BOMBA CHARGER
Passenger (Inspected) · Passenger Ship class · Built 1970s · USCG Southeast District (CGD-SE) · Other hulls named BOMBA CHARGER
BOMBA CHARGER is a 1971 passenger vessel (inspected). The Coast Guard has recorded 103 inspections since 1985, most recently in January 2026, along with 289 deficiencies and 1 operational control.
Records from 1985 to 2026. Most recent: inspection, 6 January 2026.
- Built
- 1971
- Last inspected
- 6 January 2026
- Documentation
- Not in the documentation file of 10 September 2026
- Inspections
- 103
- Deficiencies
- 289 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
531554
ZJL4476
46847
Flag
UNITED STATES
—
Maury page id
psix-46847
Inspections, by type
…with no type recorded12
Years with a record
38 calendar years (1985–2026)
The 103 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.
Documentation record
Tonnage as PSIX records it48 - Regulatory (Subpart C or D), Net Ton
71 - Regulatory (Subpart C or D), Gross Ton
71 - Regulatory (Subpart C or D), Gross Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Radio station licence
No FCC ship-station licence is recorded against this Official Number in the file of
6 September 2026. That is a fact about the licence file, not about the radio.
Inspection history · 103
6 January 2026
Administrative Inspection · MTSA/ISPS Verification · COI Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 8270826
18 July 2025
Administrative Inspection
Administrative · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 8190439
6 December 2024
Administrative Inspection · MTSA/ISPS Verification · ISM Exam · DAPI Audit
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 8043731
30 September 2024
Administrative Inspection · Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 8022896
6 December 2023
MTSA/ISPS Verification · COI Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 7822153
29 August 2023
Drydock Exam · Internal Structural Exam
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 7822433
7 December 2022
COI Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 7596133
16 August 2022
Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 7536221
14 December 2021
COI Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 7358560
24 August 2021
Drydock Exam · Internal Structural Exam
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 7313512
8 December 2020
COI Inspection · Deficiency Check
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 7102196
24 September 2020
Administrative Inspection
Administrative · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 7064430
3 August 2020
Drydock Exam · Internal Structural Exam
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 7023870
17 July 2019
Internal Structural Exam · DAPI Audit · Drydock Exam · Administrative Inspection · MTSA/ISPS Verification · COI Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6782996
11 June 2018
Hull Examination · Internal Structural Exam
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6441819
5 July 2017
Drydock Exam · Hull Examination
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6197715
13 April 2017
Deficiency Check · DAPI Audit · COI Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6121123
23 January 2017
Damage Survey · Deficiency Check · Examination of Repairs
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6075413
27 June 2016
Deficiency Check · Hull Examination
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 5920981
14 April 2016
COI Inspection · DAPI Audit · MTSA/ISPS Verification
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 5851825
28 August 2014
Deficiency Check
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 4969254
27 August 2014
Type not recorded
No type recorded · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 4973381
4 June 2014
Hull Examination
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 4879088
27 March 2014
DAPI Audit · Deficiency Check · COI Inspection · ISPS II Exam
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 4823790
2 February 2012
In-Service Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 4242314
19 December 2011
ISPS II Exam · COI Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 4210574
19 December 2011
Administrative Inspection
Administrative · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 4217280
9 December 2011
Hull Examination · Internal Structural Exam
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 4204824
7 December 2010
COI Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 3905881
2 December 2010
Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 3902477
17 March 2010
Administrative Inspection
Administrative · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 3697435
25 November 2008
Deficiency Check · COI Inspection · ISPS II Exam
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 3368976
4 October 2008
Deficiency Check · Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 3338322
9 August 2008
Type not recorded
No type recorded · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 3294295
18 October 2007
COI Inspection · Deficiency Check
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 3082161
25 September 2007
Hull Examination
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 3071436
29 November 2005
Hull Examination
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 2542697
24 December 2004
Deficiency Check
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 2297573
22 December 2004
COI Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 2263417
30 November 2004
COI Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 2250192
17 November 2004
Hull Examination
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 2243377
23 September 2004
Special
Type not classified · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 2202831
1 July 2004
ISPS II Exam
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 2117777
27 January 2004
Deficiency Check
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 1994252
2 December 2003
COI Inspection · MARPOL Annex I Examination
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 1956647
2 December 2003
Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 1958068
18 September 2003
Hull Examination
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 1910104
25 September 2002
COI Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 1680027
28 August 2002
COI Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 1667480
9 May 2002
Hull Examination
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 1773412
27 September 2001
COI Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 1612122
17 July 2001
Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1393805
7 May 2001
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1064798
18 April 2001
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1062161
12 October 2000
Re-Inspection · MARPOL Annex V Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1413813
16 June 2000
Deficiency Check · Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1404998
27 August 1999
MARPOL Annex V Examination · COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1361081
20 August 1999
Examination of Repairs · Damage Survey
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 781055
25 May 1999
Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1402878
30 March 1999
Drydock Extension
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 780433
11 February 1999
Administrative
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 793015
1 September 1998
MARPOL Annex V Examination · Re-Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1438757
23 June 1998
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1127366
30 March 1998
Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1372184
25 November 1997
Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1378221
28 August 1997
Re-Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1380981
25 October 1996
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 852939
22 August 1996
COI Inspection · Hull Examination · Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1468394
29 April 1996
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1081959
8 April 1996
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1083613
30 October 1995
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 879167
14 September 1995
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 883133
24 August 1995
COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1377502
24 August 1995
Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1414500
15 June 1995
Administrative
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1190096
29 October 1994
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1180059
26 August 1994
Type not recorded
No type recorded · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 654854
26 August 1994
COI Inspection · Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1465159
18 August 1994
Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1465158
19 July 1994
Drydock Extension · Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 869577
16 July 1994
Administrative
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 868544
27 August 1993
Deficiency Check · COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1356389
28 July 1993
Hull Examination · Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1370668
7 July 1992
COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1252923
27 May 1992
Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 954973
27 June 1991
COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1247368
11 April 1991
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 924759
11 April 1991
Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1212695
30 May 1990
Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 918441
30 May 1990
COI Inspection · Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1231454
30 May 1990
Administrative
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1234061
9 February 1989
Administrative
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1341013
14 May 1988
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1044798
13 May 1988
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1351909
1 April 1988
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1348626
23 March 1988
COI Inspection · Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1348106
25 January 1988
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1322208
21 January 1988
Administrative
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1013107
22 May 1987
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1333708
24 March 1987
COI Inspection · Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1329844
18 March 1986
COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 998858
11 June 1985
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1292293
19 March 1985
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1288122
Deficiency record · 289
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 8 December 2020
Resolved
Each nozzle must be capable of being changed between a solid and spray pattern prior to carrying passengers.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 8 December 2020
Resolved
Mark emergency exits from both bathrooms prior to carrying passengers.
Emergency exits used as means of escape must be marked on both sides in clearly legible letters at least 50 millimeters (2 inches) high: “EMERGENCY EXIT, KEEP CLEAR”
01 - Certificates & Documentation › 012 - Crew Certificates › Medical certificate
Issued 8 December 2020
Resolved
Provide proof of current enrollment for the vessel crew in a random chemical testing program prior to carrying passengers or cargo.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 24 September 2020
Resolved
Vessel's scheduled COI inspection on was not able to be completed on schedule due to the COVID-19 Pandemic. The BVI is closed and they have granted an extension for BVI required vessel documents until 31OCT20. A USCG COI inspection extension is granted until 31OCT20.
Engineering › Diesel Engine (propulsion-reduction gear) › Exhaust Manifold
Issued 13 April 2017
Resolved
Repair exhaust leaks in steering compartment on generator exhaust piping in way of flexible coupling and muffler.
Engineering › Fuel Oil Storage/Transfer System › Vent Pipe
Issued 13 April 2017
Resolved
Repair flexible coupling on fuel vent piping.
