Records from 1981 to 2020. Most recent: inspection, 6 August 2020.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 50
6 August 2020
Load Line/Change of Employment · Administrative Inspection
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7030232
7 August 2006
Administrative Inspection
Administrative · Marine Safety Center (MSC) · Activity 2738769
26 April 2006
Administrative Inspection
Administrative · Marine Safety Center (MSC) · Activity 2633867
6 January 2006
In-Service Inspection · Security Plan Review - VSP
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 2559789
27 October 2005
Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2523274
1 April 2005
Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2324564
8 October 2004
MTSA/ISPS Verification · Periodic Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 2212852
3 June 2004
MTSA/ISPS Verification
Physical examination · Commandant (CG-CVC) · Activity 2087410
9 February 2004
Examination of Repairs
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 2001641
28 January 2004
Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 1995602
16 October 2003
Annual Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1925871
10 June 2003
In-Service Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1809559
29 January 2003
Examination of Repairs
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1735875
26 June 2002
COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1666970
17 April 2002
Deadweight Survey · Inclining Experiment
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1606902
13 February 2002
Construction Oversight
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1486339
9 January 2001
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 27826
26 September 2000
COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1405053
18 November 1999
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 14391
16 August 1999
Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 777694
16 December 1998
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 807481
11 December 1998
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1381362
19 October 1998
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 802384
15 October 1998
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1471173
29 July 1998
Deficiency Check · COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1471358
8 July 1998
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 181981
17 October 1996
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1430296
22 August 1996
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1084496
22 August 1996
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1086178
7 August 1996
Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1388023
1 March 1996
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1439727
6 December 1994
Deficiency Check · COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1416041
4 May 1994
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1168802
14 April 1994
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 857150
1 February 1994
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1412588
17 August 1992
COI Inspection
Physical examination · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 936637
9 November 1991
Examination of Repairs
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 942358
29 October 1991
Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1252682
30 September 1991
Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 942225
16 September 1991
Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1309407
7 June 1991
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 941795
20 May 1991
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 942108
25 October 1990
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 920340
23 August 1990
Permit to Proceed
Administrative · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1234601
3 May 1989
COI Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1037997
16 May 1988
Re-Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1039352
20 May 1987
COI Inspection · Hull Examination
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1029628
11 November 1986
Hull Examination
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1015263
1 July 1985
Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1306315
13 January 1981
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1271420
Electrical › Electrical Distribution System (service) › Ground Detection
Issued 8 October 2004
No resolution recorded
Repair ground detection indicator light from 120v lighting circuit.
Due 11 November 2004 — due date passed with no resolution recorded
Deck/Cargo › Mooring/Anchoring › Capstan
Issued 8 October 2004
Resolved
Prove proper operation of ships anchor/ground tackle
Due 12 October 2004
Resolved 12 October 2004
Navigation › Piloting/Steering › Notices to Navigation
Issued 16 October 2003
Resolved
Provide current GMDSS shore side maintenance contract.
Due 30 November 2003
Resolved 12 October 2004
Deck/Cargo › Holds/Tanks › Hatch Cover
Issued 16 October 2003
Resolved
Replace missing dog on cargo hatch 2B, stbd side
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 October 2004
Deck/Cargo › Holds/Tanks › Hatch Cover
Issued 16 October 2003
Resolved
Prove weathertightness of #1C and #4C cargo hatches
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 October 2004
Electrical › Lighting (service) › Lighting Fixture
Issued 16 October 2003
Resolved
Repair broken light in E-gen room
Due 30 November 2003
Resolved 12 October 2004
Engineering › Steering Gear System › Hydraulic Hose
Issued 16 October 2003
Resolved
Repair leak in make up tank in steering gear room
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 October 2004
Lifesaving › Immersion Suits › Not on Board
Issued 16 October 2003
Resolved
Provide (5) additional immersion suits
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 October 2004
Lifesaving › Lifejacket/PFD (Type I) › Retroreflective Material
Issued 16 October 2003
Resolved
Vessel required (50); (12) have bad retro reflective tape and (4) need new whistles.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 October 2004
Navigation › Piloting/Steering › US Coast Pilot
Issued 16 October 2003
Resolved
Provide required and up to date navigational pubs and charts
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 October 2004
Operations/Management › Drills/Instruction › Not Conducted
Issued 16 October 2003
Resolved
Conduct fire and abandon ship drills with crew in presence of marine inspector.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 October 2004
Fire Fighting › Portable CO2 Fire Extinguisher
Issued 10 June 2003
Resolved
Provide CO2 and power extinguishers for bridge IAW plan.
