LONGVIEW is a 1997 passenger vessel (inspected). The Coast Guard has recorded 40 inspections since 1997, most recently in June 2026, along with 58 deficiencies.

Records from 1997 to 2026. Most recent: inspection, 12 June 2026.

Built
1997
Last inspected
12 June 2026
Documentation
Valid · documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

WDM8179
465596
Flag
UNITED STATES
368024520, 368240940
Maury page id
psix-465596

Inspections, by type

Years with a record 23 calendar years (1997–2026)
The 40 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.

Documentation record

Registered dimensions (L × B × D)48.0 ft × 16.0 ft × 5.2 ft
Registered tonnagegross 26 / net 21
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderCARMAN BOATS INC · MARION, MD, UNITED STATES · built 1997
Hull materialWood
PropulsionDiesel Reduction
Hull shapeShip
Hull configurationMonohull
Hailing portJAMES RIVER, VA
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 10 February 2026 · expires 28 February 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it26 - Simplified, Gross Ton
21 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

Radio station licence

WDM8179MMSI 368240940 · active · compulsorily equipped · granted 23 February 2022, expires 23 February 2032
WDJ9284MMSI 368024520 · active · compulsorily equipped · granted 24 February 2018, expires 24 February 2028 · licensed under a name not among this hull’s recorded names (not shown)
WCY4036MMSI 367350160 · expired · voluntarily equipped · granted 18 April 2008, cancelled 21 July 2018 · licensed under a name not among this hull’s recorded names (not shown)
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.

Inspection history · 40

12 June 2026 Annual Inspection · Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8402975
20 January 2026 Deficiency Check · Drydock Exam · Internal Structural Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8298434
22 April 2025 Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 8117158
11 March 2025 Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8087300
6 September 2024 Deficiency Check · Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7982765
25 June 2024 Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 7942403
12 February 2024 Deficiency Check · Drydock Exam · Internal Structural Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7863476
13 March 2023 Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7646213
1 March 2022 Deficiency Check · COI Inspection · Administrative Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7403747
7 February 2022 Internal Structural Exam · Drydock Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7391015
3 September 2020 Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7049874
14 May 2020 Internal Structural Exam · Drydock Exam
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6933002
6 September 2019 Annual Inspection · Administrative Inspection · DAPI Audit
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6805324
19 April 2018 DAPI Audit · COI Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6390896
5 April 2018 Drydock Exam · Internal Structural Exam
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6388157
8 February 2018 Annual Inspection · DAPI Audit
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6352738
13 October 2016 Annual Inspection · DAPI Audit
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6022459
24 March 2016 Drydock Exam · Internal Structural Exam
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 5849956
19 October 2015 DAPI Audit · Deficiency Check · COI Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 5745586
30 January 2012 Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 4234301
11 January 2012 Annual Inspection · Deficiency Check · DAPI Audit
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 4222872
5 August 2011 Administrative Inspection
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 4106064
28 October 2010 COI Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 3873446
20 October 2010 Administrative Inspection
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 3873442
18 March 2010 Hull Examination
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 3698902
24 March 2009 Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 3439607
25 March 2008 Hull Examination
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 3171006
20 March 2008 Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 3168621
27 March 2007 Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 2907124
6 April 2006 Deficiency Check · COI Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 2619103
22 March 2006 Hull Examination
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 2619079
12 December 2005 Administrative Inspection
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 2550123
12 April 2005 COI Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 2331362
14 December 2004 Administrative Inspection
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 2258905
27 April 2004 Periodic Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 2053783
1 April 2003 Re-Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1765648
1 December 2002 Hull Examination
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1712774
12 March 2002 Re-Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1492814
11 January 2000 Re-Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1438954
9 October 1997 Initial Certification · Hull Examination
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1401049

