Inspection history · 68
18 May 2018
Permit to Proceed
Administrative · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6419891
7 January 2018
Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6366265
18 July 2017
Annual Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6220367
3 March 2016
MTSA Verification · Annual Inspection · MARPOL Annex I Examination
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 5825689
23 July 2015
MTSA Verification · MARPOL Annex VI Survey · COI Inspection · MARPOL Annex I Examination
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 5193034
4 March 2015
Internal Structural Exam
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 5078300
20 November 2014
Annual Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 5028822
7 November 2013
Deficiency Check · Annual Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 4747591
1 September 2012
Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4427285
14 May 2012
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4313097
16 February 2012
Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 4245807
23 September 2011
MARPOL Annex I Examination · Annual Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 4152362
9 August 2010
Internal Structural Exam · MARPOL Annex I Examination · Deficiency Check · COI Inspection · MTSA Verification
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 3819495
27 July 2009
MARPOL Annex I Examination · Annual Inspection · MTSA Verification
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 3542750
3 June 2008
Drydock Exam · Internal Structural Exam · Annual Inspection · MARPOL Annex I Examination
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3231818
26 December 2007
Annual Inspection · Deficiency Check · MTSA Verification · MARPOL Annex I Examination
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 3121278
5 August 2007
Type not recorded
No type recorded · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 3050506
3 April 2007
Administrative Inspection
Administrative · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 2978435
5 September 2006
Deficiency Check · Annual Inspection · MTSA Verification
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 2761772
8 August 2005
COI Inspection · Internal Structural Exam
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 2456001
6 July 2005
Administrative Inspection
Administrative · Marine Safety Center (MSC) · Activity 2417325
21 June 2005
Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2397466
12 May 2005
MTSA Verification
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 2356135
9 September 2004
Annual Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 2190594
6 February 2004
Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2003599
30 December 2003
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1978229
17 June 2003
Hull Examination · Internal Structural Exam · Periodic Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1822925
23 July 2002
Annual Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1650834
19 July 2001
COI Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1399671
18 July 2000
COI Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1471743
5 July 2000
Hull Examination
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1052223
24 August 1999
Re-Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1411948
26 October 1998
Administrative
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 804364
29 August 1998
Hull Examination · COI Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1440049
4 March 1998
Re-Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 785351
1 December 1997
Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 774903
30 November 1997
Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 79395
5 April 1997
Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 149810
13 March 1997
COI Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1097951
16 May 1996
Re-Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1084376
31 July 1995
Hull Examination
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 872006
25 March 1995
COI Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1139521
19 May 1994
Re-Inspection · Deficiency Check
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1169988
10 August 1993
Hull Examination
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1156444
16 April 1993
COI Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 837588
23 June 1992
Re-Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1260025
1 May 1991
COI Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 907238
1 May 1991
Administrative
Administrative · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 910336
11 September 1990
Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 923953
17 July 1990
Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1222696
11 May 1990
Re-Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1238703
4 May 1989
COI Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1346632
13 October 1988
Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 888589
1 August 1988
Hull Examination
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1036264
19 November 1987
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1334173
8 October 1987
Examination of Repairs
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1320439
17 September 1987
Drydock Extension · COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1006966
9 January 1987
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1313239
19 December 1986
Damage Survey
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1027378
31 October 1986
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1015393
8 October 1986
Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1319515
21 March 1986
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 994118
23 September 1985
Credit Drydock · COI Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1296632
30 July 1985
Type not recorded
No type recorded · Commandant (CG-CVC) · Activity 1292756
21 November 1984
Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 972650
20 January 1984
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 971327
30 December 1983
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1278512
21 August 1981
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1279521
Construction/Loadline › Hull › Stiffener
Issued 23 July 2015
Resolved
Repair or replace gussets on FR 20, 38, 40, 41, 42, 45, 55, 58, 70 BY next dry-dock.
Action required: 705 - Other - as specified
Due 31 May 2018
Resolved 3 March 2016
Resolution: Vessel completed repairs during recent shipyard period in Freeport, Bahamas. Repairs inspected during annual inspection.
Construction/Loadline › Hull › Hull Plating
Issued 23 July 2015
Resolved
Lane A side curtain crack near aft deck, by next dry-dock.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 31 May 2018
Resolved 3 March 2016
Resolution: Vessel completed repairs during recent shipyard period in Freeport, Bahamas. Repairs inspected during annual inspection.
Construction/Loadline › Hull › Stiffener
Issued 23 July 2015
Resolved
Repair bent stanchions Lane E/F Frame 71, Lane C/D Frame 72, Lane E/F Frame 72, Lane E/F Frame 73 by next drydock.
Action required: 705 - Other - as specified
Due 31 May 2018
Resolved 3 March 2016
Resolution: Vessel completed repairs during recent shipyard period in Freeport, Bahamas. Repairs inspected during annual inspection.
