MAURY USCG vessel records Sign in
← All vessels

MAJESTIC FJORD

MAJESTIC FJORD is a 1998 passenger vessel (inspected). The Coast Guard has recorded 58 inspections since 1998, most recently in October 2025, along with 102 deficiencies — 1 with no resolution recorded —, 1 operational control and 3 casualty investigations between 2012 and 2018.

Records from 1998 to 2025. Most recent: inspection, 3 October 2025.

Built
1998
Last inspected
3 October 2025
Documentation
Valid · documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

WDK7997
470596
Flag
UNITED STATES
368089860
Maury page id
psix-470596

Inspections, by type

…with no type recorded1
…past their stated due date1
Years with a record 26 calendar years (1998–2025)
The 58 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.

Documentation record

Registered dimensions (L × B × D)64.9 ft × 25.3 ft × 8.5 ft
Registered tonnagegross 68 / net 54
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderALLEN MARINE INC · SITKA, AK, UNITED STATES · built 1998
Hull materialAluminum
PropulsionJet Drive
Hull shapeNot recorded
Hull configurationTwin Hull
Hailing portJUNEAU, AK
Trade endorsementsCoastwise, unrestricted, Fishery, Registry
DocumentationValid · issued 11 May 2026 · expires 30 June 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it38 - Displacement, Gross Ton
68 - Simplified, Gross Ton
54 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

Radio station licence

WDK7997MMSI 368089860 · active · compulsorily equipped · granted 26 April 2019, expires 26 April 2029
WDE9265MMSI 367415360 · expired · compulsorily equipped · granted 17 June 2009, cancelled 17 August 2019
WCY3237MMSI not assigned · expired · compulsorily equipped · granted 22 April 1998, cancelled 28 June 2008
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspection history · 58

3 October 2025 Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 8247555
25 September 2025 Annual Inspection · Internal Structural Exam
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 8241597
24 February 2025 Administrative Inspection
Administrative · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 8084043
18 January 2025 Examination of Repairs · Damage Survey
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 8067240
2 November 2024 Internal Structural Exam · Examination of Repairs · Hull Examination
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 8029627
3 October 2024 Internal Structural Exam · Deficiency Check · COI Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 8014094
9 February 2024 Administrative Inspection · In-Service Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7866250
31 August 2023 Administrative Inspection · Internal Structural Exam · Annual Inspection · Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7781054
16 November 2022 Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7595125
26 October 2022 Hull Examination · Internal Structural Exam · Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7584464
21 July 2022 Annual Inspection · Administrative Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7513033
14 June 2021 COI Inspection · Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7225022
28 April 2021 Damage Survey
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7184985
2 October 2020 Examination of Repairs · Drydock Exam · Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7071759
8 May 2020 Deficiency Check · Administrative Inspection · Annual Inspection · Internal Structural Exam
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6951465
3 April 2020 Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6939097
21 January 2020 Administrative Inspection · Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6893530
2 October 2019 Drydock Exam · Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6827618
22 May 2019 Annual Inspection · Administrative Inspection · Internal Structural Exam · DAPI Audit
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6692615
17 October 2018 Type not recorded
No type recorded · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6564065
31 July 2018 Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6497320
27 June 2018 Annual Inspection · DAPI Audit · Internal Structural Exam · Construction Oversight · Examination of Repairs
