Records from 2002 to 2026. Most recent: inspection, 17 March 2026.
Everything above is free. The detail below — the inspection history, the deficiency record, the operational controls, the recorded names, the casualty record and the documentation record — is Professional, $39 a month. Sign in.
Inspection history · 36
17 March 2026
Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8327691
26 February 2026
Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8324112
23 February 2026
Administrative Inspection · Deficiency Check
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8314189
20 January 2026
Drydock Extension · Internal Structural Exam
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8295045
4 January 2026
Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8296452
24 December 2025
Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8287312
30 September 2025
COI Inspection · Internal Structural Exam
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8220559
16 July 2025
Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8194580
19 September 2024
Internal Structural Exam · Deficiency Check · Annual Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8005974
1 September 2024
Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7995228
16 July 2024
Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7964198
7 May 2024
Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7910229
1 February 2024
Annual Inspection · Deficiency Check · Internal Structural Exam
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7852924
24 January 2024
Deficiency Check · Administrative Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7853912
24 January 2024
In-Service Inspection
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 7854151
10 May 2023
Internal Structural Exam · Deficiency Check · Drydock Exam · Examination of Repairs
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 7690438
6 September 2022
Annual Inspection · Deficiency Check
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7552444
21 April 2022
Deficiency Check · In-Service Inspection · Administrative Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7435473
12 January 2022
Deficiency Check · Internal Structural Exam · Drydock Exam
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 7379599
4 November 2021
Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7345431
26 August 2021
Annual Inspection · Internal Structural Exam
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7296094
12 August 2021
In-Service Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7284774
3 August 2021
Administrative Inspection · Drydock Extension · Internal Structural Exam
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7276498
3 September 2020
Internal Structural Exam · COI Inspection · Deficiency Check
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7047057
17 June 2020
Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7055652
8 October 2019
Deficiency Check · Administrative Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6829962
3 October 2019
Administrative Inspection · Deficiency Check
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6827789
27 June 2019
Administrative Inspection · Internal Structural Exam · Examination of Repairs · Drydock Exam · Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6726900
18 September 2018
MTSA/ISPS Verification · Administrative Inspection · Internal Structural Exam · Annual Inspection · Deficiency Check
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6542714
12 April 2018
Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6390616
27 February 2018
Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6362864
6 November 2017
Administrative Inspection · Drydock Exam · Plan Review (Other than "T") · Deficiency Check · Examination of Repairs · Internal Structural Exam
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6306547
6 October 2017
Annual Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6282827
24 January 2017
Plan Review (Other than "T")
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6077016
28 September 2016
Internal Structural Exam · MTSA Verification · Annual Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6011533
7 January 2016
Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 5795145
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 23 February 2026
Resolved
Machinery and equipment installed on each vessel must be suitable for the vessel and its operation and for the purpose intended. Vessel reported inoperable auxiliary generator. Provide root cause analysis and technician report to MI satisfaction, prior to the carriage of passengers.
46 CFR 119.100
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 February 2026
Resolution: Vessel made satisfactory repairs to aux generator
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 30 September 2025
Resolved
The fire pump must be capable of delivering a single hose stream from the highest hydrant, through the hose and nozzle at 50 psi. Stbd fire pump had insufficient pressure at approximately 20-30psi.
46 CFR 118.300 (b)
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 14 October 2025
Resolved 14 October 2025
Resolution: Completed another test with sufficient pressure. Found sea strainer vent line open.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 30 September 2025
No resolution recorded
Piping, valves, and fittings must be securely supported, and where necessary, protected against damage. Co2 Piping in the Port Steering compartment is corroded.
46 CFR 118.410(d)(3)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 May 2026 — due date passed with no resolution recorded
Resolution: To be completed at next drydock. Requires Fire System contractor to replace the section of piping in the CO2 Fire Suppression system, request extension to next drydock to resolve this.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 30 September 2025
Resolved
Exhaust gas must not leak from the piping or any connections. Stbd Fwd outboard engine exhaust has a leak.
