Records from 1982 to 2026. Most recent: inspection, 27 July 2026.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 63
27 July 2026
COI Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8449635
15 January 2026
Administrative Inspection
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8296864
15 November 2025
Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8269544
3 September 2025
Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8226082
18 August 2025
Annual Inspection · Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8212338
24 June 2024
Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7956176
1 April 2024
Internal Structural Exam · Drydock Exam
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7896749
10 July 2023
Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7742478
15 June 2022
Deficiency Check · Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7475387
2 May 2022
In-Service Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7443274
7 February 2022
Administrative Inspection
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7391762
26 April 2021
Deficiency Check · COI Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7179664
29 March 2021
Internal Structural Exam · Drydock Exam
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7177570
10 August 2020
Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7057852
22 July 2019
Annual Inspection · DAPI Audit
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6755062
31 July 2018
DAPI Audit · Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6497753
30 May 2018
Internal Structural Exam · Drydock Exam
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6429267
8 May 2017
Annual Inspection · DAPI Audit
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6142220
13 December 2016
In-Service Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6058249
30 March 2016
COI Inspection · Deficiency Check · DAPI Audit
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 5859573
18 March 2016
Administrative Inspection
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 5835973
11 June 2014
DAPI Audit · Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 4886160
16 December 2011
Deficiency Check · Hull Examination · Internal Structural Exam
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 4209703
30 March 2010
Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 3705639
22 April 2009
Hull Examination · Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 3458421
5 May 2008
Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 3202666
7 May 2007
Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 2924329
24 April 2006
COI Inspection · Hull Examination
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 2607024
5 April 2005
Periodic Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 2329644
4 May 2004
Periodic Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 2059007
11 April 2003
Hull Examination
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1789417
3 April 2003
Re-Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1789350
27 November 2002
Plan Review "T" Boat
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1711731
4 April 2002
Re-Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1603980
23 April 2001
COI Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1435253
6 April 2001
Hull Examination
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1444572
8 May 2000
Re-Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1423428
14 April 1999
Re-Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1126828
23 March 1999
Hull Examination
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 776317
6 April 1998
COI Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1122941
31 March 1998
Administrative
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 788296
12 January 1998
Administrative
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1121795
18 April 1997
Re-Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1378023
16 April 1996
Re-Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1383228
9 November 1995
Hull Examination
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1439698
26 April 1995
COI Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1448662
10 May 1994
Re-Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 865270
27 April 1994
Hull Examination
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 865267
10 May 1993
Re-Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 839455
24 April 1992
Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1260413
9 April 1992
COI Inspection · Hull Examination
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 960841
6 June 1991
Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1236471
23 May 1991
Re-Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 921942
26 April 1991
Administrative
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 931585
7 February 1991
Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1229211
16 May 1990
Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 924089
18 April 1990
Re-Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 903402
11 May 1989
COI Inspection · Deficiency Check · Hull Examination
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1344689
7 June 1988
Re-Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1032709
7 March 1988
Hull Examination
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1027305
2 June 1987
Re-Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1323651
6 June 1986
COI Inspection · Credit Drydock
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1303022
9 May 1982
Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 986661
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 27 July 2026
Resolved
A vessel on which a pre-engineered fixed gas fire extinguishing system is installed must have the following equipment at the operating station:(1) A light to indicate discharge;(2) An audible alarm that sounds upon discharge; and (3) A means to reset devices used to automatically shut down ventilation systems and engines as required by paragraph (a)(3) of this section. The vessel was unable to use the installed override switch to reset the system.
46 CFR 181.420.(b)(3)
Condition: Damaged By Earlier Event
Action required: 10 - Deficiency Rectified
Resolved 27 July 2026
Resolution: CG inspectors witnessed rectification of the issue once the installed batteries were properly charged.
10 - Safety of Navigation › N/A - No Subsystem › Other (navigation)
Issued 27 July 2026
Resolved
a) As appropriate for the intended voyage, a vessel must carry adequate and up-to-date:(1) Charts of large enough scale to make safe navigation possible;(2) U.S. Coast Pilot or similar publication;(3) Coast Guard Light List. The vessel did not have up to date Coast Pilot and Light List on board.
