MAURY USCG vessel records Sign in
← All vessels

ETHAN WILLIAM

ETHAN WILLIAM is a 1988 passenger vessel (inspected). The Coast Guard has recorded 16 inspections since 2000, most recently in October 2008, along with 69 deficiencies.

Records from 2000 to 2008. Most recent: inspection, 28 October 2008.

Built
1988
Last inspected
28 October 2008
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

WDE3521
470731
Flag
UNITED STATES
367340350
Maury page id
psix-470731

Inspections, by type

Years with a record 9 calendar years (2000–2008)
The 16 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 18 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.

Documentation record

Tonnage as PSIX records it11 - Simplified, Net Ton
14 - Simplified, Gross Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

WDE3521MMSI 367340350 · active · compulsorily equipped · granted 21 December 2017, expires 28 February 2028
WDD8056MMSI 367194650 · expired · compulsorily equipped · granted 13 June 2007, cancelled 19 August 2017 · licensed under a name not among this hull’s recorded names (not shown)
WDD2250MMSI 367112920 · expired · compulsorily equipped · granted 10 May 2006, cancelled 16 July 2016 · licensed under a name not among this hull’s recorded names (not shown)
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.

Inspection history · 16

28 October 2008 Drydock Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 3362236
11 March 2008 In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 3157652
4 September 2007 Examination of Repairs · Damage Survey · COI Inspection
Physical examination · Detached Duty Office Myrtle Beach · USCG Southeast District (CGD-SE) · Activity 3049446
13 June 2007 COI Inspection
Physical examination · Detached Duty Office Myrtle Beach · USCG Southeast District (CGD-SE) · Activity 2960262
8 August 2006 Internal Structural Exam · Hull Examination
Physical examination · Detached Duty Office Myrtle Beach · USCG Southeast District (CGD-SE) · Activity 2739685
3 May 2006 COI Inspection
Physical examination · Detached Duty Office Myrtle Beach · USCG Southeast District (CGD-SE) · Activity 2639573
21 July 2005 Hull Examination · Deficiency Check · Annual Inspection
Physical examination · Detached Duty Office Myrtle Beach · USCG Southeast District (CGD-SE) · Activity 2434492
18 August 2004 Annual Inspection
Physical examination · Detached Duty Office Myrtle Beach · USCG Southeast District (CGD-SE) · Activity 2180974
19 May 2004 In-Service Inspection
Physical examination · Detached Duty Office Myrtle Beach · USCG Southeast District (CGD-SE) · Activity 2071924
19 May 2003 Re-Inspection · Hull Examination
Physical examination · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 1798371
18 June 2002 Re-Inspection
Physical examination · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 1633209
11 April 2002 Simplified Stability Test
Physical examination · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 1603984
18 March 2002 Examination of Repairs
Physical examination · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 1494429
3 May 2001 COI Inspection
Physical examination · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 1481836
3 April 2001 Hull Examination
Physical examination · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 1439194
26 May 2000 Hull Examination · Simplified Stability Test · Initial Certification
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 1379377

