Inspection history · 22
23 June 2026
Annual Inspection · Deficiency Check · Administrative Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 8400996
8 August 2025
Annual Inspection · Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8205361
1 April 2025
Deficiency Check · Administrative Inspection · Drydock Exam · Internal Structural Exam
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 8092996
17 June 2024
Annual Inspection
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7936522
18 December 2023
Deficiency Check · In-Service Inspection
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 7840220
7 June 2023
Annual Inspection · Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7714751
2 March 2023
Hull Examination · Internal Structural Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7644332
20 January 2023
Drydock Extension · Internal Structural Exam · Administrative Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7623050
5 October 2022
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 7571879
1 June 2022
COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7465311
12 January 2021
Annual Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7103857
8 December 2020
Internal Structural Exam · Drydock Exam
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7103401
24 March 2020
Administrative Inspection
Administrative · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6930894
27 February 2020
COI Inspection · DAPI Audit · Administrative Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6911723
15 October 2019
In-Service Inspection · Deficiency Check
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 6834819
19 March 2019
Internal Structural Exam · Examination of Repairs · Administrative Inspection · Drydock Exam
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6628720
19 February 2019
Annual Inspection · DAPI Audit · Administrative Inspection · Deficiency Check
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6625637
15 August 2018
Administrative Inspection
Administrative · Navigation Center · Activity 6512817
2 April 2018
Annual Inspection · Administrative Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6384075
19 May 2017
Deficiency Check · DAPI Audit · Annual Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6144040
28 March 2017
Administrative Inspection · Hull Examination · Deficiency Check
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6099544
6 April 2016
Annual Inspection · DAPI Audit
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 5848512
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 23 June 2026
Resolved
(a)The following spaces must be equipped with a fire detection and alarm system of an approved type installed in accordance with 46 CFR part: (1) A space containing propulsion machinery. (c)Vessels described by 46 CFR 175.110(c) must have an interconnected fire detection system in compliance with § 181.450 installed in all enclosed areas where passengers and crew have routine access, including accommodation spaces and machinery spaces. Vessel did not have a fire detection system in the engine room nor an interconnected fire detection system.
Vessel is limited to a Lakes Bays and Sounds route until the alarm system is updated.
46CFR181.405 (a)(1)&(c)
Action required: 705 - Other - as specified
Resolved 30 July 2026
Resolution: Received video proof of interconnected fire detection.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 8 August 2025
Resolved
Each life float must be fitted with a lifeline, pendants, a painter, and a light. MI observed all lines, straps, and reflective material worn and not serviceable on the vessels 05 life floats.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 10 September 2025
Resolution: Vessels CG approved life floats were re-strung with grab and life lines, affixed new retro reflective tape. 03 life floats inspected Sat.
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 8 August 2025
Resolved
A vessel on an oceans, coastwise, limited coastwise, or Great Lakes route must carry—(1) Six hand red flare distress signals approved in accordance with § 160.021 in subchapter Q of this chapter, or other standard specified by the Commandant, including, but not limited to, approval series 160.121. Vessels 06 hand red flares expired.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 8 August 2025
Resolution: Vessel crew procured new flares and provided photo documentation, see def documents.
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 8 August 2025
Resolved
Each vessel that operates on the high seas, or that operates beyond three miles from the coastline of the Great Lakes, must have on board a FCC Type Accepted Category 1, 406 MHz EPIRB, installed to automatically float free and activate. Vessels EPIRB is not mounted free of overhead obstructions for float free deployment.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 10 September 2025
Resolution: Vessel crew relocated EPIRB mounting to stbd side aft storage box on open deck free from any overhead obstructions to facilitate float free activation. Inspected Sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 8 August 2025
Resolved
Repairs or alterations to the hull, machinery, or equipment that affect the safety of the vessel must not be made without the approval of the cognizant OCMI, except during an emergency. Vessel's exhaust system had epoxy patches on aluminum piping.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 10 September 2025
Resolution: Inspected permanent repairs made on vessel aluminum exhaust piping, eliminated soft temp repairs with welded pipe joints. Inspected Sat.