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6457601
3 April 2018 Damage Survey
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6384645
20 October 2017 Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6302719
3 October 2017 Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6281410
5 June 2017 Examination of Repairs · Annual Inspection · Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6166486
13 March 2017 In-Service Inspection · Damage Survey · Internal Structural Exam
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6104903
30 September 2016 Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6011978
28 June 2016 Deficiency Check · Administrative Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 5923967
29 April 2016 Administrative Inspection · COI Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 5865182
29 September 2015 Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 5737558
28 October 2014 Damage Survey
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 5013933
8 May 2014 Annual Inspection · DAPI Audit · Deficiency Check · Administrative Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 4853863
25 May 2012 Annual Inspection · Examination of Repairs · Administrative Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 4274108
26 October 2010 Special
Type not classified · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 3878100
23 March 2010 Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Detachment Ketchikan · USCG Arctic District (CGD-A) · Activity 3701281
1 May 2009 Administrative Inspection
Administrative · Marine Safety Detachment Ketchikan · USCG Arctic District (CGD-A) · Activity 3465547
25 March 2008 Drydock Exam · Annual Inspection · Internal Structural Exam
Physical examination · Marine Safety Detachment Ketchikan · USCG Arctic District (CGD-A) · Activity 3171247
17 September 2007 Deficiency Check
Physical examination · Marine Safety Detachment Ketchikan · USCG Arctic District (CGD-A) · Activity 3060036
7 May 2007 Annual Inspection
Physical examination · Marine Safety Detachment Ketchikan · USCG Arctic District (CGD-A) · Activity 2925145
29 March 2007 Deficiency Check
Physical examination · Marine Safety Detachment Ketchikan · USCG Arctic District (CGD-A) · Activity 2897962
24 August 2006 Examination of Repairs
Physical examination · Marine Safety Detachment Ketchikan · USCG Arctic District (CGD-A) · Activity 2762573
5 April 2006 Internal Structural Exam · COI Inspection · Hull Examination
Physical examination · MSD KETCHIKAN · USCG Arctic District (CGD-A) · Activity 2617906
3 May 2005 Re-Inspection
Physical examination · MSD KETCHIKAN · USCG Arctic District (CGD-A) · Activity 2361299
26 April 2004 Periodic Inspection
Physical examination · MSD KETCHIKAN · USCG Arctic District (CGD-A) · Activity 2094319
25 March 2004 Hull Examination
Physical examination · MSD KETCHIKAN · USCG Arctic District (CGD-A) · Activity 2031107
15 June 2003 Damage Survey
Physical examination · MSD KETCHIKAN · USCG Arctic District (CGD-A) · Activity 1819908
1 May 2003 Re-Inspection
Physical examination · MSD KETCHIKAN · USCG Arctic District (CGD-A) · Activity 1785481
30 April 2002 Re-Inspection
Physical examination · MSD KETCHIKAN · USCG Arctic District (CGD-A) · Activity 1613613
30 April 2002 Hull Examination · Re-Inspection
Physical examination · MSD KETCHIKAN · USCG Arctic District (CGD-A) · Activity 1636994
4 April 2002 Hull Examination
Physical examination · MSD KETCHIKAN · USCG Arctic District (CGD-A) · Activity 1601360
24 April 2001 COI Inspection
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 1387177
11 July 2000 Deficiency Check
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 1051812
6 July 2000 Administrative
Administrative · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 819830
17 April 2000 Hull Examination · Re-Inspection
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 1376199
17 June 1999 Re-Inspection
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 1418557
8 May 1998 MARPOL Annex V Examination · Initial Certification
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 1378437
24 April 1998 Deadweight Survey · Initial Construction-Excluding Oversight · Hull Examination
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 790373