Engineering › Fuel Oil Storage/Transfer System › Vent Pipe
Issued 13 April 2017
Resolved
Provide adequate supports on generator exhaust piping and fuel vent piping.
Electrical › Electrical Distribution System (service) › Wiring
Issued 13 April 2017
Resolved
Install metallic wire hangers for power conductors.
Operations/Management › Drug and Alcohol Testing › Recordkeeping
Issued 13 April 2017
Resolved
DAPI program records not available for inspection. Vessel to contact USCG MSD St Thomas marine inspectors to schedule DAPI audit.
Electrical › Electric Generation Source (service) › Generator
Issued 25 January 2017
Resolved
Provide written report of service generator detailing cause of failure and repair response. Correct prior to conducting sea trials.
Engineering › Fuel Oil Service System › Hose
Issued 23 January 2017
Resolved
Port engine was found to have (03) three oil non-metallic hoses ruptured and oil spray was found covering aft portion of engine and reduction gear. Prior to movement, demonstrate integrity (replace) oil lines, clean oil spray, and show proper operation of port engine including turbo.
Construction/Loadline › Hull › Hull Plating
Issued 28 June 2016
Resolved
Crop and renew pitted plating port and starboard of keel forward of fuel tank to forward bulkhead of space.
Engineering › Bilge Water Management System › Piping
Issued 28 June 2016
Resolved
Renew wasted bilge piping forward of fuel tank to good metal.
Construction/Loadline › Hull › Strut/Cross Tie
Issued 28 June 2016
Resolved
Reweld broken port rudder strut in lazarette.
Construction/Loadline › Hull › Longitudinal Frame
Issued 28 June 2016
Resolved
Gouge and reweld broken welds on longitudinal engine mounts forward of engines. Broken welds observed on the inboard side of both engines and outboard of starboard engine.
Construction/Loadline › Hull › Hull Plating
Issued 28 June 2016
Resolved
Drill stop, gouge and reweld cracked existing weld repair on starboard rudder.
Engineering › Bilge Water Management System › Valve
Issued 14 April 2016
Resolved
Repair or replace broken valve handle on forepeak bilge valve.
Engineering › Fuel Oil Service System › Valve
Issued 14 April 2016
Resolved
Prove proper operation of emergency fuel shut-off valve.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 14 April 2016
Resolved
Provide batteries for ring buoy water light.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 14 April 2016
Resolved
Provide water light lanyard with clip.
Communications › Radio Communications › VHF Radiotelephone
Issued 14 April 2016
Resolved
Provide GPS enabled VHF radio.
Engineering › Shafting/Propeller Arrangements › Propeller Shaft
Issued 28 August 2014
Resolved
Prior to carrying passengers in U.S. Waters, make vessel available for inspection due to propulsion shaft failure.
Engineering › Shafting/Propeller Arrangements › Propeller Shaft
Issued 28 August 2014
Resolved
Upon satisfactory repairs to propulsion shafting, make vessel available for sea trials prior to carrying passengers in U.S. Waters.
Construction/Loadline › Penetrations › Weld
Issued 4 June 2014
Resolved
Make permanent repairs to stbd, lower wasted overboard in Tank Room, as shown.
Construction/Loadline › Hull › Stiffener
Issued 4 June 2014
Resolved
Make permanent repairs by welding of stbd shell long at web frame in Tank Room, as shown.
Engineering › Shafting/Propeller Arrangements › Propeller (fixed pitch)
Issued 4 June 2014
Resolved
Make repair to excessive erosion to port and stbd propeller due to cavitation or replace port and stbd propellers.
Engineering › Shafting/Propeller Arrangements › Strut
Issued 4 June 2014
Resolved
Arrest erosion found on top of port and starboard strut due to cavitation.
Electrical › Electrical Distribution System (service) › Wiring
Issued 4 June 2014
Resolved
Make permanent repairs to loose wiring found at Lazarette bilge pump.
Engineering › Steering Gear System › Hydraulic Hose
Issued 4 June 2014
Resolved
Permanently seal forward bhd hydraulic hose penetrations in Lazarette.
Construction/Loadline › Penetrations › Weld
Issued 4 June 2014
Resolved
Make permanent repairs to stbd, forward overboard for ladies room sink drain.
Engineering › Fuel Oil Service System › Filter
Issued 27 March 2014
Resolved
Remount engine room RACOR Filter/Seperator Unit.
Fire Fighting › Fire Main › Condition
Issued 27 March 2014
Resolved
Make permanent repairs to leaking fire main piping within engine room, port and stbd.
Electrical › Electrical Distribution System (service) › Circuit Breaker
Issued 27 March 2014
Resolved
Install blank for open circuit breaker panel located in a/c room.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 27 March 2014
Resolved
Permanently install anchor light to ensure 360 degree display
Fire Fighting › Fire Main › Material
Issued 27 March 2014
Resolved
Make corrective repairs to fire main piping within engine room to eliminate the current installation of dissimilar metals no later than the 2014 dry docking period.
Operations/Management › Drug and Alcohol Testing › Employee Coverage
Issued 27 March 2014
Resolved
Provide proof of employee coverage in an approved Consortium.
Fire Fighting › Fire Pumps › Capacity
Issued 27 March 2014
Resolved
Open, inspect, repair as needed, the electric motor driven fire pump nlt 2014 dry dock.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 19 December 2011
Resolved
Fuse box had dead and corroded wire connections and was sparking when activated. Make electrical fuse box in the fuel tank space safe for intended operation.
Electrical › Electrical Distribution System (service) › Wiring
Issued 19 December 2011
Resolved
Several dead end wires throughout the machinery spaces. Remove all dead end wiring and provide metallic bracket supports for electrical wiring.
Fire Fighting › Fire Main › Condition
Issued 19 December 2011
Resolved
Wasted pipe for fire pump. Repair as original wasted pipe for fire pump.
Engineering › Bilge Water Management System › Valve
Issued 19 December 2011
Resolved
Provide positive action valves for all submersible electrical bilge pumps.
Operations/Management › Bilge/Bilge System Management › Control of Oil Mixtures
Issued 19 December 2011
Resolved
Clean out bilges in engine room.
Fire Fighting › Fire Pumps › Pressure
Issued 19 December 2011
Resolved
Replace inoperable fire gauge.
Engineering › Steering Gear System › Actuator
Issued 19 December 2011
Resolved
Replace wasted steering actuator.
Navigation › Piloting/Steering › Coast Guard Light List
Issued 19 December 2011
Resolved
Outdated Coast Pilot [name withheld], tides/currents tables. Provide updated pubs.
Operations/Management › Drug and Alcohol Testing › Testing, Equipment
Issued 19 December 2011
Resolved
No alcohol testing equipment onboard. Provide three alcohol testing kits onboard to cover all 3 crewmembers.
Navigation › Collision/Grounding Avoidance › Navigation Bridge Visibility
Issued 19 December 2011
Resolved
Port side bridge window is cracked and crazed. Replace port side bridge window.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 19 December 2011
Resolved
Update first aid kit to include ammonia inhalants.
Engineering › Shafting/Propeller Arrangements › Propeller (fixed pitch)
Issued 2 December 2010
Resolved
Prior to carrying passengers in U. S. waters, replace port propeller.
Construction/Loadline › Hull › Transverse Frame
Issued 2 December 2010
Resolved
Prior to carrying passengers in U. S. waters, repair fractures (4-total) located in forward compartment in way of stanchions, stbd side, as shown.
Stability › Watertight Integrity › General
Issued 2 December 2010
Resolved
Prior to carrying passengers in U. S. waters, seal all openings in all watertight bulkheads.
Stability › Watertight Integrity › General
Issued 2 December 2010
Resolved
Prior to carrying passengers in U. S. waters, seal all main deck openings as a result of missing hardware for passenger seating.
Stability › Unintentional Flooding › General
Issued 2 December 2010
Resolved
Prior to carrying passengers in U. S. waters, double up all steel clamps on all flexible hoses.
