. PERMANENT REPAIRS ARE TO MADE AT NEXT PORT (TAMPA,FL) AFTER DISCHARGE OF CARGO. MSO TAMPA IS TO BE NOTIFIED AND ALL REPAIRS ARE TO BE INSPECTED BY ATTENDING COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 7 August 2001
Resolved 7 August 2001
Documentation
Issued 29 May 2001 Resolved
PROVIDE CARGO PIPING BOOM HYDRAULIC INSTALLATION PLANS TO LOCAL OCMI FOR REVIEW AND APPROVAL PRIOR TO INSTALLATION OF HYDRAULIC EQUIPMENT TO EXISTING BOOMS.
Condition: Unknown
Due 29 May 2001
Resolved 5 June 2001
Construction/Loadline
Issued 29 May 2001 Resolved
REWELD BROKEN WELDS BETWEEN SIDE CORDS AND OVERHEAD IN FORWARD SECTION OF FOREPEAK.
Condition: Unknown
Due 29 May 2001
Resolved 5 June 2001
Construction/Loadline
Issued 29 May 2001 Resolved
GAUGE BOTTOM STARBOARD AFT CORNER OF LONGITUDINAL BULKHEAD IN #4 CENTER.
Condition: Unknown
Due 29 May 2001
Resolved 5 June 2001
Construction/Loadline
Issued 29 May 2001 Resolved
CROP AND RENEW IMPROPERLY SIZED CORD ON PORT SIDE OF FORPEAK.
Condition: Unknown
Due 29 May 2001
Resolved 5 June 2001
Construction/Loadline
Issued 29 May 2001 Resolved
REMOVE ALL BILGE EDUCTION BELLS FOR VISUAL INSPECTION OF HULL PLATING UNDERNEATH EDUCTORS BY ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 29 May 2001
Resolved 5 June 2001
Construction/Loadline
Issued 29 May 2001 Resolved
GAUGE AND REPAIR (CROP AND RENEW) ALL FRAMES, CHORDS, BULKHEADS AND HULL MEMBERS WHICH ARE FOUND TO BE WASTED IN EXCESS OF ABS MINIMUM RULE THICKNESS FOR NEW CONSTRUCTION AT TIME OF CONSTRUCTION.
Condition: Unknown
Due 29 May 2001
Resolved 5 June 2001
Construction/Loadline
Issued 29 May 2001 Resolved
CROP AND RENEW HATCH COMBING, MAIN DECK PLATING SURROUNDING HATCH AND HATC LEADING TO THE FORPEAK.H
Condition: Unknown
Due 29 May 2001
Resolved 5 June 2001
Construction/Loadline
Issued 29 May 2001 Resolved
GRIND DOWN TO GOOD METAL AND CLAD WELD WASHED OUT WELD ON PORT BULKHEAD OF #3 CENTER CARGO TANK.
Condition: Unknown
Due 29 May 2001
Resolved 5 June 2001
Deck/Cargo
Issued 22 June 2000 Resolved
PROVE PROPER OPERATION OF FWD ANCHOR WINDLASS.
Condition: Unknown
Due 22 June 2000
Resolved 22 June 2000
Electrical
Issued 22 June 2000 Resolved
PROVE PROPER OPERATION OF NR. 1, 2 & 3 SHIP SERVICE GENERATORS.
Condition: Unknown
Due 22 June 2000
Resolved 22 June 2000
Accommodation/Occupational Safety
Issued 22 June 2000 Resolved
REMOVE BUNK-BEDS FROM OFFICE SPACE.
Condition: Unknown
Due 22 June 2000
Resolved 22 June 2000
Deck/Cargo
Issued 22 June 2000 Resolved
RENEW NR. 2 STBD P/V VALVE ELBOW.
Condition: Unknown
Due 22 June 2000
Resolved 22 June 2000
Deck/Cargo
Issued 22 June 2000 Resolved
PROVE PROPER OPERATION OF THE EMERGENCY STOPS/SHUTDOWNS FOR ALL CARGO PUMP PRIME MOVERS.
Condition: Unknown
Due 22 June 2000
Resolved 22 June 2000
Deck/Cargo
Issued 22 June 2000 Resolved
RENEW FLAME SCREENS ON NR. 2 & 3 CENETER AND NR. 4 PORT P/V VALVES.
Condition: Unknown
Due 22 June 2000
Resolved 22 June 2000
Construction/Loadline
Issued 22 June 2000 Resolved
RENEW STBD SIDE WATER TIGHT DOOR ON NR. 2 PUMP HOUSE.
Condition: Unknown
Due 22 June 2000
Resolved 22 June 2000
Construction/Loadline
Issued 22 June 2000 Resolved
RENEW/REPAIR PORT SIDE WATER TIGHT DOOR TO NR. 3 PUMP HOUSE.
Condition: Unknown
Due 22 June 2000
Resolved 22 June 2000
Lifesaving
Issued 22 June 2000 Resolved
REMOVE OILY WASTE FROM CARGO PUMP HOUSES/BILGE.
Condition: Unknown
Due 22 June 2000
Resolved 22 June 2000
Unknown
Issued 22 June 2000 Resolved
RENEW/REPAIR FORWARD PORT NAVIGATION LIGHT POLE.
Condition: Unknown
Due 22 June 2000
Resolved 22 June 2000
Accommodation/Occupational Safety
Issued 22 June 2000 Resolved
REPAIR/RENEW AFT PORT SAFETY CHAIN STANCHON.
Condition: Unknown
Due 22 June 2000
Resolved 22 June 2000
Deck/Cargo
Issued 22 June 2000 Resolved
PROVE PROPER OPERATION OF ALL CARGO HIGH LEVEL ALARMS
Condition: Unknown
Due 22 June 2000
Resolved 22 June 2000
Deck/Cargo
Issued 22 June 2000 Resolved
PROVE PROPER OPERATION OF ALL CARGO PUMP PRIME MOVERS.
Condition: Unknown
Due 22 June 2000
Resolved 22 June 2000
Deck/Cargo
Issued 22 June 2000 Resolved
HYDRO CARGO PIPING AND PROVIDE TEST REPORT.
