MAURY USCG vessel records Sign in
← All vessels

MISS LOURDIES

MISS LOURDIES is a 1972 freight ship. The Coast Guard has recorded 33 inspections since 1981, most recently in February 2024, along with 137 deficiencies and 21 operational controls.

Records from 1981 to 2024. Most recent: inspection, 29 February 2024.

Built
1972
Last inspected
29 February 2024
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

7220491 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
Flag
SAINT VINCENT AND THE GRENADINES
—
Maury page id
psix-47149

Inspections, by type

…with no type recorded21
Years with a record 13 calendar years (1981–2024)
The 33 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the General Dry Cargo Ship class in Maury's sources begin in 1980.

Documentation record

Tonnage as PSIX records it362 - Regulatory (Subpart C or D), Gross Ton
649 - Convention (Subpart B), Gross Ton
246 - Regulatory (Subpart C or D), Net Ton
309 - Convention (Subpart B), Net Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

Inspection history · 33

29 February 2024 Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7872125
10 June 2008 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 3233567
9 June 2008 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 3232169
7 March 2008 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 3160363
8 November 2007 Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 3095368
21 September 2007 PII Safety Exam · ISPS II Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 3061797
16 March 2007 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2889088
14 March 2007 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2887594
14 March 2007 Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2887652
14 March 2007 Type not recorded
No type recorded · Station Miami Beach · USCG Southeast District (CGD-SE) · Activity 2887965
13 February 2007 ISPS II Exam · PII Safety Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2871321
1 October 2006 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2791009
6 February 2006 Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2580204
30 September 2005 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2505019
26 May 2005 Random ISPS/MTSA/PSC · Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2368640
25 May 2005 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2367695
25 April 2005 MARPOL Annex I Examination · PI Safety Exam · ISPS I Exam · Ballast Water Examination
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2341945
23 April 2005 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2341071
22 April 2005 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2340360
14 October 2003 Annual Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1927718
28 July 2003 Deficiency Check · Re-Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1859236
21 October 2002 Deficiency Check · Annual Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1693219
28 May 2002 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1621821
3 April 2002 Administrative Inspection
Administrative · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1600662
3 April 2002 Type not recorded
No type recorded · USCGC CHANDELEUR (WPB 1319) · USCG Arctic District (CGD-A) · Activity 1602595
23 March 2002 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1496161
10 September 1999 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 431989
9 October 1996 Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 657759
5 October 1996 Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 173301
21 August 1994 Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 70168
6 August 1985 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1297983
2 February 1983 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1306705
2 February 1981 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 970523

Deficiency record · 137

Fire Fighting › Portable CO2 Fire Extinguisher › Service
Issued 8 November 2007 Resolved
All portable fire extinguishers expired onboard.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 13 November 2007
Resolution: Def corrected
Accommodation/Occupational Safety › Sleeping Accommodations › Berth
Issued 8 November 2007 Resolved
Exposed wires and electrical hazards in crew staterooms.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 13 November 2007
Resolution: Def corrected
Deck/Cargo › Cargo Stowage › General
Issued 8 November 2007 Resolved
Cargo stowed on emergency steering compartment.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 13 November 2007
Resolution: Def corrected
Accommodation/Occupational Safety › Sleeping Accommodations › Berth
Issued 8 November 2007 Resolved
No lighting in of the crew's stateroom.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 13 November 2007
Resolution: Def corrected
Communications › Alarms/Indicators › General Alarm
Issued 20 September 2007 Resolved
Ships general alarm ( fire & abandon ship ) was not abe to alert all personnel on board.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 November 2007
Engineering › Steering Gear System › Rudder Angle Indicator
Issued 20 September 2007 Resolved
Rudder angle indicator is not represented for emergency steering.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 13 November 2007
Resolution: Def corrected
Lifesaving › Lifejacket/PFD (General) › Lights
Issued 20 September 2007 Resolved
01 lifejacket requies a new light due to the old one being expired.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 November 2007
Documentation › Certificates/Documents › Safety Management Certificate (ISM)
Issued 20 September 2007 Resolved
Certificate of registry, Safety Manning Doc., and Caribbean Ship Safety Certificates were not on board
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 November 2007
Lifesaving › Inflatable Liferafts › Servicing
Issued 6 February 2006 Resolved
Liferafts are overdue for servicing.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 February 2006
Resolution: Serviced liferafts
Stability › Weathertight Integrity › General
Issued 25 May 2005 Resolved
The following watertight/weathertight doors were found severly wasted, broken dogs, and were not closing properly: Starboard/Port quarter hatches leading to machinery, forward hatch, portside bridge hatch, and several weathertight doors leading to superstructure.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 13 July 2005
Stability › Watertight Integrity › General
Issued 25 May 2005 Resolved
The fwd portside mooring bit was found severly wasted broken.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 13 July 2005
Stability › Watertight Integrity › General
Issued 25 May 2005 Resolved
Found several deck fitting protecting cable runs leading from below watertight compartments to open deck, severly wasted, causing water intrusion to those compartments.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 13 July 2005
Pollution Prevention/Response › Prevention Equipment › Oily Residue (sludge/slop) Tank
Issued 25 May 2005 Resolved
Excessive oily water found in the machinery compartment bilge, in excess of over 2 feet, resulting in fire/pollution hazard.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 13 July 2005
Lifesaving › Launching Appliances › Davit
Issued 25 May 2005 Resolved
Found rescue boat davit arm severly wasted, causing rescue boat davit arm to be inoperable and unsafe.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 13 July 2005
Documentation › Safety Management System › Conformity Maintenance Procedures
Issued 25 May 2005 Resolved
Based on the severity of the deficiencies issued on this inspection, CG Sector Miami OCMI doubts the validity of the safety management system onboard. The vessel is required to conduct a third party external audit on system in the presence of a USCG marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 13 July 2005
Resolution: Vsl provided ISM 3rd party audit report via fax to Coast Guard Sector Miami
Lifesaving › Lifebuoys › Serviceable
Issued 25 April 2005 Resolved
Lifebuoys are cracked at the seams, not in satisfactory condition. Replace ALL lifebuoys on vessel.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 May 2005
Resolution: Vessel replaced all life buoys.