Engineering › Bilge Water Management System › Strainer
Issued 2 December 2010
Resolved
Prior to carrying passengers in U. S. waters, provide and install strainer for bilge suction piping for tank room, as shown.
Engineering › Bilge Water Management System › Pump
Issued 2 December 2010
Resolved
Prior to carrying passengers in U. S. waters, prove proper operation of all electric bilge pumps.
Engineering › Diesel Engine (propulsion-reduction gear) › Bedplate
Issued 2 December 2010
Resolved
Prior to carrying passengers in U. S. waters, make proper repairs to port main engine foundation mounting hardware, aft, outboard side, as shown.
Engineering › Diesel Engine (propulsion/auxiliary-electric) › Bedplate
Issued 2 December 2010
Resolved
Prior to carrying passengers in U. S. waters, provide and install foundation hardware for Ship's Service Generator found missing, as shown.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 2 December 2010
Resolved
Prior to carrying passengers in U. S. waters, provide and install guard for Ship's Service Generator cooling fan, as shown.
Stability › Unintentional Flooding › General
Issued 2 December 2010
Resolved
Prior to carrying passengers in U. S. waters, disassemble, clean, inspect, repair as needed, reassemble Ship's Service Generator raw water suction piping at hull sea chest.
Stability › Unintentional Flooding › General
Issued 2 December 2010
Resolved
Prior to carrying passengers in U. S. waters, disassemble, clean, inspect, repair as needed, reassemble stbd Main Engine raw water suction piping after sea strainer, as shown.
Engineering › Steering Gear System › Fastener
Issued 2 December 2010
Resolved
Prior to carrying passengers in U. S. waters, provide accurate size bolt/pin with retaining device for steering gear crossmember, as shown.
Engineering › Steering Gear System › Fastener
Issued 2 December 2010
Resolved
Prior to carrying passengers in U. S. waters, provide accurate size bolt/pin with retaining device for steering gear hydraulic ram fixed mounting, as shown.
Electrical › Lighting (service) › Lighting Fixture
Issued 2 December 2010
Resolved
Prior to carrying passengers in U. S. waters, properly re-install electrical light fixture and associated wiring located in steering gear room, as shown.
Construction/Loadline › Structures › Deck Plating
Issued 2 December 2010
Resolved
Prior to carrying passengers in U. S. waters, properly seal two (2) holes located on main deck above steering gear room, as shown.
Engineering › Sea-water System (primary cooling) › Valve
Issued 2 December 2010
Resolved
Prior to carrying passengers in U. S. waters, clean and make all sea valves operational.
Engineering › Bilge Water Management System › Not Operational
Issued 2 December 2010
Resolved
Prior to carrying passengers in U. S. waters, prove proper operation of all bilge high water alarms.
Engineering › Bilge Water Management System › Piping
Issued 2 December 2010
Resolved
Prior to carrying passengers in U. S. waters, prove proper operation of each individual bilge suction strainer via the ship's bilge pump.
Construction/Loadline › Hull › Bracket
Issued 2 December 2010
Resolved
Prior to carrying passengers in U. S. waters, make permanent repairs to all fractured brackets and welds in way of port rudder foundation, as shown.
Electrical › Electrical Distribution System (service) › Wiring
Issued 2 December 2010
Resolved
Prior to carrying passengers in U. S. waters, make permanent repairs by installing conduit fittings to Ship Service Generator conduit wiring from Generator housing to Generator Panel.
Accommodation/Occupational Safety › Washroom/Toilet › Toilet
Issued 25 November 2008
Resolved
The toilet within the men's restroom is inoperable. Make toilet operable.
Engineering › Bilge Water Management System › Not Operational
Issued 25 November 2008
Resolved
The audible bilge high level alarm for the rudder room is inoperable. Make alarm audible.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 4 October 2008
Resolved
PRIOR TO CARRYING PASSENGERS, CRIMP DEAD-ENDED COPPER TUBING FOUND PENETRATING AFT WATERTIGHT BULKHEAD IN FORWARD VOID, PORT SIDE.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 4 October 2008
Resolved
PRIOR TO CARRYING PASSENGERS, SEAL WIRE PENETRATION FITTING FOUND ON AFT WATERTIGHT BULKHEAD IN FORWARD VOID, PORT SIDE.
Engineering › Shafting/Propeller Arrangements › Stern Tube Lubrication/Sealing
Issued 4 October 2008
Resolved
PRIOR TO CARRYING PASSENGERS, DOUBLE UP STEEL CLAMPS FOR PORT SHAFT PACKING GLAND HOSE.
Engineering › Sea-water System (primary cooling) › Valve
Issued 4 October 2008
Resolved
PRIOR TO CARRYING PASSENGERS, RENEW STBD MAIN ENGINE SEA VALVE.
Electrical › Electrical Distribution System (service) › Switch
Issued 4 October 2008
Resolved
PRIOR TO CARRYING PASSENGERS, PROPERLY MOUNT ENGINE ROOM HIGH WATER BILGE ALARM SWITCH.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 4 October 2008
Resolved
PRIOR TO CARRYING PASSENGERS, SEAL HOLE FOUND IN ENGINE ROOM BULKHEAD, NEAR MAIN DECK @ CENTERLINE.
Navigation › Piloting/Steering › Magnetic Compass
Issued 18 October 2007
Resolved
Prior to the carriage of passengers, calibrate the vessel's magnetic compass.
Communications › Radio Communications › EPIRB
Issued 18 October 2007
Resolved
Prior to the carriage of passengers, remove expired disposable hyrdostatic release unit and install a new hydrostatic release unit with an expiration date of two years after the date on which the new unit is installed.
Operations/Management › Drug and Alcohol Testing › Proof of Enrollment
Issued 18 October 2007
Resolved
Prior to carriage of passengers, provide evidence of crew being enrolled in a drug and alcohol program.
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 18 October 2007
Resolved
Prior to the carriage of passengers, ensure child size life jackets are stowed in a location that is appropriately marked and ensure adult life jackets stowed in a location that is appropriately marked.
Accommodation/Occupational Safety › Other Accommodation Spaces › Open Deck Space
Issued 18 October 2007
Resolved
Prior to the carriage of passengers, replace or repair port aft seats.
Engineering › Fuel Oil Service System › Vent Pipe
Issued 18 October 2007
Resolved
Prior to carriage of passengers, install screens in the fuel tank vent.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 18 October 2007
Resolved
Install a guard around the alternator located on the vessel's generator.
Construction/Loadline › Hull › Bottom Plating
Issued 29 November 2005
Resolved
RENEW PORT RUDDER POST HULL PLATING IN WAY OF OLD INADEQUATE REPAIRS.
Construction/Loadline › Hull › Bottom Plating
Issued 29 November 2005
Resolved
REMOVE ALL DEBRIS AND OIL RESIDUES FROM STEERING COMPARTMENT BILGES FOR FURTHER INSPECTION
Construction/Loadline › Hull › Bottom Plating
Issued 29 November 2005
Resolved
REMOVE BOTTOM PAINT TO BARE METAL BEHIND AND IN THE VICINITY OF STBD RUDDER POST APPROX 2' SQUARE AREA FOR FURTHER INSPECTION.
Construction/Loadline › Hull › Side Shell
Issued 29 November 2005
Resolved
RENEW TRANSOM IN ITS ENTIRETY.
Construction/Loadline › Penetrations › Valve Flange
Issued 29 November 2005
Resolved
RENEW HEAD OVERBOARD DISCHARGE STBD SIDE FORWARD.
Construction/Loadline › Penetrations › Valve Flange
Issued 29 November 2005
Resolved
RENEW A/C OVERBOARD DISCHARGE PORTSIDE FWD.
Construction/Loadline › Structures › Door
Issued 29 November 2005
Resolved
RENEW PORT PILOTHOUSE DOOR HINGES
Pollution Prevention/Response › Prevention Equipment › Oily Mixture Discharge Fixed Piping System
Issued 29 November 2005
Resolved
REATTACH REACH ROD TO FOREPEAK SUCTION VALVE. USE OF BAILING WIRE NOT PERMITTED.