Deficiency record · 102

07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 25 September 2025 Resolved
On a vessel of more than 65 feet in length, the minimum capacity of the fire pump must be 189 liters per minute at a pressure of not less than 60 psi. Unable to determine PSI due to fire pump gauge being inoperable. 46 CFR 181.300(b)
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 26 September 2025
Resolution: Rectified
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 25 September 2025 Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing fire, explosion, machinery failure, and personnel injury. Raw water hose on engine #4 is damaged and needs to be replaced to satisfaction of USCG, meeting SAEJ-1942 46 CFR 182.100
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 26 September 2025
Resolution: Rectified
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 25 September 2025 Resolved
Piping for vital systems. (a) Vital systems are those systems that are vital to a vessel's survivability and safety. For the purpose of this part the following are vital systems:(2) Fire main. Fire main piping in stbd jet room has a leak. Replace to satisfaction of USCG. 46 CFR 182.710(a)(2)
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 26 September 2025
Resolution: Rectified
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 25 September 2025 Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing fire, explosion, machinery failure, and personnel injury. #3 engine has a small fuel injection leak, evident on the fuel injection rack. Repair to satisfaction of USCG. 46 CFR 182.100
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 26 September 2025
Resolution: Rectified
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 25 September 2025 Resolved
(b) Gauges to indicate engine revolutions per minute (RPM), jacket water discharge temperature, and lubricating oil pressure must be provided for all propulsion engines installed in the vessel. The gauges must be readily visible at the operating station. Engine#2 oil pressure gauge is not working at the operating station. 46 CFR 182.410(b)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 3 October 2025
Resolution: #2 MDE oil pressure gauge was replaced. Optest sat.
05 - Radio Communications › N/A - No Subsystem › Other (radio communication)
Issued 25 September 2025 No resolution recorded
Except as provided in §§ 80.177 and 80.179, operation of transmitters of any ship station must be performed by a person holding a commercial radio operator license or permit of the class required below. The operator is responsible for the proper operation of the station. Vessel captain does not have a radio operator permit. 47 CFR 80.155
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 October 2025 — due date passed with no resolution recorded
10 - Safety of Navigation › N/A - No Subsystem › Nautical publications
Issued 25 September 2025 Resolved
(a) As appropriate for the intended voyage, a vessel must carry adequate and up-to-date:(2) U.S. Coast Pilot or similar publication;(3) Coast Guard Light List;and(5) Current tables, or a river current publication issued by the U.S. Army Corps of Engineers or a river authority. 46 CFR 184.420
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 26 September 2025
Resolution: Rectified
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 25 September 2025 Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing fire, explosion, machinery failure. MI discovered raw water hoses in both engine rooms being held up by zip ties. Install permanent support to satisfaction of USCG. 46 CFR 182.100
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 3 October 2025
Resolution: Zip ties were removed and pipe hangers were utlizied for the supports.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 25 September 2025 Resolved
(c)Where flexible hoses are permitted to be clamped:(1) Double hose clamping is required on each end of the hose, where practicable, except that one hose clamp can be used if the pipe ends are expanded or beaded to provide a positive stop against hose slippage. MI discovered a missing hose clamp on the stbd side fuel tank flexible hose and on the port side engine room raw water cooling line. 46 CFR 119.410
Condition: Placed in Improper Service
Action required: 10 - Deficiency Rectified
Resolved 25 September 2025
Resolution: Rectified
01 - Certificates & Documentation › 011 - Ships Certificates › USCG Certificate of Documentation (COD)
Issued 24 February 2025 Resolved
(a) The person in command of a documented vessel must have on board that vessel the original Certificate of Documentation currently in effect for that vessel. Current COD is not in effect for the vessel. Request vessel provide documentation from NVDC that COD is being processed. 46 CFR 67.313
Action required: 701 - Prior to carriage of passengers/cargo
Due 3 March 2025
Resolved 5 March 2025
Resolution: Cleared
05 - Radio Communications › N/A - No Subsystem › Functional requirements
Issued 3 October 2024 Resolved
(a) Vessels subject to part III of title III of the Communications Act that operate in the waters described in § 80.901 must, at a minimum, be equipped as follows: 1) Vessels operated solely within 20 nautical miles of land must be equipped with a VHF-DSC radiotelephone installation meeting the requirements of § 80.1101(c). MI discovered marine radio operating without DSC capability. 47 cfr 80.905(a)(1) Due 11OCT24