Deficiency record · 69

Fire Fighting › Fire Bucket › Availability
Issued 29 February 2008 Resolved
Replace 5 gallon fire buckets with 2.5 gallon buckets.
Action required: 705 - Other - as specified
Due 7 March 2008
Resolved 3 March 2008
Resolution: Provided 2.5 Gallon fire buckets.
Fire Fighting › Portable CO2 Fire Extinguisher › Mounting Bracket
Issued 29 February 2008 Resolved
Place Fire Extinguisher in forward compartment in mounting bracket.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 7 March 2008
Resolved 3 March 2008
Resolution: Fire extinguisher remounted in new fire extinguisher bracket.
Lifesaving › Visual Distress Signals (General) › Expired
Issued 29 February 2008 Resolved
Replace all of vessels flares. Replace 3 orange smoke signals.
Action required: 705 - Other - as specified
Due 7 March 2008
Resolved 3 March 2008
Resolution: New replacement flairs and orange smoke signals were noted onboard.
Stability › Watertight Integrity › General
Issued 29 February 2008 Resolved
Repair Watertight Bulkhead through fitting between Head and Engineroom.
Due 3 April 2008
Resolved 3 April 2008
Resolution: Repairs were made to through fitting between head and engine room.
Stability › Watertight Integrity › General
Issued 29 February 2008 Resolved
Repair aft hatch to allow for easy operation and attach capturing device to both aft hatches.
Due 3 April 2008
Resolved 10 March 2008
Resolution: Repaired Aft Hatch and attached recapturing device (chain) to both hatches.
Stability › Watertight Integrity › General
Issued 29 February 2008 Resolved
Provide Gasket to forward hatch.
Due 3 April 2008
Resolved 10 March 2008
Resolution: Gasket provided on forward hatch
Stability › Weathertight Integrity › General
Issued 29 February 2008 Resolved
Repair holes in main deck (where table was formally mounted).
Due 3 April 2008
Resolved 3 April 2008
Resolution: Bolts were inserted where holes were located in deck.
Engineering › Bilge Water Management System › Pump
Issued 29 February 2008 Resolved
Repair aft bilge high level alarm and securely fasten.
Due 3 April 2008
Resolved 10 March 2008
Resolution: Reattached Bilge alarm and ensured proper operation.
Engineering › Fuel Oil Storage/Transfer System › Valve
Issued 29 February 2008 Resolved
Repair Starboard side fuel tank valve.
Due 3 April 2008
Resolved 10 March 2008
Resolution: Fuel valve was repaired on starboard side.
Engineering › Steering Gear System › Rudder
Issued 29 February 2008 Resolved
Provide Means of Auxiliary Steering.
Due 3 April 2008
Resolved 10 March 2008
Resolution: New hardward was added to rudder post to enable the use of a T-bar for auxilary steering.
Engineering › Bilge Water Management System › Hose
Issued 29 February 2008 Resolved
Double Clamp Rubber hose section of bilge discharge starboard side.
Due 3 April 2008
Resolved 10 March 2008
Resolution: Additional clamps added to bilge discharge hose starboard side.
Electrical › Electric Supply System (service) › Cable
Issued 29 February 2008 Resolved
Remove all dead end cables in engine room.
Due 3 April 2008
Resolved 10 March 2008
Resolution: All dead end and unused cables were removed.
Electrical › Electric Supply System (service) › Cable
Issued 29 February 2008 Resolved
Remove all plastic cable supports and replace with metal.
Due 3 April 2008
Resolved 10 March 2008
Resolution: All metal cables used for support have been replaced by metal supports.
Fire Fighting › Combustible Materials › Insulation
Issued 29 February 2008 Resolved
Replace all insulation on turbos in engineroom prior to carrying passengers.
Due 3 April 2008
Resolved 10 March 2008
Resolution: All insulation on turbos was replaced.
Fire Fighting › Combustible Materials › Insulation
Issued 29 February 2008 Resolved
Replace all oil soaked insulation in engine overhead and walls.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 10 March 2008
Resolution: All insullation soaked by oil was replaced.
Engineering › Diesel Engine (propulsion-direct drive) › Silencer (exhaust)
Issued 29 February 2008 Resolved
Identify and repair source of oil leak in engineroom.
Due 3 April 2008
Resolved 10 March 2008
Resolution: Oil leak was repaired.
