← All vessels
ECLIPSE
Passenger (Inspected) · Passenger Ship class · Built 1970s · USCG Northeast District (CGD-NE) · Other hulls named ECLIPSE
ECLIPSE is a 1972 passenger vessel (inspected). The Coast Guard has recorded 93 inspections since 1984, most recently in April 2025, along with 199 deficiencies and 1 operational control.
Records from 1984 to 2025. Most recent: inspection, 29 April 2025.
- Built
- 1972
- Last inspected
- 29 April 2025
- Documentation
- Valid · documentation file of 10 September 2026
- Deficiencies
- 199 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
539238
WDC5562
47167
Flag
UNITED STATES
368217460
Maury page id
psix-47167
Inspections, by type
…with no type recorded14
Years with a record
39 calendar years (1984–2025)
The 93 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.
Documentation record
Registered dimensions (L × B × D)79.9 ft × 27.2 ft × 9.7 ft
Registered tonnagegross 90 / net 61
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderBLOUT MARINE CORP · WARREN, RI, UNITED STATES · built 1972
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portNEW YORK, NY
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 11 June 2026 · expires 30 June 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it90 - Regulatory (Subpart C or D), Gross Ton
61 - Regulatory (Subpart C or D), Net Ton
61 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Radio station licence
WDM5603MMSI 368217460 · active · compulsorily equipped · granted 2 September 2021, expires 2 September 2031
WDC5562MMSI 367042980 · expired · compulsorily equipped · granted 8 May 2015, cancelled 21 June 2025 · licensed under a name not among this hull’s recorded names (not shown)
WCB2411MMSI not assigned · expired · compulsorily equipped · granted 4 August 1998, cancelled 20 December 2008 · licensed under a name not among this hull’s recorded names (not shown)
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its
US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown.
A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.
Inspection history · 93
29 April 2025
Drydock Exam · Administrative Inspection · Deficiency Check · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8123035
6 March 2025
Annual Inspection · MTSA Verification · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8088977
23 December 2024
Damage Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8050554
3 September 2024
In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7994860
4 March 2024
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7872458
12 May 2023
In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7686766
12 May 2023
Special Consideration
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 7686833
22 March 2023
Deficiency Check · Internal Structural Exam · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7655027
13 December 2022
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7601245
27 October 2021
Deficiency Check · COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7331750
3 June 2021
Drydock Exam · Hull Examination · Internal Structural Exam · Examination of Repairs · Deficiency Check · Administrative Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7214732
6 July 2020
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 6998552
21 August 2019
Deficiency Check · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6790211
30 April 2019
Internal Structural Exam · Deficiency Check · Hull Examination
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 6672548
21 August 2018
Deficiency Check · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6518487
25 May 2017
COI Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6155739
3 May 2017
Hull Examination
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6134723
27 January 2017
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 6078257
29 March 2016
Annual Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5842584
13 August 2015
DAPI Audit · MTSA Verification · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5214474
14 October 2014
Internal Structural Exam · Examination of Repairs · Hull Examination · Deficiency Check · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5012639
5 August 2014
MTSA Verification · Annual Inspection · Administrative Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4944399
11 May 2012
Deficiency Check · COI Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4308177
20 April 2009
Annual Inspection · Deficiency Check · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3457172
18 September 2008
Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3320041
7 August 2008
MTSA Verification · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3291496
3 April 2008
Hull Examination · Inclining Experiment
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3188787
16 October 2007
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 3081038
22 June 2007
Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2970420
25 May 2007
Plan Review (Other than "T")
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 2939878
7 May 2007
MARPOL Annex V Examination · MTSA Verification · COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2925376
26 May 2006
Plan Review (Other than "T")
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 2659765
18 May 2006
Internal Structural Exam · Hull Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2654291
10 February 2006
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2582846
16 June 2005
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 2392208
16 June 2005
Administrative Inspection
Administrative · Marine Safety Center (MSC) · Activity 2392344
19 May 2005
MTSA Verification · In-Service Inspection · Annual Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 2361691
15 September 2004
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2196605
14 July 2004
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 2132921
9 June 2004
Annual Inspection · MARPOL Annex V Examination · MTSA Verification · In-Service Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2093227
16 October 2003
COI Inspection · Hull Examination
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1929914
30 July 2003
Hull Examination · Administrative Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1861303
26 August 2002
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1666353
16 August 2002
Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1662253
2 August 2002
Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1655700
30 July 2002
COI Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1654143
2 August 2001
Re-Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1366520
10 July 2001
Hull Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1376672
31 July 2000
Re-Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1406768
5 August 1999
MARPOL Annex V Examination · COI Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1418576
16 July 1999
Hull Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1463489
10 August 1998
Re-Inspection · MARPOL Annex V Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1415036
13 November 1997
Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 786652
9 September 1997
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 785979
31 July 1997
Re-Inspection · MARPOL Annex V Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 781324
21 July 1997
Hull Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 779944
10 August 1996
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 94128
9 August 1996
COI Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1088750
17 July 1996
Administrative
Administrative · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 1089678
7 June 1996
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 875538
20 September 1995
Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1185309
15 August 1995
Hull Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1186979
10 August 1995
COI Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 871301
21 September 1994
COI Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1172229
3 December 1993
Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1401785
22 September 1993
COI Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 840205
10 August 1993
Hull Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1151153
20 April 1992
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 946445
1 April 1992
Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1261707
25 February 1992
COI Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1317743
25 February 1991
COI Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1230229
3 December 1990
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 917350
28 September 1990
Hull Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 902636
7 September 1990
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 925490
7 March 1990
COI Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 920323
31 January 1990
Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 920455
24 January 1990
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1213982
19 October 1989
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 893632
21 August 1989
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 888050
9 May 1989
Hull Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1201022
13 March 1989
COI Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1200603
24 January 1989
Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1209131
14 March 1988
COI Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1337842
2 November 1987
Hull Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1326032
17 September 1987
Administrative
Administrative · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1314604
29 April 1987
Administrative
Administrative · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1011660
20 March 1987
COI Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1007813
15 December 1986
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1008225
24 April 1986
Credit Drydock
Administrative · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1000878
20 March 1986
COI Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 995914
22 March 1985
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 985555
16 November 1984
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 977191
22 October 1984
Type not recorded
No type recorded · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 974508
Deficiency record · 199
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 6 March 2025
Resolved
A vessel of more than 19.8 meters (65 feet) in length must have at least one fire axe located in or adjacent to the primary operating station. Vessel missing fire axe on board. Must acquire fire axe within 14 days.