Condition: Unknown
Due 22 June 2000
Resolved 22 June 2000
Navigation
Issued 22 June 2000 Resolved
PROVE PROPER OPERATION OF ALL NAVIGATION LIGHTS.
Condition: Unknown
Due 22 June 2000
Resolved 22 June 2000
Deck/Cargo
Issued 22 June 2000 Resolved
PROVE PROPER OPERATION OF STBD BOW MOORING WINCH.
Condition: Unknown
Due 22 June 2000
Resolved 22 June 2000
Engineering
Issued 22 June 2000 Resolved
GAUGE/RENEW FUEL PIPING FROM FIRST DRESSER COUPLING FORWARD.
Condition: Unknown
Due 22 June 2000
Resolved 22 June 2000
Electrical
Issued 22 June 2000 Resolved
INSTALL MISSING AFT LIGHTING PANEL COVER L-101._x001C_
Condition: Unknown
Due 22 June 2000
Resolved 22 June 2000
Construction/Loadline
Issued 22 June 2000 Resolved
FREE AND OR REPAIR AS NECESSARY ESCAPE HATCHES IN ENGINE ROOM AND AFT STBD OFFICE SPACE.
Condition: Unknown
Due 22 June 2000
Resolved 22 June 2000
Construction/Loadline
Issued 24 February 2000 Resolved
CONDUCT APPROPRIATE METALLURGIC TESTING OF THE MAIN DECK AREA SURROUNDING _x001C_CARGO PUMP #3. TAKE DATA POINTS SHOWING THE BORDERS OF ACCEPTABLE MATERIAL. PROVIDE A CERTIFIED PROFESSIONAL'S REPORT ON THE ANALYSIS OF THETESTING RESULTS AND A RECOMMENDATION ON STATUS OF AFFECTED DECK AREA.
Condition: Unknown
Due 24 February 2000
Resolved 24 February 2000
Deck/Cargo
Issued 24 February 2000 Resolved
PROVIDE SEAL SPECIFICATIONS REQUIRED BY GOULD PUMP MANUFACTURER FOR THE MODEL CARGO PUMPS ON THE BARGE NEW YORK DOCUMENTING THE TYPE SUITABLE FOR THE GASOLINE SERVICE.
Condition: Unknown
Due 24 February 2000
Resolved 24 February 2000
Deck/Cargo
Issued 24 February 2000 Resolved
PROVIDE A COPY OF RELIEF VALVE TESTING RECORDS FOR #3 CARGO RELIEF VALVES.
Condition: Unknown
Due 24 February 2000
Resolved 24 February 2000
Deck/Cargo
Issued 24 February 2000 Resolved
PROVIDE SERVICE/MAINTENANCE RECORDS FOR CARGO PUMPS #1 THROUGH #4.
Condition: Unknown
Due 24 February 2000
Resolved 24 February 2000
Electrical
Issued 24 February 2000 Resolved
PROVIDE SPECIFICATIONS FOR FLOODLIGHTS ON ALL PUMP HOUSES AND COAST GUARD PLAN APPROVAL FOR INSTALLATIONS.
Condition: Unknown
Due 24 February 2000
Resolved 24 February 2000
Deck/Cargo
Issued 24 February 2000 Resolved
PRIOR TO CLOSE OF BUSINESS ON 28FEB00 PROVIDE MSO TAMPA WITH THE NAME AND COMPANY AND TELEPHONE NUMBER FOR THE CONTACT PERSON THAT INSTALLED THE SEALS FOR THE CARGO PUMPS.
Condition: Unknown
Due 25 February 2000
Resolved 31 March 2000
Deck/Cargo
Issued 24 February 2000 Resolved
IDENTIFY ALL SPECIFICS ON CARGO PUMP SEALS THAT HAVE BEEN REPLACED IN THE PAST 6 MONTHS FROM THIS CONTRACTOR FOR VESSELS IN YOUR FLEET.
Condition: Unknown
Due 24 February 2000
Resolved 24 February 2000
Lifesaving
Issued 24 February 2000 Resolved
PRIOR TO ARRIVAL IN THE PORT OF PORT ARTHUR, TX, CONTACT THE CAPTAIN OF THEPORT, PORT ARTHUR, TX, TO NOTIFY HIM OF VESSEL'S LAY UP INTENTIONS, AND SUBMIT LAY-UP PLAN TO THE SATISFACTION OF THE CAPTAIN OF THE PORT, PORT ARTHUR, TX.
Condition: Unknown
Due 24 February 2000
Resolved 24 February 2000
Electrical
Issued 24 February 2000 Resolved
PROVIDE SPECIFICATIONS FOR ELECTRICAL JUNCTION BOXES SERVICING ALL FLOODLIGHTS ON PUMP HOUSES.
Condition: Unknown
Due 24 February 2000
Resolved 24 February 2000
Deck/Cargo
Issued 24 February 2000 Resolved
PROVIDE MANUFACTURER'S SPECIFICATIONS FOR CHECK VALVES ON #3 CARGO LINES LOCATED NEXT TO CARGO PIPING RELIEF LINES.
Condition: Unknown
Due 24 February 2000
Resolved 24 February 2000
Deck/Cargo
Issued 24 February 2000 Resolved
PROVIDE MAKE, MODEL, SPECIFICATIONS, DRAWINGS, AND APPROPRIATE SECTIONS OF TECHNICAL MANUALS FOR CARGO PUMP SEAL ASSEMBLIES.
Condition: Unknown
Due 24 February 2000
Resolved 24 February 2000
Deck/Cargo
Issued 24 February 2000 Resolved
PROVIDE MAKE, MODEL, SPECIFICATIONS, DRAWINGS, AND APPROPRIATE SECTIONS OF TECHNICAL MANUALS FOR GOULD CARGO PUMPS.
Condition: Unknown
Due 24 February 2000
Resolved 24 February 2000
Deck/Cargo
Issued 24 February 2000 Resolved
RENEW ALL AFFECTED GASKETS AND CONDUCT A HYDROSTATIC TEST OF ALL CARGO PUMPLINES TO INCLUDE PUMP SEALS, RELIEF VALVES, BLOCKING VALVES TO 1.5 X MAWP IN PRESENCE OF MARINE INSPECTOR.
