← All vessels
ST YAKOV
Passenger (Inspected) · Passenger Ship class · Built 1990s · USCG Arctic District (CGD-A) · Other hulls named ST YAKOV
ST YAKOV is a 1998 passenger vessel (inspected). The Coast Guard has recorded 87 inspections since 1998, most recently in March 2026, along with 140 deficiencies, 2 operational controls and 2 casualty investigations between 2002 and 2014.
Records from 1998 to 2026. Most recent: inspection, 31 March 2026.
- Built
- 1998
- Last inspected
- 31 March 2026
- Documentation
- Valid · documentation file of 10 September 2026
- Deficiencies
- 140 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
- Casualties
- 2 investigations · 2002–2014
Identity
1063305
WDJ9827
470597
Flag
UNITED STATES
368029820
Maury page id
psix-470597
Inspections, by type
…with no type recorded10
Years with a record
24 calendar years (1998–2026)
The 87 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.
Documentation record
Registered dimensions (L × B × D)78.5 ft × 28.5 ft × 8.3 ft
Registered tonnagegross 91 / net 73
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderALLEN MARINE INC · SITKA, AK, UNITED STATES · built 1998
Hull materialAluminum
PropulsionJet Drive
Hull shapeNot recorded
Hull configurationTwin Hull
Hailing portSITKA, AK
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 14 March 2026 · expires 28 February 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it91 - Simplified, Gross Ton
73 - Simplified, Net Ton
73 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Radio station licence
WDJ9827MMSI 368029820 · active · compulsorily equipped · granted 28 March 2018, expires 28 March 2028
WDE3145MMSI 303555000 · expired · compulsorily equipped · granted 30 January 2008, cancelled 14 April 2018
WCY3238MMSI not assigned · expired · compulsorily equipped · granted 22 April 1998, cancelled 28 June 2008
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its
US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown.
A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.
Inspection history · 87
31 March 2026
Annual Inspection · Administrative Inspection · Internal Structural Exam
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 8338751
1 December 2025
Hull Examination · Internal Structural Exam
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 8276056
1 August 2025
Annual Inspection · Internal Structural Exam
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 8198566
17 April 2025
Administrative Inspection
Administrative · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 8113465
2 May 2024
Annual Inspection · Deficiency Check · Internal Structural Exam
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7905726
25 September 2023
Examination of Repairs · Hull Examination · Internal Structural Exam
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7798273
7 April 2023
Deficiency Check · Annual Inspection · Internal Structural Exam · Administrative Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7663380
21 February 2023
Examination of Repairs · Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7639892
1 September 2022
Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7549289
2 May 2022
COI Inspection · Deficiency Check · Administrative Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7442806
19 July 2021
Internal Structural Exam · Administrative Inspection · Examination of Repairs · Deficiency Check · Hull Examination
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7261211
28 May 2020
Administrative Inspection
Administrative · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6962898
18 February 2020
Examination of Repairs
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6911219
22 October 2019
In-Service Inspection · Administrative Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6842159
9 October 2019
Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6831772
11 September 2019
Administrative Inspection · In-Service Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6810685
17 May 2019
Administrative Inspection · Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6688879
3 May 2019
Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6676331
9 April 2019
Deficiency Check · Damage Survey · Administrative Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6659167
25 March 2019
Annual Inspection · DAPI Audit
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6649060
27 November 2018
Hull Examination · Internal Structural Exam · Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6588373
6 November 2018
In-Service Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6576044
27 April 2018
Deficiency Check · In-Service Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6404883
19 April 2018
Damage Survey · Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6402902
16 April 2018
In-Service Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6392923
5 April 2018
Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6386167
23 March 2018
Internal Structural Exam · Annual Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6375237
12 December 2017
Administrative Inspection
Administrative · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6325023
5 June 2017
Damage Survey · Examination of Repairs
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6166859
11 May 2017
Annual Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6143901
5 May 2017
Administrative Inspection · Examination of Repairs
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6148863
12 April 2017
Administrative Inspection
Administrative · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6123302
14 November 2016
Hull Examination · Internal Structural Exam
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6041121
12 May 2016
Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 5875457
27 April 2016
Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 5864902
21 April 2016
Annual Inspection · DAPI Audit
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 5859838
25 June 2014
Damage Survey · Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 4899404
24 June 2014
Type not recorded
No type recorded · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 4933642
5 June 2014
Damage Survey · Examination of Repairs
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 4880350
4 June 2014
Type not recorded
No type recorded · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 4885210
26 July 2011
Damage Survey · Examination of Repairs
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 4095421