46 CFR 118.600
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 6 March 2025
Resolved
Each vessel must be equipped with at least two operable portable battery lights. One of these lights must be located at the operating station and the other at the access to the propulsion machinery space. Vessel missing portable battery light near machinery space. Must acquire portable battery light within 14 days.
46 CFR 120.430
10 - Safety of Navigation › N/A - No Subsystem › Magnetic compass
Issued 6 March 2025
Resolved
Except as otherwise provided in this section every vessel must be fitted with a suitable magnetic compass designed for marine use, to be mounted at the primary operating station. Vessel magnetic compass not mounted inside of wheelhouse. Vessel must properly mount magnetic compass within 14 days.
46 CFR 121.402
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 6 March 2025
Resolved
A loop of tubing or a short length of flexible hose shall be installed in the fuel supply line at or
near the engines. Vessel removed fixed piping with unsuitable flex hose. Vessel must replace hose with approved means within 30 days.
OLD T 46 CFR 182.20-40(b)(4)
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 6 March 2025
Resolved
All electrical equipment and circuits must be clearly marked and identified. Vessel 12V circuit breaker in the pilot house and 32V circuit breaker in engine room not properly marked. Vessel must mark each breaker within 14 days.
46 CFR 120.220 (d)
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 12 March 2024
Resolved
(a) Each vessel must carry at least one rescue boat unless the cognizant OCMI determines that: (1) The vessel is sufficiently maneuverable, arranged, and equipped to allow the crew to recover a helpless person from the water... OCMI allows use of rescue platforms approved IAW NYIC 02/99. USCG MI observed crew unable to utilize Jacob's Ladder as designed/intended during MOB drill. Operator will devise a better rigging system for the operation of current rescue platform arrangement.
10 - Safety of Navigation › N/A - No Subsystem › Nautical publications
Issued 12 March 2024
Resolved
(a) As appropriate for the intended voyage, a vessel must carry adequate and up-to-date: (1) Charts of large enough scale to make safe navigation possible... USCG MI did not observe charts that were up-to-date. Operator will provide receipt confirming print date of current charts and/or acquire current charts.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 12 March 2024
Resolved
(b) Gages to indicate engine cooling water discharge temperature and lubricating oil pressure shall be provided for all propulsion engines... in view of operator. USCG MI observed faulty port engine J/W gage on bridge and entire gage monitor panel was unsecured and loose.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 12 March 2024
Resolved
(a) All electrical installations shall be to the satisfaction of the Officer in Charge, Marine Inspection. Forward Storage room overhead wiring and light fixture not properly secured.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 12 March 2024
Resolved
Storage batteries. Batteries shall be checked for condition and security of stowage. The batteries in the Port & Starboard Engine room start battery boxes need to be prevented from shifting/moving in the box.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 12 March 2024
Resolved
(a) Wiring. (1) All wiring shall be run as high as practicable above bilges. In the Engine room, the Port engine starting Battery box has wires running/laying in the bilge, as well as an open-ended wire.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 12 March 2024
Resolved
(a) The general construction of the vessel shall be such as to minimize fire hazards insofar as reasonable and practicable. Vessels contracted for on or after July 1, 1961, which carry more than 150 passengers shall meet the requirements of subpart 72.05... Engine room ladder well bulkhead penetration is not properly insulated. IAW with regulation and Fire Control Plan, insulate the penetration/maintain fire boundary.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 12 March 2024
Resolved
(a) Propulsion machinery must be suitable in type and design for propulsion requirements of the hull in which it is installed and capable of operating at constant marine load under such requirements without exceeding its designed limitations. Both the Port and Starboard engine mounts are loose; when forward or reverse propulsion is engaged, the engines slide forward and aft.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 12 March 2024
Resolved
(a) The general construction of the vessel shall be such as to minimize fire hazards insofar as reasonable and practicable. Vessels contracted for on or after July 1, 1961, which carry more than 150 passengers shall meet the requirements of subpart 72.05... Provide manufacturer information for installed overhead insulation.
