MAURY USCG vessel records
← All vessels

KAYLA MARIE

KAYLA MARIE is a 1970 passenger vessel (inspected). The Coast Guard has recorded 18 inspections since 2016, most recently in June 2026, along with 16 deficiencies — 1 with no resolution recorded —.

Records from 2016 to 2026. Most recent: inspection, 23 June 2026.

Built
1970
Last inspected
23 June 2026
Documentation
Valid · documentation file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 23 June 2026
Operational controls None recorded without a removal date
Years with a record 11 calendar years (2016–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

WCX8367
Flag
UNITED STATES
Maury page id
psix-46758

Documentation record

Registered dimensions (L × B × D)113.6 ft × 34.0 ft × 8.0 ft
Registered tonnagegross 93 / net 63
ITC dimensions (L × B × D)113.6 ft × 34.0 ft × 8.0 ft
ITC tonnagegross 185 / net 65
BuilderNEW BERN SHIPYARD INC · NEW BERN NC, UNITED STATES · built 1970
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portKELLEYS ISLAND, OH
Trade endorsementsCoastwise, unrestricted, Recreational
DocumentationValid · issued 15 January 2026 · expires 28 February 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it93 - Regulatory (Subpart C or D), Gross Ton
185 - Convention (Subpart B), Gross Ton
63 - Regulatory (Subpart C or D), Net Ton
65 - Convention (Subpart B), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Vessel history report

A report is not offered for this hull. Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. What a sparse-record report looks like.

Inspection history · 18

23 June 2026 Annual Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 8413518
17 November 2025 Administrative Inspection
Administrative · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 8269813
19 May 2025 Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 8139366
1 May 2025 COI Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 8116133
3 July 2024 Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 7959486
5 June 2024 Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 7929497
17 May 2023 Annual Inspection · Deficiency Check · Administrative Inspection · DAPI Audit
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 7690770
23 June 2022 Annual Inspection · DAPI Audit
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 7485768
20 January 2022 Liferaft Servicing
Physical examination · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 7413295
19 May 2021 Annual Inspection · DAPI Audit
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 7201969
8 April 2021 Drydock Exam · Internal Structural Exam
Physical examination · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 7171092
6 May 2020 COI Inspection · DAPI Audit
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 6942857
26 June 2019 DAPI Audit · Annual Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 6746939
5 June 2018 Annual Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 6434859
18 July 2017 Annual Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 6212526
25 January 2017 Liferaft Servicing
Physical examination · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 6077005
14 June 2016 DAPI Audit · Annual Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 5908289
20 April 2016 Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 5861734