Action required: 705 - Other - as specified
Resolved 16 July 2003
Fire Fighting
Issued 10 June 2003
Resolved
Change fire station #29 to inboard side of the passageway on drawing.
Action required: 705 - Other - as specified
Resolved 16 July 2003
Lifesaving › Immersion Suits
Issued 10 June 2003
Resolved
Remove immersion sit and life jacket from bow on the drawing, or provide the same.
Action required: 705 - Other - as specified
Resolved 16 July 2003
Fire Fighting › Miscellaneous Items
Issued 10 June 2003
Resolved
Add on drawing general emergency contracter switch to cargo officer.
Action required: 705 - Other - as specified
Resolved 25 June 2003
Lifesaving › Lifebuoys
Issued 10 June 2003
Resolved
Switch, on drawing, life ring (w/o light) on with next one forward (with light) on main deck, starboard side, just fwd of accomodation locker.
Action required: 705 - Other - as specified
Resolved 25 June 2003
Lifesaving › Lifebuoys
Issued 10 June 2003
Resolved
Switch, on drawing, life ring (w/o light) on with next one aft(with light) on main deck, aft side, just fwd of accomodation locker.
Action required: 705 - Other - as specified
Resolved 25 June 2003
Fire Fighting › Portable CO2 Fire Extinguisher
Issued 10 June 2003
Resolved
Change DWG to reflect FE14 is outside the crew recreation room.
Action required: 705 - Other - as specified
Resolved 25 June 2003
Fire Fighting › Semiportable CO2 Fire Extinguishers
Issued 10 June 2003
Resolved
Changed wheeled fire extinguished on drawing to CO2 hose/reel system (2x50lb bottles) to reflect actual system.
Action required: 705 - Other - as specified
Resolved 16 July 2003
Construction/Loadline
Issued 26 September 2000
Resolved
Prove proper operation of the bilge well suction in cargo hold #4 port side. All test's and repairs are to be completed to the satisfaction of the attending USCG Marine Inspector priot to 26 Oct 00.
Condition: Unknown
Due 26 September 2000
Resolved 26 September 2000
Engineering
Issued 26 September 2000
Resolved
Prove proper operation of the diesel start air receiver relief valve and the outboard ship service air receiver relief valve. All test and repairs are to be completed to the satisfaction of the attending CG Inspector priorto 26 Oct 00.
Condition: Unknown
Action required: 705 - Other - as specified
Due 6 October 2000
Resolved 22 July 2002
Lifesaving
Issued 11 December 1998
Resolved
MAKE PROPOSAL TO REPLACE OR MODIFY WOODEN CANOPY FRAMING ON LIFEBOATS TO PREVENT SIDESHELL PRESSURE AND SUBSEQUENT CRACKING.
Condition: Unknown
Due 11 December 1998
Resolved 11 December 1998
Lifesaving
Issued 11 December 1998
Resolved
PRIOR TO VESSEL SAILING FROM CURRENT MOORING/ANCHORAGE, PROVIDE REPAIR SUMMARY FOR UNAUTHORIZED LIFEBOAT REPAIRS EFFECTED IN NEW ORLEANS, LA IN SUMMER/FALL 1998. MAKE P & S LIFEBOATS AVAIL FOR INSPECTION. PREVIOUSLY NOTED SIDESHELL CRACKING ON BOTH BOATS.
Condition: Unknown
Due 11 December 1998
Resolved 11 December 1998
Navigation
Issued 29 July 1998
Resolved
PROVIDE NEW COMPASS DEVIATION TABLE.
Condition: Unknown
Due 29 July 1998
Resolved 29 July 1998
Lifesaving
Issued 29 July 1998
Resolved
CONDUCTED WEIGHT TEST OF BOTH LIFE BOATS.
Condition: Unknown
Due 29 July 1998
Resolved 29 July 1998
Fire Fighting
Issued 29 July 1998
Resolved
PROVIDE 2ND SHEET FOR PORT SIDE FIRE CONTROL PLAN AND REPLACE STBD FIRE CONTROL PLAN W/ UPDATED COPY MATCHING MAIN PLAN OUTSIDE [name withheld].