Electrical › Electrical Distribution System (service) › Wiring
Issued 29 November 2005
Resolved
PROPERLY ROUTE VHF RADIO WIRING IN PILOTHOUSE AND REMOVE ALL UNUSED WIRING.
Documentation › Certificates/Documents › Cargo Ship Safety Radio Certificate
Issued 29 November 2005
Resolved
PROVIDE EVIDENCE OF A SAFETY RADIO TELEPHONE CERTIFICATE AUTHORIZED BY FLAG STATE.
Electrical › Lighting (service) › Lighting Fixture
Issued 29 November 2005
Resolved
RENEW LIGHTING FIXTURE IN FEMALE HEAD.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 29 November 2005
Resolved
COMPLETE A INSPECTION FOR CERTIFICATION PRIOR TO CARRYING PASSENGERS IN U.S. WATERS.
Construction/Loadline › Hull › Side Shell
Issued 29 November 2005
Resolved
RENEW SIDE SHELL PORT AND STBD SIDES IN FWD COMPARTMENT AS DESIGNATED BY ATTENDING MARINE INSPECTOR. LOCATION STBD SIDE IS DIRECTLY FWD OF A/C OVBD DISCHARGE AND PORTSIDE IS EXACTLY SAME LOCATION OPPOSITE SIDE.
Construction/Loadline › Hull › Bottom Plating
Issued 29 November 2005
Resolved
REMOVE DEBRIS FROM UNDER A/C COMPRESSOR IN FWD COMPARTMENT FOR FURTHER INSPECTION.
Construction/Loadline › Penetrations › Pipe Flange
Issued 29 November 2005
Resolved
RENEW A/C OVERBOARD DISCHARGE HOSE
Accommodation/Occupational Safety › Other Accommodation Spaces › Open Deck Space
Issued 29 November 2005
Resolved
RENEW ALL BROKEN WINDOWS IN PASSENGER CABIN
Accommodation/Occupational Safety › Other Accommodation Spaces › Open Deck Space
Issued 29 November 2005
Resolved
RENEW ALL BROKEN SEATS IN MAIN PASSENGER CABINS
Construction/Loadline › Structures › Deck Plating
Issued 29 November 2005
Resolved
RENEW CORRODED DECK PLATING ABOVE FWD PORTSIDE LUGGAGE ROOM.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 29 November 2005
Resolved
SEAL ALL HOLES IN ENGINE ROOM FWD BULKHEAD.
Construction/Loadline › Structures › Deck Plating
Issued 29 November 2005
Resolved
RENEW ROTTED PLYWOOD DECK IN LUGGAGE ROOM STBD AFT SIDE
Engineering › Fuel Oil Service System › Hose
Issued 29 November 2005
Resolved
RENEW FUEL HOSES FROM PRIMARY FUEL FILTERS TO ENGINES
Construction/Loadline › Hull › Side Shell
Issued 29 November 2005
Resolved
RENEW ENGINEROOM SIDE SHELL AND BOTTOM PLATING IN WAY OF BATTERY BOXES PORT AND STBD SIDE.
Construction/Loadline › Penetrations › Pipe Flange
Issued 29 November 2005
Resolved
REMOVE RUBBER HOSES COVERING SEA WATER SUCTION BOXES PORT AND STBD ENGINE ROOM FOR FURTHER INSPECTION
Construction/Loadline › Structures › Transverse Bulkhead
Issued 29 November 2005
Resolved
RENEW WASTED BULKHEAD IN WAY OF AFT ENGINE ROOM BULKHEAD ENGINE EXHAUST PENETRATION.
Fire Fighting › Fire Main › Condition
Issued 29 November 2005
Resolved
RENEW ALL FIRE MAIN PIPING IN ENGINE ROOM.
Construction/Loadline › Hull › Side Shell
Issued 29 November 2005
Resolved
REMOVE UNUSED OVBD DISCHARGE PREVIOUSLY BLOCKED OFF PORTSIDE FWD ENGINE ROOM SIDE SHELL WITH AN 18" X 18" INSERT.
Construction/Loadline › Hull › Longitudinal Frame
Issued 29 November 2005
Resolved
REPAIR CRACKED ENGINE BED RAIL PORT MAIN ENGINE INBOARD FWD SIDE.
Construction/Loadline › Hull › Bottom Plating
Issued 29 November 2005
Resolved
REMOVE ALL DEBRIS AND OIL RESIDUES FROM ENGINE ROOM BILGE FWD CENTER SECTION FOR FURTHER INSPECTION.
Electrical › Electrical Distribution System (service) › Wiring
Issued 29 November 2005
Resolved
PROVIDE WATERPROOF JUNCTION BOX FOR STEERING ROOM ELECTRIC BILGE PUMP AND RENEW DISCHARGE HOSE WITH APPROVED TYPE RUBBER HOSE
Engineering › Diesel Engine (auxiliary) › Nozzle, Injection (fuel injection)
Issued 22 December 2004
Resolved
PRIOR TO THE CARRIAGE OF PASSENGERS, REPAIR LEAKING FUEL INJECTOR ON GENERATOR ENGINE.
Engineering › Fuel Oil Service System › Hose
Issued 22 December 2004
Resolved
RENEW FUEL RETURN LINE STBD MAIN ENGINE
Engineering › Steering Gear System › Fastener
Issued 22 December 2004
Resolved
DOUBLE FASTENER ALL STEERING GEAR LINKAGES
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 22 December 2004
Resolved
PRIOR TO THE CARRIAGE OF PASSENGERS, MAKE ANCHOR LIGHT OPERABLE
Lifesaving › Buoyant Apparatus › Marking
Issued 22 December 2004
Resolved
LABEL LIFEFLOAT PADDLES
Pollution Prevention/Response › Prevention Equipment › Oily Mixture Discharge Fixed Piping System
Issued 22 December 2004
Resolved
MAKE PERMENANT REPAIRS TO FOREPEAK BILGE SUCTION REACH ROD STUFFING TUBE.
Navigation › Piloting/Steering › Magnetic Compass
Issued 22 December 2004
Resolved
PROVIDE UPDATED MAGNETIC DEVIATION CARD AND POST IN PILOTHOUSE
Electrical › Electrical Distribution System (service) › Wiring
Issued 30 November 2004
Resolved
PRIOR TO THE CARRIAGE OF PASSENGERS, PROVIDE A DETAILED SURVEY FROM A CERTIFIED MARINE ELECTRICIAN. REPORT MUST CONTAIN DEFICIENCIES FOUND, INTENDED REPAIRS, AND LIST OF APPROVED MATERIALS TO BE USED.
Engineering › Sea-water System (primary cooling) › Piping
Issued 18 November 2004
Resolved
RENEW WASTED A/C SEA WATER PIPING IN FORWARD COMPARTMENT
Engineering › Shafting/Propeller Arrangements › Strut
Issued 18 November 2004
Resolved
PRIOR TO REFLOATING VESSEL, REPAIR WASHED OUT WELDS PORT AND STBD STRUTS AS DESIGNATED.
Pollution Prevention/Response › Prevention Equipment › Oily Mixture Discharge Fixed Piping System
Issued 18 November 2004
Resolved
INSTALL METAL WIRE TO ATTACH FOREPEAK SUCTION VALVE TO REMOTE OPERATING MECHANISM.
Pollution Prevention/Response › Prevention Equipment › Bilge Monitor
Issued 18 November 2004
Resolved
PRIOR TO THE CARRIAGE OF PASSENGERS, MAKE ALL BILGE ALARMS OPERABLE.