Condition: Unknown
Due 24 February 2000
Resolved 24 February 2000
Deck/Cargo
Issued 24 February 2000 Resolved
PROVE PROPER OPERATION OF REMOTE VALVES ON ALL CARGO PUMPS TO THE SATISFACTION OF A MARINE INSPECTOR.
Condition: Unknown
Due 24 February 2000
Resolved 24 February 2000
Deck/Cargo
Issued 24 February 2000 Resolved
VESSEL RESTRICTED FROM CARRYING CARGO UNTIL ALL 4 PUMPS HAVE BEEN COMPLETELY OVERHAULED OR REPLACED BY A TECHNICIAN TO INCLUDE INSPECTION/REPAIR OF ALL BEARINGS/BUSHINGS TO MANUFACTURER'S TOLERANCES. WORK TO BE DONE BY COMPETENT TECHNICIAN.
Condition: Unknown
Due 24 February 2000
Resolved 24 February 2000
Deck/Cargo
Issued 24 February 2000 Resolved
PROPERLY INSTALL BOLTS ON ALL FLANGE CONNECTIONS TO A MINIMUM OF 2 THREADS BEYOND THE NUT.
Condition: Unknown
Due 24 February 2000
Resolved 24 February 2000
Documentation
Issued 24 February 2000 Resolved
PROVIDE ALL APPLICABLE CLASSIFICATION SOCIETY DOCUMENTS SHOWING NO OUTSTANDING CONDITIONS OF CLASS PRIOR TO CARRYING CARGO.
Condition: Unknown
Due 24 February 2000
Resolved 24 February 2000
Deck/Cargo
Issued 24 February 2000 Resolved
PROVIDE A WRITTEN PROPOSAL ON HOW TO DISCHARGE THE REMAINING PRODUCT. THISPROPOSAL MUST BE ACCEPTED BY THE COAST GUARD PRIOR TO DISCHARGE.
Condition: Unknown
Due 25 February 2000
Resolved 31 March 2000
Deck/Cargo
Issued 24 February 2000 Resolved
PROVIDE COMPANY POLICY STATEMENT AND TRANSFER PROCEDURES THAT OUTLINE WHAT TO DO IF GASOLINE IS FOUND LEAKING FROM A SEAL WHICH WAS OBVIOUSLY COMMON PLACE ON BARGE NEW YORK AS EVIDENCED BY SPILL OVER HOSE AND BUCKETS DESIGNED TO COLLECT LEAKING GASOLINE.
Condition: Unknown
Due 24 February 2000
Resolved 24 February 2000
Deck/Cargo
Issued 24 February 2000 Resolved
PROVIDE INDICATORS FOR ALL VALVES THAT ARE NOT RISING STEM TO SHOW POSITIONOF VALVE RELATIVE TO OPEN OR SHUT CONDITION.
Condition: Unknown
Due 24 February 2000
Resolved 24 February 2000
Electrical
Issued 24 February 2000 Resolved
PROVE ALL ELECTRICAL EQUIPMENT INSTALLATIONS ON CARGO DECK OR PUMP HOUSES WITHIN 10 FEET OF PUMP SEALS MEET THE REQUIREMENTS OF 46 CFR 111 PRIOR TO CARRYING CARGO.
Condition: Unknown
Due 24 February 2000
Resolved 24 February 2000
Construction/Loadline
Issued 24 February 2000 Resolved
GAS FREE AND MAKE #4P CARGO TANK AVAILABLE FOR INSPECTION BY MARINE_x001C_ INSPECTOR TO INSPECT UNDERSIDE OF BUCKLED MAIN DECK.
Condition: Unknown
Due 24 February 2000
Resolved 24 February 2000
Deck/Cargo
Issued 24 February 2000 Resolved
VESSEL IS ALLOWED TO TRANSIT FROM TAMPA, FL, TO PORT ARTHUR, TX, TO BE PLACED IN LAY-UP STATUS, NO CARGO, ONLY CARGO RESIDUE, NO CREW ON BOARD, AND THE VESSEL WILL BE AUTHORIZED NO OTHER TRANSITS HAVING REACHED THE PORTOF PORT ARTHUR, TX, UNLESS GIVEN SPECIFIC APPROVAL BY THE COGNIZANT OCMI.
Condition: Unknown
Due 24 February 2000
Resolved 24 February 2000
Deck/Cargo
Issued 24 February 2000 Resolved
PRIOR TO CARRIAGE OF CARGO, ENSURE ALL OUTSTANDING REQUIREMENTS ARE MET TO THE SATISFACTION OF COGNIZANT OCMI.
Condition: Unknown
Due 24 February 2000
Resolved 24 February 2000
Construction/Loadline
Issued 13 October 1999 Resolved
REPLACE MANHOLE COVERS TO THE CHAIN LOCKER AND FOREPEAK DUE TO WASTAGE, DAMAGE & EXCESSIVE LEAKAGE. TO BE COMPLETED TO THE SATISFACTION OF THE COGNIZANT [name withheld] FROM THE NEXT PORT.
Condition: Unknown
Due 13 October 1999
Resolved 13 October 1999
Construction/Loadline
Issued 13 October 1999 Resolved
MAKE THE CHAIN LOCKER AND FOREPEAK READY FOR INTERNAL INSPECTION BY A USCG INSPECTOR TO EVALUATE THE CONDITION OF THESE SPACES DUE TO EXCESSIVE WATER FOUND. MAKE REPAIRS/TESTS AS DEEMED NECESSARY BY ATTENDING INSPECTOR PRIOR TO DEPARTURE FROM THE NEXT PORT.
Condition: Unknown
Due 13 October 1999
Resolved 13 October 1999
Deck/Cargo
Issued 27 June 1999 Resolved
VESSEL NOT TO LOAD ANY CARGO UNTIL PERMANENT REPAIRS ARE COMPLETED TO #2 STBD. CARGO TANK.
Condition: Unknown
Due 27 June 1999
Resolved 27 June 1999
Deck/Cargo
Issued 27 June 1999 Resolved
VESSEL TO PROCEED WITH NO CARGOES ABOARD TO MSO TAMPA, FLORIDA AOR.