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 8 August 2025
Resolved
Shutoff valves, installed so as to close against fuel flow shall be fitted on fuel lines. Remote shutoff pull failed during testing.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 8 August 2025
Resolution: Vessel crew repair pull cable and provided photo evidence, see def documents.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 1 April 2025
Resolved
A vessel that is exposed to salt water more than three months in any 12 month period since the last examination must undergo a drydock examination and an internal structural at least once every two years. The vessel's two year dry dock date is 31 March 2025. Vessel must complete a satisfactory dry dock and internal structural examination prior to the carriage of passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 April 2025
Resolved 16 April 2025
Resolution: Vessel given satisfactory drydock credit.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 17 June 2024
Resolved
Penetrations and openings must be made watertight. Discovered 3 inch opening between tool room and A/C space.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 July 2024
Resolved 1 July 2024
Resolution: Open penetration sealed.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 17 June 2024
Resolved
Wiring joints and splices shall be mechanically secure. High water connection wire in A/C space was spliced with wire nuts and electrical tape.
46 CFR 183.05-50 (Old-T)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 July 2024
Resolved 1 July 2024
Resolution: High water connection wire properly repaired.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 17 June 2024
Resolved
Each life ring buoy must be of an approved type, constructed in accordance with the subpart 160.050 of this chapter. 3 life rings were dry rotted and unserviceable.
46 CFR 180.30-1(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 July 2024
Resolved 1 July 2024
Resolution: New life buoys installed.
01 - Certificates & Documentation › 012 - Crew Certificates › Certificates for master and officers
Issued 18 December 2023
Resolved
Each officer employed on any vessel must have his license on board and available for examination; the captain did not have his license at the time of the inspection. The captain is to provide proof of license prior to operating the vessel.
Action required: 705 - Other - as specified
Due 1 January 2024
Resolved 19 December 2023
Resolution: I verified the MMC is valid in MISLE and the captain sent photographic proof that it is in his possession.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 18 December 2023
Resolved
Waste receptacles must be constructed of non-combustible material with no opening in the sides or bottom; the vessel is currently equipped with plastic waste receptacles.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 January 2024
Resolved 19 December 2023
Resolution: The captain provided photographic proof of galvanized steel trash cans.
09 - Working and Living Conditions › 091 - Living Conditions › Other (crew and accommodation)
Issued 7 June 2023
Resolved
Deck rails shall be installed around the periphery of the vessel. Three areas used to transfer crew from the vessel to dredge do not have rail courses available.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 June 2023
Resolved 14 June 2023
09 - Working and Living Conditions › 092 - Working Conditions › Protection machines/parts
Issued 7 June 2023
Resolved
Protective guards shall be installed around hot machinery parts. Protective blanket on the port and starboard turbos were excessively worn.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 June 2023
Resolved 14 June 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 22 October 2019
Resolved
All Engines must be water cooled. Starboard MDE Cooling water overboard is leaking water. Replace leaking hose with new.
Action required: 17 - Rectify deficiencies prior to departure
Due 22 October 2019
Resolved 22 October 2019
Resolution: Received picture resolving deficiency was received.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 22 October 2019
Resolved
All engines must have at least two means of stopping engines. Port MDE has wire nuts securing engine shut down wire.
Action required: 17 - Rectify deficiencies prior to departure
Due 22 October 2019
Resolved 22 October 2019
Resolution: Received picture resolving deficiency was received.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 22 October 2019
Resolved
All machinery must and equipment must be maintained to afford adequate protection against from fire. Port MDE has a oil leak from outboard turbo.
Action required: 17 - Rectify deficiencies prior to departure
Due 22 October 2019
Resolved 22 October 2019
Resolution: Received picture resolving deficiency was received.
09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 22 October 2019
Resolved
All wiring must be sheathed. Wiring for port battery charger has exposed wires covered in electrical tape.