Accommodation/Occupational Safety › Occupational Safety › Rubbish/Waste Materials
Issued 25 April 2005 Resolved
Vessel is infested with rats and roaches. Vessel needs to be fumigated in all spaces. Receipt from exterminator of RATS and ROACHES to be faxed to Sector Miami.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 20 May 2005
Resolution: Vessel used a pest contorl service to extriminate the rats and roaches.
Construction/Loadline › Structures › Ventilators
Issued 25 April 2005 Resolved
Holes on port and starboard in the bottom of the engine stacks leading to engine room. Crop and renew.
Due 10 May 2005
Resolved 20 May 2005
Resolution: Holes in stacked were filled in.
Electrical › Lighting (service) › Outlet Box
Issued 25 April 2005 Resolved
Exposed wiring and bad light fixtures found thoughout the ship. Terminate all exposed or deadend wiring into a box.
Due 10 May 2005
Resolved 20 May 2005
Resolution: Vessel covered up all exposed wiring.
Fire Fighting › International Shore Connection › Connection
Issued 25 April 2005 Resolved
International shore connection is not proper.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 19 July 2005
Documentation › Certificates/Documents › Cargo Ship Safety Certificate
Issued 25 April 2005 Resolved
The caribbean cargo ship safety certificate (CCSSC) has incorrect information. Correct certificate. (Vessel type listed as oil tanker and ITC is used instead of GT)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 May 2005
Resolution: Vessel CCSSChas right type of ship listed.
Construction/Loadline › Structures › Door
Issued 25 April 2005 Resolved
ALL deck storage spaces have openings on the doors and bulkheads leading to them. Replace dogs and permanently repair holes and corrosion.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 13 July 2005
Operations/Management › Drills/Instruction › Not Conducted
Issued 25 April 2005 Resolved
Vessel must complete full PSC exam and drills.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 July 2005
Lifesaving › Launching Appliances
Issued 14 October 2003 Resolved
Rescue boat davit motor is inop. Repair to the satisfaction of the flag state rep and prove proper operation to the attending USCG inspector. Complete rescue boat drill with the testing of the rescue boat in the water. LEGACY COMPONENT DESC: Davit
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 November 2003
Fire Fighting › Fixed CO2 Fire Extinguishing System
Issued 14 October 2003 Resolved
Place CO2 supply cylinder for Engine Room fixed gas firefighting system outside of space or prove proof of satisfactory installation to the satisfaction of the flag state rep. Ensure system has two separate controls for releasing medium. LEGACY COMPONENT DESC: Tanks
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Due 17 November 2003
Resolved 17 November 2003
Engineering › Fuel Oil Service System
Issued 14 October 2003 Resolved
Fuel day tanks in engine room do not have remote shut-offs on their discharge valves. Install remote shut-offs for these valves to the satisfaction of the flag state rep. LEGACY COMPONENT DESC: Valve
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 November 2003
Engineering
Issued 14 October 2003 Resolved
Oily water discharge pump is inop. Repair pump to the satisfaction of the flag state rep.
Condition: Improper/Lack of Maintenance
Due 1 November 2003
Resolved 12 November 2003
Engineering
Issued 14 October 2003 Resolved
Repair engine room supply ventilation.
Condition: Improper/Lack of Maintenance
Due 1 November 2003
Resolved 12 November 2003
Stability › Weathertight Integrity
Issued 14 October 2003 Resolved
Adjust weathertight door to STBD main deck engine room access and main deck weathertight door iwo galley centerline.
Condition: Improper/Lack of Maintenance
Due 1 November 2003
Resolved 12 November 2003
Electrical › Electrical Distribution System (service)
Issued 14 October 2003 Resolved
Remove dead-ended wiring in forward tunnel iwo stairway and dead ended wiring port side storage room. LEGACY COMPONENT DESC: Wiring
Condition: Improper/Lack of Maintenance
Due 1 November 2003
Resolved 12 November 2003
Navigation
Issued 28 July 2003 Resolved
Vessel not being able to control engine speed from the bridge.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 August 2003
Engineering
Issued 28 July 2003 Resolved
Unable to start starboard engine due to inoperative air start system.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 August 2003
Engineering
Issued 28 July 2003 Resolved
Two ballast pumps are inop.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 August 2003
Resolution: repaired motors
Engineering
Issued 28 July 2003 Resolved
Motor feeding seawater to main engine overheats. Flag must certify that the motor has enough capacity for its intended function and that it works correctly.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 August 2003
Lifesaving › Rescue Boat
Issued 28 July 2003 Resolved
Rescue boat not fully inflated.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 August 2003
Resolution: Replaced rescue boat(new)
Engineering
Issued 28 July 2003 Resolved
Repair hole in start air system for engine located aft of pilot house.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 August 2003
Operations/Management › Port and Waterways Safety
Issued 21 October 2002 Resolved
Prior to entering next US Port, provide proper Notice of Arrival to National Vessel Movement Center (NVMC). Vessel currently faxes arrival and is over 300 GT. LEGACY COMPONENT DESC: Notice of Arrival, General
Action required: 15 - Rectify deficiencies by next port
Due 22 October 2002
Resolved 9 December 2002
Resolution: Inspected sat.