3 March 2009
Examination of Repairs · Internal Structural Exam · Annual Inspection · Drydock Exam
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 3427193
20 June 2008
Annual Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 3242741
20 June 2008
Administrative Inspection
Administrative · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 3242777
8 February 2008
Internal Structural Exam · Drydock Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3161546
10 May 2007
Examination of Repairs
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 2927256
9 May 2007
Damage Survey
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 2926457
7 May 2007
Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 2924740
24 April 2007
Periodic Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 2914498
4 April 2007
Hull Examination · Internal Structural Exam
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 2904785
21 March 2007
Damage Survey
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 2892170
16 August 2006
Administrative Inspection
Administrative · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 2750318
15 August 2006
Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 2749131
5 July 2006
Deficiency Check · Annual Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 2702606
10 May 2005
In-Service Inspection · Deficiency Check
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 2386575
20 April 2005
Annual Inspection
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 2338843
20 April 2005
Type not recorded
No type recorded · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 2345722
14 April 2005
Hull Examination · Internal Structural Exam
Physical examination · MSD SITKA · USCG Arctic District (CGD-A) · Activity 2334843
13 October 2004
Administrative Inspection
Administrative · Marine Safety Center (MSC) · Activity 2219841
4 October 2004
Administrative Inspection
Administrative · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 2213088
10 June 2004
Annual Inspection
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 2094853
28 May 2004
Examination of Repairs
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 2081163
3 May 2004
Hull Examination · Internal Structural Exam
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 2058394
13 January 2004
Administrative Inspection
Administrative · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1983307
22 December 2003
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1970888
2 December 2003
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1959495
18 November 2003
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1950319
18 November 2003
Damage Survey
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1950350
17 July 2003
Deficiency Check
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 1849463
23 June 2003
Deficiency Check · Examination of Repairs · Damage Survey
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 1825157
9 May 2003
Re-Inspection
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 1789991
20 February 2003
Internal Structural Exam · Hull Examination
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1748830
27 June 2002
Type not recorded
No type recorded · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 1637853
6 June 2002
Deficiency Check · Damage Survey
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 1628776
2 May 2002
Re-Inspection
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 1615553
24 April 2002
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1609067
3 April 2002
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1600542
6 January 2002
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1603368
28 October 2001
Administrative
Administrative · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1073974
3 May 2001
Re-Inspection
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 1382314
11 May 2000
Type not recorded
No type recorded · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 1049392
5 May 2000
Deficiency Check
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 1049561
15 March 2000
Deficiency Check
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 1047723
14 March 2000
COI Inspection · MARPOL Annex V Examination · Hull Examination
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 1430828
25 January 2000
Administrative
Administrative · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 814770
22 May 1998
Deficiency Check
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 1126852
20 May 1998
Hull Examination · Initial Construction-Excluding Oversight · Initial Certification · Deadweight Survey
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 808038
Deficiency record · 140
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 31 March 2026
Resolved
Exhaust gas must not leak from the piping or any connections. The piping must be properly supported by
noncombustible hangers or blocks. Exhaust cooling line on stbd fwd, and both port side engines, are zip tied to framing and/or engine. Replace support with adequate securing mechanism.46CFR182.430(b)
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 31 March 2026
Resolved
Deck rails must be designed and constructed to withstand a point load of 91 kilograms (200 pounds)
applied at any point in any direction, and a uniform load of 74 kilograms per meter (50 pounds per foot). Stbd forward railing stanchion has a crack at base.46CFR177.900(b)
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 31 March 2026
Resolved
Protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by
or originating in electrical equipment, and electrical shock. MI identified multiple loose/disconnected electrical cables under bridge operating station. Additionally standing water was observed in the same location. Remove any obsolete electrical cables. Remove water, identify source of water ingress, and make proper repairs.46CFR183.200(b)
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 31 March 2026
Resolved
A bilge suction must be fitted with a suitable strainer having an open area not less than three times the area of the bilge pipe. Stbd fuel tank strainer is cracked. Repair and test bilge pick up with Marine Inspector present. 46CFR182.510(b)
10 - Safety of Navigation › N/A - No Subsystem › Magnetic compass
Issued 2 May 2024
Resolved
Except on a vessel limited to daytime operations, the compass must be illuminated. Compass light is inoperable. Vessel restricted to daylight operations. 46CFR184.402(c).