Condition: Unknown
Due 29 July 1998
Resolved 29 July 1998
Construction/Loadline
Issued 29 July 1998
Resolved
REPAIR/RENEW HIGH PRESSURE DRAINS IN BILGE IN WAY OF RUSTED PIPING.
Condition: Unknown
Due 29 July 1998
Resolved 29 July 1998
Lifesaving
Issued 29 July 1998
Resolved
PROVIDE PORTABLE SEARCH LIGHT FOR LIFEBOATS.
Condition: Unknown
Due 29 July 1998
Resolved 29 July 1998
Engineering
Issued 29 July 1998
Resolved
REPAIR INBOARD CONDENSATE PUMP SEAL.
Condition: Unknown
Due 29 July 1998
Resolved 29 July 1998
Engineering
Issued 29 July 1998
Resolved
REPAIR/RENEW STEAM STOP VALVE ON PORT BOILER, FORWARD END IN WAY OF LEAKINGVALVE STEM.
Condition: Unknown
Due 29 July 1998
Resolved 29 July 1998
Engineering
Issued 29 July 1998
Resolved
REPAIR/RENEW STEAM STOP VALVE ON PORT BOILER, HIGH PRESSURE STEAM BLEED HEATERS.
Condition: Unknown
Due 29 July 1998
Resolved 29 July 1998
Engineering
Issued 29 July 1998
Resolved
PROVIDE LETTER (OR SIGNED LOG ENTRY) FROM [name withheld] [name withheld] TEST OF MAIN TURBINE OVERSPEEDS.
Condition: Unknown
Due 29 July 1998
Resolved 29 July 1998
Deck/Cargo
Issued 17 October 1996
Resolved
PROVE PROPER OPERATION OF #4 CONSTANT TENSION MOORING WINCH-MOTOR MISSING FROM M/G SET IN STEERING FLAT.
Condition: Unknown
Due 17 October 1996
Resolved 17 October 1996
Navigation
Issued 17 October 1996
Resolved
PROVE PROPER OPERATION OF THE SHIPS SERVICE PHONE LOCATED AT THE PORT STACKPRIOR TO ACTIVATION OF VESSEL.
Condition: Unknown
Due 17 October 1996
Resolved 17 October 1996
Accommodation/Occupational Safety
Issued 17 October 1996
Resolved
PROVIDE FULL COMPLIMENT OF SHIPS MEDICAL CHEST AND EQUIPMENT PRIOR TO ACTIVATION OF VESSEL.
Condition: Unknown
Due 17 October 1996
Resolved 17 October 1996
Navigation
Issued 17 October 1996
Resolved
PROVE PROPER OPERATION OF SHIPS SOUND POWERED PHONE STATION LOCATED AT REFUELING STATION ON PORT SIDE PRIOR TO ACTIVATION OF VESSEL.
Condition: Unknown
Due 17 October 1996
Resolved 17 October 1996
Engineering
Issued 17 October 1996
Resolved
REMACHINE AND RELAP STBD. BOILER 4" DESUPERHEATER VALVE AS PER MSM VOL II CHAPTER 6.H.5.C(3)a. TO THE SATISFACTION OF THE ATTENDING C.G. MARINE INSPECTOR TO INSURE THAT 'NO' DISCONTINUITIES REMAIN ON THE VALVE SEAT OR DISC SEATING SURFFACES.
Condition: Unknown
Due 17 October 1996
Resolved 17 October 1996
Electrical
Issued 17 October 1996
Resolved
REMOVE GROUND FROM FWD SWITCHBOARD OUTSIDE CO'S ROOM.
Condition: Unknown
Due 17 October 1996
Resolved 17 October 1996
Engineering
Issued 17 October 1996
Resolved
RENEW BAD RTO FOR #5 SENSOR FOR TEMPERATURE MONITOR (FOR L.P. TURBO AFT JOURNAL) CONSOLE MIMMIC BOARD. (USE CALIBRATED LOCAL TEMP. GUAGE.)