46 CFR 184.420 (a)(2)(3)
Condition: Invalid
Action required: 10 - Deficiency Rectified
Resolved 27 July 2026
Resolution: CG inspectors witnessed vessel personnel downloaded updated PDF version of Coast Pilot and Light list onto portable devices.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 18 August 2025
Resolved
At each inspection for certification and at every other vessel inspection all observed unsafe practices, fire hazards, and other hazardous situations must be corrected and all required guards and protective devices must be in satisfactory condition. MI observed multiple "dead end" wires at the operation control station and non permanent wire splices with corrosion within the bilge alarm/pumping system. The operational control station in not structurally sound.
46CFR176.830(a)
Action required: 60 - Rectify deficiencies prior to movement
Resolved 21 August 2025
Resolution: Dead end wires have been removed and op station has been secured. All sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 18 August 2025
Resolved
On a vessel of at least 7.9 meters (26 feet) in length,
a visual and audible alarm must be provided at the
operating station to indicate a high water level in each
of the following normally unmanned spaces. The audible
and visual alarm for the bilge system was inoperative.
46CFR182.530(a)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 August 2025
Resolution: High water level alarm tested Sat.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 18 August 2025
Resolved
All electrical installations shall be to satisfaction of the OCMI (Officer in Charge, Marine Inspection). The positive cable for the main engine battery had bare wire showing with the insulation chaffed.
46CFR183.01-15(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 3 September 2025
Resolution: Received objective evidance of the battery cable wire being replaced. All sat.
05 - Radio Communications › N/A - No Subsystem › Operation/maintenance
Issued 18 August 2025
Resolved
Except as noted in paragraph (c) of this section, stations in the maritime service must be licensed by the
FCC. FCC station license was expired.
47CFR80.13(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 21 August 2025
Resolution: Station license has been renewed. All sat.
05 - Radio Communications › N/A - No Subsystem › VHF radio installation
Issued 18 August 2025
Resolved
A vessel must comply with the applicable requirements for any radio and Electronic Position Indicating Radio beacon (EPIRB) installations, including the requirements be issued by the Federal Communications Commission, as set forth in 47 CFR part 80. VHF radio did not have the vessels MMSI number programmed in it.
46CFR184.502
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 October 2025
Resolved 15 November 2025
Resolution: Received photo of MMSI number in radoi. All sat.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 24 June 2024
Resolved
A vessel on which a pre-engineered fixed gas fire extinguishing system is installed must have the following equipment at the operating station:
A light to indicate discharge;
An audible alarm that sounds upon discharge. A means to reset devices used to automatically shut down ventilation systems and engines as required by paragraph (a)(3) of this section. Vessel's pre-engineered fixed gas fire extnguishing system did mot have a light to indicate discharge (simulation).
46CFR181.420(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 July 2024
Resolved 5 July 2024
Resolution: Verified new control switch installed and working as reqired.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 24 June 2024
Resolved
At each initial and subsequent inspection for certification the owner or managing operator shall be prepared to test the steering systems of the vessel and make them available for inspection to the extent necessary to determine that they are in suitable condition and fit for the service intended. Vessel's steering gear was leaking while underway.
46CFR176.814
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 July 2024
Resolved 2 July 2024
Resolution: Verified rudder not leaking.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 10 July 2023
Resolved
The materials and construction of fuel lines, including pipe, tube, and hose, must comply with the requirements of 46 CFR 182.455. The vessels fuel line connection was wasted and needed to be replaced.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 10 July 2023
Resolution: Vessel operator replaced fuel line with copper piping.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 10 July 2023
Resolved
ach pressure type wire connector and lug must meet UL 486A or other standard specified by the Commandant. The use of twist-on type wire nuts is permitted under the following conditions:
(1) The connections must be made within an enclosure and the insulated cap of the connector must be secured to prevent loosening due to vibration. Two wires were found in void space with no wire connection attached.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 10 July 2023
Resolution: Operator installed proper connections on the exposed wires.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 10 July 2023
Resolved
An adult life jacket must be provided for each person carried on board a vessel. 03 lifejackets were removed due to unsatisfactory condition.