Deficiency record · 58

11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 12 June 2026 Resolved
Each item of lifesaving equipment determined by the marine inspector to not be in serviceable condition must be repaired or replaced. Life float grab lines are deteriorated. 46 CFR 176.808 (b)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 July 2026
Resolved 23 July 2026
Resolution: Replaced grab lines
10 - Safety of Navigation › N/A - No Subsystem › Nautical publications
Issued 6 September 2024 Resolved
As appropriate for the intended voyage, a vessel must carry adequate and up-to-date:(1) Charts of large enough scale to make safe navigation possible;(2) U.S. Coast Pilot or similar publication;(3) Coast Guard Light List;(4) Tide tables; and(5) Current tables, or a river current publication issued by the U.S. Army Corps of Engineers or a river authority. Vessel did not have up to date coast pilot or light list. 46 CFR 184.420(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 September 2024
Resolved 10 October 2024
Resolution: Vessel had printed copies of current coast pilot and light list onboard.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 6 September 2024 Resolved
Electrical equipment on a vessel must be installed and maintained to:(a) Provide services necessary for safety under normal and emergency conditions;(b) Protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by or originating in electrical equipment, and electrical shock;(c) Minimize accidental personnel contact with energized parts; and(d) Prevent electrical ignition of flammable vapors. Vessel had loose / missing grounding wires and several dead end wires in engine compartment. 46 CFR 183.200
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 September 2024
Resolved 10 October 2024
Resolution: Grounding wires were installed and dead-end wires removed. All sat.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 6 September 2024 Resolved
Machinery and equipment installed on each vessel must be suitable for the vessel and its operation and for the purpose intended. All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing fire, explosion, machinery failure, and personnel injury. Vessel has a loose nut on port main engine mount (inboard aft). 46 CFR 182.100
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 September 2024
Resolved 10 October 2024
Resolution: Engine mount nut was tightened. All sat.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 6 September 2024 Resolved
Placards containing instructions for the donning and use of the life jackets aboard the vessel must be posted in conspicuous places that are regularly accessible and visible to the crew and passengers. Vessel's life jacket placard does not match life jackets on board. 46 CFR 185.516(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 September 2024
Resolved 10 October 2024
Resolution: Lifejacket placard was replaced with proper mfr. All sat.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 6 September 2024 Resolved
All fuel tanks must be electrically bonded to a common ground. Vessel's fuel tank was not grounded. 46 CFR 182.440(10)(b)(4)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 September 2024
Resolved 10 October 2024
Resolution: Vessel fuel tank was grounded. All sat.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 6 September 2024 Resolved
Fuel lines must be protected from mechanical injury and effectively secured against excessive movement and vibration. The return fuel line for the generator was not secured. 46 CFR 182.455(b)(3)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 September 2024
Resolved 10 October 2024
Resolution: Return fuel line was properly secured. All sat.
11 - Life Saving Appliances › N/A - No Subsystem › Buoyant apparatus
Issued 6 September 2024 Resolved
If the life float or buoyant apparatus does not have a painter attachment fitting, a means for attaching the painter must be provided by a wire or line that:(1) Encircles the body of the device. The painter line for life float was not attached around the body of the float. 46 CFR 180.137(d)(1)
Action required: 10 - Deficiency Rectified
Due 6 September 2024
Resolved 6 September 2024
Resolution: Vessel tied painter line around body of life float.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 6 September 2024 Resolved
A flexible hose may be used instead of fixed pipe for the discharge line of a submersible electric bilge pump. The bilge discharge hose in F/O tank compartment was dry rotted. 46 CFR 182.520(f)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 September 2024
Resolved 6 September 2024