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 25 September 2023
Resolved
04 holes were located in the port engine room aft bulkhead where previous equipment was mounted. Make the bulkhead water/vapor tight.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 28 April 2023
Resolved
Whenever damage or deterioration to the hull plating or structural members that may affect the seaworthiness of a vessel is discovered or suspected, the cognizant OCMI may conduct an internal structural examination in any affected space including fuel tanks and may require the vessel to be drydocked or taken out of service to assess the extent of the of the damage, and to effect permanent repairs. Marine Inspector found pitting in the #2 void stbd side in the first sections on both sides of the CVK and in the #3 void stbd side in the first section on both sides of the CVK. Operator made temp repairs to voids. Operator is to make permanent repairs by cropping and renewing all areas were temp repairs were installed at the next Drydock in Mar 2024.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 7 April 2023
Resolved
Piping, including valves, pipe fittings and flanges, conveying vapor, gas, or liquid, the temperature of which exceeds 65.5 °C (150 °F), must be suitably insulated where necessary to prevent injuries. Replace missing / damaged lagging on the port aft engine where the exhaust exits the turbo charger there is a section of exposed dry exhaust.46 CFR 177.970
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 7 April 2023
Resolved
As appropriate for the intended voyage, a vessel must carry adequate and up-to-date:
(1) Charts of large enough scale to make safe navigation possible;
(2) U.S. Coast Pilot or similar publication;
(3) Coast Guard Light List;
(4) Tide tables; and
(5) Current tables, or a river current publication issued by the U.S. Army Corps of Engineers or a river authority.
(b) Extracts from the publications listed above for the areas to be transited may be provided instead of the complete publication. Vessel did not have back up paper charts or secondary electronic charts. 46 CFR 184.420
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 7 April 2023
Resolved
A vessel must carry either a first-aid kit that meets the requirements in 46 CFR 199.175(b)(10) or a kit with equivalent contents and instructions. For equivalent kits, the contents must be stowed in a suitable, watertight container that is marked “First-Aid Kit”. A first-aid kit must be easily visible and readily available to the crew. First aid kit is missing the ophthalmic ointment or eyewash. 46 CFR 184.710
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 7 April 2023
Resolved
Whenever damage or deterioration to the hull plating or structural members that may affect the seaworthiness of a vessel is discovered or suspected, the cognizant OCMI may conduct an internal structural examination in any affected space including fuel tanks and may require the vessel to be drydocked or taken out of service to assess the extent of the of the damage, and to effect permanent repairs. Marine Inspector found pitting in the #2 void stbd side in the first sections on both sides of the CVK and in the #3 void stbd side in the first section on both sides of the CVK. Operator is to provide plan to temporarily address pitting from corrosion and plans to permanently address the pitting from corrosion.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 7 April 2023
Resolved
Except as otherwise provided in this section, rails or equivalent protection must be installed near the periphery of all decks of a vessel accessible to passengers or crew. Equivalent protection may include lifelines, wire rope, chains, and bulwarks, which provide strength and support equivalent to fixed rails. The lifelines previously installed on the starboard aft of the vessel was missing the lower courses. Operator is to reinstall lifelines to original condition.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 3 May 2022
Resolved
The engine shutdown for the starboard fwd engine did not
shutdown when the CO2 engine shutdown was initiated.
Repair/renew to original condition prior to departure.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 3 May 2022
Resolved
The heat detector in the generator room appears to have
been tested using an open flame. The detector was
blackened and cracked. Repair/renew the detector to
original condition.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 3 May 2022
Resolved
All four main engines had exposed exhaust piping that
exceeded 200 degrees F. Insulate all piping that exceeds
140 degrees F on engines.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 3 May 2022
Resolved
Dead ended wires from old camera system were hanging in
starboard engine room. Remove and properly terminate
all dead ended wires.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 3 May 2022
Resolved
The light fixture installed in the generator space was
installed with a exposed "extension cord" style plug.
Re-install cable properly as per regulations.