Action required: 705 - Other - as specified
Resolved 10 July 2023
Resolution: 03 new lifejackets were provided to meet vessels COI
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 15 June 2022
Resolved
46 CFR 176.25-50(a) (Old-T): At each initial and subsequent inspection for certification, reinspection, and at every other vessel inspection the marine inspector shall require that all observed unsafe practices and hazardous situations be corrected. Identify leaking in bottom planking in way of the starboard engine bed support and provide repair proposal.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 1 April 2024
Resolution: Verified at last drydock inspection.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 2 May 2022
Resolved
Repairs or alterations to hull machinery, or equipment including repairs, re-fastening of decks/framing, internal structural members, or rigging must not be made without approval from cognizant [name withheld] as original main deck beam and floor supports and applicable fasteners to be safe for passenger operation from PORT and STBD house to engine box.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 June 2022
Resolution: Repaired to satisfaction of attending CG Marine Inspector.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 2 May 2022
Resolved
Repairs or alterations to hull machinery, or equipment including repairs, re-fastening of decks/framing, internal structural members, or rigging must not be made without approval from cognizant [name withheld] as original deck beam across op station door to be safe for passenger operation.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 June 2022
Resolution: Repaired to satisfaction of attending CG Marine Inspector.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 2 May 2022
Resolved
Repairs or alterations to hull machinery, or equipment including repairs, re-fastening of decks/framing, internal structural members, or rigging must not be made without approval from cognizant [name withheld] frame #8 STBD to reinforce crack. Frame to be same as original and refasten at chine bolts/floor fasteners and clean bilges.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 June 2022
Resolution: Repaired to satisfaction of attending CG Marine Inspector.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 2 May 2022
Resolved
Repairs or alterations to hull machinery, or equipment including repairs, re-fastening of decks/framing, internal structural members, or rigging must not be made without approval from cognizant [name withheld] floor frames PORT and STBD as applicable to include fastener replacement as original.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 June 2022
Resolution: Repaired to satisfaction of attending CG Marine Inspector.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 2 May 2022
Resolved
Repairs or alterations to hull machinery, or equipment including repairs, re-fastening of decks/framing, internal structural members, or rigging must not be made without approval from cognizant [name withheld] and recaulk as applicable vertical butt seams plus chine.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 June 2022
Resolution: Repaired to satisfaction of attending CG marine inspector.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 7 February 2022
Resolved
A drydock examination conducted in compliance with § 176.600 must be conducted while the vessel is hauled out of the water or placed in a drydock or slipway. During the examination all accessible parts of the vessel's underwater body and all through hull fittings, including the hull plating and planking, appendages, propellers, shafts, bearings, rudders, sea chests, sea valves, and sea strainers shall be made available for examination. Sea chests, sea valves, and sea strainers must be opened for examination. On wooden vessels, fastenings may be required to be pulled for examination. The vessel's required fastener pull is past it's due date.
46CFR176.610(a)
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 2 May 2022
Resolution: Vessel conducted fastener pull - See MISLE Activity #7443274
11 - Life Saving Appliances › N/A - No Subsystem › Buoyant apparatus
Issued 26 April 2021
Resolved
Each vessel constructed of wood certificated to operate on a lakes, bays, and sounds route in cold water must be provided with life floats of an aggregate capacity that will accommodate at least 100% of the total number of persons permitted on board. Vessel life float and buoy apparatus were no longer serviceable. Master advised all survival craft will be removed. Vessel is restricted from carrying passengers in cold water. (01Nov-14May). 46 CFR 180.207(a)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 May 2021
Resolved 15 May 2021
Resolution: COI updated to reflect warm water operations only.
10 - Safety of Navigation › N/A - No Subsystem › Nautical publications
Issued 26 April 2021
Resolved
As appropriate for the intended voyage, a vessel must carry adequate and up-to-date:
(1) Charts of large enough scale to make safe navigation possible; (2) U.S. Coast Pilot or similar publication;
(3) Coast Guard Light List; (4) Tide tables; and
(5) Current tables, or a river current publication issued by the U.S. Army Corps of Engineers or a river authority.
(b) Extracts from the publications listed above for the areas to be transited may be provided instead of the complete publication.