Construction/Loadline › Hull › Strut/Cross Tie
Issued 23 July 2015
Resolved
Crop and renew FR 67 wasted hole in deck cargo space A (Doubler installed)
Crop and renew Between FR 59/58 2 holes wasted side shell
Crop and renew FR 47-46 wasted holes in deck cargo space A (Doubler Installed)
Crop and renew FR 49-48 wasted holes in deck cargo space A (Doubler Installed)
All to be completed by next dry-dock
Action required: 705 - Other - as specified
Due 31 May 2018
Resolved 3 March 2016
Resolution: Vessel completed repairs during recent shipyard period in Freeport, Bahamas. Repairs inspected during annual inspection.
Construction/Loadline › Structures › Deck Plating
Issued 23 July 2015
Resolved
Crop and renew FR 18 between cargo space D/E top deck holes (3rd), Crop and renew all areas around holes in deck as identified by Marine Inspectors by next dry-dock.
Action required: 705 - Other - as specified
Due 31 May 2018
Resolved 3 March 2016
Resolution: Vessel completed repairs during recent shipyard period in Freeport, Bahamas. Repairs inspected during annual inspection.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 7 November 2013
Resolved
Properly run cables and wiring to junction box and enclose IWO port side main deck, frame 37-38.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 November 2013
Electrical › Electrical Distribution System (service) › Panelboard
Issued 7 November 2013
Resolved
Make properly operable handle to #2 Ballast Pump Panel.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 November 2013
Electrical › Electrical Distribution System (service) › Junction Box
Issued 7 November 2013
Resolved
Properly mount junction box IWO Port side 2nd Deck, frame 21-22.
Due 7 December 2013
Resolved 5 December 2013
Electrical › Electrical Distribution System (service) › Wiring
Issued 7 November 2013
Resolved
Properly mount wiring IWO port side 2nd deck, frame 20-21.
Due 7 December 2013
Resolved 5 December 2013
Electrical › Electrical Distribution System (service) › Junction Box
Issued 7 November 2013
Resolved
Properly mount junction box IWO 2nd deck, port side, frame 18-19.
Due 7 December 2013
Resolved 5 December 2013
Electrical › Electrical Distribution System (service) › Wiring
Issued 7 November 2013
Resolved
Properly terminate dead-end wiring IWO 2nd deck, stbd side frame 41-42.
Due 7 December 2013
Resolved 5 December 2013
Construction/Loadline › Hull › Girder
Issued 23 September 2011
Resolved
CROP AND RENEW TO ORIGINAL SCANTLING, THE 3RD DECK UNDERDECK TRANSVERSE GIRDER IN WAY OF FR. 72, (GIRDER RENEWEAL TO BE FROM SIDESHELL TO SIDESHELL), AND ALL ASSOCIATED STANTIONS.
Condition: Damaged By Earlier Event
Due 14 August 2013
Resolved 30 May 2013
Construction/Loadline › Hull › Strut/Cross Tie
Issued 23 September 2011
Resolved
ON THE 2ND DECK IN WAY OF FR. 16, STARBOARD OUTBOARD, MAKE PERMANENT REPAIRS TO THE FRACTURED BUTT WELD OF THE 4 IN. DIAGONAL BRACE.
Condition: Damaged By Earlier Event
Due 23 October 2011
Resolved 16 February 2012
Resolution: Witness proper repairs 2/15/12
Construction/Loadline › Hull › Strut/Cross Tie
Issued 23 September 2011
Resolved
ON THE 2ND DECK IN WAY OF FR.36, STARBOARD OUTBOARD, CROP AND RENEW THE LOWER 48 IN. OF THE WASTED 4 IN. DIAGONAL BRACE.
Condition: Damaged By Earlier Event
Due 23 October 2011
Resolved 16 February 2012
Resolution: witness proper repiars 2/16/12
Construction/Loadline › Hull › Weld
Issued 10 August 2010
Resolved
#1 Port Wing: Fr # 2 arc and weld 4" fracture in way of #5 bottom long.
Action required: 705 - Other - as specified
Due 10 September 2010
Resolved 26 August 2010
Resolution: Rewelded
Construction/Loadline › Hull › Weld
Issued 10 August 2010
Resolved
#1 Port Wing: Fr #0, crop and renew 2' of #2 bottom long at bow.
Action required: 705 - Other - as specified
Due 10 September 2010
Resolved 26 August 2010
Resolution: As required.
Construction/Loadline › Hull › Weld
Issued 10 August 2010
Resolved
#1 Port Center: Fr #25 at bow; Arc and weld fractured vertical brackets, #4,6,7,8,9 counted from centerline.
Action required: 705 - Other - as specified
Due 10 September 2010
Resolved 26 August 2010
Resolution: Rewelded
Construction/Loadline › Hull › Weld
Issued 10 August 2010
Resolved
#1 Port Center: Fr #3, install 4" clip in way of transverse frame to #3 bottom long.