Action required: 17 - Rectify deficiencies prior to departure
Due 22 October 2019
Resolved 22 October 2019
Resolution: Received picture resolving deficiency was received.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Other (ISM)
Issued 22 October 2019
Resolved
For each marine causality required to be reported by 185.202 the owner, agent, master or PIC shall determine whether there is any evidence of alcohol or drug use by any individuals directly involved in the causality. Alcohol test strips onboard are expired.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 November 2019
Resolved 4 November 2019
Resolution: New alcohol test strips were provided onboard.
05 - Radio Communications › N/A - No Subsystem › Operation/maintenance
Issued 22 October 2019
Resolved
Vessels operated more than 100NM but less than 200NM must have DSC capability. MMSI # number being transmitted is the wrong number.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 November 2019
Resolved 4 November 2019
Resolution: MMSI is correctly being transmitted.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 22 October 2019
Resolved
A vessel must be provided with satisfactory arrangement for dewatering any watertight compartment. Overboard valve for bilge system has a temporary repair on valve. Replace valve at next dry-dock.
Action required: 705 - Other - as specified
Due 31 March 2021
Resolved 5 January 2021
Resolution: Verified valve replacement.
04 - Emergency Systems › N/A - No Subsystem › Public address system
Issued 22 October 2019
Resolved
Each vessel must be equipped with a public address system P/A system is incorporable.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 November 2019
Resolved 4 November 2019
Resolution: PA system is operating as designed.
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of liferafts
Issued 19 February 2019
Resolved
Each life float and buoyant apparatus must be stowed as required under this section. The required float free link must be of proper strength for the size of the life float or buoyant apparatus as indicated on its identification tag.
Current float free link is incorrect size and strength for life floats on board.
Replace current float free link with correct size and strength float free link. Passenger count is reduced to 29 until correct float free link is installed.
46 CFR 180.137
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 March 2019
Resolved 25 February 2019
Resolution: Verified installation of float free link.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 19 February 2019
Resolved
The minimum capacity of the power fire pump shall be 50 gallons per minute at a pressure of not less than 60 psi at the pump outlet. The pump outlet shall be fitted with a pressure gauge.
No pressure gauge installed on fire pump outlet.
Install pressure gauge on fire pump outlet.
46 CFR 181.10-1(c)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 March 2019
Resolved 25 February 2019
Resolution: Verified installation of new pressure gauge.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 19 February 2019
Resolved
Where flexible nonmetallic hose is permitted for use in piping systems by this section, it must meet SAE J-1942, SAE J-2006, SAE J-1527, USCG A1, A2, B1, B2.
Flexible hose in bilge piping system is not approved type. Replace unauthorized flexible hose in bilge piping system with an approved type hose.
46 CFR 182.720(e)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 March 2019
Resolved 25 February 2019
Resolution: Verified installation of CG Approved flexible hose.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 19 February 2019
Resolved
The employer shall provide an Employee Assistance Program (EAP) for all crewmembers [name withheld] program established for crew.
Provide proof of an established EAP program for crew.
46 CFR 16.401
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 March 2019
Resolved 11 March 2019
Resolution: Verified crew EAP signature documentation.
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 15 August 2018
Resolved
Vsl is broadcasting: Invalid MMSI, invalid Call Sign, incorrect Name, no static draft information, greater/smaller than expected vessel length, and not broadcasting an AIS Ship Type.
Condition: Invalid
Action required: 705 - Other - as specified
Due 15 September 2018
Resolved 19 November 2018
Resolution: Vessel corrected AIS Deficiencies
Engineering › Bilge Water Management System › Piping
Issued 2 April 2018
Resolved
Rubber gasket in between port side aluminum bilge pipe flanges wasted and falling apart. Replace gasket to insure a leak free connection in the bilge piping system.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 2 May 2018
Resolved 13 April 2018
Engineering › Fuel Oil Storage/Transfer System › Piping
Issued 2 April 2018
Resolved
Flexible section of diesel fill pipe is soaked with fuel and has lost its structural properties and not bonded.