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 4 October 2024
Resolved 22 October 2024
Resolution: Radio DSC repaired.
04 - Emergency Systems › N/A - No Subsystem › Emergency fire pump and its pipes
Issued 31 August 2023 Resolved
On a vessel of not more than 19.8 meters (65 feet) in length carrying more than 49 passengers,... the minimum capacity of the fire pump must be 189 liters(50 gallons) per minute at a pressure of not less than 414 kPa (60 psi) at the pump outlet. Pressure gauge at fire pump outlet fluctuated between 40-60psi. 46CFR181.300(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 7 September 2023
Resolution: Pressure gauge cleaned. fire pump tested; all sat.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 31 August 2023 Resolved
Each ring life buoy on a vessel must: Be approved in accordance with § 160.050 in subchapter Q of this chapter, or other standard specified by the Commandant. Life buoy (stbd aft) grab line is deteriorating, replace life buoy or grab line. 46CFR180.70(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 7 September 2023
Resolution: Life buoy replaced.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 31 August 2023 Resolved
As appropriate for the intended voyage, a vessel must carry adequate and up-to-date: (1) Charts of large enough scale to make safe navigation possible. Charts on board are not up to date (dated 2020). 46CFR184.420
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 22 September 2023
Resolution: Updated paper chart provided.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 31 August 2023 Resolved
A device must be provided to automatically shut down power ventilation serving the protected space and engines that draw intake air from the protected space prior to release of the extinguishing agent into the space. Upon activation of port and stbd engine room CO2 systems, powered ventilation in both spaces did not shut down. 46CFR181.410(b)(10)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 September 2023
Resolution: Operator was able to demonstrate ventilation shut down via pressure switch activation.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 26 October 2022 Resolved
Remove or place into an enclosure, the dead end wire located in the port side fuel void above the fuel tank.
Action required: 705 - Other - as specified
Resolved 15 November 2022
Resolution: Operator properly installed a junction box for the dead end wires - all sat.
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 21 July 2022 Resolved
The port fwd and aft and stbd aft engines have sections of exhaust piping which is uninsulated and reaches over 150 degrees F. Properly insulate exhaust piping that reaches over 150 degrees F.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 August 2022
Resolved 27 October 2022
Resolution: Missing lagging has been replaced.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 21 July 2022 Resolved
The railings/lifelines on the aft deck port and stbd have missing courses of line. Re-install the lifelines to original condition with 3 courses of suitable strength.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 August 2022
Resolved 27 October 2022
Resolution: Railings/lifeline courses were replaced.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 14 June 2021 Resolved
Vessel crew is storing paint and other flammable material in a closet. Remove all hazardous material immediately and install a paint locker if hazardous material is stored onboard vessel.
Action required: 10 - Deficiency Rectified
Due 14 June 2021
Resolved 14 June 2021
Resolution: Hazzardous material removed.
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 14 June 2021 Resolved
Guards were missing on non-accommodation space light fixtures. Install guards or light fixtures or install new approved light fixtures.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 June 2021
Resolved 17 June 2021
Resolution: Guards installed.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 14 June 2021 Resolved
Smoke detector in boiler space is not mounted. Properly secure smoke detector to overhead of compartment.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 June 2021
Resolved 17 June 2021
Resolution: Detector mounted.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 14 June 2021 Resolved
Ring buoy on back deck has retro reflective material that is wearing off. Renew retroreflective material on ring buoy.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 June 2021
Resolved 17 June 2021
Resolution: Retro replaced.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 8 May 2020 Resolved
Port engine room aft engine block heater leads were disconnected and dead ended. Remove dead ended wires or terminate wire in a terminal box.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 June 2020
Resolved 18 June 2020
Resolution: Vessel has terminaled wires in J-box, all sat
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 8 May 2020 Resolved
MAKE PERMANENT REPAIRS TO STRESS FRACTURE AT CHINE IN #1 VOID PORT SIDE ALL THE WAY FWD AT NEXT SCHEDULED DRYDOCK.
Action required: 705 - Other - as specified
Resolved 23 October 2020
Resolution: Crack stop drilled, ground out and properly welded. See activity 7071759 for photos and details.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 8 May 2020 Resolved
CROP AND RENEW PITTED HULL PLATING IN STBD JET ROOM IWO BLACK WATER TANK NO LATER THAN NEXT SCHEDULED DRYDOCK.