46 CFR 119.430 (b)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 October 2025
Resolved 22 October 2025
Resolution: Tightened flange bolts, observed at high RPM to ensure leak resolved.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 30 September 2025
Resolved
At each inspection for certification...all observed unsafe, practices, fire hazards, and hazardous situations must be corrected. Oil was leaking fwd of the aft port engine.
46 CFR 115. 830 (a)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 October 2025
Resolved 22 October 2025
Resolution: Cleaned area, inspected over next 6 days, no additional oil leakage observed.
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 30 September 2025
No resolution recorded
A duct penetrating an A-class fire control boundary and opening into a space formed by that boundary must be equipped with a fire damper. Aft bulk head has vents with no dampers.
46 CFR 116.610 (f)(4)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 May 2026 — due date passed with no resolution recorded
Resolution: Due next DD, solution in engineering / planning stage, ongoing comms with Sector SF regarding options.
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 19 September 2024
Resolved
The installation of fuel lines, including pipe, tube, and hose, must comply with the requirements of this paragraph. The shutoff valve at the tank must be manually operable from outside the compartment in which the valve is located. Linkage for fuel shut-off valve in STBD AMR broke during testing.
46 CFR 119.455
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 19 September 2024
Resolution: Vessel repaired linkage for remote fuel shut-off.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 19 September 2024
Resolved
The design of all exhaust systems must ensure minimum risk of injury to personnel. Protection must be
provided in compliance with § 116.970 of this chapter at such locations where persons or equipment
might come in contact with an exhaust pipe. Port generator missing lagging on exhaust at elbow of turbo outlet.
46 CFR 119.430
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 October 2024
Resolved 9 October 2024
Resolution: Received pictures of installed lagging.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 19 September 2024
Resolved
Each distribution panel or switchboard must be totally enclosed and of the dead front type. Breaker #30 in power panel 203, located in STBD AFT crew space on main deck missing blank.
46 CFR 120.330(b)
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 October 2024
Resolved 30 September 2024
Resolution: Received pictures of installed blank in breaker panel.
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 1 February 2024
Resolved
A device must be provided to automatically shut down power ventilation serving the protected space and engines that draw intake air from the protected space prior to release of the extinguishing agent into the space. The fire dampeners in the port and starboard engine rooms did not close all the way.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 February 2024
Resolution: Vessel sent satisafctory videos of the dampers closing properly.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 1 February 2024
Resolved
Each vessel must have adequate emergency lighting fitted along the line of escape to the main deck from all passenger and crew accommodation spaces located below the main deck. There were 03 problems identified with the vessel's emergency lighting system:
1. Port side main deck emergency light was not working
2. Multiple emergency lights were not labeled
3. Upper deck starboard aft emergency light cover was missing and was covered by a paper plate.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 February 2024
Resolved 28 February 2024
Resolution: Vessel fixed all defective emrgency lights.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 1 February 2024
Resolved
Each entrance to a space storing carbon dioxide cylinders, a space protected by carbon dioxide systems, or any space into which carbon dioxide might migrate must be conspicuously marked as follows:Spaces protected by carbon dioxide—“CARBON DIOXIDE GAS CAN CAUSE INJURY OR DEATH. WHEN ALARM OPERATES OR WINTERGREEN SCENT IS DETECTED, DO NOT ENTER UNTIL VENTILATED. LOCK OUT SYSTEM WHEN SERVICING.” The reference to wintergreen scent may be omitted for carbon dioxide systems not
required to have odorizing units and not equipped with
such units. The engine room did not have the correct
CO2 warning signage posted per the regulations.