Documentation › Certificates/Documents
Issued 21 October 2002 Resolved
Show proof of last dry-dock. Based upon the vessel's reported dry-dock dates of 28SEP97 and 18DEC01, the vessel appears to be overdue for dry-docking. LEGACY COMPONENT DESC: CCSSC
Action required: 17 - Rectify deficiencies prior to departure
Due 22 October 2002
Resolved 9 December 2002
Resolution: Inspected onboard sat.
Construction/Loadline › Markings
Issued 21 October 2002 Resolved
Permanently affix draft marks on the STBD stern. LEGACY COMPONENT DESC: Draft Marks/Indicating System
Action required: 705 - Other - as specified
Due 21 November 2002
Resolved 3 December 2002
Resolution: Cleared on Board 12/3/02, CHK, MIAMS
Stability › Watertight Integrity
Issued 21 October 2002 Resolved
Provide bolt for both port and starboard chain locker hatch covers. Currently each hatch is missing a bolt and wing nut.
Action required: 17 - Rectify deficiencies prior to departure
Due 22 October 2002
Resolved 9 December 2002
Resolution: Inspected onboard sat.
Documentation › Certificates/Documents
Issued 21 October 2002 Resolved
Flag State to address CCSSC certificate that indicates ITC tonnage (649 GT) with no note on the certificate that the vessel is regulated under tonnage laws in effect prior to 1994 (362 GT). LEGACY COMPONENT DESC: CCSSC
Action required: 17 - Rectify deficiencies prior to departure
Due 22 October 2002
Resolved 9 December 2002
Resolution: Proper paperwork provided.
Documentation › Certificates/Documents
Issued 21 October 2002 Resolved
Flag to address why annual CCSSC survey was two months overdue. LEGACY COMPONENT DESC: CCSSC
Action required: 17 - Rectify deficiencies prior to departure
Due 22 October 2002
Resolved 9 December 2002
Resolution: Interviewed in office.
Documentation › Certificates/Documents
Issued 21 October 2002 Resolved
Flag State to address why annual survey was two months overdue. LEGACY COMPONENT DESC: International Load Line Certificate
Action required: 17 - Rectify deficiencies prior to departure
Due 22 October 2002
Resolved 9 December 2002
Resolution: Interview conducted in office.
Documentation › Certificates/Documents
Issued 21 October 2002 Resolved
Flag State to address why STBD liferaft capacity required by the CCSSC "Form of Record of Equipment and Ship Information" does not match actual liferaft capacity. Replace STBD raft with a 12 person raft of correct CCSSC certificate. LEGACY COMPONENT DESC: CCSSC
Action required: 17 - Rectify deficiencies prior to departure
Due 22 October 2002
Resolved 9 December 2002
Resolution: Certificates now match equipment for a 6 man crew.
Navigation › Piloting/Steering
Issued 21 October 2002 Resolved
Provide updated charts using current Notice to Mariners LEGACY COMPONENT DESC: Local Notices to Mariners
Action required: 17 - Rectify deficiencies prior to departure
Due 22 October 2002
Resolved 9 December 2002
Resolution: Inspected sat. onboard.
Navigation › Piloting/Steering
Issued 21 October 2002 Resolved
Update Coast Pilot [name withheld] and Coast Guard Light List with current Notice to Mariners. LEGACY COMPONENT DESC: Local Notices to Mariners
Action required: 17 - Rectify deficiencies prior to departure
Due 22 October 2002
Resolved 9 December 2002
Resolution: Inspected sat onboard.
Stability › Watertight Integrity
Issued 21 October 2002 Resolved
Remove television cables led through open portholes. These cables affect the watertight integrity of the vessel.
Action required: 17 - Rectify deficiencies prior to departure
Due 22 October 2002
Resolved 9 December 2002
Resolution: Inspected sat onboard.
Lifesaving › Lifebuoys
Issued 21 October 2002 Resolved
Provide sufficient lifebuoys IAW the vessel's CCSSC "Form of Record of Equipment and Ship Information". Vessel is currently missing two lifebuoys attached with line and two attached with light. LEGACY COMPONENT DESC: Quantity
Action required: 17 - Rectify deficiencies prior to departure
Due 22 October 2002
Resolved 9 December 2002
Resolution: Inspected sat. onboard.
Lifesaving › Embarkation Appliances/Stations
Issued 21 October 2002 Resolved
Provide proper embarkation ladders on both port and starboard side IAW CCSSC 4.10 and LSA code VI/6.1.6. LEGACY COMPONENT DESC: Steps
Action required: 17 - Rectify deficiencies prior to departure
Due 22 October 2002
Resolved 16 December 2002
Resolution: Inspected onboard sat.
Lifesaving › Launching Appliances
Issued 21 October 2002 Resolved
Repair/replace winch hand controller on rescue boat. davit. LEGACY COMPONENT DESC: Winch
Action required: 17 - Rectify deficiencies prior to departure
Due 22 October 2002
Resolved 9 December 2002
Resolution: Inspected sat onboard.
Stability › Freeing Ports
Issued 21 October 2002 Resolved
Service all freeing ports and replace missing freeing ports IAW ILLC Regulation 24. Freeing ports are currently seized throughout main deck.
Action required: 705 - Other - as specified
Due 21 November 2002
Resolved 9 December 2002
Resolution: Inspected onboard sat.
Deck/Cargo › Cargo Transfer/Lightering (liquid)
Issued 21 October 2002 Resolved
Repair/replace flame screens on F/O vents. LEGACY COMPONENT DESC: Flame Screens
Action required: 17 - Rectify deficiencies prior to departure
Due 22 October 2002
Resolved 9 December 2002
Resolution: Inspected sat onboard.