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 2 May 2022
Resolved
A New light fixture was installed in the generator
space. Provide proof that the fixtures meet UL-595 as
required.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 18 February 2020
Resolved
At next dry dock provide inspection for repairs to Hull areea approximately 12' x 10' of tunnel cropped and renewed as well as inboard sideshell from tunnel down approximately 18" and 5' from transom forward
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 22 October 2019
Resolved
Replaced both port and starboard time delay bottles. Both trips at around 24 and 27 seconds on a 30 second bottle
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 11 September 2019
Resolved
Port aft and starboard aft main engines have exhaust leaks. Vessel master and crew were unaware of length of time leaks existed. Repair exhaust systems to roiginal condition.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 11 September 2019
Resolved
Racor filter for generator was leaking fuel near base of filter and had a plastic plug. Replace plug with one of proper material for filter and repair leak.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 11 September 2019
Resolved
Generator has an oil leak at the rear seal causing oil to contaminate generator windings creating a fire risk.Oil leak must be repaired and generator windings must be cleaned prior to vessel operating.
04 - Emergency Systems › N/A - No Subsystem › Abandon ship drills
Issued 11 September 2019
Resolved
Vessel logs do not show vessel crew has conducted drills on vessel or similar vessel within three months. Ensure vessel crew conducts drills and logs as appropriate.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 9 April 2019
Resolved
Prove property operation of starboard forward main engine jet bearing
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 25 March 2019
Resolved
Vessel is required to have an operational self priming power driven fire pump; vessel's fire pump was seized and failed to operate.
04 - Emergency Systems › N/A - No Subsystem › Water level indicator
Issued 25 March 2019
Resolved
Vessel's required high water level alarms failed to operate.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 25 March 2019
Resolved
Vessel is required fire detection system failed to operate.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 25 March 2019
Resolved
Vessel's bilge dewatering system was unavailable for testing.
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 25 March 2019
Resolved
An EPIRB's battery shall be replaced prior to its expiration date; renew the EPIRB's expired battery. Vessel is restricted to voyages within 3nm of land.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 25 March 2019
Resolved
Vessel must have a means of shutting down a propulsion engine from the pilothouse; the port aft engine failed to secure.
09 - Working and Living Conditions › 092 - Working Conditions › Warning notices
Issued 25 March 2019
Resolved
Each entrance to a space protected by co2 must be properly marked; the stbd engine room entrance warning label was unreadable.
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 25 March 2019
Resolved
The port fwd engine flywheel was uncovered and did not have adequate protection for personnel.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 25 March 2019
Resolved
All electrical circuits must be clearly marked/identified; the main breaker located at the generator was unlabeled.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 6 November 2018
Resolved
Prove port aft engine secures when CO2 is discharged,
Construction/Loadline › Hull › Weld
Issued 16 April 2018
Resolved
Repair five cracked hull welds to the satisfaction of the attending MI prior to carrying passengers.
Construction/Loadline › Hull › Weld
Issued 16 April 2018
Resolved
Repair ~12 cracked welds connecting hull plating to stiffeners to the satisfaction of the attending CG MI prior to carrying passengers.
Navigation › Collision/Grounding Avoidance › Transponder
Issued 23 March 2018
Resolved
Broadcasting incorrect AIS information.
Engineering › Fuel Oil Storage/Transfer System › Vent Pipe
Issued 23 March 2018
Resolved
Provide a flame screen for the port fuel tank vent.
Documentation › Certificates/Documents › Certificate of Documentation (CG-1270)
Issued 23 March 2018
Resolved
Provide an current Certificate of Documentation.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 23 March 2018
Resolved
Post an SPV Decal in an area visible to passengers.
Construction/Loadline › Hull › Bottom Plating
Issued 23 March 2018
Resolved
Provide proposal to repair hull plate pin holes identified in the port jet room.
Construction/Loadline › Penetrations › Pipe Flange
Issued 23 March 2018
Resolved
Provide a valve for the p/w penetration in the fwd bulkhead of the port e/r.
Engineering › Diesel Engine (propulsion-direct drive) › Distributor (fuel injection)
Issued 23 March 2018
Resolved
Port aft main diesel engine failed to secure from the bridge.
Operations/Management › Drills/Instruction › Not Conducted
Issued 23 March 2018
Resolved
Conduct underway drills prior to the start of the season.
Communications › Public Address System › Announcing Station
Issued 23 March 2018
Resolved
Troubleshoot and repair the public address microphone at the operating station.
Fire Fighting › Fixed Fire Detection System › Heat Detectors
Issued 23 March 2018
Resolved
Conduct an operational test of the engine room heat detectors.
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 23 March 2018
Resolved
Correct life jacket stowage markings to reflect size and quantity.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Instructions
Issued 23 March 2018
Resolved
Mark entrances to spaces storing and protected by CO2 IAW regulation.