Condition: Unknown
Due 27 June 1999
Resolved 27 June 1999
Documentation
Issued 27 June 1999 Resolved
PROVIDE UNDERWATER DIVERS REPORT TO THE ATTENDING USCG MARINE INSPECTOR.
Condition: Unknown
Due 27 June 1999
Resolved 27 June 1999
Deck/Cargo
Issued 27 June 1999 Resolved
AT DESTINATION PERFORM PERMANENT REPAIRS TO THE #2 STBD CARGO TANK TO THE SATISFACTION OF THE ATTENDING USCG MARINE INSPECTOR.
Condition: Unknown
Due 27 June 1999
Resolved 27 June 1999
Electrical
Issued 10 March 1999 Resolved
TIGHTEN PACKING NUT PORT GENERATOR ELECTRICAL CABLE.
Condition: Unknown
Due 8 April 1999
Resolved 12 March 1999
Deck/Cargo
Issued 10 March 1999 Resolved
RENEW HYDRAULIC HOSES ON #1 AND #2 CARGO PUMP STARTING SYSTEMS (ONES THAT ARE CHAFED OR CRACKED).
Condition: Unknown
Due 3 April 1999
Resolved 12 March 1999
Documentation
Issued 10 March 1999 Resolved
UPDATE OIL RECORD BOOK BETWEEN DATES OF 11 JUN 98 TO CURRENT.
Condition: Unknown
Due 8 April 1999
Resolved 12 March 1999
Electrical
Issued 10 March 1999 Resolved
REPAIR EMERGENCY SHUTDOWN FOR #1, 2, AND 3 GENERATORS.
Condition: Unknown
Due 8 April 1999
Resolved 12 March 1999
Electrical
Issued 10 March 1999 Resolved
REPAIR FUEL LEAKS: 1) PORT GEN FUEL OIL RETURN VALVE, 2) FUEL OIL SUPPLY TEE, 3) #2 GENERATOR FUEL OIL RETURN VALVE.
Condition: Unknown
Due 8 April 1999
Resolved 12 March 1999
Electrical
Issued 10 March 1999 Resolved
INSTALL MISSING BOLT IN BRACKET ON FUEL OIL SUPPLY LINE #3 GEN.
Condition: Unknown
Due 8 April 1999
Resolved 12 March 1999
Electrical
Issued 10 March 1999 Resolved
INSTALL CAP OR BULB IN OUTLET ON ELEC. SWITCHBOARD FOR #1 GEN OIL/WATER INDICATOR.
Condition: Unknown
Due 8 April 1999
Resolved 12 March 1999
Electrical
Issued 10 March 1999 Resolved
RENEW OIL-SOAKED LAGGING PORT GENERATOR._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 8 April 1999
Resolved 12 March 1999
Electrical
Issued 10 March 1999 Resolved
REPAIR DEAD-END WIRES #1, 2, AND 3 GEN._x001C_ _x001C_
Condition: Unknown
Due 8 April 1999
Resolved 12 March 1999
Electrical
Issued 10 March 1999 Resolved
REPAIR OIL LEAKS ON ALL GEN'S.
Condition: Unknown
Due 8 April 1999
Resolved 12 March 1999
Electrical
Issued 10 March 1999 Resolved
INSTALL HANDLES ON ALL FUEL OIL STRAINERS ON ALL GEN'S.
Condition: Unknown
Due 8 April 1999
Resolved 12 March 1999
Electrical
Issued 10 March 1999 Resolved
RENEW TEE HANDLE ON FUEL OIL STRAINER #2 GEN.
Condition: Unknown
Due 8 April 1999
Resolved 12 March 1999
Electrical
Issued 10 March 1999 Resolved
REPAIR/RENEW ELECRICAL DISCONNECT SWITCH FOR MACHINERY SPACE VENTILATION.
Condition: Unknown
Due 8 April 1999
Resolved 12 March 1999
Lifesaving
Issued 10 March 1999 Resolved
STENCIL EMERG. ESCAPE ON SCUTTLE IN GENERATOR ROOM.
Condition: Unknown
Due 8 April 1999
Resolved 12 March 1999
Electrical
Issued 10 March 1999 Resolved
RENEW/REPAIR ALL MALFUNCTIONING METERS LOCATED ON ELEC. SWITCHBOARD.
Condition: Unknown
Due 8 April 1999
Resolved 12 March 1999
Lifesaving
Issued 10 March 1999 Resolved
HOUSEKEEPING OF CARGO PUMP ROOMS (OILY RAGS REMOVED FROM BILGES, OIL REMOVED FROM BILGES) AND GENERATOR ROOMS (LUBE OIL CANS REMOVED OR CAPPED, OLD FILTERS REMOVED)
Condition: Unknown
Due 10 April 1999
Resolved 12 March 1999
Electrical
Issued 10 March 1999 Resolved
GENERATORS READY FOR INSPECTION - OVERSPEEDS, SHUTDOWNS._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 3 April 1999
Resolved 12 March 1999
Navigation
Issued 10 March 1999 Resolved
PAINT BACKGROUND FOR NAV LIGHTS FLAT BLACK.
Condition: Unknown
Due 3 April 1999
Resolved 12 March 1999
Deck/Cargo
Issued 10 March 1999 Resolved
REPLACE DECK PLUGS (3).
Condition: Unknown
Due 3 April 1999
Resolved 12 March 1999
Deck/Cargo
Issued 10 March 1999 Resolved
FIX EXHAUST LEAK IN #4 CARGO PUMP ROOM - PORT SIDE PLUG MISSING.
Condition: Unknown
Due 3 April 1999
Resolved 12 March 1999
Electrical
Issued 10 March 1999 Resolved
REMOVE OR CAP DEAD END WIRING IN GENERATOR ROOM.
Condition: Unknown
Due 3 April 1999
Resolved 12 March 1999
Deck/Cargo
Issued 10 March 1999 Resolved
HYDRAULIC STARTING SYSTEM NEEDS SUPPORT BRACKET REPLACED.
Condition: Unknown
Due 3 April 1999
Resolved 12 March 1999
Deck/Cargo
Issued 10 March 1999 Resolved
#1 CARGO PUMP FUEL SUPPLY VALVE IS MISSING A HANDWHEEL.