Deck/Cargo › Cargo Stowage
Issued 21 October 2002 Resolved
Ensure forklift complies with requirements found in 49 CFR 176.78.
Action required: 705 - Other - as specified
Due 22 October 2002
Resolved 9 December 2002
Resolution: Inspected onboad sat.
Accommodation/Occupational Safety › Cooking Systems
Issued 21 October 2002 Resolved
Properly install and connect the propane gas cylinder located at the forward end of the main cargo deck. The current arrangement for the propane system has flexible rubber hose which is led through the dryer vent in to the galley. LEGACY COMPONENT DESC: LPG System Requirements
Action required: 17 - Rectify deficiencies prior to departure
Due 22 October 2002
Resolved 9 December 2002
Resolution: Inspected sat onboard.
Electrical › Lighting (service)
Issued 21 October 2002 Resolved
Repair/replace wiring in overhead in portside A/C room. LEGACY COMPONENT DESC: Lighting Feeder
Action required: 17 - Rectify deficiencies prior to departure
Due 22 October 2002
Resolved 9 December 2002
Resolution: Inspected sat onboard.
Accommodation/Occupational Safety › Refrigeration (air conditioning)
Issued 21 October 2002 Resolved
Properly install battery in portside A/C room.
Action required: 17 - Rectify deficiencies prior to departure
Due 22 October 2002
Resolved 9 December 2002
Resolution: Inspected sat onboard.
Fire Fighting › Miscellaneous Items
Issued 21 October 2002 Resolved
Remove/properly stow all flammable cylinders, dead batteries and paint located in all port side storage spaces on the main deck. LEGACY COMPONENT DESC: Paint/Flammable Liquid Lockers
Action required: 17 - Rectify deficiencies prior to departure
Due 22 October 2002
Resolved 9 December 2002
Resolution: Inspected sat onboard.
Accommodation/Occupational Safety › Occupational Safety
Issued 21 October 2002 Resolved
Remove antifreeze stored in gasoline container from starboard side storage spaces on the main deck.
Action required: 17 - Rectify deficiencies prior to departure
Due 22 October 2002
Resolved 9 December 2002
Resolution: Inspected sat onboard.
Electrical › Lighting (service)
Issued 21 October 2002 Resolved
Repair all light fixtures in both the port and starboard side storage spaces on the main deck. Fixtures missing and exposed wires protruding. LEGACY COMPONENT DESC: Lighting Fixture
Action required: 17 - Rectify deficiencies prior to departure
Due 22 October 2002
Resolved 9 December 2002
Resolution: Inspected sat onboard.
Accommodation/Occupational Safety › Occupational Safety
Issued 21 October 2002 Resolved
Provide proper gangway to access vessel. Currently vessel is using a pilot ladder. COTP order issued to correct this prior to USCG returning to finish exam.
Action required: 705 - Other - as specified
Due 22 October 2002
Resolved 9 December 2002
Resolution: Sat.
Electrical › Lighting (service)
Issued 21 October 2002 Resolved
Properly splice wiring for forward anchor lights located on the bow. LEGACY COMPONENT DESC: Lighting Feeder
Action required: 17 - Rectify deficiencies prior to departure
Due 22 October 2002
Resolved 9 December 2002
Resolution: Sat.
Construction/Loadline › Structures
Issued 21 October 2002 Resolved
Make proper repairs to wasted and holed vent pipe located on the 01 deck, starboard side, just forward of the liferaft.
Action required: 17 - Rectify deficiencies prior to departure
Due 22 October 2002
Resolved 9 December 2002
Resolution: Inspected sat onboard.
Electrical › Electrical Distribution System (service)
Issued 21 October 2002 Resolved
Properly install all circuit breakers and blanks in the lighting panel located on the bridge - panel number NPNL #5. LEGACY COMPONENT DESC: Circuit Breaker
Action required: 17 - Rectify deficiencies prior to departure
Due 22 October 2002
Resolved 9 December 2002
Resolution: Inspected sat onboard.
Electrical › Electrical Distribution System (service)
Issued 21 October 2002 Resolved
Properly connect the wires located in the box next to the mast just aft of the bridge. LEGACY COMPONENT DESC: Junction Box
Action required: 17 - Rectify deficiencies prior to departure
Due 22 October 2002
Resolved 9 December 2002
Resolution: Inspected sat onboard.
Electrical › Electric Generation Source (emergency)
Issued 21 October 2002 Resolved
Replace the missing water caps on the emergency battery located on the port side aft of the bridge.
Action required: 17 - Rectify deficiencies prior to departure
Due 22 October 2002
Resolved 9 December 2002
Resolution: Inspected sat onboard.
Personnel › Certificates/Documents/Licenses
Issued 21 October 2002 Resolved
Provide the following valid STCW 95 certificates: 1. GMDSS and Basic Safety Training for the Master. 2. Basic Safety Training for the Chief Mate. 3. Able Seaman document for [name withheld] DESC: STCW Certificate of Proficiency, Survival Craft
Action required: 17 - Rectify deficiencies prior to departure
Due 22 October 2002
Resolved 9 December 2002
Resolution: Inspected sat onboard.
Communications › Radio Communications
Issued 21 October 2002 Resolved
Provide proof of registration for the EPIRB and expiration dates for EPIRB Battery. LEGACY COMPONENT DESC: EPIRB
Action required: 17 - Rectify deficiencies prior to departure
Due 22 October 2002
Resolved 9 December 2002
Resolution: Inspected sat onboard.
Stability › Watertight Integrity
Issued 21 October 2002 Resolved
Provide a proper watertight/weathertight penetration for the wiring located on the main deck at the top of the forward bulkhead.