Action required: 705 - Other - as specified
Due 10 September 2010
Resolved 26 August 2010
Resolution: As required.
Construction/Loadline › Hull › Weld
Issued 10 August 2010
Resolved
#1 Port Center: Fr #4-5, at port longitudinal half frame, crop and renew lower 18" of 4" vertical flat bar.
Action required: 705 - Other - as specified
Due 10 September 2010
Resolved 26 August 2010
Resolution: As required.
Construction/Loadline › Hull › Weld
Issued 10 August 2010
Resolved
#2 Port Center: Fr #7 crop and renew 6" frame tab in way of bottom longs 13-14.
Action required: 705 - Other - as specified
Due 10 September 2010
Resolved 26 August 2010
Resolution: As required
Construction/Loadline › Hull › Weld
Issued 10 August 2010
Resolved
#2 Stbd Wing: Fr #9 crop and renew 6" frame tab in way of bottom longs 7-8.
Action required: 705 - Other - as specified
Due 10 September 2010
Resolved 26 August 2010
Resolution: As required.
Construction/Loadline › Hull › Weld
Issued 10 August 2010
Resolved
#5 Port Wing: Replace wasted section of ladder for fwd manhole access.
Action required: 705 - Other - as specified
Due 10 September 2010
Resolved 26 August 2010
Resolution: As required.
Construction/Loadline › Hull › Weld
Issued 10 August 2010
Resolved
#7 Port Center: Fr #34 arc and weld fractured diagonal in overhead.
Action required: 705 - Other - as specified
Due 10 September 2010
Resolved 26 August 2010
Resolution: No fracture.
Construction/Loadline › Hull › Weld
Issued 10 August 2010
Resolved
#7 Stbd Center: Fr 34 Arc and weld fractured diagonal in overhead
Action required: 705 - Other - as specified
Due 10 September 2010
Resolved 26 August 2010
Resolution: No fracture
Construction/Loadline › Hull › Weld
Issued 10 August 2010
Resolved
#7 Stbd Wing: Fr #33 ½ deck insert under outboard rub rail approximately 4'x4' from bounding angle
Action required: 705 - Other - as specified
Due 10 September 2010
Resolved 26 August 2010
Resolution: 60 in. x 52 in. x 1/2 in. deck insert.
Construction/Loadline › Hull › Weld
Issued 10 August 2010
Resolved
#9 Port Wing: Fr 46 - WTB 43 30" x 30' gauge and find good transverse connections, and longitudinal butt inboard of long. Bulkhead, approx 9".Crop and insert. Remove all 22" channel type rub-rail and associated vertical stanchions and diagonal gussets.
Action required: 705 - Other - as specified
Due 10 September 2010
Resolved 26 August 2010
Resolution: 32 ft. 2 in. x 30 in. x 1/2 in. deck insert
Construction/Loadline › Hull › Weld
Issued 10 August 2010
Resolved
#9 Centerline: Fr #43-44. Three each fractures in the centerline vertical keel flange plate butt.
Action required: 705 - Other - as specified
Due 10 September 2010
Resolved 26 August 2010
Resolution: As required.
Construction/Loadline › Hull › Weld
Issued 10 August 2010
Resolved
#9 Centerline: Fr #49, in way of vertical flange plate stiffener, and Fr #44, as marked. Drill stop arc gouge and weld.
Action required: 705 - Other - as specified
Due 10 September 2010
Resolved 26 August 2010
Resolution: As required.
Construction/Loadline › Hull › Weld
Issued 10 August 2010
Resolved
#9 Stbd Centerline: Fr #47, gouge and re-weld lower diagonal truss connection to bottom transverse frame. Two locations, inboard and outboard.
Action required: 705 - Other - as specified
Due 10 September 2010
Resolved 26 August 2010
Resolution: As required.
Construction/Loadline › Hull › Weld
Issued 10 August 2010
Resolved
#9 Stbd Wing: Fr #45; gouge and reweld crack at the side-web frame and side long.
Action required: 705 - Other - as specified
Due 10 September 2010
Resolved 26 August 2010
Resolution: As required.
Construction/Loadline › Hull › Weld
Issued 10 August 2010
Resolved
#10 Port Wing: Fr #50 longitudinal bulkhead; crop and insert main deck, in way of Lane B/C, and 22" rub-rail. 24" x 36' x 1/2" approx.
Action required: 705 - Other - as specified
Due 10 September 2010
Resolved 26 August 2010
Resolution: 81-1/4 in. x 36 in. x 1/2 in. deck insert.
