Inspection history · 27
17 November 2025
Administrative Inspection
Administrative · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 8269559
7 August 2025
In-Service Inspection · MTSA Verification
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 8204737
5 August 2025
Deficiency Check
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 8202955
26 June 2025
Damage Survey · Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 8168386
26 June 2025
Type not recorded
No type recorded · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 8172053
2 October 2024
Administrative Inspection · COI Inspection · In-Service Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 8013313
2 February 2024
Administrative Inspection
Administrative · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 7859677
29 September 2023
Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 7802056
23 September 2023
Damage Survey · Deficiency Check
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 7797200
23 September 2023
Type not recorded
No type recorded · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 7798571
25 May 2023
Administrative Inspection · In-Service Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 7696437
26 April 2023
Administrative Inspection · Damage Survey · Examination of Repairs
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 7678853
14 September 2022
Annual Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 7559759
19 August 2022
In-Service Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 7540379
15 November 2021
Inclining Experiment
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 7356557
26 July 2021
Administrative Inspection
Administrative · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 7268139
7 July 2021
Annual Inspection · Deficiency Check · MTSA Verification · Examination of Repairs
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 7247855
28 October 2020
Drydock Exam · Internal Structural Exam
Physical examination · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 7085719
19 June 2020
COI Inspection · DAPI Audit
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 6953068
8 July 2019
DAPI Audit · Annual Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 6742930
16 July 2018
MTSA Verification · Annual Inspection · DAPI Audit
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 6482028
12 September 2017
Administrative Inspection
Administrative · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 6264868
21 August 2017
Annual Inspection · MTSA Verification · DAPI Audit
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 6247440
26 April 2017
Excursion Permit
Administrative · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 6133093
8 December 2016
MTSA Verification
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 6054628
25 July 2016
Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 5953257
6 May 2016
Excursion Permit
Administrative · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 5881117
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 5 August 2025
No resolution recorded
For a life float—Approved under approval series 160.027 or other standard specified by the Commandant. Buoyant apparatus may be used to meet requirements for life floats if the buoyant apparatus was installed on board the vessel on or before March 11, 1996, and if the buoyant apparatus remains in good and serviceable condition. Vessel has two buoyant apparatus installed that were manufactured in 2021. Vessel is required to replace buoyant apparatus with life floats approved under approval series 160.027 prior to 2026 operating season.
Condition: Invalid
Action required: 705 - Other - as specified
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 30 June 2025
No resolution recorded
Drydock examinations in excess of the periodic examinations required may be of the same scope; a periodic examination shall include the propellers and shall be of sufficient scope to determine that these items are in a satisfactory condition for the service intended. Each propeller has damage; replace each propeller at next scheduled drydock inspection so vessel is in a satisfactory condition for the service intended.
Action required: 705 - Other - as specified
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 30 June 2025
No resolution recorded
Drydock examinations in excess of the periodic examinations required may be of the same scope; a periodic examination shall include the underwater hull and appendages and shall be of sufficient scope to determine that these items are in a satisfactory condition for the service intended. Multiple insets on the port bow in the vicinity of the FWD hold compartment were discovered. Make necessary repairs at next scheduled drydock inspection so vessel is in a satisfactory condition for the service intended.
Action required: 705 - Other - as specified
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 26 June 2025
Resolved
A vessel is inspected for compliance with the standards
required by this subchapter. For items not covered by standards in this subchapter, inspections shall be in accordance with standards acceptable to the cognizant Officer in Charge, Marine Inspections, as good
marine practice. In the application of inspection
standards due consideration will be given to the hazards
involved in the operation permitted by a vessel's
Certificate of Inspection. Thus, the standards may vary
in accordance with the vessel's area of operation or any
other operational restrictions or limitations. Vessel
ran aground near Ballast Island. Vessel's current
material condition has not been verified and will
require a damage survey by a Coast Guard Marine
Inspector from the local OCMI prior to being authorized
to operate in a commercial status. Vessel is not authorized to carry any passengers until authorized to do so by the local OCMI.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 July 2025
Resolution: Marine Inspector witnessed sea trials aboard vessel, all sat.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 3 October 2024
Resolved
Each item of survival craft equipment must be of good quality, and efficient for the purpose it is intended to serve. Two(2) of the lifefloats on board the vessel are deteriorated to the point they are no longer serviceable. Additionally, some of the other lifefloats required further inspection to ensure they are still serviceable. Vessel shall replaced the two deteriorated lifefloats and have the other remaining lifefloats (6) removed from their stowage position so they can be further inspected by a CG marine inspector. Vessel's passenger capability has been reduced to two-hundred and sixty-four (264) passengers until the vessel receives the two new lifefloats that have been purchased and the stowage has been verified by a CG marine inspector.