Action required: 17 - Rectify deficiencies prior to departure
Due 22 October 2002
Resolved 9 December 2002
Resolution: Inspected sat. onboard.
Accommodation/Occupational Safety › Occupational Safety
Issued 21 October 2002 Resolved
Properly stow propane gas cylinder on the main deck at the entrance to the accommodation spaces.
Action required: 17 - Rectify deficiencies prior to departure
Due 22 October 2002
Resolved 9 December 2002
Resolution: Inspected sat onboard.
Construction/Loadline › Structures
Issued 21 October 2002 Resolved
Make proper repairs to the crack in the overhead of the port side storage space (2nd one aft of the forward bulkhead). This crack corresponds to the base of the forward most guardrail stanchion on the port side of the 01 deck. LEGACY COMPONENT DESC: Longitudinal Bulkhead
Action required: 17 - Rectify deficiencies prior to departure
Due 22 October 2002
Resolved 9 December 2002
Resolution: Inspected sat onboard.
Engineering › Diesel Engine (propulsion-direct drive)
Issued 21 October 2002 Resolved
Properly label the engine room emergency shut offs located on the port side engine room access trunk.
Action required: 17 - Rectify deficiencies prior to departure
Due 22 October 2002
Resolved 16 December 2002
Resolution: Inspected sat onboard.
Stability › Watertight Integrity
Issued 21 October 2002 Resolved
Properly repair holes cut in the engine room exhaust casing on the port and starboard sides.
Action required: 17 - Rectify deficiencies prior to departure
Due 22 October 2002
Resolved 9 December 2002
Resolution: Inspected sat onboard.
Accommodation/Occupational Safety › Occupational Safety
Issued 21 October 2002 Resolved
Provide suitable crew guardrails or safety chains on both sides of the port side and stern loading ramps. LEGACY COMPONENT DESC: Deck Rail
Action required: 17 - Rectify deficiencies prior to departure
Due 22 October 2002
Resolved 9 December 2002
Resolution: Inspected sat onboard.
Stability › Weathertight Integrity
Issued 21 October 2002 Resolved
Provide weatherproof material in stuffing tube located on forward bulkhead on main deck.
Action required: 17 - Rectify deficiencies prior to departure
Due 22 October 2002
Resolved 9 December 2002
Resolution: Inspected sat onboard.
Electrical › Electrical Distribution System (service)
Issued 21 October 2002 Resolved
Provide housing for exposed junction box IWO air handler. LEGACY COMPONENT DESC: Outlet Box
Action required: 17 - Rectify deficiencies prior to departure
Due 22 October 2002
Resolved 9 December 2002
Resolution: Inspected sat onboard.
Navigation › Piloting/Steering
Issued 21 October 2002 Resolved
Provide magnetic compass with spare IAW SOLAS V/19.2.1.1 and 19.2.2.1. LEGACY COMPONENT DESC: Magnetic Compass
Action required: 17 - Rectify deficiencies prior to departure
Due 22 October 2002
Resolved 9 December 2002
Resolution: Inspected sat onboard.
Navigation › Collision/Grounding Avoidance
Issued 21 October 2002 Resolved
Provide echo-sounding device IAW SOLAS V/ 19.2.3.1 LEGACY COMPONENT DESC: Echo-sounding Device
Action required: 17 - Rectify deficiencies prior to departure
Due 22 October 2002
Resolved 9 December 2002
Resolution: Vessel does not need gear.
Navigation › Collision/Grounding Avoidance
Issued 21 October 2002 Resolved
Provide NAVTEX IAW SOALS IV/7.1.4 and show proper operation. LEGACY COMPONENT DESC: Danger Messages
Action required: 17 - Rectify deficiencies prior to departure
Due 22 October 2002
Resolved 9 December 2002
Resolution: sat.
Construction/Loadline › Markings
Issued 21 October 2002 Resolved
Provide deck reference mark in a contrasting color. LEGACY COMPONENT DESC: Load Line Mark
Action required: 17 - Rectify deficiencies prior to departure
Due 22 October 2002
Resolved 9 December 2002
Resolution: Inspected sat onboard.
Lifesaving › Lifejacket/PFD (General)
Issued 21 October 2002 Resolved
Provide additional life jacket for a total of twelve. LEGACY COMPONENT DESC: Quantity
Action required: 17 - Rectify deficiencies prior to departure
Due 22 October 2002
Resolved 9 December 2002
Resolution: Vessel atleast one per member.
Lifesaving › Lifejacket/PFD (General)
Issued 21 October 2002 Resolved
Provide lights for two of the lifejackets that were missing lights. LEGACY COMPONENT DESC: Lights
Action required: 17 - Rectify deficiencies prior to departure
Due 22 October 2002
Resolved 9 December 2002
Resolution: Inspected sat onboard.
Communications › Visual Communication
Issued 21 October 2002 Resolved
Provide daylight signaling lamp IAW SOLAS V/19.2.2.2. LEGACY COMPONENT DESC: Signalling Lamp
Action required: 17 - Rectify deficiencies prior to departure
Due 22 October 2002
Resolved 9 December 2002
Resolution: Inspected sat onboard.
Communications › Internal Communications System
Issued 21 October 2002 Resolved
Provide better hand held radios for emergency steering and for communication between the navigation bridge and the machinery space IAW CCSSC 2.34.1.1. LEGACY COMPONENT DESC: Portable Radios
Action required: 17 - Rectify deficiencies prior to departure
Due 22 October 2002
Resolved 9 December 2002
Resolution: Inspected sat onboard.
Stability › Watertight Integrity
Issued 21 October 2002 Resolved
Hole in hull on stem. Crop to good metal and make permanent and proper repairs to the satisfaction of the Administration.