Engineering › Sea-water System (primary cooling) › Valve
Issued 18 November 2004
Resolved
PRIOR TO THE CARRIAGE OF PASENGERS, MAKE OPERABLE A/C OVERBOARD DISCHARGE VALVE
Electrical › Lighting (service) › Lighting Fixture
Issued 18 November 2004
Resolved
PRIOR TO THE CARRIAGE OF PASSENGERS, REPAIR/RENEW LIGHTING FIXTURES AS DESIGNATED THROUGHOUT VESSEL.
Construction/Loadline › Hull › Hull Plating
Issued 18 November 2004
Resolved
PRIOR TO THE CARRIAGE OF PASSENGERS, REPAIR CORROSION HOLE IN STBD STERN TRANSOM CORNER
Construction/Loadline › Hull › Hull Plating
Issued 18 November 2004
Resolved
PRIOR TO THE CARRIAGE OF PASSENGERS, RENEW FRACTURED AND DELAMINATED HULL PLATING AS DESIGNATED STBD AFT STEERING ROOM.
Pollution Prevention/Response › Prevention Equipment › Oily Mixture Discharge Fixed Piping System
Issued 18 November 2004
Resolved
PRIOR TO THE CARRIAGE OF PASSENGERS, RENEW STEERING COMPARTMENT FIXED BILGE SYSTEM SUCTION PIPING.
Engineering › Sea-water System (primary cooling) › Piping
Issued 18 November 2004
Resolved
PRIOR TO THE CARRIAGE OF PASSENGERS, RENEW HOLED SECTION OF STBD ENGINE SEA WATER SUCTION PIPING.
Engineering › Sea-water System (primary cooling) › Piping
Issued 18 November 2004
Resolved
PRIOR TO THE CARRIAGE OF PASSENGERS, RENEW DAMAGED PORT ENGINE SEA WATER RETURN PIPING.
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 18 November 2004
Resolved
PRIOR TO THE CARRIAGE OF PASSENGERS, COVER ALL NON SEA WATER COOLED EXHAUST PIPING WITH LAGGING.
Construction/Loadline › Structures › Manhole
Issued 18 November 2004
Resolved
PRIOR TO THE CARRIAGE OF PASSENGERS, MAKE STEERING ROOM WATERTIGHT SCUTTLE OPERABLE
Electrical › Electrical Distribution System (service) › Wiring
Issued 18 November 2004
Resolved
PRIOR TO THE CARRIAGE OF PASSENGERS, COMPLETE DEFICIENCY ISSUED 02DEC03. IN ADDITION, ALL WIRING DISCREPANCIES THROUGHOUT THE VESSEL MUST BE CORRECTED IN WAY OF IMPROPER TERMINAL CONNECTIONS, DETERIORATED WIRING AND BRACKETING OF WIRE RUNS.
Electrical › Electric Supply System (service) › Battery Charger
Issued 23 September 2004
Resolved
PRIOR TO CARRYING PASSENGERS, MAKE PERMANENT REPAIRS TO AND PROVE PROPER OPERATION OF ALL DC BATTERY POWER AND DC BATTERY CHARGING SYSTEMS ON BOARD THE VESSEL TO THE SATISFACTION OF AN ATTENDING CG MARINE INSPECTOR.
Electrical › Electrical Distribution System (emergency) › Wiring
Issued 2 December 2003
Resolved
PROVIDE COMPREHENSIVE PLAN TO RENEW WIRING THROUGHOUT VESSEL BEGGINNING WITH ENGINE ROOM TO BE COMPLETED PRIOR TO NEXT COI LEGACY COMPONENT DESC: Wiring
Navigation › Collision/Grounding Avoidance
Issued 26 November 2003
Resolved
MAKE STERN LIGHT OPERABLE LEGACY COMPONENT DESC: Navigation Lights
Construction/Loadline › Structures
Issued 26 November 2003
Resolved
RENEW STBD PILOTHOUSE DOOR WINDOW LEGACY COMPONENT DESC: Door
Fire Fighting › Portable Dry Chemical Fire Extinguisher
Issued 26 November 2003
Resolved
REPAIR FIRE EXTINGUISHER BRACKET FWD CABIN PORTSIDE LEGACY COMPONENT DESC: Mounting Bracket
Pollution Prevention/Response › Prevention Equipment
Issued 26 November 2003
Resolved
PROVIDE MEANS OF POSITIVE SHUT-OFF FOE ENGINE ROOM ELECTRIC BILGE PUMP DISCHARGE
Electrical › Electrical Distribution System (service)
Issued 26 November 2003
Resolved
BUNDLE AND CORRECTLY BRACKET ALL WIRING FOR PORT ENGINE LEGACY COMPONENT DESC: Wiring
Electrical › Electrical Distribution System (service)
Issued 26 November 2003
Resolved
PROVIDE CORRECT JUNCTION BOX FOR STBD ENGINE BATTERY CABLE AND BRACKET ALL ENGINE WIRING. LEGACY COMPONENT DESC: Wiring
Engineering › Diesel Engine (auxiliary)
Issued 26 November 2003
Resolved
RENEW GENERATOR OIL GAUGE LINE WITH CG APPROVED MATERIALS
Pollution Prevention/Response › Prevention Equipment
Issued 26 November 2003
Resolved
MAKE ELECTRIC FIXED BILGE PUMPING SYSTEM OPERABLE
Engineering
Issued 26 November 2003
Resolved
REMOVE OILY RESIDUE FROM ALL ENGINE ROOM SURFACES
Operations/Management › Drug and Alcohol Testing
Issued 26 November 2003
Resolved
PROVIDE EVIDENCE THAT CREW ONBOARD ARE ACTIVELY ENROLLED IN A CG APPROVED CONSORTIUM LEGACY COMPONENT DESC: Employee Coverage
Operations/Management › Drills/Instruction
Issued 26 November 2003
Resolved
DEMONSTRATE DRILLS IN THE PRESENCE OF A CG INSPECTOR
Pollution Prevention/Response › Prevention Equipment
Issued 18 September 2003
Resolved
REMOVE ALL DEBRIS FROM ALL BILGES IN ALL COMPARTMENTS
Engineering › Diesel Engine (propulsion-reduction gear)
Issued 18 September 2003
Resolved
REPAIR CRACKED MOTOR MOUNT PORT ENGINE INBOARD FORWARD SIDE. LEGACY COMPONENT DESC: Bedplate
Construction/Loadline › Penetrations
Issued 18 September 2003
Resolved
INSTALL NON-RETURN DEVICES IN ALL OVERBOARD DISCHARGE DEVICES-A/C DISCHARGE, REDUCTION GEAR PORT AND STBD SIDES.
Engineering › Diesel Engine (propulsion-reduction gear)
Issued 18 September 2003
Resolved
RENEW STBD ENGINE REDUCTION GEAR RAW WATER DISCHARGE HOSE
Construction/Loadline › Hull
Issued 18 September 2003
Resolved
CUT 18X18 INSERT IN FOREPEAK SHELL PLATING STBD SIDE FOR FURTHER EXAMINATION. RENEW ALL METAL AS DESIGNATED BY CG INSPECTOR LEGACY COMPONENT DESC: Hull Plating
Construction/Loadline › Hull
Issued 18 September 2003
Resolved
RENEW SIDE SHELL PLATING UNDER STBD SIDE A/C RAW WATER DISCHARGE LEGACY COMPONENT DESC: Side Shell
Construction/Loadline › Hull
Issued 18 September 2003
Resolved
CUT 18X18 INSERT UNDER SEWAGE TANK. RENEW ALL DAMAGED METAL AS DESIGNATED BY CG INSPECTOR LEGACY COMPONENT DESC: Hull Plating
Construction/Loadline › Hull › Side Shell
Issued 18 September 2003
Resolved
RENEW TRANSOM PLATING AS DESIGNATED BY CG INSPECTOR
Construction/Loadline › Structures
Issued 18 September 2003
Resolved
INSTALL 18X18 INSERT ON STEERING ROOM BLKHD STBD SIDE LEGACY COMPONENT DESC: Transverse Bulkhead
Documentation
Issued 12 October 2000
Resolved
PROVIDE CPR CERTIFICATION FOR AT LEAST 50% OF CREW NO LATER THAN 12NOV00.