Vessel's publications were over 3 years old.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 May 2021
Resolved 3 May 2021
Resolution: Images received of appropriate updated pubs.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 29 March 2021
Resolved
Water lubricated rubber bearings must be rebushed when any water groove is half the original depth. Vessels Bearing was found to be worn beyond 50 percent depth. 46 CFR 61.20-23
Action required: 701 - Prior to carriage of passengers/cargo
Due 12 April 2021
Resolved 1 April 2024
Resolution: Verified at last drydock inspection.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 22 July 2019
Resolved
The steering system of the vessel shall be in suitable condition and fit for service intended. The rudder post is leaking while vessel is underway. 46 CFR 182.440(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 August 2019
Resolved 25 July 2019
Resolution: Verified repairs made to the vessels rudder post (repacked) and no additional water leaking into the vessel.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 22 July 2019
Resolved
All fuel tanks must be electronically bonded to a common ground. Ground wire on fuel tank broken off. 46 CFR182.440(b)
Action required: 10 - Deficiency Rectified
Resolved 22 July 2019
Resolution: Vessel O/O replaced the grounding wire on the spot.
Construction/Loadline › Hull › Transverse Frame
Issued 30 May 2018
Resolved
Repair frame under house Stbd side forward as marked.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 June 2018
Resolved 5 June 2018
Resolution: Received via email pictures of the repairs to the frame under the house. Repairs were satisfactory.
Engineering › Steering Gear System › Linkage
Issued 30 May 2018
Resolved
Clean and repair steering linkage under house Stbd side as shown.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 June 2018
Resolved 5 June 2018
Resolution: Received via email pictures of the repairs to the steering linkage. Repairs were satisfactory.
Construction/Loadline › Hull › Side Shell
Issued 30 May 2018
Resolved
Repair gunwhale Portside aft of amidships. Temporary repair are allow until completed after fishing season.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 December 2018
Resolved 25 September 2020
Resolution: Approved repair.
Navigation › Piloting/Steering › Coast Guard Light List
Issued 30 March 2016
Resolved
Vessel needs updated/current light list and coast pilot for area of operation.
Due 13 April 2016
Resolved 12 April 2016
Resolution: Verified that updated Coast Pilot and Light list available and onboard vessel
Fire Fighting › Fixed Gas Fire Extinguishing System › Operating Controls
Issued 30 March 2016
Resolved
Issued (01) CG-835 to repair Pre-Engineered Fire extinguishing system for operating audible and visual indications
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 April 2016
Resolution: Verified that a new Audible/visual indicator for Fireboy had been installed. Tested Fireboy shutdown and indicator worked as required.
Lifesaving › Lifefloat › Retroreflective Material
Issued 30 March 2016
Resolved
Issued (01) CG-835 to add retro reflective tape to all life floats to replace worn tape
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 April 2016
Resolution: Verified Retro Reflective tape had been added to all life floats as needed
Lifesaving › Lifefloat › Painter
Issued 30 March 2016
Resolved
issue (01) CG-835 to properly attach the painter line for the life float attached to weak link
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 April 2016
Resolution: Verified that the Painter lines for life floats were correctly secured to weak link
Lifesaving › Lifefloat › Painter
Issued 30 March 2016
Resolved
issued (01) CG-835 to replace the painter line on the forward life float due to wastage
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 April 2016
Resolution: Verified the replacement of the painter line for the forward life float
Lifesaving › Lifejacket/PFD (Type I) › Storage
Issued 30 March 2016
Resolved
issued (01) CG-835 to properly label number and location for all adult and child lifejackets in storage location
Due 13 April 2016
Resolved 12 April 2016
Resolution: Verified proper labeling of the number and size for the vessels life jackets.
Construction/Loadline › Hull › Side Shell
Issued 16 December 2011
Resolved
West system epoxy applied to an area of rot port side in the vicinity of the pilot house directly underneath the gunwhale. Remove West System epoxy and rotted wood to good wood and make a proper repair with new wood.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 February 2012
Resolution: Rotted plank removed and replaced as new to the satisfaction of the CG marine inspector.
Construction/Loadline › Hull › Stringer
Issued 16 December 2011
Resolved
#9 frame port side cracked. Replace as original or sister with good wood along the entire length of frame.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 February 2012
Resolution: #9 port side frame sistered to the satisfaction of the CG marine inspector.