Action required: 17 - Rectify deficiencies prior to departure
Due 22 October 2002
Resolved 3 December 2002
Resolution: Cleared on Board 12/3/02, CHK, MIAMS
Stability › Watertight Integrity
Issued 21 October 2002 Resolved
Through hole fitting and rub rail appear to be improper, wasted and possible holes on hull. Crop to good metal and make permanent and proper repairs to the satisfaction of the Administration.
Action required: 17 - Rectify deficiencies prior to departure
Due 22 October 2002
Resolved 3 December 2002
Resolution: Cleared on Board 12/3/02, CHK, MIAMS
Documentation › Certificates/Documents
Issued 21 October 2002 Resolved
Provide work list and/or proof of Hull Survey completed on October 5, 2002 to the USCG Marine Safety Officer in Miami Beach, Fax Number [phone withheld] Prior to departing Port of Miami. But No later than 01November 2002.
Action required: 705 - Other - as specified
Due 1 November 2002
Resolved 4 December 2002
Resolution: Cleared on Board 12/3/02, CHK, MIAMS
Engineering › Diesel Engine (propulsion/auxiliary-electric)
Issued 21 October 2002 Resolved
The Stbd Gen is covered and dripping with lube and F/O, several major leaks are suspected. Starter wiring improper and gauges not wired properly. Make proper repairs to the satisfaction of the Administration and prove proper operation to the satisfaction of the attend USCG Marine Inspector.
Action required: 17 - Rectify deficiencies prior to departure
Due 22 October 2002
Resolved 9 December 2002
Resolution: Inspected sat onboard.
Engineering › Sea-water System (primary cooling)
Issued 21 October 2002 Resolved
Main seawater piping is badly wasted and has numerous soft patches on it. Make permanent and proper repairs to the satisfaction of Administration. LEGACY COMPONENT DESC: Piping
Action required: 17 - Rectify deficiencies prior to departure
Due 22 October 2002
Resolved 3 December 2002
Resolution: Cleared on Board 12/3/02, CHK, MIAMS
Engineering › Generator (propulsion-electric)
Issued 21 October 2002 Resolved
Port generator improperly wired, dead end cable hanging and battering not secured. Make permanent and proper repairs to the satisfaction of the Administration and prove proper operation to the satisfaction of the attending USCG Marine Inspector.
Action required: 17 - Rectify deficiencies prior to departure
Due 22 October 2002
Resolved 3 December 2002
Resolution: Cleared on Board 12/3/02, CHK, MIAMS
Engineering › Sea-water System (primary cooling)
Issued 21 October 2002 Resolved
Main seawater cooling piping to the starboard main, held in place with chain ratchet and hose clamps. Make permanent and proper repairs to the satisfaction of the Administration and prove proper operation to the satisfaction of the attending USCG Marine Inspector LEGACY COMPONENT DESC: Piping
Action required: 17 - Rectify deficiencies prior to departure
Due 22 October 2002
Resolved 3 December 2002
Resolution: Cleared on Board 12/3/02, CHK, MIAMS
Engineering › Diesel Engine (propulsion-reduction gear)
Issued 21 October 2002 Resolved
Lagging on starboard main hanging and not attached proper. Make permanent and proper repairs to the satisfaction of the Administration. LEGACY COMPONENT DESC: Piping (exhaust)
Action required: 17 - Rectify deficiencies prior to departure
Due 22 October 2002
Resolved 9 December 2002
Resolution: Inspected sat onboard.
Fire Fighting › Fire Main
Issued 21 October 2002 Resolved
Second fire pump attached to fire main improperly. Make permanent and proper repairs to the satisfaction of the Administration and prove proper operation to the satisfaction of the attending USCG Marine Inspector. LEGACY COMPONENT DESC: Condition
Action required: 17 - Rectify deficiencies prior to departure
Due 22 October 2002
Resolved 29 February 2024
Resolution: Cleared on Board 12/3/02, CHK, MIAMS
Stability › Watertight Integrity
Issued 21 October 2002 Resolved
Vsl appears to have been designed with a watertight door and bulkhead forward in Engine Room. Make bulkhead watertight and prove proper operation of the watertight door to the satisfaction of the Administration and prove proper operation to the satisfaction of the attending USCG Marine Inspector.
Action required: 17 - Rectify deficiencies prior to departure
Due 22 October 2002
Resolved 9 December 2002
Resolution: Inspected sat onboard.
Accommodation/Occupational Safety › Potable Water System
Issued 21 October 2002 Resolved
Hole in aft starboard fresh water tank. Make permanent and proper repairs to the satisfaction of the Administration.
Action required: 17 - Rectify deficiencies prior to departure
Due 22 October 2002
Resolved 29 February 2024
Resolution: Cleared on Board 12/3/02, CHK, MIAMS
Accommodation/Occupational Safety › Occupational Safety
Issued 21 October 2002 Resolved
Man walk between forward tanks are unsafe. Provide permanent and proper walkway to the satisfaction of the Administration.
Action required: 17 - Rectify deficiencies prior to departure
Due 22 October 2002
Resolved 3 December 2002
Resolution: Cleared on Board 12/3/02, CHK, MIAMS
Electrical › Electrical Distribution System (service)
Issued 21 October 2002 Resolved
Improper and dead electrical wiring and lighting throughout the engine room. Make permanent and proper repairs to the satisfaction of the Administration. (Tape is not a proper repair!). LEGACY COMPONENT DESC: Wiring
Action required: 17 - Rectify deficiencies prior to departure
Due 22 October 2002
Resolved 3 December 2002
Resolution: Cleared on Board 12/3/02, CHK, MIAMS
Accommodation/Occupational Safety › Potable Water System
Issued 21 October 2002 Resolved
Hole in aft starboard fresh water tank. Make permanent and proper repairs to the satisfaction of the Administration.