Action required: 705 - Other - as specified
Resolved 23 October 2020
Resolution: Area of wastage cropped and renewed. See activity 7071759 for photos and details.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 3 April 2020 Resolved
Vessel's fixed fire system is out of order for both engine rooms due to removal of CO2 bottles for hydrostatic test/mainenance. Vessel may not start or use engines until CO2 bottles are reinstalled, tested and approved by the attending marine inspector.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 8 April 2020
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 3 April 2020 Resolved
Vessel does not have the requisite number of lifejackets per the COI. Vessel is limited to sixty-one (61) adult passengers and replace the one bad child lifejacket.
Action required: 705 - Other - as specified
Resolved 11 May 2020
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 3 April 2020 Resolved
Vessel's bilge piping is holed in the port #2 void which services #1 void. Renew bilge piping to original condition to satisfaciton of marine inspector prior to movement.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 8 April 2020
08 - Alarms › N/A - No Subsystem › Fire alarm
Issued 21 January 2020 Resolved
Fixed fire extinguishing system does not have an audible alarm when system is discharged as required. Install audible alarm for system.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 3 April 2020
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 22 May 2019 Resolved
Repair or replace 15 adult and 3 children’s life jackets
Action required: 10 - Deficiency Rectified
Resolved 22 May 2019
Resolution: vessel has repaired all Lifejacktes
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 22 May 2019 Resolved
Replace expired float free link on both IBAs
Action required: 10 - Deficiency Rectified
Resolved 22 May 2019
Resolution: Vessel has repalced both float free links
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 22 May 2019 Resolved
Replace expired Life Ring Buoy light battery prior to operating at night or low visibility
Action required: 705 - Other - as specified
Resolved 3 October 2019
Resolution: Batteries replaced.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 22 May 2019 Resolved
Replace all expired items in all first aid kits onboard
Action required: 10 - Deficiency Rectified
Resolved 22 May 2019
Resolution: Vessel has replaced all expired items
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 22 May 2019 Resolved
Remove main engine jacket water heater from bilge and all associated wiring on fwd starboard engine.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 3 October 2019
Resolution: Items removed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 22 May 2019 Resolved
Replace fuel tank vent line flex hose on both fuel tanks
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 3 October 2019
Resolution: Flex hose in vent piping replaced.
08 - Alarms › N/A - No Subsystem › Fire alarm
Issued 22 May 2019 Resolved
Provide alarm at operating station for pre-engineered system for furnace space on second deck and prove it secures the furnace prior to operating the furnace
Action required: 705 - Other - as specified
Resolved 21 January 2020
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Shipboard operations
Issued 27 June 2018 Resolved
All marine employers must submit drug testing program data annually, provide proof of submission of MIS data collection form.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 July 2018
Resolved 31 July 2018
Resolution: Vessel rep provided proof of MIS email submission and Coast Guard receipt.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 27 June 2018 Resolved
CO2 discharge locations, storage locations, and alarms must be clearly and conspicuously marked. Provide proper markings for these aforementioned items.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 July 2018
Resolved 31 July 2018
Resolution: Vessel rep provided photographs of required CO2 signage in both storage and discharge locations.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 27 June 2018 Resolved
A vessel must carry appropriate and up-to-date charts and pubs as appropriate for the intended voyage. Provide up-to-date charts, Coast Pilot [name withheld], Tide Tables, and Current Tables.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 30 June 2018
Resolution: Verified all charts and pubs were provided.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 27 June 2018 Resolved
Each life jacket must be marked with Type I retro. Remove improper retro and renew with Type I.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 July 2018
Resolved 31 July 2018
Resolution: Unsuitable PFD retro was removed and replaced with SOLAS A, Type I.
Construction/Loadline › Hull › Hull Plating
Issued 3 April 2018 Resolved
: Vessel is allowed to do a onetime transit from Auke bay, AK to Hoonah, AK with no passengers to complete permeant repairs to vessels port and starboards hulls to the satisfaction of the USCG Marine Inspector attending. During transit vessel will have a de-watering pump on standby. Additional checks on the space will be made during transit.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 20 April 2018
Resolution: Vessel has completed all hull repairs
Construction/Loadline › Structures › Transverse Bulkhead
Issued 3 October 2017 Resolved
