Documentation record
Registered dimensions (L × B × D)58.2 ft × 20.7 ft × 8.6 ft
Registered tonnagegross 73 / net 62
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderBLOUNT MARINE CORPORATION · WARREN, RI, UNITED STATES · built 1971
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portROCKLAND, ME
Endorsements, as the file codes themcw_un
DocumentationValid · issued 17 September 2025 · expires 31 October 2026
Service, as the file records itTank Ship
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it73 - Regulatory (Subpart C or D), Gross Ton
62 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
The full record for this vessel
Behind this panel: 21 inspections, each with its date, unit and type; 16 deficiencies with the resolution recorded against each; operational controls, none recorded without a removal date; no tow-unit appearances recorded; no other recorded names; the documentation record: dimensions, tonnage, builder, hailing port and endorsements. Every line is a record the Coast
Guard wrote; the counts above are the same counts as in the summary, and they are free.
Professional is $39 a month or $299 a year,
or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks
every detail section on every vessel page, fleet watch tied to your account, and ownership records
on request. Already a subscriber? Sign in.
Maury does not score, rate or grade vessels, at any price.
Inspection history · 21
12 May 2026
Vessel Attendance · Examination of Repairs · Drydock Exam · Cargo Tank Internal · Internal Structural Exam
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 8347236
16 September 2025
DAPI Audit · COI Inspection
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 8229684
21 November 2024
Annual Inspection · DAPI Audit · MTSA Verification
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 8033380
23 February 2024
Cargo Tank Internal · Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 7869224
15 November 2023
DAPI Audit · Annual Inspection · MTSA Verification · Deficiency Check
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 7818954
30 November 2022
DAPI Audit · Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 7570589
20 May 2022
Cargo Tank Internal · Hull Examination · Internal Structural Exam
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 7432943
8 November 2021
Annual Inspection
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 7337639
16 September 2020
DAPI Audit · Deficiency Check · MTSA Verification · COI Inspection
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 7059024
10 September 2019
Administrative Inspection · MTSA Verification · Deficiency Check · DAPI Audit · Annual Inspection
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 6808814
17 July 2019
Administrative Inspection
Administrative · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 6792258
28 June 2019
Examination of Repairs
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 6728572
31 October 2018
Deadweight Survey · Administrative Inspection
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 6571979
12 October 2018
Administrative Inspection · Examination of Repairs · Cargo Tank Internal · Drydock Exam · Plan Review (Other than "T") · Internal Structural Exam
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 6579842
1 October 2018
Periodic Inspection · MTSA Verification · Deficiency Check · DAPI Audit
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 6540259
14 August 2018
Type not recorded
No type recorded · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 6512932
14 August 2018
Deficiency Check · Examination of Repairs
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 6517967
28 November 2017
Deficiency Check · DAPI Audit · Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 6313969
2 June 2017
Hull Examination
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 6166072
25 January 2017
Deficiency Check
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 6076808
27 September 2016
MTSA Verification · Annual Inspection · DAPI Audit
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 6003981
11 - Life Saving Appliances › N/A - No Subsystem › Immersion suits
Issued 15 November 2023
Resolved
Found 01 suit needs vessel identification.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 November 2023
Resolved 17 November 2023
Resolution: Vessel name on suit.
11 - Life Saving Appliances › N/A - No Subsystem › Immersion suits
Issued 15 November 2023
Resolved
03 Immersions suits need light changed, expired batteries.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 November 2023
Resolved 17 November 2023
Resolution: New lights installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 15 November 2023
Resolved
Positive 4 gang pole mounting needs cover to prevent shock/ short circuit.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 November 2023
Resolved 17 November 2023
Resolution: Protective covering installed on battery terminals.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo transfer - Tankers
Issued 10 December 2019
Resolved
Mark all cargo hoses the date and the pressue they were hydro tested at.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 December 2019
Resolved 10 December 2019
Resolution: Proper label of hose completed.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo transfer - Tankers
Issued 10 December 2019
Resolved
Replace the stbd Big reel fuel transfer hose; noted cracked and checking on the hose.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 December 2019
Resolved 23 December 2019
Resolution: Big Reel hose replaced with new and proper test and label completed.
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 10 December 2019
Resolved
Repair the Port & Stbd engine room ventilation fire dampners above the pilothouse, dampners did not fit securley over the air vents.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 December 2019
Resolved 12 December 2019
Resolution: Proper fitment and closure of fire dampers completed, test sat.
09 - Working and Living Conditions › 092 - Working Conditions › Gas instruments
Issued 1 October 2018
Resolved
Provide 01 portable combustible gas indicator device as required.
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 November 2018
Resolved 31 October 2018
Resolution: Corrected
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 14 August 2018
Resolved
The cargo pump's hydraulic supply hose burst when the cargo pump was secured. Vsl to replace the hydraulic hose and ensure that it meets SAE J1942.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 15 August 2018
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 28 November 2017
Resolved
The retro-reflective tape was worn on the stbd buoy.
Action required: 705 - Other - as specified
Due 28 December 2017
Resolved 15 December 2017
Resolution: New tape was applied.
Operations/Management › Lifesaving › Op Readiness/Maintenance/Inspection
Issued 28 November 2017
Resolved
No livesaving equipment log book was used; vsl to create a logbook for conducting the required safety checks.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 28 December 2017
Resolved 15 December 2017
Resolution: Corrected
Construction/Loadline › Structures › Machinery Space Opening
Issued 28 November 2017
Resolved
Gasket is worn on the E/R escape hatch; new gasket to be installed.
Action required: 705 - Other - as specified
Due 28 December 2017
Resolved 22 January 2018
Resolution: New gasket installed
Personnel › Certificates/Documents/Licenses › License, Master
Issued 27 September 2016
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Resolved 25 January 2017
Resolution: MMD for [name withheld] was renewed.
Navigation › Piloting/Steering › Magnetic Compass
Issued 27 September 2016
Resolved
Repair/replace the compass light.
Action required: 705 - Other - as specified
Due 27 October 2016
Resolved 27 October 2016
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 27 September 2016
Resolved
The 02 FIREBOY fixed extinguisher units were overdue for annual servicing; vsl to provide a valid service report for the engine room's fixed fire extinguisher system.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 27 October 2016
Resolved 5 October 2016
Resolution: A service report was submitted for the Fireboy testing and inspection.
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 27 September 2016
Resolved
Attach the floating line around the body of the 02 buoys onboard, not around the lifelines.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 27 October 2016
Resolved 27 September 2016
Resolution: Corrected prior to conclusion of the annual exam.
Operations/Management › Drug and Alcohol Testing › Recordkeeping
Issued 27 September 2016
Resolved
Provide documentation of the vls's DAPI information.
Action required: 705 - Other - as specified
Due 27 October 2016
Resolved 29 September 2016
Resolution: Reviewed DAPI info, all sat.