Construction/Loadline › Hull › Weld
Issued 10 August 2010
Resolved
#10 Port Centerline: WTB #54 in way of transverse bulkhead, Lane D/E, 8 foot , outboard of CVK in way of vertical bulkhead stiffener. Crop and insert, possible 36" square 1/2" plate, aft into Tank #11 center, make first cut 3 inches from bulkhead to verify before cutting across water tight bulkhead
Action required: 705 - Other - as specified
Due 10 September 2010
Resolved 26 August 2010
Resolution: 31 in. x 37 in. x 1/2 in. deck insert
Construction/Loadline › Hull › Weld
Issued 10 August 2010
Resolved
#10 Stbd Centerline: Fr #53, bottom transverse frame , connection of diagonal truss to lower bottom transverse frame, 2 each fillet welds
Action required: 705 - Other - as specified
Due 10 September 2010
Resolved 26 August 2010
Resolution: As required.
Construction/Loadline › Hull › Weld
Issued 10 August 2010
Resolved
#12 Stbd Wing Ballast Tank: Fr #60, Crop and renew the #2 side long, crop and renew 3 foot, fwd of deep web frame toward the WTB #59.
Action required: 705 - Other - as specified
Due 10 September 2010
Resolved 24 August 2010
Resolution: As required.
Construction/Loadline › Hull › Weld
Issued 10 August 2010
Resolved
#12 Stbd Wing Ballast Tank: Stbd access ladder, weld back bottom connection of standoff.
Action required: 705 - Other - as specified
Due 10 September 2010
Resolved 24 August 2010
Resolution: As required.
Construction/Loadline › Hull › Weld
Issued 10 August 2010
Resolved
#12 Stbd Wing Ballast Tank: Remove 2 each construction aids, flat bar, at Fr stbd c/l , Fr 63/62, and at CVK, WTB connection, Fr 59, broke loose
Action required: 705 - Other - as specified
Due 10 September 2010
Resolved 24 August 2010
Resolution: As required.
Construction/Loadline › Hull › Weld
Issued 10 August 2010
Resolved
#13 Port Wing: Fr #68 Crop and renew #5 side long 4"x8"x10'
Action required: 705 - Other - as specified
Due 10 September 2010
Resolved 26 August 2010
Resolution: As required.
Construction/Loadline › Hull › Weld
Issued 10 August 2010
Resolved
#13 Port Wing: Fr #68 Crop and insert frame 5/6 18"x31"x1/2" plate
Action required: 705 - Other - as specified
Due 10 September 2010
Resolved 26 August 2010
Resolution: As directed
Construction/Loadline › Hull › Weld
Issued 10 August 2010
Resolved
#13 Port Wing: Fr #69 Crop and renew vertical bracket #3 at bottom 6"x3'x1/2" flat bar
Action required: 705 - Other - as specified
Due 10 September 2010
Resolved 26 August 2010
Resolution: As required.
Construction/Loadline › Hull › Weld
Issued 10 August 2010
Resolved
#14 Port Wing: Fr #69 Crop and insert water tight bulkhead at bottom of ladder
Action required: 705 - Other - as specified
Due 10 September 2010
Resolved 26 August 2010
Resolution: As required.
Construction/Loadline › Hull › Weld
Issued 10 August 2010
Resolved
#14 Port Wing: Fr #69-70 Crop and renew overhead long at ladder as marked
Action required: 705 - Other - as specified
Due 10 September 2010
Resolved 26 August 2010
Resolution: As required.
Construction/Loadline › Hull › Hull Plating
Issued 26 December 2007
Resolved
The towing shackle on the bow has worn two small holes in the bow plate, 4 ft above the main deck. Repair holes in bow.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 26 January 2008
Resolved 8 January 2008
Resolution: Insert made in bow plate.
Electrical › Electrical Distribution System (service) › Cable
Issued 26 December 2007
Resolved
Secure the wires at FR 48 to 44, on the stbd side, main deck.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 26 January 2008
Resolved 8 January 2008
Resolution: Wires secured.
Construction/Loadline › Structures › Superstructure
Issued 26 December 2007
Resolved
At FR 64, in lane B and C, on the main deck. Repair the stanchion
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 26 January 2008
Resolved 8 January 2008
Resolution: Stanchion repaired.
Construction/Loadline › Structures › Superstructure
Issued 26 December 2007
Resolved
Crop and renew the gussets (webs) to the transverse truss, as needed on the main deck. At the next dry dock.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 31 August 2008
Resolved 8 January 2008
Resolution: Several gussets repaired/replaced. Note will be added to vessel file for next drydock.
Construction/Loadline › Structures › Superstructure
Issued 26 December 2007
Resolved
At FR 72 in lane B and C, on the main deck. Renew or repair the upright stanchion.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 26 January 2008
Resolved 8 January 2008
Resolution: Stanchion repaired.