46 CFR 180.175
Action required: 705 - Other - as specified
Resolved 5 August 2025
Resolution: Lifefloats inspected. See narrative.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 3 October 2024
Resolved
Each paddle must be of at least 1,220 millimiters (4 feet) in length, lashed to the life float to which it belongs and buoyant. Some life float paddles are below four (4) feet in length. Replaced paddles that do not meet this criteria.
46 CFR 180.175(f)(2)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 November 2024
Resolved 5 August 2025
Resolution: All paddles SAT.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 3 October 2024
Resolved
Life floats and buoyant apparatus must not be stowed in tiers more than 4 feet high. When stowed in tiers, the separate units must be kept apart by spacers. No spacers were installed to separate life floats.
46 CFR 180.137(f)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 October 2024
Resolved 5 August 2025
Resolution: Spacers installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 3 October 2024
Resolved
Suitable covers, guards, or rails shall be installed in way of all exposed and hazardous places such as gears,
machinery, etc. Propeller shafts and front starboard engine do not have guards to protect personnel. Installed a means to protect personnel from rotating machinery by April 2025.
46 CFR 177.35-15
Action required: 705 - Other - as specified
Resolved 5 August 2025
Resolution: Rails were installed inboard of each shaft.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 3 October 2024
Resolved
The general construction of the vessel shall be such as to minimize fire hazards insofar as reasonable and practicable. Exhaust and overhead bulkhead in the engine room is missing required insulation. Installed removed insulation to original condition.
46 CFR 177.10-5
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 5 August 2025
Resolution: Insulation installed over exhaust and in overhead over generator and MDE where it had been missing.
05 - Radio Communications › N/A - No Subsystem › Other (radio communication)
Issued 3 October 2024
Resolved
A proper certificate issued by the Federal Communications Commission shall be regarded as evidence that the radio installation, if any, is in compliance with the requirements of that agency.
Vessel did not have a certificate on board.
46 CFR 184.25-1(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 October 2024
Resolved 4 October 2024
Resolution: Certificate was on board during drills
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 2 October 2024
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Action required: 60 - Rectify deficiencies prior to movement
Resolved 3 October 2024
Resolution: Conducted COI renewal.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 23 September 2023
Resolved
The main steering gear and rudder stock must be of adequate strength for and capable of steering the vessel at maximum ahead service speed. Vessel experienced loss of steering. Necessary repairs must be made to steering system prior to operating with passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Due 29 September 2023
Resolved 29 September 2023
Resolution: Repairs made to steering gear system, all sat.
04 - Emergency Systems › N/A - No Subsystem › Water level indicator
Issued 14 September 2022
Resolved
High Level Float switch did not illuminate light in pilot house upon activation. Replace or properly repair bilge high water level float switch.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 September 2022
Resolved 16 September 2022
Resolution: Tested switch and witnessed audible and visual alarm in pilot house.
09 - Working and Living Conditions › 091 - Living Conditions › Sanitary Facilities
Issued 13 April 2021
Resolved
The freshwater line that supplies water to the vessel toilets is wasted and holed in way of the #5 WTB in the exhaust piping space just forward of the sewage waste tank and steering space. Toilets are unable to receive fresh water for flushing. Make permanent repair to fresh water line to the satisfaction of the attending Coast Guard Marine Inspector prior to carrying passengers.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 July 2021
Resolution: Vessel made repairs to raw water line supplying toilets as required.