Construction/Loadline › Hull › Stringer
Issued 16 December 2011
Resolved
Gussett supporting the #10 frame port side wasted. Replace as original.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 February 2012
Resolution: Gussett on #10 frame replaced as new.
Construction/Loadline › Hull › Hull Plating
Issued 16 December 2011
Resolved
Approximately 9' of the vessel (measured from the stem back) has been sheathed in FRP without CG knowledge or approval. Owner tasked with providing the scope of work outling the sheathing process.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 February 2012
Resolution: Letter from LA Thompson shipyard outlined the sheathing process to the satisfation of the CG marine inspector.
Engineering › Fuel Oil Service System › Vent Pipe
Issued 16 December 2011
Resolved
Diesel fuel vent & screen on the side of the vessel directly beneath fuel fill wasted. Replace as new.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 February 2012
Resolution: Diesel fuel vent screen replaced to the satisfaction of the CG marine inspector.
Electrical › Electric Supply System (service) › Battery Installation
Issued 16 December 2011
Resolved
Battery box wasted. Make appropriate repairs and install a scupper in the box to allow water to adequately drain from the box.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 February 2012
Resolution: Battery box repaired to the satisfaction of the attending CG inspector.
Construction/Loadline › Hull › Transverse Frame
Issued 11 April 2003
Resolved
Renew rotted frame in port bow; retain fasteners removed for marine inspector
Action required: 705 - Other - as specified
Resolved 18 April 2003
Construction/Loadline › Structures › Deck Plating
Issued 11 April 2003
Resolved
Renew canopy boards designated by marine inspector
Action required: 705 - Other - as specified
Resolved 18 April 2003
Lifesaving › Buoyant Apparatus
Issued 3 April 2003
Resolved
Label Life Float with no. of passengers and paddles with name of vessel. Lash paddles to the Life Float. LEGACY COMPONENT DESC: labeling
Due 11 April 2003
Resolved 3 April 2003
Electrical
Issued 8 May 2000
Resolved
Repair wiring on deck lights (wiring in junction box) and provide guards for globes.
Condition: Unknown
Due 8 June 2000
Resolved 18 August 2000
Accommodation/Occupational Safety
Issued 8 May 2000
Resolved
Tighten brackets supporting the seating on port, stbd and aft fixed seating.
Condition: Unknown
Due 8 June 2000
Resolved 18 August 2000
Lifesaving
Issued 8 May 2000
Resolved
Update First Aid Kit.
Condition: Unknown
Due 8 June 2000
Resolved 18 August 2000
Engineering
Issued 16 April 1996
Resolved
INSTALL WARNING DEVICE TO INDICATE FAILURE OF WATER FLOW TO EXHAUST COOLINGSYSTEM WHICH IS SEPARATE FROM ENGINE COOLING SYSTEM.
Condition: Unknown
Due 26 May 1996
Resolved 23 May 1996
Engineering
Issued 9 April 1992
Resolved
PROVIDE TEST OF MAIN PROPULSION ENGINE, TEST HYDRAULIC DECK WINCH AND PROVIDE UNDERWAY EVALUATION OF VESSEL.
Condition: Unknown
Due 9 April 1992
Resolved 9 April 1992
Construction/Loadline
Issued 9 April 1992
Resolved
MAKE REPAIRS TO TRANSOM BOARD WATERLINE TO KEEL AND PLUG SMALL HOLES IN INNER BOARD, STBD SIDE INWAY OF CHINE.