Electrical › Electric Supply System (service) › Battery Installation
Issued 29 February 2008 Resolved
Tighten battery connectors.
Due 3 April 2008
Resolved 10 March 2008
Resolution: Battery connectors were tightened.
Lifesaving › Lifejacket/PFD (Type I) › Marking
Issued 29 February 2008 Resolved
Pleace vessel name on all lifejackets, lifefloats and paddles, transom and bow.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 10 March 2008
Resolution: Vessel Name was properly marked on vessel, lifejackets and paddles.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Location
Issued 29 February 2008 Resolved
Place fire extinguisher in forward compartment in proper bracket.
Due 3 April 2008
Resolved 10 March 2008
Resolution: Bracket in forward compartment was replaced and properly installed.
Construction/Loadline › Hull › Longitudinal Frame
Issued 4 September 2007 Resolved
Properly repair all cracked framing welds to the satisfaction of attending marine instpector.
Condition: Design Flaw
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 19 September 2007
Resolution: All cracks repaired and additional stiffeners put in place in an effort to stop problem.
Construction/Loadline › Hull › Stiffener
Issued 4 September 2007 Resolved
Allow for satisfactory inspection of longitudinal stiffeners being added to vessel IVO aft fuel tank/lazerette area.
Condition: Design Flaw
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 19 September 2007
Resolution: Completed satisfactory inspection of installation.
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 4 September 2007 Resolved
Demonstrate satisfactory MOB drill.
Condition: Placed in Improper Service
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 17 September 2007
Resolution: Conducted Satisfactory MOB drill.
Operations/Management › Equipment Service/Testing › EPIRB
Issued 13 June 2007 Resolved
Replace expired EPIRB hydrostatic release.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 June 2007
Resolution: hydrostatic release replaced.
Lifesaving › Buoyant Apparatus › Floating Electric Waterlight
Issued 13 June 2007 Resolved
prove proper operation of water light for buoyant apparatus
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 June 2007
Resolution: Life float battery replaced and light operational
Lifesaving › Lifejacket/PFD (General) › Quantity
Issued 13 June 2007 Resolved
Provide 01 child lifejackets
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 June 2007
Resolution: 01 child lifejacket purchase and on board.
Engineering › Fuel Oil Service System › Filter
Issued 13 June 2007 Resolved
Provide flamecup for fuel filter.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 June 2007
Resolution: Flame cup provided.
Electrical › Electric Supply System (service) › Battery Installation
Issued 13 June 2007 Resolved
Provide cover for battery box.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 June 2007
Resolution: Cover provided for battery box.
Navigation › Piloting/Steering › Magnetic Compass
Issued 13 June 2007 Resolved
Provide light for magnetic compass.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 June 2007
Resolution: Light bulb replaced.
Accommodation/Occupational Safety › Occupational Safety › Rubbish/Waste Materials
Issued 13 June 2007 Resolved
Provide lid for trash can.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 June 2007
Resolution: Lid provided.
Operations/Management › Bilge/Bilge System Management › Control of Oil Mixtures
Issued 13 June 2007 Resolved
Remove excessive oil from bilges.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 June 2007
Resolution: Oil removed and bilges scrubbed clean.
Operations/Management › Bilge/Bilge System Management › Control of Oil Mixtures
Issued 8 August 2006 Resolved
Ensure bilge is clean and excess oil is removed.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 September 2006
Resolution: Bilge was cleaned and clear of oil
Engineering › Fuel Oil Storage/Transfer System › Tank
Issued 8 August 2006 Resolved
Repair crack in stbd. side fuel tank.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 September 2006