Flex hoses installed must be highly resistant to water, petroleum oils etc and not properly bonded. Rep
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 16 April 2018
Resolved 13 April 2018
Engineering › Bilge Water Management System › Valve
Issued 2 April 2018
Resolved
Vessel's aluminum fixed bilge pumping system does not have a check valve in each line. Bilge systems with a central control point must have stop valves at the manifold and check valves with in each line. Install check valves in each bilge line as necessary.
Condition: Invalid
Action required: 705 - Other - as specified
Due 2 May 2018
Resolved 13 April 2018
Fire Fighting › Fire Main › Material
Issued 2 April 2018
Resolved
Vessel's fixed metallic bilge piping system and fire main system have non metallic hoses connecting hard pipes in various sections in both systems utilizing hose clamps for connections. Vessel is aluminum and therefore is allowed the use of non ferrous metallic piping in the fire and bilge system. Replace hoses with suitable material that is acceptable to the local OCMI.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 2 May 2018
Resolved 13 April 2018
Engineering › Bilge Water Management System › Piping
Issued 2 April 2018
Resolved
Vessel's fixed metallic bilge piping system and fire main system have non metallic hoses connecting hard pipes in various sections in both systems utilizing hose clamps for connections. Vessel is aluminum and therefore is allowed the use of non ferrous metallic piping in the fire and bilge system. Replace hoses with suitable material that is acceptable to the local OCMI.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 2 May 2018
Resolved 13 April 2018
Electrical › Electrical Distribution System (service) › Wiring
Issued 19 May 2017
Resolved
Remove dead-end cables in engine compartment IAW 46 CFR 183.05-50
Action required: 705 - Other - as specified
Due 3 June 2017
Resolved 19 May 2017
Lifesaving › Lifefloat › Painter
Issued 19 May 2017
Resolved
Replace sea painters on life float installations with 100ft of dark synthetic line IAW 46 CFR 180.15-5
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 19 May 2017
Documentation › Certificates/Documents › Certificate of Documentation (CG-1270)
Issued 19 May 2017
Resolved
Provide unexpired Certificate of Documentation or proof of application IAW 46 CFR 67.7
Action required: 60 - Rectify deficiencies prior to movement
Due 30 May 2017
Resolved 23 May 2017
Resolution: Received notification from NVDC that COD is processed.
Engineering › Shafting/Propeller Arrangements › Bearing
Issued 28 March 2017
Resolved
Replace starboard shaft bearing iaw 46CFR176.15-5.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 5 April 2017
Resolved 30 March 2017
Resolution: New bearing installed.
Construction/Loadline › Hull › Weld
Issued 28 March 2017
Resolved
Repair pinhole on aft starboard chine iaw 46CFR176.25-5.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 5 April 2017
Resolved 30 March 2017
Resolution: Pinhole was rewelded.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 28 March 2017
Resolved
Repair cracked welding on water tight bulkhead around generator exhaust iaw 46CFR176.15-5.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 5 April 2017
Resolved 30 March 2017
Resolution: Additional plating was welded onto bulkhead around exhaust pipe.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 28 March 2017
Resolved
Repairs cracked weld in forward compartment in accomodation area, stbd forward, along collision bulkhead iaw 46CFR176.15-5.
Condition: Invalid
Action required: 705 - Other - as specified
Due 5 April 2017
Resolved 30 March 2017
Resolution: Rewelded along support frame.
Electrical › Electrical Distribution System (service) › Wiring
Issued 28 March 2017
Resolved
Install wire stuffing at water tight bulkhead in aft accomodation area iaw 46CFR176.15.5.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 5 April 2017
Resolved 30 March 2017
Resolution: Installed silicon stuffing at wire run.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 28 March 2017
Resolved
Repair 03 welds in forward compartment at collision bulkhead iaw 46CFR176.15.5
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 5 April 2017
Resolved 30 March 2017
Resolution: Cracked welds were rewelded to the satisfaction of the attending marine inspector.