Action required: 17 - Rectify deficiencies prior to departure
Due 22 October 2002
Resolved 3 December 2002
Resolution: Cleared on Board 12/3/02, CHK, MIAMS
Engineering › Fuel Oil Storage/Transfer System
Issued 21 October 2002 Resolved
Access plate to aft starboard wing tank has an improper gasket and appears to have a crack around. Make permanent and proper repairs to the satisfaction of the Administration and prove proper operation to the satisfaction of the attending USCG Marine Inspector. REMOVE COVER FOR INSPECTION OF RING
Action required: 17 - Rectify deficiencies prior to departure
Due 22 October 2002
Resolved 9 December 2002
Resolution: Inspected sat onboard.
Electrical › Electrical Distribution System (service)
Issued 21 October 2002 Resolved
Main Electrical panel has improper fitting breakers. Have Class check entire panel for proper breaker size and installation. LEGACY COMPONENT DESC: Panelboard
Action required: 705 - Other - as specified
Due 15 November 2002
Resolved 3 December 2002
Resolution: Cleared on Board 12/3/02, CHK, MIAMS
Engineering › Fuel Oil Storage/Transfer System
Issued 21 October 2002 Resolved
Expansion tank for starboard Generator wasted and leaking. Make permanent and proper repairs to the satisfaction of the Administration and prove proper operation to the satisfaction of the attending USCG Marine Inspector
Action required: 705 - Other - as specified
Due 15 November 2002
Resolved 3 December 2002
Resolution: Cleared on Board 12/3/02, CHK, MIAMS
Electrical › Electric Generation Source (service)
Issued 21 October 2002 Resolved
Remove make shift starter button on Port Generator and Make permanent and proper repairs to the satisfaction of the Administration and prove proper operation to the satisfaction of the attending USCG Marine Inspector. LEGACY COMPONENT DESC: Switch
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 December 2002
Resolution: Inspected sat onboard.
Fire Fighting › Fire Main
Issued 21 October 2002 Resolved
Repair fire main branch line port side under deck. LEGACY COMPONENT DESC: Condition
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 3 December 2002
Resolved 16 December 2002
Resolution: Inspected sat onboard.
Electrical › Electric Generation Source (service)
Issued 21 October 2002 Resolved
Major oil leak on starboard side generator. Make permanent and proper repairs to the satisfaction of the Administration and prove proper operation to the satisfaction of the attending USCG Marine Inspector
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 December 2002
Resolution: Inspected sat onboard.
Engineering › Diesel Engine (propulsion/auxiliary-electric)
Issued 21 October 2002 Resolved
Remove grating from front of Starboard generator and install proper guard to the satisfaction of the attending USCG Marine Inspector.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 December 2002
Resolution: Inspected sat onboard.
Communications › Radio Communications
Issued 21 October 2002 Resolved
Vessel's NAVTEX is being repaired at a facility. LEGACY COMPONENT DESC: NAVTEX
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 October 2003
Communications › Radio Communications
Issued 21 October 2002 Resolved
Prove that EPIRB is registered. LEGACY COMPONENT DESC: EPIRB
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 October 2003
Lifesaving › Inflatable Liferafts
Issued 21 October 2002 Resolved
Liferafts are overdue for maintenance. LEGACY COMPONENT DESC: Servicing
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 December 2003
Electrical › Lighting (service)
Issued 21 October 2002 Resolved
Make permanent and proper repairs to electric cables on forward mast. LEGACY COMPONENT DESC: Conductor
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 23 December 2002
Resolved 23 December 2003
Electrical › Electrical Distribution System (service)
Issued 21 October 2002 Resolved
Provide housing for exposed wires for air handlers. LEGACY COMPONENT DESC: Cable
Condition: Placed in Improper Service
Due 23 December 2002
Resolved 23 December 2003
Documentation › Certificates/Documents
Issued 21 October 2002 Resolved
Provide proof of last two drydocks.
Condition: Improper/Lack of Maintenance
Due 13 December 2002
Resolved 23 December 2003
Lifesaving › Rescue Boat Equipment
Issued 3 April 2002 Resolved
Provide missing SARTand IMO placard portside bridge. In accordance with the Caribbean Cargo Ship Safety Code.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 July 2002
Resolution: SART provided IAW CCSSC.
Operations/Management › Drills/Instruction
Issued 3 April 2002 Resolved
Commence conducting and logging Fire and Abandonship drills.
Action required: 15 - Rectify deficiencies by next port
Resolved 14 June 2002
Resolution: Log verified their fire and abandon ship drills were conducted.
Operations/Management › Drills/Instruction
Issued 3 April 2002 Resolved
Commence logging and lowering rescue boat monthly. LEGACY COMPONENT DESC: Launching/Recovery of Survival Craft
Action required: 15 - Rectify deficiencies by next port
Resolved 14 June 2002
Resolution: Log provided with required rescue boat entries.
Electrical › Electrical Distribution System (service)
Issued 3 April 2002 Resolved
Provide non-conductive matting in way of main switchboard in engine room. LEGACY COMPONENT DESC: Non-conducting Deck Covering
Action required: 15 - Rectify deficiencies by next port
Resolved 14 June 2002
Resolution: Non-conductive matting provided.
Accommodation/Occupational Safety › Occupational Safety
Issued 3 April 2002 Resolved
Provide machinery guards on starboard side generator. LEGACY COMPONENT DESC: Guards for Exposed Hazards
Action required: 15 - Rectify deficiencies by next port
Resolved 14 June 2002
Resolution: Machinery guards provided.