09 - Working and Living Conditions › 091 - Living Conditions › Sanitary Facilities
Issued 13 April 2021
Resolved
The sewage tank vent line on the port side of the sewage tank in steering space is wasted and holed that may cause raw sewage to leak into space. Make permanent repairs to the vent line to the satisfaction of the attending Coast Guard Marine Inspector prior to operating any sewage or waste generating equipment.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 12 July 2021
Resolution: Sewage tank vent line repaired as required.
02 - Structural Conditions › N/A - No Subsystem › Bulkhead -corrosion
Issued 13 April 2021
Resolved
Permanent repairs that were completed to the #5 WTB are unable to be nondestructively tested until the sewage tank vent line can be permanently repaired. Once vent line repairs are completed, conduct satisfactory nondestructive testing to the repaired #5 WTB welds in the presence of the attending Coast Guard Marine Inspector prior to carrying passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 July 2021
Resolution: NDT of repairs made in #5 tank was satisfactorily completed.
02 - Structural Conditions › N/A - No Subsystem › Bulkhead -corrosion
Issued 4 December 2020
Resolved
Forward tank bulkhead that is integral to the #5 WTB is severely holed and wasted in it's entirety.
Entire tank perimeter in the rudder space (all three (03) sides) is severely holed and wasted approximately 8" to 10" up from bottom plate.
Viewing from the tank exterior (internal ladder wasted) the internal vessel longitudinal structural members are wasted beyond acceptance.
Vessel transverse and longitudinal structural members in the rudder space surrounding and IWO the sewage tank are wasted beyond acceptance.
Submit a repair proposal to crop out to good metal and renew wasted structural members and bulkheads prior to departure.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 13 April 2021
Resolution: Permanent repairs satisfactory
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 4 December 2020
Resolved
In the forward hold, two sections, of athwart-ships framing, were identified to be cropped and renewed. Submit a repair proposal to crop out to good metal and renew wasted structural members prior to departure.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 13 April 2021
Resolution: Final repairs satisfactory
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 4 December 2020
Resolved
Descale, clean, and evaluate the #5 WTB IWO Sewage tank and bottom plate, external to tank in the rudder space. Submit findings to attending Coast Guard Marine Inspector prior to departure.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 13 April 2021
Resolution: Results of evaluation satisfactory, no further action required.
02 - Structural Conditions › N/A - No Subsystem › Stability/strength/loading information and instruments
Issued 28 October 2020
Resolved
Due to the unknown subtraction, addition and movement of weight on board this vessel, a Dead Weight Survey is required to be conducted and the calculations provided to the OCMI and/or the Coast Guard Marine Safety Center for review and issuance of a new stability letter. This must be done prior to carrying passengers.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Due 9 April 2021
Resolved 12 July 2021
Resolution: OCMI reduced pax count per MSC recommendation until new deadweight survey can be completed.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Mounting Bracket
Issued 21 August 2017
Resolved
Mount 02 fire extinguishers in Engine Room in an approved marine type bracket.
Action required: 705 - Other - as specified
Due 21 September 2017
Resolved 28 August 2017
Resolution: Brackets have been purchased and installed on vessel.
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 21 August 2017
Resolved
Seperate adult and child size PFD's on upper deck storage in order to prevent mixing of sizes.
Action required: 705 - Other - as specified
Due 28 August 2017
Resolved 28 August 2017
Resolution: PFD's have been seperated as required.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 25 July 2016
Resolved
Discovered a 10" diameter welded circular insert in the collision bulkhead located on the stbd side near the top section. Insert is not welded from the fwd side (welded on aft side only). Properly weld the insert with a full penetration weld so as to ensure watertight integrity. (46CFR179.320)
Action required: 705 - Other - as specified
Due 25 August 2016
Resolved 6 September 2016
Resolution: Weld visually inspected and tested with air-lance/soapy water; all sat.