Navigation
Issued 12 October 2000
Resolved
PROVIDE ALL NAVIGATION PUBLICATIONS IAW 46 CFR 184.420 NO LATER THAN 12NOV00.
Documentation
Issued 12 October 2000
Resolved
PROVIDE AND IMPLIMENT SAFETY MANAGEMENT SYSTEM IAW CH IX OF SOLAS PRIOR TO THE CARRIAGE OF PASSENGERS.
Lifesaving
Issued 12 October 2000
Resolved
PROVIDE EMERGENCY RADIO BROADCAST PLACARD NO LATER THAN 12NOV00.
Construction/Loadline
Issued 12 October 2000
Resolved
REPAIR FORWARD AND AFT WATERTIGHT DECK HATCHES PRIOR TO THE CARRIAGE OF PASSENGERS.
Navigation
Issued 12 October 2000
Resolved
RENEW STEERING PUMP SUCTION HOSE NO LATER THAN 12NOV00.
Documentation
Issued 12 October 2000
Resolved
PROVIDE EVIDENCE THAT ALL CREW ARE IN COMPLIANCE WITH 46 CFR 16 NO LATER THAN 12NOV00.
Electrical
Issued 12 October 2000
Resolved
INSTALL COVERS ON AIR CONDITIONING WIRING JUNCTION BOXES NO LATER THAN 12NOV00.
Engineering
Issued 12 October 2000
Resolved
INSTALL FIRE SHIELDS ON RACOR FUEL FILTERS NO LATER THAN 12NOV00.
Engineering
Issued 12 October 2000
Resolved
REPAIR CRACKED MOTOR MOUNT PORT MAIN ENGINE FORWARD INBOARD SIDE PRIOR TO THE CARRIAGE OF PASSENGERS.
Engineering
Issued 12 October 2000
Resolved
RENEW GENERATOR EXHAUST PIPING AND MUFFLER IN STEERING SPACE PRIOR TO THE CARRIAGE OF PASSENGERS.
Lifesaving
Issued 12 October 2000
Resolved
REMOVE BILGE WATER FROM AFT STEERING SPACE PRIOR TO THE CARRIAGE OF PASSENGERS.
Electrical
Issued 12 October 2000
Resolved
PROVIDE 1 ADDITIONAL PORTABLE LIGHT NO LATER THAN 12NOV00.
Engineering
Issued 12 October 2000
Resolved
REPAIR EMERGENCY FUEL SHUT-OFF VALVE PRIOR TO THE CARRIAGE OF PASSENGERS.
Lifesaving
Issued 12 October 2000
Resolved
RENEW 1 22 MAN LIFEFLOAT, PAINTER, AND ASSOCIATED EQUIPMENT PRIOR TO THE CARRIAGE OF PASSENGERS.
Documentation
Issued 12 October 2000
Resolved
PROVIDE AND POST STABILITY LETTER NO LATER THAN 12NOV00.
Documentation
Issued 12 October 2000
Resolved
PROVIDE EVIDENCE OF CREW TRAINING, FIRE FIGHTING, AND LIFESAVING EQUIPMENT MAINTENANCE NO LATER THAN 12NOV00.
Accommodation/Occupational Safety
Issued 27 August 1999
Resolved
Provide MSD discharge placard.
Accommodation/Occupational Safety
Issued 27 August 1999
Resolved
Replace all broken windows.
Documentation
Issued 27 August 1999
Resolved
Enroll in Chemical Testing Program.
Lifesaving
Issued 27 August 1999
Resolved
Provide 7 adult Coast Guard Approved PFDs.
Construction/Loadline
Issued 27 August 1999
Resolved
Install high bilge level alarm system.
Documentation
Issued 27 August 1999
Resolved
Provide a waste management plan.
Lifesaving
Issued 27 August 1999
Resolved
Provide 3 child sized CG Approved PFDs.
Lifesaving
Issued 27 August 1999
Resolved
Provide primary lifesaving for 94 persons.
Electrical
Issued 28 August 1997
Resolved
PROPERLY SECURE ALL WIRING IN #3 VOID.
Engineering
Issued 28 August 1997
Resolved
REPAIR OR RENEW ALL LEAKING ENGINE AND REDUCTION GEAR COOLING PIPING.
Engineering
Issued 28 August 1997
Resolved
RENEW OR REPAIR PORT RPM GAGE.
Documentation
Issued 28 August 1997
Resolved
PROVIDE COPY OF BRITISH REGISTRY.
Navigation
Issued 28 August 1997
Resolved
PROVIDE NAVIGATION LIGHTS THAT MEET UL1104.
Navigation
Issued 22 August 1996
Resolved
REPLACE GONG ON BELL.
Lifesaving
Issued 22 August 1996
Resolved
REMOVE FROM VESSEL UNUSED COPPER OIL LINE TO PORT ENGINE.
Accommodation/Occupational Safety
Issued 22 August 1996
Resolved
SECURE LADDER TO ENGINE COMPARTMENT SECURE.
Construction/Loadline
Issued 22 August 1996
Resolved
GOUGE AND WELD CRACKS IN PORT AND STARBOARD STERN CORNER SIDESHELL.
Lifesaving
Issued 22 August 1996
Resolved
PROVIDE FLASHLIGHT AT OPERATING STATION AND ENTRANCE TO MACHERARY SPACE.
Electrical
Issued 22 August 1996
Resolved
PROPERLY INSTALL APPROVED COMPRESSION FITTINGS (WIRE NUTS) ON ALL GENERATORWIRE CONNECTIONS.
Lifesaving
Issued 22 August 1996
Resolved
PROVIDE LIFE PRESERVER DONNING PROCEEDURES.
Navigation
Issued 22 August 1996
Resolved
CROP AND RENEW PORT AND STARBOARD RUDDER SHAFT GUIDE IN WAY OF THE PENETRATION TO THE HULL.
Accommodation/Occupational Safety
Issued 22 August 1996
Resolved
PROVIDE MSD TANK WATCH SYSTEM AT 3/4 FULL I.A.W. 33CFR159.
Engineering
Issued 22 August 1996
Resolved
CONDUCT NONE DESTRUCTIVE TESTING OF PORT AND STARBOARD SHAFT AT FORWARD THIRD OF TAPER (KEY WAY).
Navigation
Issued 22 August 1996
Resolved
RENEW PORT RUDDER CUTLASS BEARING.
Engineering
Issued 22 August 1996
Resolved
RENEW PORT SHAFT CUTLASS BEARING AND STARBOARD SHAFT CUTLASS BEARING AT REAR SUPPORT.
Electrical
Issued 8 April 1996
Resolved
PROPERLY REPAIR VESSEL'S MIAN GENERATOR. VESSEL IS NOT TO OPERATE IN U.S. WATERS WITH PASSENGERS UNTIL THIS REQUIREMENT IS COMPLETE TO THE SATISFACTION OF THE ATTENDING USCG MARINE INSPECTOR. USE OF A PORTABLE DIESEL GENERATOR IS PROHIBITED.
Lifesaving
Issued 24 August 1995
Resolved
PROVIDE SIX ADULT's PFD AND 2 CHILD SIZE PFD's. VESSEL LIMITED TO 93 PERSONS TOTAL AND NO MORE THAN 8 CHILDERN UNTIL TOTAL NUMBER OF PFD'S MEETSTHE REQUIRMENTS OF THE COI PROVIDED THAT REQUIREMENT O1 HAS BEEN SATISFIED.
Lifesaving
Issued 24 August 1995
Resolved
PROVIDE TWO(2) SERVICED 25-MAN INFLATABLE LIFERAFTS. VESSEL LIMITED TO 44 PERSONS TOTAL UNTIL SERVICED LIFERAFTS ARE PROVIDED.