Resolution: New starboard fuel tank installed, pressure tested sat
Operations/Management › Bilge/Bilge System Management › Control of Oil Mixtures
Issued 3 May 2006 Resolved
Remove oil from bilge
Condition: Unknown
Due 17 May 2006
Resolved 4 May 2006
Resolution: Sufficiently removed oil
Electrical › Lighting (service) › Lighting Fixture
Issued 3 May 2006 Resolved
Remove inoperable light fixture from engine room.
Condition: Improper/Lack of Maintenance
Due 17 May 2006
Resolved 4 May 2006
Resolution: Removed light and wiring.
Electrical › Electrical Distribution System (service) › Wiring
Issued 3 May 2006 Resolved
Provide metal support brackets every 24" for engine room wiring
Condition: Improper Installation
Due 17 May 2006
Resolved 4 May 2006
Resolution: Installed new metal brackets.
Lifesaving › Lifejacket/PFD (Type I) › Quantity
Issued 3 May 2006 Resolved
Provide (1) additional childs pfd.
Condition: Unknown
Due 17 May 2006
Resolved 4 May 2006
Resolution: Purchased new pfd.
Engineering › Shafting/Propeller Arrangements › Bearing
Issued 21 July 2005 Resolved
Replace cutlass bearings.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 25 July 2005
Resolution: Installed new bearings.
Engineering › Steering Gear System › Rudder
Issued 21 July 2005 Resolved
repair rudder support.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 25 July 2005
Resolution: installed new rudder supports.
Engineering › Diesel Engine (auxiliary) › Piping (exhaust)
Issued 21 July 2005 Resolved
Reseal exhaust through hole.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 25 July 2005
Resolution: Sealed through hole with plating and foam.
Stability › Watertight Integrity › General
Issued 21 July 2005 Resolved
Seal all watertight bulkheads.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 25 July 2005
Resolution: Sealed bulkheads holes w/ foam, placed valves on water through holes.
Operations/Management › Vessel Safety Management › Reports and Analysis
Issued 21 July 2005 Resolved
Provide shaft alignment report.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 25 July 2005
Resolution: Provided report.
Engineering › Bilge Water Management System › Pump
Issued 21 July 2005 Resolved
Provide proper operation of aft bilge pump.
Condition: Improper Installation
Due 10 August 2005
Resolved 16 August 2005
Resolution: Installed new bilge pump
Electrical › Electrical Distribution System (service) › Wiring
Issued 21 July 2005 Resolved
Enclose all exposed wiring in fully encapsulated wire connectors.
Condition: Improper Installation
Due 10 August 2005
Resolved 16 August 2005
Resolution: Enclosed all splices and loose ends in proper connectors.
Electrical › Electrical Distribution System (service) › Wiring
Issued 21 July 2005 Resolved
Secure engine room wiring with metal brackets every 18 inches.
Condition: Improper Installation
Due 10 August 2005
Resolved 16 August 2005
Resolution: Installed proper brackets
Operations/Management › Pollution › Retention of Oily Mixture
Issued 21 July 2005 Resolved
Remove Oil from bilge
Condition: Unknown
Due 10 August 2005
Resolved 16 August 2005
Resolution: Removed
Operations/Management › Equipment Service/Testing › EPIRB
Issued 21 July 2005 Resolved
Properly mount EPIRB
Condition: Improper Installation
Due 10 August 2005
Resolved 16 August 2005
Resolution: New Mount
Engineering › Bilge Water Management System › Piping
Issued 21 July 2005 Resolved
Replace all bilge system with metallic piping.
Condition: Improper Installation
Due 10 August 2005
Resolved 16 August 2005
Resolution: Installed new piping.
Documentation › Markings/Placards › Warning Signs
Issued 21 July 2005 Resolved
Stencil marking on flare box.
Condition: Improper Installation
Due 17 August 2005
Resolved 16 August 2005
Resolution: Properly labeled.
Lifesaving › Rigid Liferafts › Weak Link
Issued 21 July 2005 Resolved
Weak link expired.
Condition: Improper/Lack of Maintenance
Due 17 August 2005
Resolved 16 August 2005
Resolution: New weak link installed.
Documentation › Markings/Placards › Lifejacket Placard
Issued 21 July 2005 Resolved
Provide donning placards for both types of pfd's onboard.
Condition: Improper Installation
Due 17 August 2005