Condition: Unknown
Due 3 April 1999
Resolved 12 March 1999
Construction/Loadline
Issued 10 March 1999 Resolved
FREE AND/OR REPAIR AS NECESSARY ESCAPE HATCHES IN PUMP ROOMS, FREE DOGS ON FOC'SLE HATCH TO BOS'N STORES ON FOREPEAK, AND REPLACE HATCH ON STBD VOID ON FOC'SLE.
Condition: Unknown
Due 10 March 1999
Resolved 10 March 1999
Construction/Loadline
Issued 10 March 1999 Resolved
CARGO PUMP ROOM DOOR GASKETS NEED TO BE REPLACED OR SHOWN TO BE ADEQUATE (CHALKTEST).
Condition: Unknown
Due 3 April 1999
Resolved 12 March 1999
Fire Fighting
Issued 7 May 1998 Resolved
MAKE PERMANENT REPAIRS AND PROVE PROPER OPERATION IN THE PRESENCE OF CG MARINE INSPECTOR OF THE HEATER RISER DETECTION SYSTEM ON THE FIXED CO2 SYSTEM SUPPLYING THE STBD STORAGE SPACE.
Condition: Unknown
Due 14 May 1998
Resolved 26 May 1998
Documentation
Issued 7 May 1998 Resolved
BARGE OWNER TO PROVIDE WRITTEN GUIDANCE FOR TOWING VESSEL OPERATOR ABOUT BRIDGE RESOURCE MGMT POLICY/PROCEDURE, AND VESSEL SPECIFIC WATCH POLICY ANDPROCEDURES PER NVIC 2-97.
Condition: Unknown
Due 7 May 1998
Resolved 7 May 1998
Construction/Loadline
Issued 7 May 1998 Resolved
REPLACE EARS ON WATERTIGHT DOOR LEADING TO THE STBD STORAGE SPACE. PROVE PROPER CLOSURE IN THE PRESENCE OF CG MARINE INSPECTOR.
Condition: Unknown
Due 14 May 1998
Resolved 26 May 1998
Engineering
Issued 13 March 1997 Resolved
STENCIL FUEL OIL ENGINE ROOM SUPPLY VALVES.
Condition: Unknown
Due 25 April 1997
Resolved 25 April 1997
Unknown
Issued 13 March 1997 Resolved
PROVIDE DOCUMENTATION OF BUNKER PIPING HYDRO TEST.
Condition: Unknown
Due 25 April 1997
Resolved 25 April 1997
Construction/Loadline
Issued 13 March 1997 Resolved
AT CLASS SOCIETY SCHEDULED HULL EXAM CROP AND RENEW SECTION OF PORT SIDE SHELL PLATE BELOW ANCHOR CHUTE IN BOW COMPARTMENT. REPLACE IN KIND OR PROVIDE APPROVED PLANS._x001C_ _x001C_
Condition: Unknown
Due 13 March 1997
Resolved 13 March 1997
Fire Fighting
Issued 13 March 1997 Resolved
RE-STENCIL CO2 INSTRUCTIONS ON PORT SIDE AFT.
Condition: Unknown
Due 25 April 1997
Resolved 25 April 1997
Electrical
Issued 13 March 1997 Resolved
LABEL BREAKER PANELS IN FOC'SLE. INSTALL PROTECTIVE GUARD AROUND RESISTOR GRID AND INSTALL COVER TO PREVENT DEBRIS FROM ENTERING INSIDE MAIN PANEL INFOC'SLE.
Condition: Unknown
Due 25 April 1997
Resolved 25 April 1997
Electrical
Issued 13 March 1997 Resolved
PROPERLY SUPPORT WIRING TO MAIN ELECTRICAL PANEL IN FOC'SLE.
Condition: Unknown
Due 25 April 1997
Resolved 25 April 1997
Electrical
Issued 13 March 1997 Resolved
REPAIR ALL LIGHTING IN FOC'SLE.
Condition: Unknown
Due 25 April 1997
Resolved 25 April 1997
Electrical
Issued 13 March 1997 Resolved
PROVE PROPER OPERATION OF #1 GENERATOR (OVERSPEED & SHUTDOWNS).
Condition: Unknown
Due 25 April 1997
Resolved 25 April 1997
Engineering
Issued 13 March 1997 Resolved
INSTALL PLUGS IN STORAGE TANKS IN PORT SIDE ENGINE ROOM.
Condition: Unknown
Due 25 April 1997
Resolved 25 April 1997
Electrical
Issued 13 March 1997 Resolved
PROVIDE DATA TAG FOR #3 (SMALL) GENERATOR.
Condition: Unknown
Due 13 March 1997
Resolved 13 March 1997
Electrical
Issued 13 March 1997 Resolved
INSTALL MACHINERY GUARDS OVER 2 ELECTRICAL PUMP COUPLINGS.
Condition: Unknown
Due 25 April 1997
Resolved 25 April 1997
Electrical
Issued 13 March 1997 Resolved
INSTALL NEW TAGS ON SWITCHBOARD FOR #2 GENERATOR.
Condition: Unknown
Due 25 April 1997
Resolved 25 April 1997
Electrical
Issued 13 March 1997 Resolved
PLUG SQUARE HOLE IN MAIN SWITCHBOARD (FRONT) AND #2 GENERATOR.
Condition: Unknown
Due 25 April 1997
Resolved 25 April 1997
Documentation
Issued 13 March 1997 Resolved
PROVIDE PROOF OF ANNUAL REVIEW OF SOPEP & VRP.
Condition: Unknown
Due 25 April 1997
Resolved 25 April 1997
Deck/Cargo
Issued 13 March 1997 Resolved
REMOVE BRASS PETCOCKS FROM ALL CARGO PUMP ENGINES.
Condition: Unknown
Due 25 April 1997
Resolved 25 April 1997
Construction/Loadline
Issued 5 March 1997 Resolved
CONDUCT TEMP. REPAIR AND PROCEED TO HOUSTON,TX TO CONDUCT PERMANENT REPAIR TO 1 1/2' DAMAGE IN FWD. RAKE. VESSEL MAY NOT OPERATE FOR COMMERCE UNTIL PERMANENT REPAIRS ARE MADE AND ALL INSPECTIONS AND TESTS MUST BE APPROVED BY ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 5 March 1997
Resolved 5 March 1997
Deck/Cargo
Issued 4 February 1997 Resolved
Make permanent repairs to #1 center cargo tank suction valve reach rod prior to loading any cargo into #1C.