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 12 May 2023
Resolved
Portable fire extinguishers shall be installed and located to the satisfaction of the officer in charge of marine inspections.
Fire extinguisher missing from bracket in aft store room. Replace extinguisher or remove bracket. 46 CFR 181.30(b)
04 - Emergency Systems › N/A - No Subsystem › Safe areas
Issued 12 May 2023
Resolved
All escape hatches and other emergency exits used as means of escape must be marked on both sides in clearly legible letters at least 50 millimeters (2 inches) high: “EMERGENCY EXIT, KEEP CLEAR”.
Emergency exits not marked for main deck and engine room. 46 CFR 185.606
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 12 May 2023
Resolved
Each ring life buoy on a vessel must be readily accessible and be stowed in a way it can be rapidly cast loose.
Life ring on second deck was not readily accessible. 46 CFR 180.70(b)(2)
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 12 May 2023
Resolved
Placards containing instructions for the donning and use
of the life jackets aboard the vessel must be posted in conspicuous places that are regularly accessible and visible to the crew and passengers.
Vessel did not have required placards posted. 46 CFR 185.516(a)
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 12 May 2023
Resolved
All electrical installations shall be to the satisfaction of the Officer in Charge of Marine Inspections.
Junction box located on the 2nd deck, port side in the overhead was not secure to the bulkhead and had exposed wire nuts. (old T) 183.10-15(a)
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 12 May 2023
Resolved
All electrical installations shall be to the satisfaction of the Officer in Charge of Marine Inspections.
Junction box on the aft main deck by the emergency exit was missing the cover plate. (old T0 183.01-15(a)
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 12 May 2023
Resolved
On a vessel on which the number of passengers permitted on upper decks is limited by stability criteria, the maximum number of passengers allowed on an upper deck must be indicated by a durable marking of at least 1 inch numbers and letters at the entranceway to that deck.
Vessel did not a placard stating the number of passengers permitted on the upper deck. 46 CFR 185.602(g)
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Emergency preparedness
Issued 12 May 2023
Resolved
The owner, charterer, master or managing operator shall instruct each crew member, upon first being employed and prior to getting underway for the first time on a particular vessel and at least once every three months, as to the duties that the crew member is expected to perform in an emergency.
Crew was not familiar with the vessel or their duties.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 13 December 2022
Resolved
(01) of the required (03) Ring Buoy's not in serviceable condition and requires replacement.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 13 December 2022
Resolved
(03) of the required (03) Ring Buoy's retro reflective material wasted/worn and requires replacement.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 13 December 2022
Resolved
(03) of the required (03) Ring Buoy's requires the vessels name marked on it.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 13 December 2022
Resolved
During the Fire Drill the hose was discovered to have a hole in the line requiring it's renewal.
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 13 December 2022
Resolved
Vessel's Class I Watertight Door installed below deck shall have installed an indicator light for each door which warns when the door is open must be installed on the bridge.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 28 December 2021
Resolved
EACH LIFE RING BUOY MUST BE APPROVED IN ACCORDANCE WITH 46 CFR 160.050 IN SUBCHAPTER Q AND BE IN GOOD CONDITION. MI DISCOVERED THAT THE AFT LIFE RING BUOY WAS PUNCTURED WITH EXPOSED FLOATATION.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 17 December 2021
Resolved
Vessel shall meet the requirements of subpart 72.05 of sub-chapter H. Incorrect SFP insulation requires replacement in engine room. There are multiple openings in the engine room fire boundaries that require insulation.
46CFR177.10-5
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 17 December 2021
Resolved
All electrical installations shall be to the satisfaction of the [name withheld] stranded cable installed through out boat requires removal/replacement.
46CFR183.01-15(a)
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 17 December 2021
Resolved
Multiple deficiencies found not to the satisfaction of OCMI throughout vessel. Burnt/damaged wiring in galley overhead. Improperly secured/installed outlets in void #2. Top deck outlets not marine grade for outdoor use. Broken knobs and missing blanking plates on main generator switchboard. CB's in pilot house not labeled. Battery banks in engine room and pilot house not covered. Dead end wires located in fuel tank void.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 17 December 2021
Resolved
Fire stop missing throughout vessel around wire feed throughs. Ventilation dampener required on galley to accomodation air supply duct.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 17 December 2021
Resolved
Wet exhause hose stbd generator needs double clamp. Replace water lift on stbd generator due to improper repair. Insulate all dry exhaust piping. Port/starboard exhaust systems require overheard support.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 17 December 2021
Resolved
10BC fire extinguisher missing from pilot house.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 17 December 2021
Resolved
New wood material located in stairwell of main accomodation space. Vessel needs to provide evidence this was a replacement in kind and does not impact fire load calculations.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 17 December 2021
Resolved
Port side top deck ring life buoy grablines need replacement.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 17 December 2021
Resolved
Multiple children and adult lifejackets were either not marked with a vessel name or marked with incorrect vessel name.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 17 December 2021
Resolved
Vessel must have a rescue boat unless recovery of MOB can be visually observed from the operating station. Vessel recovered MOB from rescue platform at the stern of the vessel with no visibility for master.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 17 December 2021
Resolved
Vessel currently does not have a general arrangement to verify maximum passenger capacity.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 27 October 2021
Resolved
Vessel shall meet the requirements of subpart 72.05 of
sub-chapter H. Incorrect SFP insulation requires
replacement in engine room. There are multiple openings
in the engine room fire boundaries that require
insulation. Vessel passenger capacity reduced to 150
until required insulation is installed.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 27 October 2021
Resolved
Each vessel shall meet the applicable requirements of
subchapter S.