Resolution: Vessel removed rotted section of discharge hose.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 25 June 2024 Resolved
46 CFR 176.500(b)(1): Vessel must undergo an annual inspection within the 3 months before or after each anniversary date. Vessel did not complete last annual inspection. Annual inspection is required prior to carrying passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 10 September 2024
Resolution: Vessel completed its annual Coast Guard inspection. Endorsed COI.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Scuppers, inlets and discharges
Issued 2 May 2024 Resolved
Repairs or alterations to the hull, machinery, or equipment that affect the safety of the vessel must not be made without the approval of the cognizant OCMI, except during an emergency. A through hull fitting in steering compartment was replaced without an approved plan given to OCMI for approval. Haul out required to verify what was installed. 46CFR176.700(a)
Action required: 705 - Other - as specified
Resolved 15 May 2024
Resolution: A new through hull valve was installed. All sat.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 13 March 2023 Resolved
Replace plastic zip ties used to secure cords and wires with metal clamps in main hold compartment. Cable and wiring must be installed with metal supports spaced not more than 24 in apart. 46 CFR 183.340(b)(4)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 March 2023
Resolved 20 March 2023
Resolution: All zip ties have been replaced with metal clamps.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 13 March 2023 Resolved
Port exhaust is missing a metal clamp. Nonmettalic hose may be used for wet exhaust systems provided it is ... double clamped where practicable. 46 CFR 182.430(e)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 March 2023
Resolved 20 March 2023
Resolution: All metal clamps on the exhaust have been replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 7 March 2022 Resolved
On a vessel of at least 7.9 meters (26 feet) in length, a visual and audible alarm must be provided at the operating station to indicate a high water level in each of the following normally unmanned spaces: (1) A space with a through-hull fitting below the deepest load waterline, such as a lazarette. Forward and Aft hatch spaces visual alarms were inoperable. 49 CFR 182.530(a)(1)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 23 March 2022
Resolution: Witnessed successful operation of visual alarms for both spaces.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 7 March 2022 Resolved
In systems and applications where flexible hoses are permitted to be clamped: (1) Double hose clamping is required where practicable. Fuel fill tube connection on tank only has one clamp. 46 CFR 182.410(d)(1)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 23 March 2022
Resolution: Second clamp attached to hose connection.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 7 March 2022 Resolved
The discharge ends of fuel tank vent pipes must be fitted with removable flame screens or flame arresters. The flame screens must consist of a single screen of corrosion resistant wire of at least 30 × 30 mesh. The flame screens or flame arresters must be of such size and design as to prevent reduction in the net cross sectional area of the vent pipe and permit cleaning or renewal of the flame screens or arrester elements. Fuel vent is painted over. 46 CFR 182.450(e)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 23 March 2022
Resolution: Fuel vent replaced with new.
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboat inventory
Issued 7 March 2022 Resolved
Lifeline and pendants. The lifeline and pendants must be as furnished by the manufacturer with the approved life float or buoyant apparatus. Replacement lifelines and pendants must meet the requirements in Subpart 160.010 of this chapter. Light. The light must be a floating waterlight approved under approval series 161.010 or other standard specified by the Commandant. The floating waterlight must be attached around the body of the life float or buoyant apparatus by a 10 mm (3/8 inch) lanyard, resistant to deterioration from ultraviolet light, and at least 5.5 meters (18 feet) in length. The name of the vessel must be marked or painted in clearly legible letters on each life float paddle. Lifefloat missing pendants, lifeline, and vessel name on the paddles. Float light line was attached to the sea painter and not the body of the lifefloat. 46 CFR 185.604(g) 46 CFR 180.175(f)(1) 46 CFR 180.175(f)(4)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 23 March 2022