Condition: Unknown
Due 4 February 1997
Resolved 4 February 1997
Lifesaving
Issued 2 February 1996 Resolved
REPLACE ALL CARGO TANK ALUMINUM HATCH COVERS WITH STEEL HATCH COVERS OR PROVIDE DOCUMENTATION THAT EXISTING ALUMINUM HATCH COVERS WERE APPROVED. TOTAL 15 COVERS.
Condition: Unknown
Due 4 March 1996
Resolved 9 February 1996
Documentation
Issued 2 February 1996 Resolved
PROVIDE ON BOARD THE VESSEL THE ORIGINAL IOPP CERTIFICATE.
Condition: Unknown
Due 4 March 1996
Resolved 5 February 1996
Deck/Cargo
Issued 28 March 1995 Resolved
IN A GAS FREE STATE, PROVIDE PRESSURE VACUUM RELIEF VALVES FOR INTERNAL INSPECTION AT NEXT DRYDOCK. THE ABOVE REQUIREMENT TO BE MET TO THE SATISFACTION OF THE COGNIZANT [name withheld] 31AUG95.
Condition: Unknown
Due 30 March 1995
Resolved 30 March 1995
Fire Fighting
Issued 28 March 1995 Resolved
REPAIR AND PROVE PROPER OPERATION OF CO2 (FIXED) FOR OFFICE AREA; REPAIR ORREPLACE FAULTY VALVE.
Condition: Unknown
Due 30 March 1995
Resolved 30 March 1995
Fire Fighting
Issued 28 March 1995 Resolved
REPAIR AND PROVE PROPER OPERATION OF TIME DELAY IN #1 PUMP HOUSE CO2 SYSTEM.
Condition: Unknown
Due 30 March 1995
Resolved 30 March 1995
Electrical
Issued 1 June 1994 Resolved
PROVIDE MISSING BLANKS FOR THE LIGHTING PANEL L-102.
Condition: Unknown
Due 1 August 1994
Resolved 3 June 1994
Deck/Cargo
Issued 1 June 1994 Resolved
REMOVE ALL UNUSED CAPILLARY TUBES.
Condition: Unknown
Due 1 August 1994
Resolved 3 June 1994
Electrical
Issued 1 June 1994 Resolved
EFFECT PERMANENT REPAIRS TO THE CENTER DIESEL GENERATOR IN WAY OF DIESEL FUEL OIL LEAKS.
Condition: Unknown
Due 1 August 1994
Resolved 3 June 1994
Electrical
Issued 1 June 1994 Resolved
REMOUNT COVER ON THE 440V DISTRIBUTION PANEL IN THE FORWARD SPACE.
Condition: Unknown
Due 1 August 1994
Resolved 3 June 1994
Electrical
Issued 1 June 1994 Resolved
PROVE PROPER OPERATION OF THE FORWARD STBD STORAGE ROOM LIGHT SWITCH.
Condition: Unknown
Due 1 August 1994
Resolved 3 June 1994
Electrical
Issued 1 June 1994 Resolved
PROVIDE SUITABLE COVERS, GUARDS, AND BULBS FOR ALL ELECTRICAL OUTLETS AND SOCKETS IN THE FORWARD HOLD.
Condition: Unknown
Due 1 August 1994
Resolved 3 June 1994
Construction/Loadline
Issued 1 June 1994 Resolved
MAKE OPERABLE OR REMOVE FORWARD BALLAST PUMP AND REACH ROD LOCATED IN THE FORWARD SPACE.
Condition: Unknown
Due 30 August 1995
Resolved 3 June 1994
Electrical
Issued 14 April 1993 Resolved
PROVE PROPER OPERATION OF VESSEL'S GENERATORS OVERSPEED TRIPS IN THE PRESENCE OF A USCG MARINE INSPECTOR.
Condition: Unknown
Due 14 April 1993
Resolved 14 April 1993
Deck/Cargo
Issued 14 April 1993 Resolved
PROVE PROPER OPERATION OF THE VESSEL'S CARGO PUMPS EMERGENCY SHUTDOWNS IN THE PRESENCE OF A USCG MARINE INSPECTOR.
Condition: Unknown
Due 14 April 1993
Resolved 14 April 1993
Deck/Cargo
Issued 14 April 1993 Resolved
PROVE PROPER OPERATION OF VAPOR RECOVERY SYSTEM HIGH LEVEL/OVERFILL ALARM SYSTEM'S LOSS OF POWER ALARM IN THE PRESENCE OF A USCG MARINE INSPECTOR.
Condition: Unknown
Due 14 April 1993
Resolved 14 April 1993
Deck/Cargo
Issued 14 April 1993 Resolved
MAKE INDIVIDUAL CARGO TANK PV VALVES AVAILABLE FOR INTERNAL INSPECTION BY AUSCG MARINE INSPECTOR.
Condition: Unknown
Due 14 April 1993
Resolved 14 April 1993
Construction/Loadline
Issued 11 February 1993 Resolved
MADE TEMPORARY REPAIRS TO 4' CRACK STBD SIDE SHELL (DRILL STOP) 3 STBD TANK. OFF LOAD CARGO, VESSEL NOT TO CARRY CARGO UNTIL PERMANENT REPAIRS MADE TO SATISFACTION OF CLASS SOCIETY AND COGNIZANT OCMI.
Condition: Unknown
Due 11 February 1993
Resolved 11 February 1993
Deck/Cargo
Issued 23 November 1992 Resolved
Final acceptance of vessel's Vapor Recovery System is pending the calibration of the "high level" & "over fill" alarms. Contact the cognazantOCMI for an inspector to witness the operation of the high level & over fill alarms. After completion of this test the COI may be endorsed.
Condition: Unknown
Due 23 November 1992
Resolved 23 November 1992
Accommodation/Occupational Safety
Issued 3 July 1992 Resolved
REPAIR/REPLACE WASTED LIFELINE STANCHIONS AND WIRE ROPE CLIPS.