Deficiency record · 16

13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 23 June 2026 Resolved
For the purpose of flexibility only, flexible hose installed in lengths of not more than 760 millimeters (30 inches) and subject to pressures of not more than 35 kPa (5 psig), may meet the following requirements:Flexible hose designed for use with hose clamps may be installed with two clamps, at both ends of the hose, which do not rely on the spring tension of the clamp for compressive force; and are installed beyond the bead or flare or over the serrations of the mating spud, pipe, or hose fitting; and USCG Type A1, A2, B1, or B2 flexible hose may be accepted in accordance with 33 CFR part 183, subpart J. MI found improper fuel hoses on both generators. 46 CFR 182.720(e)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 July 2026
Resolved 3 July 2026
Resolution: Installed new fuel hoses
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 23 June 2026 Resolved
A vessel is inspected for compliance with the standards required by this subchapter. Machinery, equipment, materials, and arrangements not covered by standards in this subchapter may be inspected in accordance with standards acceptable to the cognizant OCMI as good marine practice. MI found that both compressed air pressure vessels(30 gallons each) state that they require pressure relief devices and none were installed. 46 CFR 176.800(a)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 July 2026
Resolved 3 July 2026
Resolution: Installed pressure relief.
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 23 June 2026 No resolution recorded
Except as allowed by paragraph (b) of this section, each vessel certificated to operate on a Great Lakes route must be provided with the survival craft required by § 180.205 (a) through (e), as appropriate. Vessel is missing a IBA due to servicing. 46 CFR 180.206(a)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 October 2026
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 23 June 2026 Resolved
Gauges to indicate engine revolutions per minute (RPM), jacket water discharge temperature, and lubricating oil pressure must be provided for all propulsion engines installed in the vessel. The gauges must be readily visible at the operating station. Jacket water temperature gauges did not appear to be working for the port main engine. 46 CFR 182.410(b)
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 July 2026
Resolved 3 July 2026
Resolution: New gauge installed.
04 - Emergency Systems › N/A - No Subsystem › Location of emergency installations
Issued 1 May 2025 Resolved
The master and crew of a vessel will be familiar with the content of and have mounted at the operating station, emergency instructions containing the actions to be taken in the event of fire, heavy weather, or man overboard conditions. Vessel is missing emergency instructions at the operating station. 46 CFR 185.510(a)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 June 2025
Resolved 19 May 2025
Resolution: Emergency Instructions posted as required.
02 - Structural Conditions › N/A - No Subsystem › Bulkhead -corrosion
Issued 1 May 2025 Resolved
The construction and arrangement of a vessel must allow the safe operation of the vessel in accordance with the terms of its Certificate of Inspection giving consideration to provisions for a seaworthy hull, protection against fire, means of escape in case of a sudden unexpected casualty, guards and rails in hazardous places, ventilation of enclosed spaces, and necessary facilities for passengers and crew. Vessel has a hole on the lower port bulkhead of the women’s restroom. 46 CFR 177.100
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 June 2025
Resolved 19 May 2025
Resolution: Structural Wastage was repaired in accordance with requirements.
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 1 May 2025 Resolved
Remote fuel shutoff stations shall be marked in at least 1-inch letters indicating purpose of the valve and direction of operation. Vessel’s fuel shutoff valves are missing required markings. 46 CFR 185.30-20
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 June 2025
Resolved 19 May 2025
Resolution: Fuel shut offs labeled as required.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 5 June 2024 Resolved
All Machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing fire, explosion, machinery failurem and personal injury. Vessels 03 CAT engines had holdbacks or deleted air shutoff solenoids preventing closure of air to vessel in the event off overspeed or runaway. Renew/replace and verify proper operation for CG MI's.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 July 2024
Resolved 3 July 2024
Resolution: Solenoid/shut-off replaced on STBD engine and holdbacks removed on all other engines.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 17 May 2023 Resolved
All vessels shall be provided with a satisfactory arrangement for draining any watertight compartment other than small buoyancy compartments, under all practical conditions. Vessel unable to correctly arrange valves to drain forepeak during inspection. 46 CFR 182.500
Action required: 705 - Other - as specified
Due 24 May 2023
Resolved 18 May 2023
Resolution: Tested Bilge system with vessel rep. All sat.
Stability › Watertight Integrity › General
Issued 14 June 2016 Resolved
Provide a means to attach watertight hatch covers to the vessel by means of hinges, captive chains, or other device to prevent its loss.
Action required: 705 - Other - as specified
Due 28 June 2016
Resolved 27 June 2016
Resolution: Watertight deck hatches are now secured to vessel with captive chains.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 14 June 2016 Resolved
Provide exhaust lagging for center diesel engine.
Action required: 705 - Other - as specified
Due 28 June 2016
Resolved 27 June 2016
Resolution: Exhaust lagging is installed as required.
Engineering › Fuel Oil Service System › Piping
Issued 14 June 2016 Resolved
Fuel leak discovered at rigid fuel line b-nut/fitting on port diesel engine. Make repairs to ensure leak free.
Action required: 701 - Prior to carriage of passengers/cargo
Due 14 June 2016
Resolved 14 June 2016
Resolution: Corrected with a new fuel line installed prior to making another passenger run.
Engineering › Diesel Engine (propulsion-direct drive) › Block
Issued 14 June 2016 Resolved
Determine cause of oil leak on STBD diesel engine and make permanent repairs as required. Remove all temporary repairs in way of JB Weld type compound in location of oil leak. Currently leakage of approximately 25 drops per minute.
Action required: 705 - Other - as specified
Due 21 June 2016
Resolved 27 June 2016
Resolution: Oil leak was pinpointed to "o" ring and "o" ring has been renewed and compound removed as required.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 20 April 2016 Resolved
A 5' linear section of the watertight transverse bulkhead in the stbd-side bow thruster room is damaged and detached at it's intersection with the bottom plating. The structural and watertight integrity of this bulkhead is compromised. Crop and renew, as original, this damaged section of bulkhead IAW 46 CFR 176.802.
Action required: 705 - Other - as specified
Due 20 May 2016
Resolved 15 June 2016
Resolution: Wasted/damaged section of bulkhead has been cropped and renewed to original. Air lance test conducted by vessel crew and found to be satisfactory. Repairs completed.
Construction/Loadline › Hull › Transverse Frame
Issued 20 April 2016 Resolved
There is a wasted floor frame immediately under the deck-hatch of the void space aft of the fuel room void. Crop and renew wasted floor frame as original IAW 46 CFR 176.802.
Action required: 705 - Other - as specified
Due 20 May 2016
Resolved 15 June 2016
Resolution: Floor frame has been cropped and renewed to original. Repair completed.
Construction/Loadline › Hull › Stiffener
Issued 20 April 2016 Resolved
There is a vertical stiffener IWO the void space aft of the fuel room that is detached from the side shell at multiple stitch welds. Reattach stiffener as original IAW 46 CFR 176.802.
Action required: 705 - Other - as specified
Due 20 May 2016
Resolved 15 June 2016
Resolution: Stiffener has been reattached to side shell by stitch welds in line with existing welding method.

Ownership record