Condition: Design Flaw
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 February 2024
Resolved 12 February 2024
Resolution: Vessel representative sent a satisfactory photo via email showing correct CO2 signage posted.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 1 February 2024
Resolved
Electrical equipment on a vessel must be installed and maintained to: Provide services necessary for safety under normal and emergency conditions. There was aninstance of potentially overloaded circuits due to multiple items plugged into surge protectors in the snack area near the wheelhouse.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 February 2024
Resolved 28 February 2024
Resolution: Vessel corrected overloaded circuit
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 1 February 2024
Resolved
Electrical equipment on a vessel must be installed and maintained to: Minimize accidental personnel contact with energized parts. There were 02 problems identified in the wheel house:
1. Port wheel house control system was not closed.
2. The fuse box below the wheel house was left ajar.
Condition: Design Flaw
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 February 2024
Resolved 12 February 2024
Resolution: The vessel representative sent satisfactory photos of The port wheelhouse junction box containing breakers for the control system has been closed and latched and The fuse box door for the PA/GA system has been secured closed.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 1 February 2024
Resolved
Electrical equipment on a vessel must be installed and maintained to: Protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by or originating in electrical equipment, and electrical shock. There were cut electrical cables between the port side AMR and engine room spaces. Pull the unused wires and fill the holes to ensure the space is vapor tight.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 February 2024
Resolved 13 February 2024
Resolution: Vessel represntative sent satisfacotry photos of the cables removed and properly filled.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 1 February 2024
Resolved
An enclosed or partially enclosed space within a vessel
must be adequately ventilated in a manner suitable for
the purpose of the space. The starboard vent in the aft
jet room was painted shut.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 February 2024
Resolved 13 February 2024
Resolution: Vessel representative sent a photo showing the vent able to open as manufactured.
09 - Working and Living Conditions › 092 - Working Conditions › Cleanliness of engine room
Issued 1 February 2024
Resolved
At each inspection for certification and at every other
vessel inspection the bilges and other spaces may be examined to see that there is no excessive accumulation of oil, trash, debris, or other matter that might create a fire hazard, clog bilge pumping systems, or block emergency escapes. The Port and starboard engine room bilge was filled with an excess amount of liquids and needs to be cleaned.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 February 2024
Resolved 28 February 2024
Resolution: Cleaned bilge to the satisfaction of the marine inspector.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 24 January 2024
Resolved
A vessel must undergo an annual inspection within the 3 months before or after each anniversary date. Vessel has not completed annual inspection.
46 CFR 115.500
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 February 2024
Resolution: Vessel completed their annual exam on 01FEB2024.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 6 September 2022
Resolved
Doors in A-Class fire control boundaries must meet the following requirements: Holdback hooks are not allowed. If installed, a holdback mechanism for a door must allow the door to be released locally, upon signal from a control space, and upon disruption of the power system. Vessel has several holdback devices in A-Class boundaries.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 September 2022
Resolved 24 February 2023
Resolution: Verified removal of holdbacks.
07 - Fire Safety › N/A - No Subsystem › Fire control plan
Issued 6 September 2022
Resolved
A fire control plan (FCP) must be posted on the vessel in a location that is accessible and visible to all passengers. The plan must show escape routes, areas of refuge, embarkation stations, the location of fire protection/emergency equipment, compartment titles and hazard classification of accommodation and service spaces, and structural fire protection boundaries. Vessel has a Fire Control Plan that is not approved by [name withheld], this FCP is missing hazard classification of accommodation and service spaces and structural fire protection boundaries.
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 October 2022
Resolved 24 February 2023
Resolution: Reviewed and approved updated FCP.
04 - Emergency Systems › N/A - No Subsystem › Muster list
Issued 6 September 2022
Resolved
Except when paragraph (b) of this section is applicable, the station bill of a vessel of more than 19.8 meters (65 feet) in length required to have more than four crew members, must set forth the special duties and duty station of each crew member for various emergencies. The duties must, as far as possible, be comparable with the regular work of the individual. The duties must include at least the following and any other duties necessary for the proper handling of a particular emergency. The Station Bill that is currently onboard does not include roles for all of the crew positions (i.e. Mate) and does not include all of the equipment that the vessel currently uses (fire pump and rescue equipment). Additionally, during the drills witnessed during this inspection, crew did not follow the steps and roles listed on the Station Bill. Company to develop relevant Station Bill for crew positions and actual roles that crew should carry out.