Electrical › Electrical Distribution System (service)
Issued 3 April 2002 Resolved
Remove all dead end wiring from throughout ship. (i.e. engineroom, aft steering and storage area on main deck) LEGACY COMPONENT DESC: Wiring
Action required: 15 - Rectify deficiencies by next port
Resolved 14 June 2002
Resolution: All dead end wiring removed.
Navigation › Emergency Steering
Issued 3 April 2002 Resolved
Provide steering gear instructions and block diagram in steering gear flat.
Action required: 15 - Rectify deficiencies by next port
Resolved 14 June 2002
Resolution: Steering gear instructions and block diagram provided in steering flat.
Fire Fighting › International Shore Connection
Issued 3 April 2002 Resolved
Update Fire Plan to reflect the location of the Internantional Shore Connection.
Action required: 15 - Rectify deficiencies by next port
Resolved 14 June 2002
Resolution: Fire plan updated to reflect International Shore Connection.
Pollution Prevention/Response › Prevention Equipment
Issued 3 April 2002 Resolved
Provide containment around standard discharge connection. LEGACY COMPONENT DESC: Fixed Containment
Action required: 15 - Rectify deficiencies by next port
Resolved 14 June 2002
Resolution: Containment provided around standard discharge connection.
Construction/Loadline › Structures
Issued 3 April 2002 Resolved
Replace gasket on Port Side engineroom door on main deck. LEGACY COMPONENT DESC: Door
Action required: 15 - Rectify deficiencies by next port
Resolved 14 June 2002
Resolution: Gasket replaced.
Fire Fighting › Fire Hoses
Issued 3 April 2002 Resolved
Provide Fire axe, Fire hose and Nozzle infront of forcastle IAW Fire control plan and Bulkhead labeling. LEGACY COMPONENT DESC: Location
Action required: 15 - Rectify deficiencies by next port
Resolved 14 June 2002
Resolution: Fire fighting equipment provided infront of forcastle IAW fire control plan and bulkhead labeling.
Engineering › Fuel Oil Storage/Transfer System
Issued 3 April 2002 Resolved
Replace sight glass on day tank in engine room aft. LEGACY COMPONENT DESC: Gauge
Action required: 17 - Rectify deficiencies prior to departure
Due 10 July 2002
Resolved 10 July 2002
Resolution: Sight glass provided.
Lifesaving › Buoyant Apparatus
Issued 3 April 2002 Resolved
Replace battery on starboard side upper deck ring buoy.
Action required: 15 - Rectify deficiencies by next port
Resolved 14 June 2002
Resolution: Battery replaced.
Construction/Loadline › Hull
Issued 3 April 2002 Resolved
Provide proof of dry docking.
Action required: 15 - Rectify deficiencies by next port
Resolved 14 June 2002
Resolution: Proof of dry dock supplied.
Pollution Prevention/Response
Issued 3 April 2002 Resolved
Remove and provide receipts of waste oil from steering gear room and tunnel in way of engine room.
Action required: 15 - Rectify deficiencies by next port
Resolved 14 June 2002
Resolution: Waste oil removed and receipts provided.
Communications › Radio Communications
Issued 3 April 2002 Resolved
Provide service report attesting to the satisfactory operation of GMDSS/ INMARSAT C to MSO Miami. ( vsl can receive messages but can't send.) LEGACY COMPONENT DESC: Satellite Communications Capability
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 July 2002
Resolution: Service report provided to the satisfactory operation of GMDSS/INMARSCAT C.
Personnel › Certificates/Documents/Licenses
Issued 3 April 2002 Resolved
Provide licensed crew IAW minimum safe manning document.
Action required: 15 - Rectify deficiencies by next port
Resolved 14 June 2002
Resolution: Crew licenses verified.
Lifesaving › Embarkation Appliances/Stations
Issued 3 April 2002 Resolved
Provide suitable illumination for survival craft embarkation IAW CCSSC 4.10.1.2
Action required: 15 - Rectify deficiencies by next port
Resolved 14 June 2002
Resolution: Illumination provided.
Deck/Cargo
Issued 10 September 1999 Resolved
provide additional anchor
Condition: Unknown
Due 10 September 1999
Resolved 10 September 1999
Fire Fighting
Issued 10 September 1999 Resolved
provide spanner wrenches to all fire stations
Condition: Unknown
Due 10 September 1999
Resolved 10 September 1999
Lifesaving
Issued 10 September 1999 Resolved
mount two light/smoke lifebuoys
Condition: Unknown
Due 10 September 1999
Resolved 10 September 1999
Navigation
Issued 10 September 1999 Resolved
provide markings to indicate rudder angle indicator on emergency steering station.
Condition: Unknown
Due 10 September 1999
Resolved 10 September 1999
Navigation
Issued 10 September 1999 Resolved
have class surveyor address adequancy of emergency steering and bridge rudder angle indicator.
Condition: Unknown
Due 10 September 1999
Resolved 10 September 1999
Accommodation/Occupational Safety
Issued 10 September 1999 Resolved
replace portside bridge window.
Condition: Unknown
Due 10 September 1999
Resolved 10 September 1999
Deck/Cargo
Issued 10 September 1999 Resolved
have class surveyor address anchor brake/release
Condition: Unknown
Due 10 September 1999
Resolved 10 September 1999
Documentation
Issued 10 September 1999 Resolved
provide current radio equipment certificate and prove operation of gmdss radios.
Condition: Unknown
Due 10 September 1999
Resolved 10 September 1999
Electrical
Issued 10 September 1999 Resolved
provide guards over generator drive belts.
Condition: Unknown
Due 10 September 1999
Resolved 10 September 1999

Ownership record