Water tight door in storage void does not fully shut and
requires repairs/replacement.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 21 August 2019
Resolved
THE MARINE EMPLOYER SHALL ENSURE THAT ALL PERSONS DIRECTLY INVOLVED IN A SERIOUS MARINE INCIDENT ARE CHEMICALLY TESTED FOR EVIDENCE OF DANGEROUS DRUGS AND ALCOHOL IN ACCORDANCE WITH THE REQUIREMENTS OF 46 CFR 4.06. PROVIDE VESSEL'S WRITTEN PROTOCOLS FOR MARINE CASUALTY DRUG TESTING WITHIN DAPI PROGRAM.
04 - Emergency Systems › N/A - No Subsystem › Water level indicator
Issued 21 August 2019
Resolved
INSPECTION SHALL BE IAW STANDARDS ACCEPTABLE AS GOOD MARINE PRACTICE. REMOUNT AND SECURE THE #2 FOREPEAK HIGH LEVEL FLOAT SWITCH.
46 CFR 176.25-1 (OLD T)
04 - Emergency Systems › N/A - No Subsystem › Public address system
Issued 21 August 2019
Resolved
INSPECTION SHALL BE IAW STANDARDS ACCEPTABLE AS GOOD MARINE PRACTICE. REMOUNT AND PROPERLY SECURE THE LOUD HAILER ON THE MAST THAT IS PARTIALLY SECURED WITH ZIP TIES.
46 CFR 176.25-1 (OLD T)
01 - Certificates & Documentation › 012 - Crew Certificates › Certificates for master and officers
Issued 21 August 2019
Resolved
ALL VESSELS OF LESS THAN 100 GRT - ONE MATE (EXCEPT VESSELS ON VOYAGES NOT EXCEEDING 12 HOURS IN DURATION MAY, IF THE [name withheld] TO BE SAFE, BE OPERATED WITHOUT MATES). PROVIDE SENIOR DECKHAND DESIGNATION LETTER.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 21 August 2019
Resolved
INSPECTION SHALL BE IAW STANDARDS ACCEPTABLE AS GOOD MARINE PRACTICE. PROPERLY SECURE THE UNSECURED ANCHOR ON THE TOP DECK.
46CFR176.25-1 (OLD T)
09 - Working and Living Conditions › 092 - Working Conditions › Steam pipes and pressure pipes
Issued 21 August 2019
Resolved
EACH OUTLET OR JUNCTION BOX MUST HAVE A COVER UNLESS A FIXTURE CANOPY, SWITCH COVER, RECEPTACLE COVER OR OTHER COVER IS USED. REPLACE MISSING JUNCTION BOX COVER ON UPPER DECK STBD SIDE FWD CORNER.
46CFR111.81-3(c)(OLD T)
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 21 August 2019
Resolved
INSPECTION SHALL BE IAW STANDARDS ACCEPTABLE AS GOOD MARINE PRACTICE. REMOVE DEAD END WIRE IN E/R PORT OUTBOARD SIDE @ 3RD LONGITUDINAL GIRDER NEAR "ON/OFF BOX.
46CFR176.25-1 (OLD T)
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 21 August 2019
Resolved
EACH OUTLET BOX MUST BE FIXED. PROPERLY SECURE DIMMABLE SWITCH ON UPPER DECK PORT SIDE ABOVE DOOR.
46CFR111.81-9 (OLD T)
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 21 August 2019
Resolved
EACH OUTLET BOX MUST BE FIXED. PROPERLY SECURE JUNCTION BOX UPPER DECK PORT SIDE ABOVE DOORWAY.
46CFR111.81-9 (OLD T)
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 21 August 2019
Resolved
ALL PIPING, VALVES AND FITTINGS SHALL BE IAW GOOD MARINE PRACTICE AND SUITABLE FOR THE INTENDED PURPOSE. REPLACE FIRE MAIN PIPING ABOVE STBD MDE THAT HAS 02 PIN HOLE LEAKS.
46CFR181.15-5(c)(OLD T)
09 - Working and Living Conditions › 091 - Living Conditions › Sanitary Facilities
Issued 21 August 2019
Resolved
ALL TOILETS AND WASH BASINS PROVIDED SHALL BE FITTED WITH ADEQUATE PLUMBING. REMOVE OR REPLACE WATER PUMP FOR TOILETS.