Condition: Unknown
Due 17 October 1996
Resolved 17 October 1996
Engineering
Issued 17 October 1996
Resolved
CONDUCT MAIN H.P./L.P TURBINE OVERSPEED TRIPS AT SEA. RESULTS TO BE LOGGEDAND SIGNED BY CHIEF ENGINEER.
Condition: Unknown
Due 17 October 1996
Resolved 17 October 1996
Fire Fighting
Issued 1 March 1996
Resolved
PRIOR TO PLACING VESSEL IN OPERATION, OBTAIN APPROVAL FOR SMOKE DETECTING SYSTEM ALTERATION FROM THE U.S. COAST GUARD MARINE SAFETY CENTER AS PER 46 CFR 91.55-10.
Condition: Unknown
Due 1 March 1996
Resolved 1 March 1996
Documentation
Issued 6 December 1994
Resolved
PROVIDE ONBOARD THE VESSEL A VALID FCC CERTIFICATE (SAFETY RADIO TELEPHONE)PRIOR TO ACTIVATION OF VESSEL.
Condition: Unknown
Due 6 December 1994
Resolved 6 December 1994
Engineering
Issued 14 April 1994
Resolved
OBTAIN APPROVAL FROM THE U.S. COAST GUARD MARINE SAFETY CENTER, WASHINGTON,D.C. FOR BOILER AUTOMATION MODIFICATIONS INCLUDING TEST PROCEDURES PER 46 CFR 50.20.
Condition: Unknown
Due 14 April 1994
Resolved 14 April 1994
Navigation
Issued 14 April 1994
Resolved
PRIOR TO PLACING THE VESSEL IN OPERATION OBTAIN APPROVAL FOR STEERING GEAR ALTERATIONS AS PER 46 CFR 50.20 FOR REVIEW AND APPROVAL TO THE U.S. COAST GUARD MARINE SAFETY CENTER, WASHINGTON, D.C.
Condition: Unknown
Due 14 April 1994
Resolved 14 April 1994
Navigation
Issued 1 February 1994
Resolved
SUBMIT PLANS FOR STEERING GEAR ALTERATIONS AS PER 46 CFR 50.20 FOR REVIEW AND APPROVAL TO THE U. S. COAST GUARD MARINE SAFETY CENTER, WASHINGTON, D.C.
Condition: Unknown
Due 1 February 1994
Resolved 1 February 1994
Engineering
Issued 1 February 1994
Resolved
SUBMIT PLANS FOR BOILER AUTOMATION MODIFICATIONS INCLUDING TEST PROCEDURES AS PER 46 CFR 50.20 FOR REVIEW AND APPROVAL TO THE U.S. COAST GUARD, MARINESAFETY CENTER, WASHINGTON, D.C.
Condition: Unknown
Due 1 February 1994
Resolved 1 February 1994
Navigation
Issued 1 February 1994
Resolved
CONDUCT UNDERWAY TEST OF STEERING GEAR SYSTEM AS REQUIRED BY 46 CFR 58.25, SOLAS REGULATION 29 (3) AND (4).
Condition: Unknown
Due 1 February 1994
Resolved 1 February 1994
Unknown
Issued 17 August 1992
Resolved
PROPERLY SERVICE, STOW ALL FIRE FIGHTING, LIFE, SAFETY AND NAVIGATION EQUIPMENT. CONDUCT ALL INSPECTIONS REQUIRED AND DUE BY REGULITION TO THE SATISFACTION OF THE USCG INSPECTOR WHEN VESSEL IS ACTIVATED FROM THE READY RESERVE FLEET.
Condition: Unknown
Due 17 August 1992
Resolved 17 August 1992
Deck/Cargo
Issued 29 October 1991
Resolved
PROVIDE CONTAINMENT FOR ALL CARGO/FUEL OIL TANK VENTS IAW 33 CFR 155.320(a)
Condition: Unknown
Due 29 October 1991
Resolved 29 October 1991
Deck/Cargo
Issued 29 October 1991
Resolved
PROVE/ENSURE THAT THE VENT PIPE ARRANGEMENT FOR THE FWD LIQUID CARGO TANKS (#1-2 P/S) IS ADEQUATE IAW 46 CFR 56.50-85 (10).