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 October 2022
Resolved 20 September 2022
Resolution: Received updated station bill.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 6 September 2022
Resolved
A structure is considered open to the weather when an exterior end bulkhead of the structure is open and is not fitted with any means of closing. Aft tonnage opening interior in concession room is blocked by permanently fitted cupboards and is not considered in the clear in accordance with 46 CFR 117(d)(2)(i). Stairway tonnage opening has permanently affixed bike bike track at the forward lower corner preventing its removal. Make corrections to tonnage openings to the satisfaction of attending MI by next credit drydock.
46 CFR 69.117(d)(2)
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 17 May 2023
Resolution: Cabinet and bike rack were removed.
04 - Emergency Systems › N/A - No Subsystem › Abandon ship drills
Issued 6 September 2022
Resolved
The master shall conduct sufficient drills and give sufficient instructions to make sure that all crew members are familiar with their duties during emergencies that necessitate abandoning ship or the recovery of persons who have fallen overboard. MI found last drill was conducted on November 2021 and the crew was unfamiliar with some the equipment onboard and the proper use (i.e. recovery equipment and first aid/CPR equipment).
46 CFR 122.520(a)
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 6 September 2022
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 3 September 2020
Resolved
A-Class bulkheads must be composed of steel or equivalent material, suitably stiffened and made intact with the main structure of the vessel, such as the structural bulkhead. The Fire Control Plan identifies the bulkhead at the lower deck refreshment station as an A-0 Boundary; however, the bulkhead (a tonnage opening) has been modified to accept a permanent large penetration into the refreshment station.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 October 2020
Resolved 15 September 2020
Resolution: Received email with Fire Control Plan and pictures attesting to proper marking of the emergency escape hatches and emergency fuel shut-off locations. Fire Control Plan update to include proper fire boundary.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 3 September 2020
Resolved
Suitable means shall be provided for priming centrifugal bilge pumps which are not of the self-priming type. Both port and stbd bilge pumps took approximately 5 minutes to suitably prime.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 October 2020
Resolved 16 September 2020
Resolution: Witnessed satisfactory bilge pumping arrangements from both port and stbd hull.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › UMS - Ship
Issued 3 September 2020
Resolved
Periodic Safety Test Procedures (PTSPs) must be submitted for Coast guard Approval. The vessel’s PSTPs did not go through the required approval process. Once USCG Marine Safety Center reviewed the PSTPs, the local Office in Charge of Marine Inspections (OCMI) must complete the testing of the PSTP procedures in order for them to be “Approved."
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 October 2020
Resolved 30 September 2020
Resolution: Completed testing of the PSTP.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 3 September 2020
Resolved
All escape hatches and other emergency exits used as a means of escape must be marked on both sides in clearly legible letters at least 2-inches high “EMERGENCY EXIT, KEEP CLEAR.” Emergency exit hatches from both the port and stbd engine-rooms are not clearly legible.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 October 2020
Resolved 15 September 2020
Resolution: Received pictures attesting to proper marking of the emergency escape hatches.
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 3 September 2020
Resolved
Remote fuel shutoff stations must be marked in clearly legible letters at least 1-inch high indicating purpose of the valve and direction of operations. The installed fuel shutoff valves do not have 1-inch high, clearly legible letters, with direction of operation.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 October 2020
Resolved 15 September 2020
Resolution: Received pictures attesting to proper marking of the emergency fuel shut-off locations.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 3 September 2020
Resolved
Excluded spaces (tonnage openings) use to calculate gross tonnage, must not: 1) be fitted with shelves or other means designed for securing store; 2) an opening that would otherwise permit the space to be excluded space as fitted with a means of closure; or 3) other features of the space make it possible for the space to be closed. The tonnage openings located on the main deck, stbd aft at the refreshment station are fitted with shelves and counter arrangements that are directly attached to the tonnage opening.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 October 2020
Resolved 16 September 2020
Resolution: Verified tonnage opening arrangements were installed in a portable manner.