Documentation › Certificates/Documents › FCC SSL
Issued 23 March 2018
Resolved
Provide a current Radio Station Authorization.
Engineering › Non-conventional Propulsion/Steering › Hydraulic Bucket Cylinder (jet)
Issued 5 June 2017
Resolved
Repair STBD side buckets hydraulic system with the blown O-ring directional hydraulic valve. Call for inspection of repairs.
Pollution Prevention/Response › Prevention Equipment › Sewage System Piping
Issued 14 November 2016
Resolved
Flexible nonmetallic hose must be installed with approved end fittings. provide proper hose attachemtnts for the vessel's sewage piping.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 14 November 2016
Resolved
Each connection to a conductor shall be made in an enclosure. Make all bilge pumps, floats, and miscellaneous salt water pump wiring connections in an enclosure.
Electrical › Electrical Distribution System (service) › Wiring
Issued 14 November 2016
Resolved
Each conductor shall be held with metal supports not more than 24" apart. Provide supports for the sewage pump power supply conductors in the #3 port void.
Lifesaving › Hand Flares › Quantity
Issued 21 April 2016
Resolved
Provide 3 red hand held flares or proper substitution. 46CFR180.68
Navigation › Piloting/Steering › Marine Charts
Issued 21 April 2016
Resolved
Provide adequate and up to date marine charts. 46CFR184.420
Navigation › Piloting/Steering › Coast Guard Light List
Issued 21 April 2016
Resolved
Provide adequate and up to date CG Light List. 46CFR184.420
Navigation › Piloting/Steering › Tide/Tidal Current Tables
Issued 21 April 2016
Resolved
Provide adequate and up to date Tide tables. 46CFR184.420
Navigation › Piloting/Steering › Tide/Tidal Current Tables
Issued 21 April 2016
Resolved
Provide adequate and up to date current tables. 46CFR184.420
Operations/Management › Drills/Instruction › Abandon Ship
Issued 21 April 2016
Resolved
Provide crew emergency training records. 46CFR185.420
Electrical › Electric Generation Source (emergency) › Number of Sources
Issued 21 April 2016
Resolved
Prove proper operation of 12volt/Emerg lights. 46CFR183.200
Accommodation/Occupational Safety › Ventilation › General
Issued 21 April 2016
Resolved
Prove proper operation of engine room fans. 46CFR182.465
Fire Fighting › Fixed Fire Detection System › Alarms
Issued 21 April 2016
Resolved
Prove proper operation of port engine room fire alarm. 46CFR181.400
Lifesaving › Lifebuoys › Serviceable
Issued 21 April 2016
Resolved
Replace peeled retro tape on aft two ring buoys. 46CFR180.70
Engineering › Steering Gear System › Fastener
Issued 21 April 2016
Resolved
Identify reason for hose clamps on #1port jet & repair if needed. 46CFR182.200
Fire Fighting › Portable CO2 Fire Extinguisher › Condition
Issued 21 April 2016
Resolved
Replace wasted B-II extinguisher on stern of vessel. 46CFR181.500
Engineering › Diesel Engine (auxiliary) › Piping (air intake)
Issued 21 April 2016
Resolved
Repair coolant/oil leaks on generator. 46CFR182.310
Operations/Management › Drills/Instruction › Abandon Ship
Issued 21 April 2016
Resolved
Conduct emergency drills with crew. 46CFR185.520
Personnel › Certificates/Documents/Licenses › License, Master
Issued 21 April 2016
Resolved
Provide valid CG license for vessel operators.
Electrical › Electrical Distribution System (service) › Circuit Breaker
Issued 25 June 2014
Resolved
Vessel had a power failure of the bridge battery system that could not be overcome through charging.
Engineering › Diesel Engine (propulsion-direct drive) › Turbocharger
Issued 5 June 2014
Resolved
Repair turbocharger hot side clamp loose on the Port Forward Main Diesel Engine.
Lifesaving › Inflatable Liferafts › Capacity
Issued 3 March 2009
Resolved
Provide 100% capacity prior to carring more than 150 persons on board or provide exemption letter.
Construction/Loadline › Hull › Hull Plating
Issued 10 March 2008
Resolved
C&R hull platting IWO fracture located in #2 voids P & S frame to shell attachment connection.
Construction/Loadline › Hull › Hull Plating
Issued 8 February 2008
Resolved
Repair fractures to hull platting #3 void port side (02) locations.