46CFR177-5(b)(OLD T)
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 21 August 2019
Resolved
INSURE THAT SCANTLINGS, MATERIAL, FASTENINGS, WORKMANSHIP AND ARRANGEMENT OF EACH VESSEL ARE SUCH TO PROVIDE FOR SAFE OPERATION. REPAIR/REPLACE WASTED SEWAGE TANK SUPPORT BRACKET ON FWD STBD SIDE OF TANK.
46CFR177.01-5 (OLD T)
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 21 August 2019
Resolved
EACH FIXTURE GLOBE, LENS, OR DIFFUSER MUST HAVE A HIGH STRENGTH GUARD OR BE MADE OF HIGH STRENGTH MATERIAL. REPLACE BROKEN LIGHT FIXTURE IN THE AFT PART OF THE LIQUOR STORAGE ROOM.
46CFR111.75-20(B)(OLD T)
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 21 August 2019
Resolved
INSPECTION SHALL BE IAW STANDARDS ACCEPTABLE AS GOOD MARINE PRACTICE. REROUTE WIRING FOR GALLEY AC THERMOSTAT.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 21 August 2018
Resolved
Replace life ring buoy in stern. 46CFR117.70(a)(3)
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 21 August 2018
Resolved
Properly mount cables in galley and on 1st void high level alarm. 46CFR120.340(b)(4)
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 21 August 2018
Resolved
Blanks on galley and main distribution panel. 46CFR120.330(b)
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 21 August 2018
Resolved
Repair battery cable to selector switch on starboard engine. 46CFR111.60-11(a)
Engineering › Bilge Water Management System › Not Operational
Issued 26 May 2017
Resolved
Demonstrate proper operation of fixed bilge dewatering system from all protected compartments.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 27 January 2017
Resolved
Complete credit DD/ISE prior to operating with passengers.
Communications › Radio Communications › Radiotelephone Transceiver (2-27.5 MHz)
Issued 29 March 2016
Resolved
Provide proof of MMSI # properly programmed into radio equipment and AIS.
Engineering › Fuel Oil Service System › Filter
Issued 29 March 2016
Resolved
Install fuel filter bowl on port MDE.
Electrical › Lighting (emergency) › Lighting Fixture
Issued 29 March 2016
Resolved
Install 2 emergency lights.
Electrical › Electrical Distribution System (service) › Wiring
Issued 13 August 2015
Resolved
Remove 02 deadend cables outside Engine Room.
Construction/Loadline › Penetrations › Gasket
Issued 13 August 2015
Resolved
Renew Engine Room escape scuttle gasket.
Engineering › Compressed Air System (control) › Valve
Issued 13 August 2015
Resolved
Install relief valve on blue bladder tank in Port Side of Engine Room.
Electrical › Electrical Distribution System (service) › Wiring
Issued 13 August 2015
Resolved
Clean up loose wires on the starboard exhaust fan.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 13 August 2015
Resolved
Prove proper payment of User Fees.
Lifesaving › Lifebuoys › Serviceable
Issued 13 August 2015
Resolved
Replace life ring on Starboard bridge wing.
Electrical › Electrical Distribution System (service) › Outlet Box
Issued 13 August 2015
Resolved
Replace outlet cover behind bar on 2nd deck.
Pollution Prevention/Response › Prevention Equipment › Sewage System Piping
Issued 11 December 2014
Resolved
AB02: Sewage tank vent is wasted and must be replaced in kind.
Construction/Loadline › Hull › Bottom Plating
Issued 14 October 2014
Resolved
Owner must complete UT belt gauging of the hull to ensure acceptable thickness and ensure no other areas of significant corrosion exist. Ultra Sonic testing will be completed to the satisfaction of the attending [name withheld] activity 5012639 for details
Electrical › Electrical Distribution System (service) › Switchboard
Issued 14 October 2014
Resolved
AB01: During DD/ISE and repair of hull plate in engine room it was noticed that main switch panel box for MDE batteries is wasted and could cause an electrical hazard. Must replace in kind or submit drawings, material list, and plans to SECNY for approval and conduct operational function test with USCG Marine Inspector.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 5 August 2014
Resolved
Prove payment of user fees.
Lifesaving › Lifebuoys › Serviceable
Issued 5 August 2014
Resolved
Replace Port Side ring buoy
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 5 August 2014
Resolved
Replace expired items in First Aid Kit (Aspirin & Ammonia Inhalant).
Construction/Loadline › Structures › Door
Issued 5 August 2014
Resolved
Make permanent repairs to Fire Doors.
Electrical › Electrical Distribution System (service) › Wiring
Issued 5 August 2014
Resolved
Remove dead end wiring (transducer) from space forward of Engine Room
Engineering › Reduction Gearing/Clutches › Bolt
Issued 5 August 2014
Resolved
Replace cotter pins on steering system.