Condition: Unknown
Due 29 October 1991
Resolved 29 October 1991
Engineering
Issued 20 May 1991
Resolved
PROVE PROPER OPERATION OF MOTOR OPERATED SEA SUCTION VALVE FOR MAIN CONDENSOR._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 20 May 1991
Resolved 20 May 1991
Engineering
Issued 20 May 1991
Resolved
MAKE PORT BOILER AVAILABLE FOR FIRESIDE WATERSIDE EXAM AND 1 1/4 X MAWP HYDRO DURING NEXT DRYDOCK EXAM BUT IN NO CASE LATER THAN 30 SEPTEMBER 1991.
Condition: Unknown
Due 20 May 1991
Resolved 20 May 1991
Engineering
Issued 20 May 1991
Resolved
CALIBRATE P/S BOILERS PROPULSION AND GENERATOR METERS AND GAUGES DURING NEXT DRYDOCK EXAM BUT IN NO CASE LATER THAN 30 SEPTEMBER 1991.
Condition: Unknown
Due 20 May 1991
Resolved 20 May 1991
Deck/Cargo
Issued 20 May 1991
Resolved
REPLACE MISSING ANCHOR AND ANCHOR CHAIN PORTSIDE AND PROVE PROPER OPERATIONOF SAME TO THE SATISFACTION OF ATTENDING USCG MARINE INSPECTOR._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 20 May 1991
Resolved 20 May 1991
Fire Fighting
Issued 20 May 1991
Resolved
PROVE PROPER OPERATION OF LOSS OF POWER ALARM FOR SMOKE DETECTION SYSTEM INWAY OF MAIN CONTROL PANEL/CO2 ROOM._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 20 May 1991
Resolved 20 May 1991
Navigation
Issued 20 May 1991
Resolved
PROVE PROPER OPERATION OF EPIRB UPON INSTALLATION OF NEW BATTERY._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 20 May 1991
Resolved 20 May 1991
Fire Fighting
Issued 20 May 1991
Resolved
IN PRESENCE OF CG MARINE INSPECTOR; PROPERLY TEST/SERVICE ALL FIXED CO2 FIREFIGHTING SYSTEMS INCLUDING ALARMS, TIME DELAYS, SHUTDOWNS, FLEX LOOPS, POLLS AND CYLINDERS. _x001C_ _x001C_
Condition: Unknown
Due 6 September 1991
Resolved 6 September 1991
Deck/Cargo
Issued 20 May 1991
Resolved
INSTALL ALARM SYSTEM (OUTSIDE SPACE) OR INSTALL ANTI LOCKING PERSONNEL ESCAPE DEVICES ON #1014 & #1002 REEFER UNITS._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 20 May 1991
Resolved 20 May 1991
Navigation
Issued 20 May 1991
Resolved
REPLACE ALL EXISTING PORT & STBD RUNNING LIGHTS, AND MAST LIGHTS, WITH CG APPROVED VERTICAL FLAMENT LIGHTS._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 6 September 1991
Resolved 6 September 1991
Lifesaving
Issued 20 May 1991
Resolved
CONDUCT LIFEBOAT TEST IN PRESENCE OF CG MARINE INSPECTOR._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 6 September 1991
Resolved 6 September 1991
Engineering
Issued 20 May 1991
Resolved
MAKE DC HEATER AVAILABLE FOR INTERNAL EXAM DURING NEXT DRYDOCK EXAW BUT IN NO CASE LATER THAN 30 SEPTEMBER 1991.
Condition: Unknown
Due 20 May 1991
Resolved 20 May 1991
Lifesaving
Issued 20 May 1991
Resolved
REPLACE WASTED PORT & STBD LIFEBOAT EMBARKATION LADDERS WITH CG-APPROVED TYPE II LADDERS AS PER 46 CFR 94.50-5.