Construction/Loadline › Hull › Hull Plating
Issued 9 May 2007
Resolved
Complete proper weld repairs to (02) hull cracks IWO Fm#4, Stbd void #2 inboard and outboard hull chines to the satisfaction of the attending Marine Inspector.
Operations/Management › Drills/Instruction › Fire
Issued 25 April 2007
Resolved
Demonstrate required emergency drills with the permanent hired crew onboard.
Engineering › Steering Gear System › Rudder Angle Indicator
Issued 25 April 2007
Resolved
Double nut steering gear leakage for the Port & STBD rudder angle indicator.
Fire Fighting › Fixed Fire Detection System › Control Panel
Issued 12 April 2007
Resolved
Ensure that fire detection is electrically supervised. Contact Sector Juneau Inspectors for guidance and testing.
Construction/Loadline › Hull › Side Shell
Issued 4 April 2007
Resolved
Approx. 12' aft of port bow crop and renew 1' x 2' inset section above spray rail/chine.
Construction/Loadline › Hull › Side Shell
Issued 4 April 2007
Resolved
On port side just forward of amidships, clad weld area of bolt gouge in hull.
Construction/Loadline › Hull › Side Shell
Issued 4 April 2007
Resolved
Aft port quarter outboard, crop and renew 1' x 3' inset section.
Construction/Loadline › Hull › Side Shell
Issued 4 April 2007
Resolved
Inboard on stbd side, crop and renew 16" x 16" inset hull just below generator exhaust.
Construction/Loadline › Hull › Transverse Frame
Issued 4 April 2007
Resolved
In second port void crop & renew approx. 1' x 1' section with multiple fractures/repairs.
Construction/Loadline › Hull › Weld
Issued 4 April 2007
Resolved
In second port void, pick up two areas of weld porosity (from original construction).
Construction/Loadline › Hull › Transverse Frame
Issued 4 April 2007
Resolved
In second stbd void V & weld area with multiple fractures/repairs. Consider permanent repairs with engineered fix provided by Coastwise Engineering.
Construction/Loadline › Hull › Side Shell
Issued 4 April 2007
Resolved
Crop and renew inset area of aft stbd quarter.
Construction/Loadline › Hull › Hull Plating
Issued 4 April 2007
Resolved
Crop and renew deck under MSD tank due to severe exfoliation corrosion.
Electrical › Electrical Distribution System (service) › Wiring
Issued 4 April 2007
Resolved
Rewire RULE bilge pumps in P & S jet rooms, which were improperly spliced to lengthen wiring. a) Splices not in "J" box and b) New wiring & 2nd splice lay in the bilges.
Electrical › Lighting (service) › Neutral Ground
Issued 4 April 2007
Resolved
Remove automotive style lights, which were improperly installed in Jet Rooms with single wire power source and light contact with hull providing ground.
Electrical › Electrical Distribution System (emergency) › Wiring
Issued 4 April 2007
Resolved
a) Properly rewire fire pump with appropriate UL Boat Cable or place appropriate single wire conductors in conduit. b) Correct undersized wire for the load. c) Reroute wiring to proper source - DC distribution panel instead of directly being tied to a battery.
Construction/Loadline › Hull › Hull Plating
Issued 21 March 2007
Resolved
Complete proper weld repairs to longitudinal crack in #2 void space, outboard sideshell, portside hull at chine prior to carriage of passengers for hire.
Engineering › Fuel Oil Service System › Filter
Issued 25 April 2006
Resolved
Install fuel strainers with solid metal plugs
Accommodation/Occupational Safety › Heating › Metal Protection
Issued 25 April 2006
Resolved
Install exhaust blanket on starboard aft engine
Personnel › Training › First Aid/CPR
Issued 25 April 2006
Resolved
Provide CPR & first aid cards for crew
Lifesaving › Inflatable Buoyant Apparatus › Quantity
Issued 25 April 2006
Resolved
Provide 6 man IBA to meet passenger and crew COI carriage requirements
Fire Fighting › Fire Hoses › Condition
Issued 22 April 2005
Resolved
Fire hose on upper deck aft had 2 holes. Replace hose with a new hose that complies with 46CFR181.320(b). Enough pressure is provided at the nozzle for temp service while waiting for suitable replacement.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 22 April 2005
Resolved
First Aid kit is missing wire splint. Obtain suitable wire splint and place into first aid kit to meet requirements of 46CFR160.041
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 22 April 2005
Resolved
Water light for ring life buoy works only intermittently. Repair/Replace water light
Engineering › Steering Gear System › Ram
Issued 22 April 2005
Resolved
Missing double nut/cotter pins/nylocks on steering rams for both port and starboard sides. Install cotter pins to prevent the nuts from backing off the bolts on both steering rams.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 22 April 2005
Resolved
The rail courses on the 4 gates on upper deck exceed 4" between the deck and bottom course. Make repairs to all 4 gates to meet 4" requirements of 46CFR177.900(g)(1)(iii).