Construction/Loadline › Structures › Superstructure
Issued 26 December 2007
Resolved
On the stern. In lanes F and G, on the #2 deck. Renew or repair the stanchion.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 January 2008
Resolution: Stanchion renewed.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 5 September 2006
Resolved
Bent hand rail on upper deck, starboard side, approx 50 feeet from stern. Straighten or crop and renew.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 5 October 2006
Resolved 13 September 2006
Resolution: New rail installed.
Electrical › Electrical Distribution System (service) › Wiring
Issued 5 September 2006
Resolved
Wire cut off and bare, at junction box onStarboard side upper deck amidship. Remove wire and blank off box.
Condition: Damaged By Earlier Event
Due 5 October 2006
Resolved 13 September 2006
Resolution: Wire removed and junction box plugged.
Electrical › Electrical Distribution System (service) › Wiring
Issued 5 September 2006
Resolved
Deadend and frayed wire at frame 34 port side of 2nd deck. Remove dead end wire.
Condition: Damaged By Earlier Event
Due 5 October 2006
Resolved 13 September 2006
Resolution: Wire removed.
Electrical › Electrical Distribution System (service) › Wiring
Issued 5 September 2006
Resolved
Wire spliced and held in place with plastic wire tie at frame 57 port side main deck. Remove wire spice and install junction box, or run new wire.
Condition: Placed in Improper Service
Due 5 October 2006
Resolved 13 September 2006
Resolution: New Junction box installed, new wire supports installed.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 5 September 2006
Resolved
Stainless junction boxes at frame 51, and between frames 49 and 50, port side main deck have open penetrations. Block off open penetrations in junction boxes.
Condition: Placed in Improper Service
Due 5 October 2006
Resolved 13 September 2006
Resolution: Holes properly plugged.
Electrical › Electrical Distribution System (service) › Wiring
Issued 5 September 2006
Resolved
Wire straps broken at frame 47 port side main deck, just over hatch, hatch is catching on wires. Install steel wire straps to keep hatch off of wires.
Condition: Improper/Lack of Maintenance
Due 5 October 2006
Resolved 13 September 2006
Resolution: New straps installed.
Construction/Loadline › Hull › Stiffener
Issued 5 September 2006
Resolved
Diagonal tube frame supports at frame 36, 1st inboard of port side and 2nd inboard of starboard side, and at frame 16 1st inboard of port side, are broken at top. Crop and renew.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 13 September 2006
Resolution: Frames were cut off approx 1foot below cracks and new inserts installed.
Construction/Loadline › Hull › Hull Plating
Issued 5 September 2006
Resolved
Deck plate under cleat on port side between frames 30 and 31 is buckled and shows sign of deterioration. Crop and renew deck plate under cleat approx 3 ft x 5ft. area.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 13 September 2006
Resolution: Approximately 3 ft by 4 ft deck insert installed under cleat located between frames 30 and 31.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 5 September 2006
Resolved
Exhaust lagging (insulation) on generator is missing pieces and deteriorated. Renew lagging from exhaust manifolds to muffler.
Condition: Improper/Lack of Maintenance
Due 5 October 2006
Resolved 13 September 2006
Resolution: New lagging installed on all exhaust piping up to 8ft above deck.
Engineering › Fuel Oil Service System › Hose
Issued 5 September 2006
Resolved
Fire sleeve on fuel oil supply and return lines to generator engine are torn, frayed and held on with plastic ties. Renew fire sleeve according to manufactures instructions, or renew hoses with CG approved fire rated hose.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 13 September 2006
Resolution: Replaced hoses with new fire rated hose.
Construction/Loadline › Hull › Side Shell
Issued 5 September 2006
Resolved
Side shell just above deck between frames 25 and 26, and bottom outboard side of frame 26 are wasted. Crop and renew back to good material.
Condition: Improper/Lack of Maintenance
Due 5 October 2006
Resolved 13 September 2006
Resolution: Metal was renewed.
Construction/Loadline › Hull › Longitudinal Frame
Issued 5 September 2006
Resolved
Third longitudinal above main deck, at frame 26 inboard of side shell is wasted. Crop and renew.
Condition: Improper/Lack of Maintenance
Due 5 October 2006
Resolved 13 September 2006
Resolution: Longitudinal angle was renewed.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 5 September 2006
Resolved
Properly secure junction box at frame 50 port side upper deck.
Condition: Improper/Lack of Maintenance
Due 5 October 2006
Resolved 13 September 2006
Resolution: Junction box bolted to bulwark.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 5 September 2006
Resolved
Ladder support rail on starboad bow 2nd deck just forward of the watertight door is wasted. Crop and renew.
Condition: Improper/Lack of Maintenance
Due 5 October 2006
Resolved 13 September 2006
Resolution: New rail support installed.
Construction/Loadline › Hull › Hull Plating
Issued 5 September 2006
Resolved
Repair hole in upper deck lane #5 approximately 30 feet form stern.