Make non-metalic potable water valves operable from the bulkhead deck or provide 1 valve on either side of the aft bulkhead in the port and stbd fuel void.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 3 November 2017
Resolved 15 December 2017
Resolution: Vessel has replaced all valaves
Construction/Loadline › Hull › Weld
Issued 3 October 2017 Resolved
Provide proposal to repair weld fracture in way of stbd aft swim step ladder.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 3 November 2017
Resolved 15 December 2017
Resolution: Vessel has completed all weld repairs.
Construction/Loadline › Hull › Hull Plating
Issued 5 June 2017 Resolved
Permanently repair fracture approximately 4-5 inches on the STBD hull compartment 2, Frame 4, in a way of the hull step 3-4 inches below the waterline. Vessel temporary repair of splash zone be monitored every hour & an emergency sub-pump be on standby in case is needed to pump the compartment.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 20 June 2017
Resolved 16 June 2017
Resolution: Vsl Haul-Out in Hoonah Travel Lift for repairs. Attended with hired welder, completed repairs plus two other found (1) fracture P-side hull forward inboard bow & Stbd-side hull outboard aft straps during haul-out damaged, all sat. Witnessed leak tests,sat
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 2 May 2016 Resolved
Renew expired items in vessels first aid kit.
Action required: 705 - Other - as specified
Due 16 May 2016
Resolved 28 June 2016
Resolution: Owners rep renewed all expired items in the first aid kit.
Fire Fighting › Fixed Gas Fire Extinguishing System › Quantity of Gas
Issued 29 April 2016 Resolved
Properly reinstall fixed fire boy system in vessels heating boiler space on the aft part of the upper house and provide vent closures for the heating boiler space. Prior to operating heating boiler. (System was tagged out while we were onboard)
Action required: 705 - Other - as specified
Due 16 May 2016
Resolved 28 June 2016
Resolution: Southeast fire extinguisher servicing company reinstalled pre engineered fire boy system for the heating boiler compartment aft of the house on the upper deck. Ventilation closures provided for the same compartment.
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 29 April 2016 Resolved
Properly reinstall broken wiring fm the vessels port fwd and stbd aft engine exhaust overheat alarms.
Action required: 705 - Other - as specified
Due 16 May 2016
Resolved 28 June 2016
Resolution: Owners maintenance team replaced the damaged wiring to the alarms. Tested -SAT.
Engineering › Bilge Water Management System › Pump
Issued 8 May 2014 Resolved
Properly repair the port hull bilge pump.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 22 May 2014
Resolved 8 May 2014
Lifesaving › Lifejacket/PFD (Type I) › Storage
Issued 8 May 2014 Resolved
Properly mark child lifejacket stowage location and quantity of jackets in each location (x2 locations).
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 22 May 2014
Resolved 8 May 2014
Construction/Loadline › Structures › Transverse Bulkhead
Issued 25 May 2012 Resolved
Install proper bulk head fittings and metallic valves on non-metallic heating system piping throughout vessel. Replace vessel heating system fuel supply line with CG approved hose or metallic piping.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 25 August 2012
Resolved 31 August 2012
Operations/Management › Drug and Alcohol Testing › Employee Coverage
Issued 25 May 2012 Resolved
Provide proof of enrolment by all marine employees to company's drug consortium provider.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 10 June 2012
Resolved 11 June 2012
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 28 March 2012 Resolved
Submit plans to install grab rails or deck railing system on vessels bow section.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 25 June 2012
Resolved 29 June 2012
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 28 March 2012 Resolved
Submit plans to modify vessels upper deck rails so there is not more than 4"s of space between rails.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 25 June 2012
Resolved 29 June 2012
Construction/Loadline › Penetrations › Gasket
Issued 23 March 2010 Resolved
Prove #2 port void hatch is watertight.
Condition: Improper/Lack of Maintenance
Due 10 April 2010
Resolved 6 April 2010
Resolution: Witnessed test Port Hatch, sat.
Construction/Loadline › Structures › Machinery Space Opening
Issued 23 March 2010 Resolved
Prove proper operation of dogs on jet room hatches
Condition: Improper/Lack of Maintenance
Due 10 April 2010
Resolved 5 May 2010
Construction/Loadline › Penetrations › Pipe Flange
Issued 23 March 2010 Resolved
Replace plastic thru hull fitting with metallic thru hulls on submersible bilge pumps and sewage system.
Condition: Improper Installation
Due 10 April 2010
Resolved 5 May 2010
Fire Fighting › Fixed Fire Detection System › Arrangement
Issued 7 May 2007 Resolved
Provide approved electronically monitored fire detection system for port and starboard engine rooms and fuel tank compartment.
Action required: 705 - Other - as specified
Due 7 June 2007
Resolved 17 September 2007
Lifesaving › Inflatable Liferafts › Servicing
Issued 7 May 2007 Resolved
Provide service report for liferafts and fixed fire extinguishing systems.
Action required: 701 - Prior to carriage of passengers/cargo
Due 9 May 2007
Resolved 9 May 2007