Fire Fighting › Fixed Fire Detection System › Heat Detectors
Issued 14 April 2005
Resolved
Repair cut wire to heat sensor in Stbd Engine Room.
Electrical › Lighting (service) › Lighting Fixture
Issued 14 April 2005
Resolved
Repair or replace broken DC light that is hanging by electrical cord in Stbd engine room.
Electrical › Electrical Distribution System (service) › Wiring
Issued 14 April 2005
Resolved
Provide proper suspension of hose for water injection into exhaust. Sensor wiring being improperly used for this purpose.
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type III
Issued 14 April 2005
Resolved
Remove vent for Marine Sanitation Device where it is connected to overboard discharge. Run vent properly up through deck and provide flame screen. As installed vent is designed to allow overflow to freely discharge overboard.
Construction/Loadline › Penetrations › Pipe Flange
Issued 14 April 2005
Resolved
C&R stand pipe and 12"x12" hull plate in way of raw water suctions for engines and generator due to severe corrosion.
Construction/Loadline › Hull › Weld
Issued 14 April 2005
Resolved
Pick up missing transverse weld in aft bay, inboard on tunnel, of void 2, on stbd side.
Construction/Loadline › Hull › Weld
Issued 14 April 2005
Resolved
V & weld 2 areas of collapsed weld at inboard step, in void 2, on stbd side.
Construction/Loadline › Hull › Weld
Issued 14 April 2005
Resolved
Pick up deck/hull weld where missing in both port & stbd sides outboard at bow.
Construction/Loadline › Hull › Weld
Issued 14 April 2005
Resolved
In port fuel void, pick-up missing weld on outboard frame on at middle of the fuel tank, skip welds missing at the step.
Engineering › Bilge Water Management System › Hose
Issued 14 April 2005
Resolved
Renew improper potable water service hose being for bilge dewatering on independent RULE pumps.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 14 April 2005
Resolved
Replace missing cover for rotating gear on fwd engine on port side.
Engineering › Freshwater System (jacketwater cooling)
Issued 10 June 2004
Resolved
Sea suction hoses for all four MDE's show signs of deterioration. Replace hoses for all four MDE's. LEGACY COMPONENT DESC: Hose
Engineering › Sea-water System (primary cooling)
Issued 10 June 2004
Resolved
Missing second hose clamps on all hose connections in the Port/Starboard FloJet cooling system. Double clamp all connections at and below 6" above waterline. LEGACY COMPONENT DESC: Piping
Lifesaving › Launching Appliances › Release Mechanism
Issued 10 June 2004
Resolved
Expired hydrostatic release for the float free mount on the EPIRB.
Stability › Watertight Integrity
Issued 10 June 2004
Resolved
Access hatches to jet pump room do not have a means of preventing accidental loss overboard when they are removed. Required tag lines or other means of loss prevention be installed. LEGACY COMPONENT DESC: Flooding Prevention
Operations/Management › Drills/Instruction › Abandon Ship
Issued 10 June 2004
Resolved
Unable to conduct underway drills due to vessels engine being down for maintenance.
Operations/Management › Drills/Instruction › Fire
Issued 10 June 2004
Resolved
Were not able to conduct underway drills due to engine down for maintenance.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Quantity of CO2
Issued 28 May 2004
Resolved
Master discharged CO2 when the crew discovered smoke coming from the engine room. Recharge CO2 and provide receipt to local OCMI.