Condition: Unknown
Due 3 July 1992
Resolved 3 July 1992
Electrical
Issued 3 July 1992 Resolved
RENEW ARMOURED ELECTRICAL CABLE WHERE ARMOUR IS DISCONTINOUS IN AREAS OF WINCHES AND NAV LIGHTS.
Condition: Unknown
Due 3 July 1992
Resolved 3 July 1992
Electrical
Issued 3 July 1992 Resolved
REFASTEN PORT AFT MOORING WINCH CONTROL SWITCH.
Condition: Unknown
Due 3 July 1992
Resolved 3 July 1992
Fire Fighting
Issued 3 July 1992 Resolved
RELABEL GENERATOR ROOM FIXED CO2 PULL HANDLE, PORT SIDE.
Condition: Unknown
Due 3 July 1992
Resolved 3 July 1992
Lifesaving
Issued 3 July 1992 Resolved
COMPLETE GENERAL HOUSEKEEPING OF CARGO PUMP ROOMS, GENERATOR ROOM, GENERAL STORES ROOM, TANKERMAN "DOGHOUSE", BY REMOVING COMBUSTABLES, SPARE OIL, GREASE, PAINTS, ETC. CLEAN ENGINES, UNDERNEATH, AND DECK.
Condition: Unknown
Due 3 July 1992
Resolved 3 July 1992
Deck/Cargo
Issued 3 July 1992 Resolved
HYDROSTATICALLLY TEST ALL CARGO PIPING TO 1.5 X MAWP.
Condition: Unknown
Due 3 July 1992
Resolved 3 July 1992
Accommodation/Occupational Safety
Issued 3 July 1992 Resolved
REMOVE SHACKLES AND CHAINS FROM GENERATOR ROOM AND DRY STORE ROOM ESCAPE SCUTTLES.
Condition: Unknown
Due 3 July 1992
Resolved 3 July 1992
Construction/Loadline
Issued 3 July 1992 Resolved
REPAIR PORT SIDE MOORING BITT WHERE RIPPED AWAY.
Condition: Unknown
Due 3 July 1992
Resolved 3 July 1992
Engineering
Issued 3 July 1992 Resolved
REPLACE #1 CARGO PUMP ENGINE F/O FILTER HOSE WITH APPROVED HOSE IAW 46CFR56.60-25(C).
Condition: Unknown
Due 3 July 1992
Resolved 3 July 1992
Engineering
Issued 3 July 1992 Resolved
FREE-UP AND PROVE PROPER OPERATION OF FUEL OIL TRANSFER AND SERVICE REMOTE VALVES.
Condition: Unknown
Due 3 July 1992
Resolved 3 July 1992
Electrical
Issued 3 July 1992 Resolved
PROVIDE DRIP PANS FOR TOP OF GENERATOR ROOM FAN AND PUMP CONTROLLERS BY FUEL OIL TANK.
Condition: Unknown
Due 3 July 1992
Resolved 3 July 1992
Electrical
Issued 3 July 1992 Resolved
CLEAN NAVIGATION LIGHT BATTERY TERMINALS AND BOX.
Condition: Unknown
Due 3 July 1992
Resolved 3 July 1992
Documentation
Issued 2 August 1990 Resolved
VESSEL MUST COMPLETE MIDPERIOD INSPECTION PRIOR TO CARRYING CARGO BUT NO LATER THAN 15 AUG 90
Condition: Unknown
Due 2 August 1990
Resolved 2 August 1990
Construction/Loadline
Issued 2 August 1990 Resolved
PORT AND STBD AFT RAKES, COMPLETE WELD ON THE 4 ACCESS PLATES, FRAME #64, APPX 36 INCHES FROM OUTBOARD BULKHEAD.
Condition: Unknown
Due 2 August 1990
Resolved 2 August 1990
Construction/Loadline
Issued 2 August 1990 Resolved
CROP AND RENEW PORTION OF WASTED CENTERLINE BULKHEAD IN FWD RAKE/FOREPEAK FROM #6 FRAME BACK TO AFT BULKHEAD; FROM KEEL BAR UP TO APPX 5 FEET
Condition: Unknown
Due 2 August 1990
Resolved 2 August 1990
Documentation
Issued 5 July 1990 Resolved
VESSEL MUST OFFLOAD CARGO & MAY NOT TAKE CARGO UNTIL CERT OF DOCUMENTATION IS RENEWED. MIDPERIOD EXAMINATION IS COMPLETED AND CREDIT DRYDOCK IS COMPLETED AS PER 46 CFR 30.10-21 AND 46CFR 31.10-17.
Condition: Unknown
Due 5 July 1990
Resolved 5 July 1990
Construction/Loadline
Issued 10 January 1989 Resolved
VESSEL IS TO DISCHARGE CARGO AS SOON AS POSSIBLE AND PROCEDE TO REPAIR FACILITY AND/OR MAKE BARGE AVAILABLE FOR INTERNAL EXAMINATION IN WAY OF DAMAGED FOREPEAK. TO BE COMPLETED IN PRESENSE OF CG MARINE INSPECTOR BY 30 JAN 89 AND/OR PRIOR TO CARRIAGE OF CARGO.
Condition: Unknown
Due 10 January 1989
Resolved 10 January 1989
Deck/Cargo
Issued 13 July 1988 Resolved
REPLACE MISSING EXHAUST PIPE GUARDS ON ALL CARGO PUMP ENGINES. 46 CFR 31.10-15(B)
Condition: Unknown
Due 13 July 1988
Resolved 13 July 1988
Accommodation/Occupational Safety
Issued 13 July 1988 Resolved
RE-ATTACH HAND RAIL AT TOP OF LADDER LEADING TO GENERATOR ROOM. 46 CFR 31.10-15(B)
Condition: Unknown
Due 13 July 1988
Resolved 13 July 1988
Electrical
Issued 13 July 1988 Resolved
LOCATE AND CORRECT GROUND ON INBOARD (NO. 1) GENERATOR. 46 CFR 111.05-11 AND 46 CFR 111.05-21
Condition: Unknown
Due 13 July 1988
Resolved 13 July 1988
Construction/Loadline
Issued 27 November 1987 Resolved
SECURE DRAINAGE HOLD IN DECK PORT SIDE OF FORWARD MACHINERY VOID.