Construction/Loadline
Issued 24 August 1995
Resolved
MAKE PROPER REPAIRS TO THE CRACKED TRANSVERSE FRAME IN THE STEERING COMPARTMENT. (2ND FRAME FWD FROM STERN)
Engineering
Issued 24 August 1995
Resolved
RENEW STBD SHAFT CUTLASS BEARING, ON THE AFT STRUT.
Construction/Loadline
Issued 24 August 1995
Resolved
REPAIR PINHOLE CRACK IN THE PORT STERN CORNER, APPROX. 6" BELOW DECK GUNWALE.
Construction/Loadline
Issued 24 August 1995
Resolved
SECURE VALVE HANDLE ON FWD COMPARTMENT BILGE SUCTION.
Construction/Loadline
Issued 24 August 1995
Resolved
MAKE PROPER REPAIRS TO THE SIDE SHELL CRACK ON THE STBD BOW, 5 FEET ABOVE THE WATERLINE AND 1 FOOT BELOW THE DECK GUNWALE IN WAY OF THE A/C COMPARTMENT.
Engineering
Issued 18 August 1994
Resolved
REPLACE PITTED PROPELLERS ON BOTH MAIN PROPULSION SHAFTS.
Fire Fighting
Issued 18 August 1994
Resolved
SERVICE PORTABLE FIRE EXTINGUISHERS WHICH WERE LAST SERVICED IN JULY 0F 1993.
Lifesaving
Issued 27 August 1993
Resolved
Provide SOLAS approved lights for all life jackets.
Construction/Loadline
Issued 28 July 1993
Resolved
PROVIDE WRENCH FOR MANHOLE COVERS AND DEMONSTRATE PROPER OPERATION OF HATCHCLOSURES.
Fire Fighting
Issued 28 July 1993
Resolved
PROVIDE DOUBLE HOSE CLAMPS FOR FIRE/BILGE SYSTEM
Accommodation/Occupational Safety
Issued 28 July 1993
Resolved
PROPERLY RECONNECT MARINE SANITATION DEVICE AND DOUBLE CLAMP ALL THROUGH- HULL HOSE CONNECTIONS.
Construction/Loadline
Issued 28 July 1993
Resolved
FREE-UP DOGS ON STARBOARD WATERTIGHT PILOT HOUSE DOOR.
Engineering
Issued 7 July 1992
Resolved
Identify and repair oil leak on starboard main diesel engine on outboard side.
Engineering
Issued 7 July 1992
Resolved
Tighten engine and transmission mounts on port main diesel engine.
Construction/Loadline
Issued 7 July 1992
Resolved
Provide rubber insulation between steel bilge piping and aluminum fuel tank.
Lifesaving
Issued 7 July 1992
Resolved
Conduct a satisfactory man overboard drill and fire drill in the presence of a Coast Guard marine inspector.
Accommodation/Occupational Safety
Issued 7 July 1992
Resolved
Repair cracked welds on weather deck grab rails on aft starboard side and port side forward of passenger embarkation area.
Lifesaving
Issued 7 July 1992
Resolved
Provide two additional lifejackets for a total of 99.
Accommodation/Occupational Safety
Issued 7 July 1992
Resolved
Repair cracked mounts on air conditioning motor.
Documentation
Issued 7 July 1992
Resolved
Provide evidence of compliance with pre-employment, post-incident, reasonable cause and random drug testing.
Fire Fighting
Issued 7 July 1992
Resolved
Recharge B-I extinguisher in pilot house.
Navigation
Issued 7 July 1992
Resolved
Repair all-round white navigation light.
Electrical
Issued 7 July 1992
Resolved
Permanently wire VCR and television to their power source.
Electrical
Issued 7 July 1992
Resolved
Provide a protective cover for the light bulb in the men's head.
Lifesaving
Issued 7 July 1992
Resolved
Stencil name of vessel on paddles for buoyant apparatus.
Construction/Loadline
Issued 7 July 1992
Resolved
Repair holes in lazarette forward bulkhead.
Electrical
Issued 7 July 1992
Resolved
Properly dead end loose wire in bilge pump wire bundle located in lazarette.
Electrical
Issued 7 July 1992
Resolved
Re-hang wires and hydraulic lines in lazarette.
Engineering
Issued 7 July 1992
Resolved
Repair or remove exhaust pipe bracket on port side exhaust pipe.
Electrical
Issued 7 July 1992
Resolved
Properly seal wire penetration in lazarette forward bulkhead.
Construction/Loadline
Issued 7 July 1992
Resolved
Provide gasket for deck hatch in lazarette.
Electrical
Issued 7 July 1992
Resolved
Provide junction box covers on all open electrical boxes and properly connectr wires which are presently connected by wire nuts in the forward machinery space.
Construction/Loadline
Issued 7 July 1992
Resolved
Provide gasket for watertight doors leading into aft passenger area amidships. Provide dog for starboard door where missing.
Construction/Loadline
Issued 7 July 1992
Resolved
Provide skin valves for all through hull fittings which are within six inches of the load water line.
Accommodation/Occupational Safety
Issued 27 June 1991
Resolved
REPAIR, REATTACH, AND PROVE PROPER OPERATION OF SEWAGE DISCHARGE PUMP.
Accommodation/Occupational Safety
Issued 30 May 1990
Resolved
REPAIR PIPING SYSTEM TO THE MARINE SANITATION DEVICE (HOLDING TANK) TO ENSURE THAT THE HOLDING TANK CAN BE USED WHILE IN PORT AND THAT A METHOD BE PROVIDED TO PUMP OUT THE TANK.
Electrical
Issued 30 May 1990
Resolved
PROVIDE GLASS GLOBES AND STEEL CAGES FOR ALL ELECTRICIAL LIGHTING FIXTURES THROUGHOUT THE VESSEL.
Documentation
Issued 30 May 1990
Resolved
PROVIDE A COPY OF A VALID STABILITY LETTER AND POST IN THE PILOT HOUSE.
Lifesaving
Issued 30 May 1990
Resolved
PROVIDE WHISTLES ON ALL ADULT AND CHILD SIZED LIFE JACKETS. THESE ARE REQUIRED FOR INTERNATIONAL ROUTE.
Engineering
Issued 30 May 1990
Resolved
REPLACE THE CORRODED FLAME SCREEN ON PORT FUEL TANK VENT.
Engineering
Issued 30 May 1990
Resolved
INSTALL STAINLESS STEEL DRIP PANS UNDER EACH DIESEL FUEL FILTER GLOBE.
Documentation
Issued 30 May 1990
Resolved
PROVIDE A COPY OF A VALID STABILITY LETTER AND POST IN THE PILOT HOUSE.
Accommodation/Occupational Safety
Issued 30 May 1990
Resolved
REPAIR PIPING SYSTEM TO THE MARINE SANITATION DEVICE (HOLDING TANK) TO ENSURE THAT THE HOLDING TANK CAN BE USED WHILE IN PORT AND THAT A METHOD BE PROVIDED TO PUMP OUT THE TANK.
Electrical
Issued 30 May 1990
Resolved
PROVIDE GLASS GLOBES AND STEEL CAGES ON ALL ELECTRICIAL LIGHTING FIXTURES.
Lifesaving
Issued 30 May 1990
Resolved
PROVIDE WHISTLES ON ALL ADULT AND CHILD SIZE LIFEJACKETS. THESE ARE REQUIR-ED FOR INTERNATIONAL VOYAGES.
Engineering
Issued 30 May 1990
Resolved
PROVIDE NEW FLAME SCREEN ON PORT SIDE FUEL TANK VENT.
Engineering
Issued 30 May 1990
Resolved
INSTALL STAINLESS STEEL DRIP PANS UNDER EACH DIESEL FUEL FILTER GLOBES.
Navigation
Issued 23 March 1988
Resolved
MAKE PERMANENT REPAIRS TO THE PORT RUDDER BEARING POST BEARINGS AND THE STARBOARD TAILSHAFT SUPPORTS.