Resolution: Pendants attached, float light line attached to body of appliance, vessel name stenciled on paddles and paddles lashed to the netting.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 7 March 2022 Resolved
For vessels other than those covered in paragraphs (b) and (c) of this section, the name of the vessel must be marked on some clearly visible exterior part of the port and starboard bow and the stern of the vessel. The hailing port of the vessel must be marked on some clearly visible exterior part of the stern of the vessel. Vessel was not marked with the vessel name or hailing port on either bow or the stern. 46 CFR 67.123(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 18 April 2022
Resolution: Operator supplied photographs of vessel name on bow and stern of vessel.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 7 March 2022 Resolved
A vessel not required to have a power driven fire pump by § 181.300 must have at least three 9.5 liter (21/2 gallon) buckets, with an attached lanyard satisfactory to the cognizant OCMI, placed so as to be easily available during an emergency. The words “FIRE BUCKET” must be stenciled in a contrasting color on each bucket. 46 CFR 181.610 Vessel missing 01 fire bucket.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 23 March 2022
Resolution: 3rd fire bucket added to the vessel.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 7 March 2022 Resolved
At each initial and subsequent inspection for certification the owner or managing operator shall be prepared to test the steering systems of the vessel and make them available for inspection to the extent necessary to determine that they are in suitable condition and fit for the service intended. Starboard steering gear mount is highly corroded. 46 CFR 176.814
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 March 2022
Resolution: Renewed steering gear mount bracket.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 1 March 2022 Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing fire, explosion, machinery failure, and personnel injury. Port steering gear assembly missing retaining clip on lower end of pin. 46 CFR 182.100
Action required: 705 - Other - as specified
Due 30 March 2022
Resolved 25 March 2022
Resolution: Retaining clip installed.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 1 March 2022 Resolved
Each rescue boat and ring life buoy must be marked with Type II retroreflective material approved in accordance with 46 CFR 164.018 or other standard specified by the Commandant. Each buoyant apparatus must have Type II retroreflective material meeting subpart 164.018 of this chapter on each side and end. Ring life buoy missing retro, and life float has DOT retro. 46 CFR 185.604(i) 46 CFR 160-010-4(p)
Action required: 705 - Other - as specified
Due 30 March 2022
Resolved 25 March 2022
Resolution: Operator installed SOLAS Type II retroreflective tape on lifefloat and ring buoy.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Cargo & other hatchways
Issued 1 March 2022 Resolved
A hatch cover must: (1) Have securing devices; and (2) Be attached to the hatch frame or coaming by hinges, captive chains, or other devices of substantial strength to prevent its loss. Aft hatch missing attachment to coaming. 46 CFR 179.360(b)(2)
Action required: 705 - Other - as specified
Due 30 March 2022
Resolved 25 March 2022
Resolution: Operator installed retaining line on hatch.
11 - Life Saving Appliances › N/A - No Subsystem › Buoyant apparatus
Issued 1 March 2022 Resolved
The color of the buoyant apparatus must be vivid reddish orange as defined by FED-STD-595C, sec 13 and 14. Life float is painted wrong color. 46 CFR 160.010-4(p)
Action required: 705 - Other - as specified
Due 30 March 2022
Resolved 25 March 2022
Resolution: Operator painted life float appropriate color.
10 - Safety of Navigation › N/A - No Subsystem › Nautical publications
Issued 3 September 2020 Resolved
As appropriate for the intended voyage, a vessel must carry adequate and up-to-date charts to make safe navigation possible, U.S. Coast Pilot [name withheld] List, Tide tables; and Current tables. All required charts and publications were out of date. 46CFR184.420(a)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 September 2020
Resolved 25 March 2022
Resolution: Vessel has all up to date charts and pubs.
11 - Life Saving Appliances › N/A - No Subsystem › Buoyant apparatus
Issued 3 September 2020 Resolved
The color of the buoyant apparatus must be vivid reddish orange. Life float is painted green. 46CFR180.200(a)(2) 46CFR160.010-4(n)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 September 2020
Resolved 25 March 2022