Condition: Placed in Improper Service
Due 5 October 2006
Resolved 13 September 2006
Resolution: Hole welded satisfactory.
Construction/Loadline › Hull › Longitudinal Frame
Issued 5 September 2006
Resolved
Crop and renew longitudinal frame under upper deck overhang between frames 39 and 42.
Condition: Improper/Lack of Maintenance
Due 5 October 2006
Resolved 13 September 2006
Resolution: Frame renewed.
Construction/Loadline › Hull › Stiffener
Issued 5 September 2006
Resolved
Crop and renew diagonal gusset gracket at frame 45 stbd side main deck overhang.
Condition: Improper/Lack of Maintenance
Due 5 October 2006
Resolved 13 September 2006
Resolution: New gusset installed.
Construction/Loadline › Hull › Side Shell
Issued 5 September 2006
Resolved
Crop and renew stbd side lower side shell angle bracket between frames 46 and 47 main deck.
Condition: Improper/Lack of Maintenance
Due 5 October 2006
Resolved 13 September 2006
Resolution: New side plate installed.
Construction/Loadline › Hull › Side Shell
Issued 5 September 2006
Resolved
Crop and renew lower two side shell angle brackets between frames 30 and 31 starboard side.
Condition: Improper/Lack of Maintenance
Due 5 October 2006
Resolved 13 September 2006
Resolution: Side shell brackets renewed.
Construction/Loadline › Hull › Longitudinal Frame
Issued 5 September 2006
Resolved
Repair fractured welds at frame 21 overhead main deck starboard side.
Condition: Improper/Lack of Maintenance
Due 5 October 2006
Resolved 13 September 2006
Resolution: Crack drill stopped and welded.
Construction/Loadline › Hull › Side Shell
Issued 5 September 2006
Resolved
Crop and renew fractured side shell plate between frames 62 and 63 starboard side second deck, above window opening.
Condition: Improper/Lack of Maintenance
Due 5 October 2006
Resolved 13 September 2006
Resolution: Drill stopped crack and rewelded fracture.
Construction/Loadline › Hull › Longitudinal Frame
Issued 5 September 2006
Resolved
Repair fractured frames on third deck apron flange, near frame 63.
Condition: Improper/Lack of Maintenance
Due 5 October 2006
Resolved 13 September 2006
Resolution: Rewelded fracture.
Construction/Loadline › Hull › Girder
Issued 5 September 2006
Resolved
Crop and renew wasted loading ramp port side aft corner on 2nd deck.
Condition: Improper/Lack of Maintenance
Due 5 October 2006
Resolved 13 September 2006
Resolution: Renewed wasted metal.
Electrical › Electrical Distribution System (service) › Wiring
Issued 5 September 2006
Resolved
Properly secure electric cable in junctin box on starboard side main deck beween frames 54 and 55.
Condition: Improper/Lack of Maintenance
Due 5 October 2006
Resolved 13 September 2006
Resolution: Bolted to bulwark with new bolts and nuts.
Construction/Loadline › Structures › Deck Plating
Issued 9 September 2004
Resolved
3RD DECK PORT BOW OUTBOARD LANE (TRAILER STAND A-14): DECK WASTED IN 4FT DIAMETER AREA. PROVIDE CLASS REPORT NLT 9 OCT 2004.
Action required: 705 - Other - as specified
Due 9 October 2004
Resolved 16 September 2004
Resolution: RECEVIED LOADLINE SURVEY ABS AWARE
Construction/Loadline › Structures › Deck Plating
Issued 9 September 2004
Resolved
3RD DECK STBD BOW FR 19: DECK WASTED IN 4 FT DIA. AREA. PROVIDE CLASS REPORT NLT 9 OCT 2004.
Action required: 705 - Other - as specified
Due 9 October 2004
Resolved 16 September 2004
Resolution: RECIEVED LOADLINE SURVEY ABS AWARE
Electrical › Electrical Distribution System (service) › Outlet Box
Issued 9 September 2004
Resolved
3RD DECK STBD OUTBOARD FR 34: EXPOSED WIRES ON ELECTRICAL OUTLET BOX. CAP OR REWIRE.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 9 October 2004
Resolved 16 September 2004
Resolution: PORT ENG REMOVED DEADEND WIRES
Electrical › Lighting (service) › Lighting Fixture
Issued 9 September 2004
Resolved
3RD DECK STBD BOW OUTBOARD: BRACKET BROKEN ON 2ND DECK LIGHT HEADING AFT. REPLACE BRACKET.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 9 October 2004
Resolved 16 September 2004
Resolution: PORT ENG REPLACED LIGHT FIXTURE
Electrical › Lighting (service) › Lighting Fixture
Issued 9 September 2004
Resolved
3RD DECK STBD OUTBOARD FR 69: LIGHT FIXTURE MISSING AND FEEDER WIRES EXPOSED WITH ONLY ELECTRICAL TAPE INSULATION. REPLACE FIXTURE, CAP WIRES, OR REWIRE.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 9 October 2004
Resolved 16 September 2004
Resolution: PORT ENG REMOVED DEAD END WIRES
Electrical › Lighting (service) › Conductor
Issued 23 July 2002
Resolved
Condition: Unknown
Due 26 July 2002
Resolved 24 July 2002
Construction/Loadline
Issued 5 July 2000
Resolved
VEE & WELD FRACTURED WELDS TO ALL TRANSVERSE DIAGONALS AT CVK/TRANSVERSE GIRDER ATTACHMENTS IN WAY OF #8 AND #9 CENTER VOIDS.