Condition: Unknown
Due 6 September 1991
Resolved 6 September 1991
Engineering
Issued 20 May 1991
Resolved
REPAIR OR REPLACE HOLED FLEX PIPE FOR PORT BOILER SUPER HEATER SAFETY ESCAPE PIPE._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 20 May 1991
Resolved 20 May 1991
Fire Fighting
Issued 20 May 1991
Resolved
REPLACE CRACKED FLEX LOOP FOR ENGINEER'S PAINT LOCKER FIXED CO2 SYSTEM._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 6 September 1991
Resolved 6 September 1991
Engineering
Issued 20 May 1991
Resolved
PROVE PROPER OPERATION OF PORT BOILER IGNITOR._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 6 September 1991
Resolved 6 September 1991
Accommodation/Occupational Safety
Issued 20 May 1991
Resolved
PROVE PROPER OPERATION OF ACCOMMODATION VENTILATION REMOTE SHUTDOWN FROM BRIDGE. CIRCUIT BREAKER LOCATED AT SWITCH BOARD OUTSIDE CO2 SYSTEM. _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 6 September 1991
Resolved 6 September 1991
Lifesaving
Issued 20 May 1991
Resolved
REMOVE + REPLACE IN KIND, ALL WASTED LIFEBOAT HANDRAILS (PORT SIDE) PRIOR TO COMPLETION OF NEXT DRYDOCK._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 20 May 1991
Resolved 20 May 1991
Accommodation/Occupational Safety
Issued 20 May 1991
Resolved
REMOVE EXISTING CEMENT (TEMPORARY SOFT PATCH) PORT SIDE ABOVE WATER BALLASTTANK AND MAKE APPROVED PERMANENT REPAIRS._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 20 May 1991
Resolved 20 May 1991
Engineering
Issued 25 October 1990
Resolved
HYDROSTATICALLY TEST AIR HEATER AND ASSOCIATED PIPING PRIOR TO USE.
Condition: Unknown
Due 25 October 1990
Resolved 25 October 1990
Engineering
Issued 25 October 1990
Resolved
INSTALL AIR HEATER AND EXPANSION JOINT PORT BOILER
Condition: Unknown
Due 25 October 1990
Resolved 25 October 1990
Engineering
Issued 23 August 1990
Resolved
PROVIDE PROPER CONTAINMENT AT ALL FUEL VENTS IN ACCORDANCE WITH 33 CFR 155.320
Condition: Unknown
Due 23 August 1990
Resolved 23 August 1990
Construction/Loadline
Issued 23 August 1990
Resolved
PROPERLY STENCIL STBD MIDSHIP REMOTE WATER TIGHT DOOR OPERATORS.
Condition: Unknown
Due 23 August 1990
Resolved 23 August 1990
Electrical
Issued 23 August 1990
Resolved
PROVE PROPER OPERATION OF ALL GENERAL ALARM BELLS ON WEATHER DECKS.
Condition: Unknown
Due 23 August 1990
Resolved 23 August 1990
Navigation
Issued 23 August 1990
Resolved
RENEW/ADJUST LEAKING SEALS TO PORT AND STBD STEERING RAMS.
Condition: Unknown
Due 23 August 1990
Resolved 23 August 1990
Engineering
Issued 23 August 1990
Resolved
PROVE AUTOMATIC CHANGE OVER OF LUBE OIL PUMPS.
Condition: Unknown
Due 23 August 1990
Resolved 23 August 1990
Engineering
Issued 23 August 1990
Resolved
REMOVE POP OFF VALVES FROM CONTROL AIR RECEIVER AND SHIPS SERV. AIR RECEIVER AND RENEW WITH VALVES OF THE PROPER SETTING.
Condition: Unknown
Due 23 August 1990
Resolved 23 August 1990
Electrical
Issued 23 August 1990
Resolved
DEMONSTRATE OPERATION OF ALL ALARMS AND TRIPS ON AUX DIESEL GENERATOR.
Condition: Unknown
Due 23 August 1990
Resolved 23 August 1990
Engineering
Issued 23 August 1990
Resolved
RENEW DEFECTIVE TUBES IN PORT BOILER. PROVIDE A SATISFACTORY HYDROSTATIC TEST TO PROVE ALL REPAIRS. DEMONSTRATE ALL FLAME SAFETIES, LEVEL ALARMS AND TRIPS AND SET AND SEAL ALL SAFETY VALVES.
Condition: Unknown
Due 23 August 1990
Resolved 23 August 1990
Fire Fighting
Issued 23 August 1990
Resolved
PROVIDE APPROVED FIRE CONTROL PLAN.
Condition: Unknown
Due 23 August 1990
Resolved 23 August 1990
Documentation
Issued 3 May 1989
Resolved
PRIOR TO ACTIVIATION COMPLETE ALL INSPECTION ITEMS FOR INSPECTION FOR CERTIFICATION.
Condition: Unknown
Due 3 May 1989
Resolved 3 May 1989