Engineering › Freshwater Generation System › Piping
Issued 25 July 2016
Resolved
There is a 2" pipe (open on both ends and unused) that penetrates the collsion bulkhead and continues into the fwd hold compartment. Properly blank off or remove pipe and ensure that collision bulkhead watertight integrity is maintained. (46CFR179.320)
Action required: 705 - Other - as specified
Due 25 August 2016
Resolved 6 September 2016
Engineering › Freshwater Generation System › Piping
Issued 25 July 2016
Resolved
There is a 1" pipe located in the stbd overhead of the fuel tank space and the engine room that has multiple soft patches throughout its length. Vessel representative believed that the pipe is associated with the potable water system and possibly no longer used. Make permanent repairs to pipe, replace, or remove. (46 182.700-.730)
Action required: 705 - Other - as specified
Due 25 October 2016
Resolved 15 August 2016
Resolution: Vessel removed rubber patches and piping was found to be in satisfactory condition. Rubber patches were being used as chaffing gear not soft patches.
Navigation › Piloting/Steering › Marine Charts
Issued 25 July 2016
Resolved
Provide adequate and up-to-date navigation charts for operational area. (46CFR184.420)
Action required: 705 - Other - as specified
Due 8 August 2016
Resolved 6 September 2016
Fire Fighting › Portable CO2 Fire Extinguisher › Mounting Bracket
Issued 25 July 2016
Resolved
Noted multiple portable fire extinguishers that were hanging from "J-Hooks" only without proper supporting brackets as provided by the manufacturer. Provide proper mounting brackets so as to prevent unnecessary movement. (46CFR181.520)
Action required: 705 - Other - as specified
Due 25 August 2016
Resolved 15 August 2016
Resolution: Approved type mounting brackets were properly installed.
Fire Fighting › Portable CO2 Fire Extinguisher › Discharge Hose/Tube
Issued 25 July 2016
Resolved
The portable CO2 fire extinguisher located on the port-side of the wheelhouse has a cracked/damaged sheathing on the discharge hose. Replace discharge hose or replace extinguisher. (46CFR176.810)
Due 8 August 2016
Resolved 15 August 2016
Resolution: Fire extinguisher hose was replaced and found in serviceable condition.
Accommodation/Occupational Safety › Other Accommodation Spaces › Open Deck Space
Issued 25 July 2016
Resolved
The upper deck is not marked for maximum number of passengers per the stability letter. Properly mark passenger count allowed on upper deck. (46CFR185.602(g))
Action required: 705 - Other - as specified
Due 8 August 2016
Resolved 15 August 2016
Resolution: Proper passenger count for upper deck is marked on aft stairway as required.
Construction/Loadline › Structures › Door
Issued 25 July 2016
Resolved
The watertight door in the trunk leading from the main deck to the engine room does not operate or seal properly due to mis-alignment, poor condition of the mechanical components, and condition of the gasket. Demontrate operability and watertight integrity of the door upon completion of repairs and alignment. (46CFR171.113)
Action required: 705 - Other - as specified
Due 25 January 2017
Resolved 21 August 2017
Resolution: Door found to be operating correctly, new gasket installed and closing mechanism was cleaned and operates smoothly.
Lifesaving › Lifefloat › Painter
Issued 25 July 2016
Resolved
All 10 lifefloats are linked to a single painter attachment. 46CFR180.137(e) requires that the combined weight of each group of lifefloats (attached to a single painter) must not exceed 400 lbs. Re-configure lifefloat painters so that this weight restriction is not exceeded. Reference above cite for full details of painter installation procedure.
Action required: 705 - Other - as specified
Due 8 August 2016
Resolved 6 September 2016
Lifesaving › Lifefloat › Serviceable
Issued 25 July 2016
Resolved
Majority of lifefloats are in poor condition due to deterioration of the outer coverings and attached components. Provide written plan of action to address servicability through authorized repair methods and materials. Plan should include a timeline to address repairs to outer skin covering, restoration of color, and replacement of deteriorated attachments.(46CFR180.15)
Action required: 705 - Other - as specified
Due 25 August 2016
Resolved 6 September 2016
Resolution: Written plan provided by O/O includes planned repair IAW manufacturer instruction and replacement of 2 life-floats in the worst condition.