Condition: Unknown
Due 9 April 1992
Resolved 9 April 1992
Navigation
Issued 18 April 1990
Resolved
PROVIDE CHARTS OF OPERATING AREA NOT MORE THAN THREE YEARS OLD & 1990 TIDE TABLES
Condition: Unknown
Due 18 April 1990
Resolved 18 April 1990
Navigation
Issued 18 April 1990
Resolved
PROVIDE LETTER TO MSO BALTIMORE STATING A DRUG TESTING PROGRAM HAS BEEN STARTED PRIOR TO 21DEC90
Condition: Unknown
Due 18 April 1990
Resolved 18 April 1990
Navigation
Issued 18 April 1990
Resolved
INSTALL NEW ANCHOR/MASTHEAD LIGHT
Condition: Unknown
Due 18 April 1990
Resolved 18 April 1990
Lifesaving
Issued 18 April 1990
Resolved
RENEW GRAB LINES ON BA'S
Condition: Unknown
Due 18 April 1990
Resolved 18 April 1990
Lifesaving
Issued 18 April 1990
Resolved
INSTALL 18' LANYARDS FOR WATERLIGHTS ON BA
Condition: Unknown
Due 18 April 1990
Resolved 18 April 1990
Navigation
Issued 7 June 1988
Resolved
REPACK RUDDER PACKING.
Condition: Unknown
Due 7 June 1988
Resolved 7 June 1988
Navigation
Issued 7 June 1988
Resolved
DOUBLE NUT LINKAGE AT STEERING QUADRANT.
Condition: Unknown
Due 7 June 1988
Resolved 7 June 1988
Electrical
Issued 7 June 1988
Resolved
SUPPORT (FASTEN) ALL LOOSE WIRES IN BILGES AND REMOVE ALL UNUSED WIRING.
Condition: Unknown
Due 7 June 1988
Resolved 7 June 1988
Lifesaving
Issued 7 June 1988
Resolved
PROVIDE ONE CHILD AND EIGHT ADULT PFD'S. UNTIL THIS REQUIREMENT IS MET, PASSENGER CARRYING CAPACITY IS REDUCED TO 26 PASSENGERS.
Condition: Unknown
Due 7 June 1988
Resolved 7 June 1988
Electrical
Issued 7 June 1988
Resolved
PROVIDE LEAD LINING FOR BATTERY BOX.
Condition: Unknown
Due 7 June 1988
Resolved 7 June 1988
Electrical
Issued 7 June 1988
Resolved
REMOVE UNUSED VENT BLOWERS AND WIRING.
Condition: Unknown
Due 7 June 1988
Resolved 7 June 1988
Lifesaving
Issued 7 June 1988
Resolved
PROVIDE 11-20 PERSON CERTIFIED WEAKLINK FOR THE TWO BUOYANT APPARTUS.
Condition: Unknown
Due 7 June 1988
Resolved 7 June 1988
Lifesaving
Issued 7 June 1988
Resolved
PROVIDE WATERLIGHT FOR SECOND BUOYANT APPARATUS.
Condition: Unknown
Due 7 June 1988
Resolved 7 June 1988
Lifesaving
Issued 2 June 1987
Resolved
PROVIDE PROPER SET UP FOR BUOYANT APPARATUS LINE TO BE UNTANGLED AND RUN FREELY IF NEEDED.
Condition: Unknown
Due 2 June 1987
Resolved 2 June 1987
Construction/Loadline
Issued 2 June 1987
Resolved
PROVIDE HATCH KEEPERS TO ALL DECK COVERINGS.
Condition: Unknown
Due 2 June 1987
Resolved 2 June 1987
Fire Fighting
Issued 2 June 1987
Resolved
PROVIDE A HAND HELD BILGE/FIRE PUMP.
Condition: Unknown
Due 2 June 1987
Resolved 2 June 1987
Deck/Cargo
Issued 2 June 1987
Resolved
PROVIDE PROPER BILGE PIPING HOSE WHICH IS OIL RESISTANT, REINFORCED AND AT LEAST 1" IN NOMINAL SIZE.
Condition: Unknown
Due 2 June 1987
Resolved 2 June 1987
Unknown
Issued 2 June 1987
Resolved
PROVIDE AN FCC SAFETY CERTIFICATE.
Condition: Unknown
Due 2 June 1987
Resolved 2 June 1987
Unknown
Issued 6 June 1986
Resolved
PROVIDE 12 ADULT SIZE TYPE 1, AND 1 CHILD SIZE, TYPE 1, PFD'S (PERSONAL FLOTATION DEVICES). UNTIL ABOVE REQUIREMENT IS COMPLETED, VESSEL IS LIMITED TO 18 PERSONS IN ADDITION TO THE CREW.
Condition: Unknown
Due 6 June 1986
Resolved 6 June 1986