09 - Working and Living Conditions › 092 - Working Conditions › Protection machinery
Issued 19 September 2018
Resolved
Piping used in vital systems must meet 46CFR 56.60 in subchapter F. Non metallic hose must be SAE J2942. It must be used in lengths not to exceed 30 inches. Non metallic hose must be complete with factory assembled fittings requiring no further adjustment of the fittings on the hose. Hose fittings must comply with SAE J1475. #1, #2, #3, and #4 MDE salt water exhaust cooling lines have non-metallic hoses installed with hose clamps and of lengths in excess of 30 inches.
46CFR 119.710(c), 46CFR 56.60-25(b), 46CFR 56.60(b)(5)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 October 2018
Resolved 25 September 2019
Resolution: Hoses are J1942 and less than 30".
09 - Working and Living Conditions › 092 - Working Conditions › Protection machinery
Issued 19 September 2018
Resolved
Piping used in vital systems must meet 46CFR 56.60 in subchapter F. Non metallic hose must be SAE J2942. It must be used in lengths not to exceed 30 inches. Non metallic hose must be complete with factory assembled fittings requiring no further adjustment of the fittings on the hose. Hose fittings must comply with SAE J1475. #1, #2, #3, and #4 reduction gear salt water cooling lines are connected via hose clamps. 46CFR 119.710(c), 46CFR 56.60-25(b)(1-2), 46CFR 56.60(b)(5).
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 October 2018
Resolved 25 September 2019
Resolution: Hoses are J1942 and under 30".
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 19 September 2018
Resolved
Piping used in vital systems must meet 46CFR 56.60 in subchapter F. Non metallic hose must be SAE J2942. It must be in lengths not to exceed 30inches. Non metallic hose must be complete with factory assembled fittings requiring no further adjustment of the fittings on the hose. Hose fittings must comply with SAE J1475. Salt water piping on #1 and #2 ship service generators are connected using hose clamps. 46CFR 119.710(c), 46CFR 56.60-25(b)(1-2), 46CFR 56.60(b)(5)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 October 2018
Resolved 25 September 2019
Resolution: Hoses are J1942 and less than 30"
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 19 September 2018
Resolved
Penetrations in A-Class fire control boundaries must be constructed to prevent the passage of flame and smoke for one hour. In addition, the penetrations must be designed or insulated so that it will withstand the same temperature rise limits as the boundary penetrated. Port and starboard machinery space hatches are constructed of uninsulated stainless steel material too thin to meet the requirement.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 October 2018
Resolved 5 September 2019
Resolution: New A-class hatches installed.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 19 September 2018
Resolved
Penetrations in A-Class fire control boundaries must be constucted to prevent the passage of flame and smoke for one hour. In addition, the penetrations must be designed or insulated so that it will withstand the same temperature rise limits as the boundary penetrated. Hatch covers on port and starboard machinery space entry are splitting and seperating on the edges preventing hatch to seal.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 October 2018
Resolved 10 October 2018
Resolution: Hatches were welded to repair.