Navigation › Piloting/Steering › Marine Charts
Issued 11 May 2012
Resolved
HA02-vessel must provide current charts for operating area.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 11 May 2012
Resolved
HA03-Post visible placard for Emergency Escape Hatch
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 11 May 2012
Resolved
HA04-Post signage on liquor hold side for water tight door.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 11 May 2012
Resolved
HA05-Install Guard on light in general hold.
Electrical › Lighting (service) › Lighting Fixture
Issued 11 May 2012
Resolved
HA07-Permanently install wires for lights up to second deck in way of ice Maker.
Pollution Prevention/Response › Prevention Equipment › Bilge Monitor
Issued 11 May 2012
Resolved
HA08- Remove oil from bilges in Engine Room.
Documentation › Certificates/Documents › FCC SSL
Issued 20 April 2009
Resolved
Provide a Bridge to Bridge Radiotelephony Certificate.
Communications › Alarms/Indicators › Bilge Alarm
Issued 20 April 2009
Resolved
Demonstrate proper operation of all bilge high water alarms.
Electrical › Electrical Distribution System (service) › Panelboard
Issued 20 April 2009
Resolved
Properly label all circuit breakers for two distribution panels located in the wheelhouse. All breakers not in service should be removed from the panel and properly blanked off.
Electrical › Electrical Distribution System (service) › Wiring
Issued 20 April 2009
Resolved
Remove extention cords from the bar service area located on the upper deck.
Communications › Alarms/Indicators › Speed/Distance Indicator
Issued 20 April 2009
Resolved
Make repairs to the starboard side generator RPM indicator located in the engine room and demonstrate proper operation of the same.
Electrical › Electrical Distribution System (service) › Metallic Enclosure/Frame
Issued 7 August 2008
Resolved
Provide cover for the A/C condenser
Lifesaving › Lifejacket/PFD (Type I) › Quantity
Issued 7 August 2008
Resolved
Provide onboard an additional 66 Adult Type 1 PFD's and 9 Child Type 1 PFD's and label each with vessel's name in accordance with 46 CFR 122.604.
Electrical › Electrical Distribution System (service) › Panelboard
Issued 7 August 2008
Resolved
Replace main circuit panel knobs (engine room).
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type 1
Issued 7 August 2008
Resolved
Replace hose (flex hose) for toilets which connect to salt water pump.
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 7 August 2008
Resolved
Properly label all PFD stowage areas with proper number of jackets in each.
Operations/Management › Equipment Service/Testing › EPIRB
Issued 7 August 2008
Resolved
Remove expired/unneeded EPIRB from vessel.
Stability › Incline Test › General
Issued 25 May 2007
Resolved
Based on the weight changes submitted to this office on 11MAY2007 Your vessel has experienced a total aggregate weight change in excess of 10% of the approved lightship displacement. In accordance with Marine Safety Center Technical Note 04-95 you are required to conduct a full stability test.
Stability › Incline Test › General
Issued 25 May 2007
Resolved
Based on the Marine Safety Center (MSC) review of your calculations your total passenger count is reduced to 325, and the maximum number of passengers carried on the upper deck is 200. This restriction remains in affect until a new stability letter is issued by MSC
Stability › Incline Test › General
Issued 25 May 2007
Resolved
Based on you weight change calculations your vessel is damage sensitive aft. It is imperative your vessel remain in compliance with the draft restrictions on your stability letter (paragraph 3). Prior to getting underway you are required to measure you freeboard to ensure compliance with the draft restrictions and log the readings.
Stability › Incline Test › General
Issued 25 May 2007
Resolved
The above requirements must be completed no later than 31OCT2007, at which time the vessel will no longer be allowed to operate with passengers.
Fire Fighting › Structural - A Class Divisions › Accommodation Spaces
Issued 7 May 2007
Resolved
Reinstall missing fire boundary insulation around door to crew quarters.
Electrical › Electrical Distribution System (service) › Wiring
Issued 7 May 2007
Resolved
Secure wiring for chest freezer outlet in crew quarters with metal supports every 24 inches.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 7 May 2007
Resolved
Replace missing junction box cover in crew quarters port side on overhead.
Electrical › Electrical Distribution System (service) › Wiring
Issued 7 May 2007
Resolved
Secure wiring in crew quarters forward bulkhead and aft bulkhead at light fixture with metal supports every 24 inches.
Electrical › Electrical Distribution System (service) › Wiring
Issued 7 May 2007
Resolved
Secure wiring for fresh water pumps in liquor room with metal supports every 24 inches.
Electrical › Electrical Distribution System (service) › Wiring
Issued 7 May 2007
Resolved
Remove or properly enclose dead end cable in engine space above starboard generator behind distribution panel.
Electrical › Electrical Distribution System (service) › Wiring
Issued 7 May 2007
Resolved
Secure wiring in engine space with metal supports every 24 inches at: starboard side battery charger cables; starboard side cables running to distribution panel; and wire port side aft and along aft bulkhead.
Electrical › Electrical Distribution System (service) › Wiring
Issued 7 May 2007
Resolved
Secure wiring for bilge high level alarm in forepeak with metal supports every 24 inches.