Resolution: Life float has been painted vivid reddish orange as per regulation.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 3 September 2020 Resolved
Each battery must be secured to protect against shifting and free from exposure to water. Battery box was filled with water. 46CFR183.350(b)
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 17 September 2020
Resolved 3 September 2020
Resolution: Battery box was drained and cover properly affixed; corrected on the spot.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 3 September 2020 Resolved
Electrical equipment must be permanently bonded together to a common ground by a normally non-current carrying conductor. Ground wire from the Port engine starter was not attached. 46CFR183.372(a)
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 17 September 2020
Resolved 3 September 2020
Resolution: Ground wire was properly attached; corrected on the spot.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 3 September 2020 Resolved
Valves for removing water or impurities from diesel fuel in strainers are permitted. Valves must be provided with caps or plugs to prevent fuel leakage. Two of the three racor filter drains fitted with petcocks valves did not have caps. 46CFR182.455(b)(9)
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 17 September 2020
Resolved 3 September 2020
Resolution: The two Racors have been fitted with caps; corrected on the spot.
Lifesaving › Lifefloat › Retroreflective Material
Issued 13 October 2016 Resolved
Replace/Renew retro-reflective “SOLAS”-type Tape on life float.
Due 17 October 2016
Resolved 18 October 2016
Resolution: Received email picture of correction.
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 13 October 2016 Resolved
Replace/Renew deteriorated “grab lines” on life ring.
Due 17 October 2016
Resolved 18 October 2016
Resolution: Received email picture of correction.
Operations/Management › Drug and Alcohol Testing › Testing, Equipment
Issued 19 October 2015 Resolved
Vessels had expired Alcohol test kits onboard. 46 CFR 4.06
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 19 October 2015
Resolved 20 October 2015
Resolution: O/O provided proof of valid test kits onboard vessel.
Engineering › Shafting/Propeller Arrangements › Coupling
Issued 19 October 2015 Resolved
Port shaft coupling is leaking during operation. 46 CFR 176.804
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 3 November 2015
Resolved 12 November 2015
Resolution: Attending MI verified that repairs have been made and is no longer leaking.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 19 October 2015 Resolved
STBD side dash has a hole at the operating station. 46 CFR 183.200(b)
Action required: 705 - Other - as specified
Due 3 November 2015
Resolved 12 November 2015
Resolution: O/O made repairs closing the hole.
Fire Fighting › Fixed Gas Fire Extinguishing System › Operating Controls
Issued 19 October 2015 Resolved
Pre- engineered system does not provide an audible alarm at the operating station. 46 CFR 181.420(b)92)
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 3 November 2015
Resolved 12 November 2015
Resolution: Verified the Audible alarm has been installed and is operational.
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 11 January 2012 Resolved
Ring lifebuoy retro-reflective tape need to be renew. Install new tape. 46CFR185.604(I).
Condition: Design Flaw
Due 26 January 2012
Resolved 30 January 2012
Resolution: Installed new retro-reflective tape on ring lifebuoy. Test sat.
Lifesaving › Lifefloat › Markings
Issued 11 January 2012 Resolved
Life float retro-reflective tape need to be re-new. Install new tape.
Condition: Design Flaw
Due 26 January 2012
Resolved 30 January 2012
Resolution: Owner installed new retro-reflective tape on life float. Test sat.
Lifesaving › Hand Flares › Not on Board
Issued 11 January 2012 Resolved
Missing two red hand flares. Purchase, and carrying on board at all time. 46CFR180.68.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 19 January 2012
Resolution: Owner purchased new red flares. Six total red flares onboard.
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 11 January 2012 Resolved
Life jackets stowage/labeling is not marked correctly. 46CFR180.68
Condition: Improper/Lack of Maintenance
Due 26 January 2012
Resolved 19 January 2012
Resolution: Marked lifejackets storage area in accordance with 46 CFR 180.68.
Documentation › Markings/Placards › Lifejacket Placard
Issued 11 January 2012 Resolved
Life jacket donning placard not on board. Post it accordingly with 46CFR185.516
Due 26 January 2012
Resolved 19 January 2012