09 - Working and Living Conditions › 092 - Working Conditions › Protection machines/parts
Issued 19 September 2018
Resolved
Piping, pipe fittings and flanges, conveying vapor, gas, or liquid, the temperature of which exceeds 65.5 degrees celcius, must be insulated where necessary to prevent injuries. #1, #2, #3 and #4 MDE A and B bank exhaust piping have exposed flanges just above where the salt water cooling line enters the exhaust that reach a temperature exceeding the requirement.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 September 2018
Resolved 25 September 2019
Resolution: Hoses are J1942 and less than 30"
09 - Working and Living Conditions › 092 - Working Conditions › Protection machinery
Issued 19 September 2018
Resolved
Piping used in vital systems must meet 46CFR 56.60 in subchapter F. Non metallic hose must be SAE J2942. It must be used in lengths not to exceed 30 inches. Non metallic hose must be complete with factory assembled fittings requiring no further adjustment of the fittings on the hose. Hose fittings must comply with SAE J1475. #1 and #2 Ship service generator exhaust cooling line is attached utilizing a non metallic hose with hose clamps. 46CFR 119.710(c), 46CFR 56.60-25(b)(1-2), 46CFR 56.60(b)(5).
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 October 2018
Resolved 25 September 2019
Resolution: Hose is J1942 and less than 30"
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 19 September 2018
Resolved
A vessel must be provided with a bilge piping system that meets 46CFR 56.50-50. Piping used in a vital system must meet 46CFR 56.60. Strainers in both port and starboard ballast tank voids bilge piping contain plastic strainers. Install metallic sea strainers. 46CFR 119.710, 46CFR 56.50-50, 46CFR119.510, 46CFR 56.60.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 October 2018
Resolved 10 October 2018
Resolution: Plastic strainers were replaced with metalic.
Construction/Loadline › Hull › Weld
Issued 6 November 2017
Resolved
07 welds in Starboard Void #2 require repair IAW 46 CFR 116.100.
Action required: 705 - Other - as specified
Due 22 December 2017
Resolved 18 December 2017
Resolution: All identified welds were repaired to the satisfaction of the attending Marine Inspector.
Construction/Loadline › Structures › End Bulkhead
Issued 6 October 2017
Resolved
Tonnage openings on the aft starboard side, main deck, are being blocked by seats and bar. Areas must be cleared in accordance with tonnage exemption regulations.
Action required: 705 - Other - as specified
Due 31 October 2017
Resolved 30 December 2017
Resolution: Proper alterations and arrangements were made to allow for easy installation and removal of tonnage doors.
Fire Fighting › Structural - A Class Divisions › Machinery Spaces
Issued 6 October 2017
Resolved
Starboard side engine room lagging is coming off and must be reattached.
Action required: 705 - Other - as specified
Due 31 October 2017
Resolved 30 December 2017
Resolution: Shipyard personnel renewed lagging in STBD engine room IAW 46 CFR 116.415.
Communications › Alarms/Indicators › Bilge Alarm
Issued 6 October 2017
Resolved
Port side engine room has inoperable high level alarm. Provide proposal for checking engine room water level for OCMI approval until issue permanently fixed at next DD.
Due 31 October 2017
Resolved 26 September 2019
Resolution: New installed high level alarm tested sat.
Construction/Loadline › Penetrations › Pipe Flange
Issued 24 January 2017
Resolved
Provide permanent repair for abandoned transom trim tab assemblies to consist of capped metallic through hulls or crop and renew areas at next drydock. Temp repair consisting of metallic cap on existing non-metallic through hull and marine epoxy inside the shaft tube approved in the interim.
Action required: 705 - Other - as specified
Due 31 December 2017
Resolved 7 December 2017
Resolution: Permanently welded plugs were installed in abandoned trim tab assembly openings.
Engineering › Diesel Engine (propulsion-direct drive) › Pump, High Pressure (fuel injection)
Issued 7 January 2016
Resolved
Provide technician's report and prove proper operation of the inboard starboard propulsion system to the satisfaction of the attending marine inspector. Until repairs are made and verified by attending marine inspector an additional deck member is required to be on the bridge as a lookout while the vessel is underway. 46CFR 119.200(a)
Condition: Invalid
Action required: 705 - Other - as specified
Due 23 January 2016
Resolved 27 April 2016