Condition: Unknown
Due 5 July 2000
Resolved 5 July 2000
Construction/Loadline
Issued 5 July 2000
Resolved
CROP & RENEW WASTED PLATING (APPROX LOWER 24") OF INBOARD LONGITUDINAL BLKHD @ FRAME 13 IN WAY OF #3 PORT VOID.
Condition: Unknown
Due 5 July 2000
Resolved 5 July 2000
Construction/Loadline
Issued 5 July 2000
Resolved
VEE & WELD FRACTURE LOCATED AT AFT BLKHD TO OVERHEAD PLATING FILLET WELD APPROX 16' INBOARD OF SIDESHELL PLATING IN WAY OF #14 CENTER VOID.
Condition: Unknown
Due 5 July 2000
Resolved 5 July 2000
Construction/Loadline
Issued 5 July 2000
Resolved
DEBALLAST #12 & 13 VOIDS, GAS FREE, AND MAKE READY FOR INTERNAL STRUCTURAL EXAM.
Condition: Unknown
Due 5 July 2000
Resolved 5 July 2000
Construction/Loadline
Issued 5 July 2000
Resolved
VEE & WELD BUTT JOINT FRACTURE ON 3RD BOTTOM LONG INBOARD OF SIDESHELL APPROX 4' FORWARD OF AFT BULKHEAD IN WAY OF #1 PORT VOID.
Condition: Unknown
Due 5 July 2000
Resolved 5 July 2000
Construction/Loadline
Issued 5 July 2000
Resolved
CROP & RENEW UPSET AREA OF SIDESHELL VERTICAL DEEP WEB FRAME NO. 8 APPROX 12' FROM BOTTOM PLATE IN WAY OF #2 PORT VOID.
Condition: Unknown
Due 5 July 2000
Resolved 5 July 2000
Construction/Loadline
Issued 5 July 2000
Resolved
CROP & RENEW AFT 8' OF WASTED OUTBOARD BOTTOM LONG IN WAY OF #3 STBD VOID.
Condition: Unknown
Due 5 July 2000
Resolved 5 July 2000
Construction/Loadline
Issued 31 July 1995
Resolved
#4 TANK PORT STERN CORNER BRACKET #4 CROP AND RENEW.
Condition: Unknown
Due 1 August 1995
Resolved 31 July 1995
Construction/Loadline
Issued 31 July 1995
Resolved
#5 TANK EFFECT PERMANENT REPAIRS TO FRAME 21 WATER TIGHT BULKHEAD FROM DECK TO SIDE LONG #1.
Condition: Unknown
Due 1 August 1995
Resolved 31 July 1995
Construction/Loadline
Issued 31 July 1995
Resolved
#2 TANK PORT BOW FIRST VERTICAL SIDE LONG AT THE SIDE SHELL. CROP AND RENEW.
Condition: Unknown
Due 1 August 1995
Resolved 31 July 1995
Construction/Loadline
Issued 31 July 1995
Resolved
#2 TANK FRAME #1 BOTTOM STIFFNER AT SWASH BLKHD STARBOARD SIDE - RENEW CONNECTION AT DECK.
Condition: Unknown
Due 1 August 1995
Resolved 31 July 1995
Construction/Loadline
Issued 31 July 1995
Resolved
#4 TANK FRAME 13- SIDE LONGS 3, 5, 6 FRACTURED AT THE FRAME CONNECTION- REWELD ALL CONNECTIONS.
Condition: Unknown
Due 1 August 1995
Resolved 31 July 1995
Construction/Loadline
Issued 31 July 1995
Resolved
AT THE BOW PORTSIDE FRAME ONE AT THE SWASH BULKHEAD EFFECT REPAIRS TO THE PENETRATION AT THE SLOPE SLEET.
Condition: Unknown
Due 1 August 1995
Resolved 31 July 1995
Construction/Loadline
Issued 31 July 1995
Resolved
EFFECT REPAIRS TO VERTICAL STIFFNNERS (2) AT THE FIRST TRANSVERSE FRAME ANDTHE #5 FROM THE PORT SWASH BULKHEAD.