Construction/Loadline › Hull
Issued 17 July 2003
Resolved
Extended compliance dates for requirements item No. 2 & No.3 dtd 6/23/2003 by JUNMS to 3/1/2004 with attached conditions. Master/Owner to inspect hull condition on a weekly basis. Write detailed findings & conditions found to [name withheld] with Master or Port Eng'r signature. Start report: 28JULY03. LEGACY COMPONENT DESC: Weld
Construction/Loadline › Hull
Issued 23 June 2003
Resolved
Repair all weld fractures #1, 2 starboard & #1 port voids in way of reverse chine. LEGACY COMPONENT DESC: Weld
Construction/Loadline › Hull
Issued 23 June 2003
Resolved
Gouge & reweld areas marked in the port & stbd void tanks in a way of forward bow keel plate & chine upper & lower plates. Build up undercutting weldment around 2nd web frame from bow area P & S. LEGACY COMPONENT DESC: Weld
Construction/Loadline › Hull
Issued 23 June 2003
Resolved
Gouge & reweld hairline fracture in STDB No.2 void 2nd web frame chime area. LEGACY COMPONENT DESC: Weld
Lifesaving › Hand Flares
Issued 9 May 2003
Resolved
Provide 3 orange smoke flares per 46 CFR 180.68.
Operations/Management › Drills/Instruction
Issued 9 May 2003
Resolved
Complete underway drills with permanent seasonal crew.
Communications › Radio Communications
Issued 9 May 2003
Resolved
Provide new hydrostatic release for EPIRB. Expiration sticker on bracket read 06/01. LEGACY COMPONENT DESC: EPIRB
Communications › Radio Communications › EPIRB
Issued 9 May 2003
Resolved
EPRIB must be rigged to automatically activate upon hydrostatic release per instruction manual.
Communications › Radio Communications
Issued 9 May 2003
Resolved
Provide NOAA EPIRB registration. LEGACY COMPONENT DESC: EPIRB
Construction/Loadline › Hull › Hull Plating
Issued 6 June 2002
Resolved
Crop and renew fractured side-shell plating and adjacent fractured frame member in way of the reverse chine area at frame #4 in the starboard/outboard hull (Void #2S).
Operations/Management › Drug and Alcohol Testing
Issued 2 May 2002
Resolved
Unknown Component - Missing
Fire Fighting › Fixed CO2 Fire Extinguishing System
Issued 2 May 2002
Resolved
Provide proof of servicing for port & stbd engine room fixed extinguishing systems.
Navigation › Electronic Positioning
Issued 2 May 2002
Resolved
Provide category I EPIRB, registered and mounted appropriately. LEGACY COMPONENT DESC: EPIRB
Lifesaving › Inflatable Liferafts
Issued 2 May 2002
Resolved
Replace all expired IBA hydrostatic releases. LEGACY COMPONENT DESC: Hydrostatic Release Unit
Documentation › Certificates/Documents › Certificate of Inspection
Issued 2 May 2002
Resolved
Post COI in a location viewable by passengers.
Construction/Loadline › Hull
Issued 3 April 2002
Resolved
welds not completed in way of CVK at the point where the hull plate's met in fwd laz port/stbd side on both inboard/outboard side shell. LEGACY COMPONENT DESC: Hull Plating
Construction/Loadline › Hull › Weld
Issued 3 April 2002
Resolved
Hatch inserts port/stbd side just tack welded in place. Inserts fwd of collision bulkhead. Required weld to be completed.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 3 April 2002
Resolved
Welds on Half frames in fwd laz port stbd not completed. Skip welds on half frames and stingers not completed.
Construction/Loadline
Issued 11 May 2000
Resolved
Demonstrate that jet drive shaft penetrations in the aft port and starboardengine room bulkheads are watertight. Plans shall be submitted to the CoastGuard prior to making any modifications to the existing jet drive bulkhead penetrations.
Lifesaving
Issued 14 March 2000
Resolved
Conduct abandon ship, person overboard, and fire drills to the satisfactionof an attending Coast Guard marine inspector prior to placing vessel into passenger carrying service. 46 CFR 176.808(g) and 176.810(d)
Fire Fighting
Issued 14 March 2000
Resolved
All waste receptacles shall be constructed of non-combustible materials with no openings in the sides or bottom. 46 CFR 177.405(f)
Lifesaving
Issued 14 March 2000
Resolved
The three (3) inflatable buoyant apparatus (IBA) shall be serviced by a Coast Guard approved facility, or replaced by IBAs that have been recently serviced.
Casualty record · 2
27 June 2002Routine · role: Subject to Marine Inspection · activity 1637853
4 June 2014Routine · role: Involved in a Marine Casualty · activity 4885210
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.
Recorded names · 1
KEET (2002). Names as the Coast Guard recorded them in incident records, with the years they appear; some are renames and some are spelling variants.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.