Construction/Loadline › Penetrations › Gasket
Issued 7 May 2007 Resolved
Provide watertight seal around all shaft penetrations in forward bulkhead of both jet rooms.
Action required: 701 - Prior to carriage of passengers/cargo
Due 9 May 2007
Resolved 9 May 2007
Electrical › Electrical Distribution System (service) › Overcurrent Device
Issued 7 May 2007 Resolved
Provide proof of overcurrent protection device on generator.
Action required: 705 - Other - as specified
Due 7 June 2007
Resolved 17 September 2007
Communications › Radio Communications › EPIRB
Issued 7 May 2007 Resolved
Provide proof of EPIRB registration.
Action required: 705 - Other - as specified
Due 7 June 2007
Resolved 10 May 2007
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type III
Issued 7 May 2007 Resolved
Provide 3/4 tank full indication device for the MSD.
Action required: 705 - Other - as specified
Due 7 June 2007
Resolved 17 September 2007
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 5 April 2006 Resolved
Provide servicing reports for fixed fire ext. systems.
Due 30 May 2006
Resolved 29 March 2007
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type III
Issued 5 April 2006 Resolved
Install 30x30 stainless steel mesh in MSD vent.
Due 30 May 2006
Resolved 29 March 2007
Accommodation/Occupational Safety › Occupational Safety › Rubbish/Waste Materials
Issued 5 April 2006 Resolved
Remove all combustible waste receptacle containers.
Due 30 May 2006
Resolved 29 March 2007
Engineering › Fuel Oil Service System › Filter
Issued 3 May 2005 Resolved
Provide metallic drain plug on genset fuel oil filter
Due 17 May 2005
Resolved 3 May 2005
Electrical › Electrical Distribution System (service) › Circuit Breaker
Issued 3 May 2005 Resolved
Label range breaker disconnect
Due 17 May 2005
Resolved 3 May 2005
Engineering › Fuel Oil Service System › Valve
Issued 3 May 2005 Resolved
label emergency fuel oil shut off valve direction of operation.
Due 17 May 2005
Resolved 3 May 2005
Construction/Loadline › Hull › Hull Plating
Issued 25 March 2004 Resolved
Provide ultrasonic gaging report of #2 Void Portside.
Action required: 705 - Other - as specified
Resolved 26 March 2004
Resolution: Report received.
Engineering › Bilge Water Management System › Pump
Issued 30 April 2002 Resolved
Replace broken guide for bilge alarm.
Due 30 April 2002
Resolved 30 April 2002
Resolution: Replace and tested sat during RIN.
Electrical › Electrical Distribution System (service) › Wiring
Issued 30 April 2002 Resolved
E/R & all spaces: Install metal wire supports in engine room and properly support bilge alarm wires in all spaces. KPB
Due 30 April 2002
Resolved 30 April 2002
Resolution: Inspected all spaces and E/R finding all wires properly supported.
Electrical › Electrical Distribution System (emergency) › Wiring
Issued 30 April 2002 Resolved
Pilothouse controlling station electric panel: Remove dead ended wires and remove wire caps and make proper connections. KPB
Due 30 April 2002
Resolved 30 April 2002
Resolution: Inspected sat.
Construction/Loadline › Penetrations › Weld
Issued 30 April 2002 Resolved
Jet room: V/W required IWO both port and starboard exhaust weld penetrations at transom. Cracks noted outboard side. KPB
Due 30 April 2002
Resolved 30 April 2002
Resolution: Completed grind and weld of area, tested with die-pen and hose test with sat results.
Construction/Loadline › Hull › Longitudinal Frame
Issued 30 April 2002 Resolved
Void #2, starboard, and bay #3-5, weld SSL's 3&4 from bottom side - weld missing. KPB
Due 30 April 2002
Resolved 30 April 2002
Resolution: Inspected welds, tested with die pen and hose test.
Construction/Loadline › Hull › Hull Plating
Issued 30 April 2002 Resolved
Void #2, port, and bay 3, IWO SSL #1 & 2, V/W butt weld where crack noted with die pen. Area noted to be 4 feet from water line. KPB
Due 30 April 2002
Resolved 30 April 2002
Resolution: Inspected welds, tested with die pen and hose test.
Electrical › Electrical Distribution System (service)
Issued 4 April 2002 Resolved
Properly support wires for bilge high level alarms in all spaces. LEGACY COMPONENT DESC: Wiring
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 12 April 2002
Resolved 30 April 2002
Resolution: Witnessed satisfactory installation of support for wires all bilge high-level alarms.
Electrical › Electrical Distribution System (service)
Issued 4 April 2002 Resolved
Starboard side engine room, over port aft engine, properly support cables every 24" with metal wire supports LEGACY COMPONENT DESC: Conductor
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 12 April 2002
Resolved 30 April 2002
Resolution: Witnessed satisfactory installation of wire support.
Fire Fighting › Fire Pumps
Issued 4 April 2002 Resolved
Upon repairs to bearings prove proper operation of system. LEGACY COMPONENT DESC: Bearings
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 12 April 2002
Resolved 30 April 2002
Resolution: Witnessed satisfactory test of pump.
Documentation › Certificates/Documents
Issued 4 April 2002 Resolved
Provide original COI and maintain on board vessel. LEGACY COMPONENT DESC: Certificate of Inspection
Due 12 April 2002
Resolved 30 April 2002
Resolution: Original COI onboard however owners representative requested new COI due to poor condition of document.
Documentation › Certificates/Documents
Issued 4 April 2002 Resolved
Provide COD and maintain original onboard vessel during operations. LEGACY COMPONENT DESC: Certificate of Documentation (CG-1270)