Condition: Unknown
Due 27 November 1987
Resolved 27 November 1987
Electrical
Issued 27 November 1987 Resolved
SECURE ALL ELECTRICAL POWER TO FORWARD MACHINERY VOID, PROPERLY TAG BREAKERS.
Condition: Unknown
Due 27 November 1987
Resolved 27 November 1987
Electrical
Issued 27 November 1987 Resolved
DEMONSTRATE INTEGRITY OF ALL ELECTRICAL WIRING IN FORWARD MACHINERY VOID INPRESENCE OF USCG INSPECTOR AT NEXT DRYDOCK.
Condition: Unknown
Due 27 November 1987
Resolved 27 November 1987
Construction/Loadline
Issued 27 November 1987 Resolved
REPAIR AND/OR RE-NEW AS NECESSARY ALL STRUCTURAL COMPONENTS OF VESSEL IN WAY OF FORWARD MACHINERY SPACE WHICH WERE DAMAGED BY EXPLOSION 26 NOVEMBER 1987.
Condition: Unknown
Due 27 November 1987
Resolved 27 November 1987
Deck/Cargo
Issued 27 November 1987 Resolved
RE-NEW 4 INCH VENT LINE FOR FORWARD DOUBLE-BOTTOM VOID, PORT SIDE.
Condition: Unknown
Due 27 November 1987
Resolved 27 November 1987
Deck/Cargo
Issued 27 November 1987 Resolved
IDENTIFY SOURCE OF PRODUCT LEAKING INTO FORWARD MACHINERY VOID AND FORWARD DOUBLE-BOTTOM VOID AND REPAIR TO SATISFACTION OF COGNIZANT OCMI.
Condition: Unknown
Due 27 November 1987
Resolved 27 November 1987
Documentation
Issued 8 May 1987 Resolved
OBTAIN A CURRENT CERTIFICATE OF DOCUMENTATION.
Condition: Unknown
Due 8 May 1987
Resolved 8 May 1987
Deck/Cargo
Issued 8 May 1987 Resolved
PROVIDE A COPY OF THE CARGO PIPING HYDROSTATIC TEST REPORT TO THE [name withheld], TEXAS.
Condition: Unknown
Due 8 May 1987
Resolved 8 May 1987
Construction/Loadline
Issued 8 May 1987 Resolved
MAKE PERMANENT REPAIRS TO THE WASTED BALLAST TANK VENT PIPE LOCATED ON THE STBD SIDE IN THE FORWARD ENGINE SPACE.
Condition: Unknown
Due 8 May 1987
Resolved 8 May 1987
Construction/Loadline
Issued 12 March 1987 Resolved
TEPORARY REPAIRS COMPLETED (DRILLED STOPPER HOLES AT EACH END OF CRACK AND WELDED EXTERNALLY) ON APPROXIMATLY 3" CRACK IN#5 STBD CARGO TANK FRM 57AT TURN OF BILGE.PERMANENT REPAIRS (WELDED INTERNALLY) ARE TO BE COMPLETED AT NEXT DRYDOCK.
Condition: Unknown
Due 12 March 1987
Resolved 12 March 1987
Unknown
Issued 7 July 1986 Resolved
SUBMIT A COPY OF THE FIREFIGHTING EQUIPMENT SERVICING REPORT TO [name withheld], TEXAS.
Condition: Unknown
Due 7 July 1986
Resolved 7 July 1986
Fire Fighting
Issued 28 April 1986 Resolved
INSTALL NEW TIME DELAYS ON THE FIXED CO2 SYSTEM SERVING THE GENERATOR ROOM AND TEST IN THE PRESENCE OF A MARINE INSPECTOR.
Condition: Unknown
Due 28 April 1986
Resolved 28 April 1986
Electrical
Issued 28 April 1986 Resolved
MAKE OPERABLE THE DOOR TO THE BREAKER BOX LOCATED IN THE GENERATOR ROOM AND PRESENT FOR INSPECTION.
Condition: Unknown
Due 28 April 1986
Resolved 28 April 1986
Electrical
Issued 28 April 1986 Resolved
REPAIR THE DOOR TO THE LARGE ELECTRICAL BOX LOCATED IN THE ANCHOR WINDLASS ROOM AND INSTALL BLANKS IN UNUSED RELAY SWITCHES.
Condition: Unknown
Due 28 April 1986
Resolved 28 April 1986
Electrical
Issued 28 April 1986 Resolved
PROPERLY MOUNT THE LOOSE RELAY BOX LOCATED IN THE GENERATOR ROOM.
Condition: Unknown
Due 28 April 1986
Resolved 28 April 1986
Deck/Cargo
Issued 4 May 1985 Resolved
CONDUCT HYDRO TEST OF CARGO PIPING.
Condition: Unknown
Due 4 May 1985
Resolved 4 May 1985
Unknown
Issued 15 May 1984 Resolved
PROVIDE ON BOARD A SUITABLE PILOT LADDER.
Condition: Unknown
Due 15 May 1984
Resolved 15 May 1984
Electrical
Issued 15 May 1984 Resolved
REMOVE DEAD END CABLES FROM FOREPEAK MOTOR ROOM.
Condition: Unknown
Due 15 May 1984
Resolved 15 May 1984
Electrical
Issued 15 May 1984 Resolved
PLACE DRIP SHIELDS AND COVERS ON MOTOR CONTROLERS IN THE FOREPEAK MOTOR ROOM.
Condition: Unknown
Due 15 May 1984
Resolved 15 May 1984
Electrical
Issued 15 May 1984 Resolved
MAKE PERMANENT REPAIRS TO P-101 AFT POWER PANEL AND L-101 AFT LIGHTING PANEL WHERE COVERS ARE MISSING OR RENEW BOTH PANELS.
Condition: Unknown
Due 15 May 1984
Resolved 15 May 1984
Unknown
Issued 15 May 1984 Resolved
PROVIDE ON BOARD A CURRENT CERTIFICATE OF DOCUMENTATION.
Condition: Unknown
Due 15 May 1984
Resolved 15 May 1984

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.