Condition: Unknown
Due 1 August 1995
Resolved 31 July 1995
Construction/Loadline
Issued 31 July 1995
Resolved
TANK #2, #5 STARBOARD TO TRANSVERSE GIRDER CONNECTION FRATURE EFFECT REPAIRS TO SAME.
Condition: Unknown
Due 1 August 1995
Resolved 31 July 1995
Construction/Loadline
Issued 31 July 1995
Resolved
PREPARE AND PRESENT FOR INSPECTION FOR AN ATTENDING MARINE INSPECTOR THE FOLLOWING TANKS: #11, #12 AND #13 BALLAST TANKS.
Condition: Unknown
Due 31 July 1995
Resolved 31 July 1995
Construction/Loadline
Issued 31 July 1995
Resolved
#1 TANK: EFFECT REPAIRS TO THE THIRD VERTICAL LONG, PORT SIDE AT THE SIDE SHELL.
Condition: Unknown
Due 1 August 1995
Resolved 31 July 1995
Construction/Loadline
Issued 31 July 1995
Resolved
TANK #2 STARBOARD STERN #2 CORNER BRACKET TRIP- EFFECT REPAIRS._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 1 August 1995
Resolved 31 July 1995
Construction/Loadline
Issued 25 March 1995
Resolved
EFFECT PERMANENT REPAIRS TO THE THIRD DECK STARBOARD WING DECK WASTAGE
Condition: Unknown
Due 25 March 1995
Resolved 25 March 1995
Construction/Loadline
Issued 19 May 1994
Resolved
Prior to departing Jacksonville conduct hose test of bulkhead insert, port forward bow insert in way of port forward 2nd deck, sideshell to bow transition.
Condition: Unknown
Due 25 May 1994
Resolved 25 May 1994
Construction/Loadline
Issued 17 July 1990
Resolved
MAKE PERMANENT REPAIRS IN LIEU OF TEMPORARY REPAIRS TO INTERNAL STRUCTURAL MEMBERS IN NO. 14 VOID.
Condition: Unknown
Due 17 July 1990
Resolved 17 July 1990
Construction/Loadline
Issued 17 July 1990
Resolved
MAKE PERMANENT REPAIRS TO BOTH FORWARD AND AFTER WATERTIGHT BULKHEADS AND STRUCTURAL MEMBERS IN NO. 4 VOID.
Condition: Unknown
Due 17 July 1990
Resolved 17 July 1990
Unknown
Issued 19 December 1986
Resolved
THE FORWARD STBD LADDER BETWEEN 2ND AND 3RD DECK IS DESTROYED.
Condition: Unknown
Due 19 December 1986
Resolved 19 December 1986
Unknown
Issued 19 December 1986
Resolved
TWO 3RD DECK OVERHANG BRACES ARE DESTROYED, AND THREE TRANSVERSE DECK BEAMS
Condition: Unknown
Due 19 December 1986
Resolved 19 December 1986
Construction/Loadline
Issued 19 December 1986
Resolved
MAKE PERMANENT REPAIRS TO COLLISION DAMAGE, IN WAY OF FORWARD STBD CORNER ON 3RD DECK. DAMAGE CONSISTS OF BUCKLED DECK AND BULWARK, AND DENTED IN SIDE SHELL OVERHANG, JUST BELOW 3RD DECK EXTENDING FROM CORNER AT STBD RUNNING LIGHT TO A POINT APPROX. 15' AFT OF THE LIGHT.
Condition: Unknown
Due 19 December 1986
Resolved 19 December 1986
Electrical
Issued 8 October 1986
Resolved
MAKE PERMANENT REPAIRS TO THE OVERSPEED TRIP INSTALLED ON THE DIESEL GENERATOR AND CONDUCT AN OPERATIONAL TEST IN THE PRESENCE OF A USCG MARINE INSPECTOR.
Condition: Unknown
Due 8 October 1986
Resolved 8 October 1986
Construction/Loadline
Issued 21 November 1984
Resolved
CRACKS LOCATED IN STERN LOG GUSSETS,CAUSED BY BENDING FATIQUE WHEN NEW GUSSETS WERE BENT INTO ANGLE.
Condition: Unknown
Due 21 November 1984
Resolved 21 November 1984
Unknown
Issued 30 December 1983
Resolved
REPLACE THE MISSING SECTION OF HAND RAIL ON THE FORWARD TOWING DECK.
Condition: Unknown
Due 30 December 1983
Resolved 30 December 1983
Unknown
Issued 30 December 1983
Resolved
THE FOLLOWING DEFICIENCIES ARE FOR THE TMT JACKSONVILLE, DN524658.
Condition: Unknown
Due 30 December 1983
Resolved 30 December 1983