Resolved 16 August 2005
Resolution: Installed seperate donning placards for both types of pfd''s onboard.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Mounting Bracket
Issued 18 August 2004 Resolved
B-II brackets rusted beyond repair.
Condition: Unknown
Due 1 September 2004
Resolved 19 August 2004
Resolution: Brackets replaced with new.
Fire Fighting › Fire Bucket › Availability
Issued 18 August 2004 Resolved
Missing a third bucket.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 18 August 2004
Resolution: Third bucket added.
Fire Fighting › Structural Fire Protection - General › Structural Bulkhead Construction
Issued 18 August 2004 Resolved
Open holes in E/R fwd bulkbead.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 18 August 2004
Resolution: Holes filled with approved fire stop.
Fire Fighting › Fixed Fire Detection System › Arrangement
Issued 18 August 2004 Resolved
Manual vent closures frozen in open position.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 18 August 2004
Resolution: Replaced hardware and made vent closures work as intended.
Lifesaving › Hand Flares › Quantity
Issued 18 August 2004 Resolved
Two red flares missing.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 18 August 2004
Resolution: Two red flares added.
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 18 August 2004 Resolved
Lifeline worn.
Condition: Unknown
Due 1 September 2004
Resolved 19 August 2004
Resolution: Line replaced.
Fire Fighting › Fixed Gas Fire Extinguishing System
Issued 19 May 2003 Resolved
Engine room fixed fire extinguishing system passed inspection due date - Have inspected.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 May 2003
Resolution: Fire boy inspected [name withheld] Fire & Safety.
Stability › Watertight Integrity
Issued 19 May 2003 Resolved
Seal all watertight bulkhead penetrations.
Due 2 June 2003
Resolved 22 May 2003
Resolution: Corrected
Engineering
Issued 19 May 2003 Resolved
Replace port side raw water suction valve.
Due 2 June 2003
Resolved 22 May 2003
Resolution: Gate valve replaced with ball valve.
Engineering › Fuel Oil Storage/Transfer System
Issued 18 June 2002 Resolved
Provide 30X30 flame screen for both port & starboard fuel vents. LEGACY COMPONENT DESC: Vent Pipe
Condition: Improper Installation
Due 28 June 2002
Resolved 19 May 2003
Resolution: Screens provided both port and stbd.
Navigation › Emergency Steering
Issued 18 June 2002 Resolved
Prove proper operation of emergency steering system
Due 28 June 2002
Resolved 18 June 2002
Documentation › Certificates/Documents
Issued 18 June 2002 Resolved
Provide proof of valid COD LEGACY COMPONENT DESC: Certificate of Documentation (CG-1270)
Due 28 June 2002
Resolved 19 May 2003
Construction/Loadline › Structures
Issued 3 April 2001 Resolved
RENEW WATER TIGHT BULKHEAD HATCH GASKET LOCATED AFT OF ENGINE ROOM. LEGACY COMPONENT DESC: Machinery Space Opening
Condition: Unknown
Due 28 May 2001
Resolved 14 May 2001
Navigation › Emergency Steering
Issued 3 April 2001 Resolved
PROVE PROPER OPERATION OF EMERGENCY TILLER ARM.
Condition: Unknown
Due 28 May 2001
Resolved 14 May 2001
Lifesaving › Lifejacket/PFD (Type I)
Issued 3 April 2001 Resolved
PROPERLY STENCIL STOWAGE COMPARTMENT FOR CHILD/ ADULT PFDS. LEGACY COMPONENT DESC: Marking
Condition: Unknown
Due 3 April 2001
Resolved 14 May 2001
Construction/Loadline › Structures
Issued 3 April 2001 Resolved
Renew 3" cracked weld located starboard side on stern dive platform. LEGACY COMPONENT DESC: Superstructure
Condition: Unknown
Due 28 May 2001
Resolved 14 May 2001
Engineering › Bilge Water Management System
Issued 3 April 2001 Resolved
Install UL approved bilge alarms with audible and visual indicators.
Due 28 May 2001
Resolved 14 May 2001
Construction/Loadline › Penetrations
Issued 3 April 2001 Resolved
Properly make hydraulic lines penetrations in stern watertight.
Condition: Unknown
Due 28 May 2001
Resolved 14 May 2001
Construction/Loadline › Structures
Issued 3 April 2001 Resolved
Prove collision bulkhead is watertight. LEGACY COMPONENT DESC: Longitudinal Bulkhead
Due 28 May 2001
Resolved 14 May 2001

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.