Navigation
Issued 23 March 1988
Resolved
REPAIR STARBOARD PROPELLOR SO THAT IT IS TIGHT ON THE TAILSHAFT.
Navigation
Issued 23 March 1988
Resolved
REPLACE CUTLAS BEARING ON THE PORT TAILSHAFT WITH NEW AS ORIGINAL.
Electrical
Issued 23 March 1988
Resolved
PULL OUT ALL DEAD ELECTRICAL WIRING AND PROPERLY SECURE ALL OTHER ELECTRICAL WIRING WITH SUPPORTS.
Documentation
Issued 23 March 1988
Resolved
RENEW VESSELS CERTIFICATE OF DOCUMENTATION.
Lifesaving
Issued 23 March 1988
Resolved
REPAIR OR REPLACE WITH 73 ADULT LIFE JACKETS AND 5 CHILD LIFE JACKETS, SO THEY ARE PROPERLY MARKED WITH VESSELS NAME, VESSEL IS RESTRICTED TO 28 TOTAL PERSONS UNTIL THIS REQUIREMENT IS CORRECTED TO THE SATISFACTION OF THE COGNIZANT OCMI.
Electrical
Issued 23 March 1988
Resolved
REPAIR OR REPLACE THE ELECTRIC SHORE TIE.
Lifesaving
Issued 23 March 1988
Resolved
SERVICE ALL INFLATABLE LIFERAFTS ALONG WITH THEIR HYDRSTAIC RELEASES. RE- INSTALL WITH APPROVED WEAK LINKS. VESSEL RESTRICTED TO THE THE NUMBER OF PERSONS THAT CAN BE CARRIED IN THE SERVICED LIFERAFTS ON BOARD.
Fire Fighting
Issued 23 March 1988
Resolved
SERVICE ALL PORTABLE FIRE EXTINGUISHERS.
Engineering
Issued 23 March 1988
Resolved
PROVIDE EXHAUST PIPE LAGGINE WHERE NEEDED ON MAIN ENGINE AND GENERATOR EXHAUST LINE.
Navigation
Issued 23 March 1988
Resolved
REPLACE WITH NEW THE CAPACITOR IN THE STEERING SYSTEM TELEMOTOR HYDRAULIC SYSTEM. ONCE SYSTEM IS CORRECTED, CONDUCT A STEERING GEAR TEST IN THE PRESENCE OF A COAST GUARD MARINE INSPECTOR.
Accommodation/Occupational Safety
Issued 23 March 1988
Resolved
REPAIR AIR CONDITIONING SYSTEM LEAVING NO EXPOSED WIRING AND MAKE PERMANENT REPAIRS TO THE DUCTING.
Electrical
Issued 23 March 1988
Resolved
PLACE THE BATTERY FOR THE VHF-FM RADIO IN A APPROVED BATTERY TRAY
Electrical
Issued 23 March 1988
Resolved
REPACE ALL LIGHT BULBS IN ALL LIGHTING FIXTURES, NORMAL AND EMEMRGENCY LIGHTING, SO THAT ALL FIXTURES ARE OPERATIONAL.
Electrical
Issued 23 March 1988
Resolved
MAKE THE INDEPENDENT GENERATOR OPERATIONAL AND TEST THE STEERING GEAR WHILETHE GENERATOR IS IN OPERATION
Lifesaving
Issued 23 March 1988
Resolved
ACQUIRE TWO NEW HAND HELD ORANGE SMOKE DITRESS LIGNALS AND TWO NEW HAND HELD RED FLARES THAT ARE COAST GUARD APPROVED.
Accommodation/Occupational Safety
Issued 23 March 1988
Resolved
MAKE ALL PASSENGER SEATING SECURED TO THE DECK AS ORGINAL.
Construction/Loadline
Issued 23 March 1988
Resolved
PUMP BILGES DRY TO AN APPROVED RECEPTION FACILITY AND CLEAN THE ENGINE ROOM
Fire Fighting
Issued 23 March 1988
Resolved
REPLACE WITH NEW AS ORIGINAL THE HANDLE FOR THE PORT FIRE STATION HYDRANT VALVE.
Accommodation/Occupational Safety
Issued 23 March 1988
Resolved
REPLACE NEW AS ORIGINAL THE MARINE SANITATION DEVICE HOLDING TANK.
Construction/Loadline
Issued 23 March 1988
Resolved
REPLACE WITH NEW THE BILGE PIPIING FOR THE NUMBER 2 CREW QUARTERS VOID.
Engineering
Issued 25 January 1988
Resolved
REPLACE OR MAKE PERMENANT REPAIRS TO THE FOLLOWING ITEMS. PORT RUDDER POST BEARING AND STARBOARD TAILSHAFT SUPPORTS. COAST GUARD INSPECTION REQUIRED PRIOR TO PLACEMENT OF VESSEL BACK IN WATER.
Accommodation/Occupational Safety
Issued 24 March 1987
Resolved
PROVIDE AN MSD HOLDING TANK OR AN APPROVED MSD SYSTEM.
Lifesaving
Issued 24 March 1987
Resolved
CONNECT THE LIFERAFT WEAKLINKS TO THE VESSEL.
Documentation
Issued 24 March 1987
Resolved
POST THE VESSEL'S STABILITY LETTER IN THE WHEELHOUSE.
Electrical
Issued 24 March 1987
Resolved
PROVIDE PROPER ELECTRICAL CONNECTIONS WHEREVER NEEDED.
Engineering
Issued 24 March 1987
Resolved
PROVIDE EXHAUST LINE LAGGING WHERE NEEDED FOR THE MAIN ENGINES AND GENERATOR DRIVE EXAUST LINE.
Deck/Cargo
Issued 24 March 1987
Resolved
MAKE THE ANCHOR AND IT'S ASSOCIATED EQUIPMENT AVAILABLE FOR IMMEDIATE USE.
Electrical
Issued 24 March 1987
Resolved
PLACE THE PORT SIDE SHORE TIE AND IT'S ASSOCIATED WIRING AND EQUIPMENT IN TO PROPER OPERATING CONDITION.
Construction/Loadline
Issued 24 March 1987
Resolved
REPAIR THE PITTING IN THE COLLISION BULKHEAD.
Lifesaving
Issued 24 March 1987
Resolved
PROVIDE HYDROSTATIC RELEASES FOR THE LIFERAFTS OR PLACE THEM IN A FLOAT FREE RACK.
Engineering
Issued 24 March 1987
Resolved
RESECURE ALL LOOSE BILGE SUCTION LINES AS NEEDED. MORE
Electrical
Issued 24 March 1987
Resolved
REMOVE ALL EXTRANIOUS ELECTRICAL WIRING AND ELECTRICAL DEVICES NO LONGER INSERVICE.
Electrical
Issued 24 March 1987
Resolved
INSURE THAT THE WIRING CONNECTIONS ARE PROPER IN THE STEERING PUMP JUNCTIONBOX AND REPLACE THE MISSING COVER PLATE.
Electrical
Issued 24 March 1987
Resolved
REPAIR ALL BATTERY BOXES.
Lifesaving
Issued 18 March 1986
Resolved
PROVIDE WEAK LINKS FOR PAINTERS FOR INFLATABLE LIFERAFTS.
Navigation
Issued 11 June 1985
Resolved
COMPLETE INSTALLATION OF THE STBD RUDDER POST.
Construction/Loadline
Issued 11 June 1985
Resolved
PROCURE AND INSTALL ONE DOG FOR THE STBD MIDSHIPS PASSENGER WEATHER DOOR WHERE MISSING.
Construction/Loadline
Issued 11 June 1985
Resolved
REPAIR HOLE IN THE A/C OVERBOARD DISCHARGE THRU-HULL.
Fire Fighting
Issued 11 June 1985
Resolved
SERVICE THE B-I PORTABLE FIRE EXTINGUISHER LOCATED IN THE HEAD.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.