Electrical › Electrical Distribution System (service) › Wiring
Issued 7 May 2007
Resolved
Secure wiring in life jacket locker on upper deck with metal supports every 24 inches.
Accommodation/Occupational Safety › Other Accommodation Spaces › Recreation Space
Issued 7 May 2007
Resolved
Permanently secure AC enclosure near aft stairwell on main deck.
Lifesaving › Lifejacket/PFD (Type I) › Condition
Issued 7 May 2007
Resolved
Two child-size life jackets were not in serviceable condition. Number of children allowed onboard is reduced to 35 until this requirement is met.
Fire Fighting › Means of Escape › Escape Route Signs
Issued 7 May 2007
Resolved
Properly mark engine room escape hatch in engine room and on main deck. CLEARED ON BOARD.
Lifesaving › Lifefloat › Not on Board
Issued 26 May 2006
Resolved
Vessel has removed all of the primary lifesaving . The vessels route is restricted to Lakes, Bays, and Sounds no more than one mile from shore. 46CFR117.207(d)
Fire Fighting › Means of Escape › Stairways
Issued 26 May 2006
Resolved
The forward fire doors do not meet the means of escape requirements outlined in 46 CFR 116.500(i). The owner must install a panic bar and prove proper operation to the attending Marine Inspector.
Fire Fighting › Means of Escape › Stairways
Issued 26 May 2006
Resolved
Until the item # PT03 is satisfied you must provide one extra crewmember (in addition to what is required by your COI), who's sole duty is to open the forward fire door incase of an emergency.
Fire Fighting › Structural - A Class Divisions › Doors
Issued 26 May 2006
Resolved
Remove the carpet from under the aft fire door.
Fire Fighting › Combustible Materials › Partial Bulkheads/Decks
Issued 18 May 2006
Resolved
Provide a descrition of work being done to second deck.
Fire Fighting › Combustible Materials › Partial Bulkheads/Decks
Issued 18 May 2006
Resolved
Provide list of materials being installed on second deck.
Fire Fighting › Combustible Materials › Partial Bulkheads/Decks
Issued 18 May 2006
Resolved
Provide flammability characteristics of materials being installed on second deck.
Stability › Incline Test › General
Issued 18 May 2006
Resolved
Provide total amount of weight removed and added to second deck.
Communications › Alarms/Indicators › Bilge Alarm
Issued 19 May 2005
Resolved
Prove proper operation of holding tank room high level bilge alarm.
Lifesaving › Lifefloat › Floating Electric Waterlight
Issued 19 May 2005
Resolved
Replace 2 waterlights on LifeRafts
Lifesaving › Lifefloat › Paddle
Issued 19 May 2005
Resolved
Label all paddles with vessels name.
Documentation › Markings/Placards › Capacity Marking
Issued 19 May 2005
Resolved
Label UD with max pass (200).
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 19 May 2005
Resolved
Provide fire control plan.
Documentation › Manifests/Lists › Muster List/Emergency Instructions
Issued 19 May 2005
Resolved
Provide a station bill.
Personnel › Manning/Qualifications › Minimum Safe Manning
Issued 19 May 2005
Resolved
Designate senior deckhands in writing.
Operations/Management › Drills/Instruction › Not Conducted
Issued 16 October 2003
Resolved
COMPLETE REQUIRED DRILLS TO SATISFACTION OF ATTENDING MARINE INSPECTOR.
Documentation › Certificates/Documents › Stability Letter
Issued 16 October 2003
Resolved
PROVIDE COPY OF APPROVED STABILTY LTR TO LOCAL COTP/[name withheld] PASSENGERS.
Operations/Management › Equipment Service/Testing › EPIRB
Issued 16 October 2003
Resolved
PROVIDE PROOF OF EPIRB REGISTRATION AND HYDROSTATIC RELEASE EXPIRY DATE.
Operations/Management › Passenger Operations › Safety Orientation
Issued 16 October 2003
Resolved
PRESENT VSL TO NYCMI NEW YORK FOR NEW TO ZONE INSPECTION UPON ARRIVAL AND PRIOR TO CONDUCTING PASSENGER OPERATIONS.
Lifesaving › Buoyant Apparatus
Issued 30 July 2002
Resolved
Provide three floating water lights. LEGACY COMPONENT DESC: Floating light
Communications › Radio Communications
Issued 30 July 2002
Resolved
Provide new EPIRB hydrstatic release mechanism. LEGACY COMPONENT DESC: EPIRB
Electrical › Electric Generation Source (service)
Issued 30 July 2002
Resolved
Provide plan to comply with 46CFR183.10-5(f). LEGACY COMPONENT DESC: Generator rating
Electrical › Electrical Distribution System (service)
Issued 30 July 2002
Resolved
Remove obsolete power panels and switchboards as discusssed with CG Inspector. LEGACY COMPONENT DESC: Panelboard
Accommodation/Occupational Safety › Occupational Safety
Issued 30 July 2002
Resolved
Relocate emergency escape hatch key for engine room and label hatch. LEGACY COMPONENT DESC: Emergency Escape
Engineering
Issued 2 August 2001
Resolved
Repair/replace deteriorated fuel hoses.