Resolution: Posted lifejacket placard inside pilot house.
Engineering › Bilge Water Management System › Pump
Issued 11 January 2012 Resolved
Bilge pump at lazarrete is inoperative. Conduct repair. 46CFR176.804(H).
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 19 January 2012
Resolution: Bilge pump level sensor wiring wasted. Spliced wire, and installed new electrical connector. Test sat.
Fire Fighting › Structural Fire Protection - General › Accommodation Space Protection
Issued 20 March 2008 Resolved
Provide structural fire protection to the inside of the engine boxes.
Action required: 705 - Other - as specified
Due 20 April 2008
Resolved 28 April 2008
Resolution: Received fax from O/Op clearing the above deficiency.
Engineering › Bilge Water Management System › Pump
Issued 20 March 2008 Resolved
Provide U/L listed electrical submersible bilge pumps (5). Current pumps are Rule 1500 installed when vessel was constructed 1997.
Action required: 705 - Other - as specified
Due 1 April 2009
Resolved 18 March 2010
Resolution: Noted Rule 2000 pumps in all compartments
Documentation › Certificates/Documents › FCC SSL
Issued 20 March 2008 Resolved
Provide onboard FCC Marine Radio Operators Permit.
Action required: 705 - Other - as specified
Due 20 April 2008
Resolved 28 April 2008
Resolution: Received fax from O/Op clearing the above deficiency.
Fire Fighting › Fixed Gas Fire Extinguishing System › Operating Controls
Issued 6 April 2006 Resolved
Generator is not hooked up to allow automatic shut off upon activation of fixed system within engine room. Provide vessel for satisfactory test of fire extinguishing system. Generator can not be used while carrying passengers for hire.
Action required: 705 - Other - as specified
Due 22 May 2006
Resolved 6 June 2006
Resolution: Generator hooked up to fire extinguishing system. Verified by marine inspector and completed operational test of system, sat.
Construction/Loadline › Hull › Transverse Frame
Issued 14 December 2004 Resolved
Make permanent repairs to rotting frame and plywood sheeting.
Due 27 January 2005
Resolved 6 April 2005
Resolution: Repairs completed.
Operations/Management › Drug and Alcohol Testing › Employee Coverage
Issued 27 April 2004 Resolved
Provide proof of enrollement to approved drug test program.
Action required: 701 - Prior to carriage of passengers/cargo
Due 27 April 2004
Resolved 27 April 2004
Resolution: Faxed copy of enrollment to Maritime Consortium.
Engineering › Shafting/Propeller Arrangements › Stern Tube
Issued 27 April 2004 Resolved
Install double hose clamps on stuffing box.
Due 23 May 2004
Resolved 27 April 2004
Resolution: Double hose clamps installed.
Fire Fighting › Fixed Halon Fire Extinguishing System
Issued 1 April 2003 Resolved
Provide current servicing of Fixed Fire Fighting system. LEGACY COMPONENT DESC: Servicing
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 May 2003
Construction/Loadline › Penetrations
Issued 1 April 2003 Resolved
Tighten port shaft bearing. LEGACY COMPONENT DESC: Shaft Bearing
Due 1 May 2003
Resolved 30 April 2003
Construction/Loadline › Structures
Issued 1 April 2003 Resolved
Provide 2 inch combing into main cabin for cock pit. LEGACY COMPONENT DESC: Combing
Due 1 May 2003
Resolved 1 April 2003
Engineering › Bilge Water Management System
Issued 1 April 2003 Resolved
Double clamp hose for raw water cooling of generator. LEGACY COMPONENT DESC: Clamp
Due 1 May 2003
Resolved 1 April 2003
Construction/Loadline › Penetrations
Issued 1 December 2002 Resolved
PROVIDE ACCESS TO GENERATOR EXHAUST LINE OVBD DISCHARGE IN AFT STBD QUARTER IN ENGINEROOM.
Due 15 April 2003
Resolved 1 April 2003
Lifesaving › Buoyant Apparatus
Issued 12 March 2002 Resolved
PATCH LIFEFLOAT, RENEW REFLECTIVE TAPE AND LIFELINES.
Condition: Placed in Improper Service
Action required: 701 - Prior to carriage of passengers/cargo
Due 12 April 2002
Resolved 1 April 2003
Lifesaving › Lifejacket/PFD (Type I)
Issued 12 March 2002 Resolved
PROVIDE 7 ADULT AND 2 CHILD LIFEJACKETS. VESSEL NOT TO CARRY MORE THAN 44 ADULTS AND 4 CHILDREN UNTIL COMPLETE.
Condition: Unknown
Due 12 April 2002
Resolved 1 April 2003
Documentation › Certificates/Documents › Certificate of Documentation (CG-1270)
Issued 12 March 2002 Resolved
PROVIDE PROOF OF CURRENT DOCUMENTATION.
Condition: Unknown
Due 12 April 2002
Resolved 12 March 2002
Engineering
Issued 12 March 2002 Resolved
BLANK OFF OR COMPLETE INSTALLATION OF LIVE WELL PUMP VALVE.
Due 12 April 2002
Resolved 1 April 2003
Navigation
Issued 11 January 2000 Resolved
Provide and post an emergency radio broadcast placard.
Condition: Unknown
Due 11 January 2000
Resolved 11 January 2000

Ownership record