Action required: 701 - Prior to carriage of passengers/cargo
Due 12 April 2002
Resolved 30 April 2002
Resolution: Original COD onboard
Construction/Loadline › Hull
Issued 4 April 2002 Resolved
Starboard side void #2, bay #3, ssl #3 and #4 stich weld as mark during manufacturing. Missisng welds. LEGACY COMPONENT DESC: Longitudinal Frame
Condition: Improper Installation
Due 12 April 2002
Resolved 30 April 2002
Resolution: Inspected welds finding all satisfactory.
Engineering › Diesel Engine (propulsion-reduction gear)
Issued 4 April 2002 Resolved
V/W both the port and starboard pipes IWO cracked welds on transum. LEGACY COMPONENT DESC: Silencer (exhaust)
Condition: Unknown
Due 12 April 2002
Resolved 30 April 2002
Resolution: Inspected weld and completed hose test of both the port and starboard side repairs
Construction/Loadline › Hull
Issued 4 April 2002 Resolved
Port void #2, bay #3, 3 inches above ssl #1 V/W butt weld IWO pit. Leak noted during inspection, required weld inspection LEGACY COMPONENT DESC: Side Shell
Condition: Improper Installation
Due 12 April 2002
Resolved 30 April 2002
Resolution: Inspected weld and completed hose test of V/W of 3-foot section of butt weld.
Fire Fighting
Issued 24 April 2001 Resolved
Replace 2 portable fire extinguisher brackets located on stern.
Condition: Unknown
Due 25 April 2001
Resolved 25 September 2001
Lifesaving
Issued 24 April 2001 Resolved
Properly label all PFD stowage locations.
Condition: Unknown
Due 25 April 2001
Resolved 25 September 2001
Electrical
Issued 17 April 2000 Resolved
Various switchboards are complicated and all switches must be correctly positioned for emergency systems to be active. Develop electrical switch checkoff sheet to ensure all switches are correctly positioned prior to getting underway.
Condition: Unknown
Due 17 April 2000
Resolved 17 April 2000
Construction/Loadline
Issued 17 April 2000 Resolved
Main propulsion drive shaft (four total) penetrations through after engine room bulkhead are not watertight. This is from new construction and is a design issue. Make these penetrations watertight or add longitudinal bulkhead between pontoon steering compartments. Probable flooding hazard.
Condition: Unknown
Due 17 April 2000
Resolved 17 April 2000
Electrical
Issued 8 May 1998 Resolved
Install and prove proper operation of automatic emergency lighting at 4 main deck exits and stairwell IAW 46 CFR 183.432. Vessel is restricted to operating between sunrise and sunset until corrected.
Condition: Unknown
Due 8 May 1998
Resolved 8 May 1998
Fire Fighting
Issued 8 May 1998 Resolved
Install and prove proper operation of pilothouse fire pump remote start, vessels COI reduced to < 49 passengers until completed.
Condition: Unknown
Due 8 May 1998
Resolved 18 August 1998
Navigation
Issued 8 May 1998 Resolved
Swing compass and post deviation table near mag compass.
Condition: Unknown
Due 8 June 1998
Resolved 18 August 1998
Accommodation/Occupational Safety
Issued 8 May 1998 Resolved
Lock type III MSD O/B discharge valve in the closed position, label "Do notpump down unless > 3NM offshore."
Condition: Unknown
Due 15 May 1998
Resolved 18 August 1998
Fire Fighting
Issued 8 May 1998 Resolved
Clearly label the MDE throttle that has the fire pump PTO (power take off).
Condition: Unknown
Due 15 May 1998
Resolved 18 August 1998
Navigation
Issued 8 May 1998 Resolved
Label gauges in pilothouse to coorespond w/MDE's 1-4.
Condition: Unknown
Due 15 May 1998
Resolved 18 August 1998
Lifesaving
Issued 8 May 1998 Resolved
Post lifejacket donning, oil pollution, garbage, and IBA launching instructions prior to carrying passengers.
Condition: Unknown
Due 8 May 1998
Resolved 18 August 1998
Lifesaving
Issued 8 May 1998 Resolved
Post "CREW ONLY" placards on port and stbd stern doors prior to carring passengers.
Condition: Unknown
Due 8 May 1998
Resolved 18 August 1998
Lifesaving
Issued 8 May 1998 Resolved
Post "EXIT" signs at all doors leading to WX decks with "EMERGENCY EXIT" noted on forward doors of main deck prior to carrying passengers.
Condition: Unknown
Due 8 May 1998
Resolved 18 August 1998
Lifesaving
Issued 8 May 1998 Resolved
Post emergency checklist on both decks and in pilothouse prior to carrying passengers.
Condition: Unknown
Due 8 May 1998
Resolved 18 August 1998
Documentation
Issued 8 May 1998 Resolved
Prove application made for FCC Station and Radiotelephony certificates._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 8 May 1998
Resolved 18 August 1998
Fire Fighting
Issued 8 May 1998 Resolved
Place rubber pad under both CO2 bottles to lift off deck.
Condition: Unknown
Due 8 May 1998
Resolved 18 August 1998
Fire Fighting
Issued 8 May 1998 Resolved
Move CO2 alarm placards to location visible to crew.
Condition: Unknown
Due 8 May 1998
Resolved 18 August 1998
Documentation
Issued 8 May 1998 Resolved
Provide original Certificate of Documentation prior to carrying passengers.
Condition: Unknown
Due 8 May 1998
Resolved 18 August 1998
Documentation
Issued 8 May 1998 Resolved
Provide original stability letter issued to vessel prior to carrying passengers.
Condition: Unknown
Due 8 May 1998
Resolved 18 August 1998

Casualty record · 3

26 December 2012Routine · role: Involved in a Marine Casualty · activity 4513386
25 December 2013Routine · role: Involved in a Marine Casualty · activity 4776690
17 October 2018Routine · role: Acknowledged Pollution Source · activity 6564065
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.