Construction/Loadline
Issued 2 August 2001
Resolved
Provide correct/approved hose for bilge system with proper connections.
Engineering
Issued 2 August 2001
Resolved
Provide missing flame shields for Racor filters.
Construction/Loadline
Issued 2 August 2001
Resolved
Provide permanent closure where it is blanked-off at the hull penetration.,
Construction/Loadline
Issued 2 August 2001
Resolved
Repair identified leaking areas on Bridge by marine inspector.
Lifesaving
Issued 2 August 2001
Resolved
Provide missing sea rails on stove top.
Electrical
Issued 2 August 2001
Resolved
Provide adequate emergency lighting and signs as identified by marine inspector.
Construction/Loadline
Issued 2 August 2001
Resolved
Repair deteriorated engine room vents on open deck where rain gets into engine room.
Accommodation/Occupational Safety
Issued 2 August 2001
Resolved
Provide means of opening escape hatch located on main deck.
Documentation
Issued 2 August 2001
Resolved
Current fire plan.
Documentation
Issued 2 August 2001
Resolved
Provide current Station Bill.
Lifesaving
Issued 2 August 2001
Resolved
Provide wWeak link for LFs with the proper breaking strength.
Navigation
Issued 31 July 2000
Resolved
OUTDATED CHARTS AND LIGHT LIST
Lifesaving
Issued 31 July 2000
Resolved
OARS FOR LIFE RAFT NEED TO BE RE-STENCILED
Lifesaving
Issued 31 July 2000
Resolved
CLEAR PLASTIC LIGHT COVERS ARE CRACKED
Lifesaving
Issued 31 July 2000
Resolved
Life jacket reflective tape worn.
Lifesaving
Issued 31 July 1997
Resolved
INSTALL EPIRB IN A FLOAT FREE MANNER PRIOR TO CARRYING PASSENGERS OUTSIDE THREE NM._x001C_ _x001C_ _x001C_
Electrical
Issued 31 July 1997
Resolved
PROPERLY CAP LOOSE/DEAD-END CABLES IN ENGINE COMPARTMENT._x001C_ _x001C_ _x001C_ _x001C_
Deck/Cargo
Issued 31 July 1997
Resolved
INSTALL VESSEL'S ANCHOR IN READY USE CONDITION, MINIMUM 150' OF LINE, AND PROPERLY SECURE TO VSL._x001C_ _x001C_ _x001C_
Navigation
Issued 31 July 1997
Resolved
PROVIDE PROPER WATERPROOF CASE/PROPER LABELING FOR DISTRESS SIGNALS._x001C_ _x001C_ _x001C_ _x001C_
Lifesaving
Issued 31 July 1997
Resolved
PROPERLY SECURE ALL PADDLES FOR LIFEFLOATS TO THE RESPECTIVE PRIMARY DEVICES._x001C_ _x001C_ _x001C_
Electrical
Issued 31 July 1997
Resolved
INSTALL BATTERY CUTOFFS FOR ALL BATTERY INSTALLATIONS, (SPECIFICALLY, PORT GENERATOR START BATTERY)_x001C_ _x001C_ _x001C_
Lifesaving
Issued 31 July 1997
Resolved
DETERMINE REASON/CAUSE FOR 18"X18" PLYWOOD PATCH ON MSD TANK._x001C_ _x001C_ _x001C_ _x001C_
Fire Fighting
Issued 31 July 1997
Resolved
PROVIDE BRONZE OR EQUIVALENT UL STANDARD DUAL PURPOSE NOZZLES FOR ALL FIRE STATIONS._x001C_ _x001C_ _x001C_
Lifesaving
Issued 31 July 1997
Resolved
PROVIDE RETRO-REFLECTIVE TAPE FOR ALL REQUIRED RING BUOYS/PROPERLY ATTACH WATERLIGHT W/ SNAPHOOK.
Lifesaving
Issued 31 July 1997
Resolved
INSTALL BATTENS BETWEEN ALL L/F, BAs._x001C_ _x001C_ _x001C_ _x001C_
Construction/Loadline
Issued 15 August 1995
Resolved
Repair area around aft stbd chock.
Construction/Loadline
Issued 15 August 1995
Resolved
Clean and prepare for inspection area around shaft sleeves & make ready forinspection.
Construction/Loadline
Issued 15 August 1995
Resolved
Repair area wasted on side plate, 4th panel aft of port side opening.
Construction/Loadline
Issued 15 August 1995
Resolved
Clean sludge from around eng room bilge suction & sea chest area.
Lifesaving
Issued 10 August 1995
Resolved
Attach Water Light to ring bouy by seperate painter.
Lifesaving
Issued 10 August 1995
Resolved
Provide 6 additional adult PFDs & 2 child size. Number of total persons reduced to 357 until item corrected.
Electrical
Issued 10 August 1995
Resolved
Mount watertight door warning light.
Documentation
Issued 10 August 1995
Resolved
Provide pollution placard for eng compt._x001C_ _x001C_ _x001C_ _x001C_
Electrical
Issued 22 September 1993
Resolved
120V CIRCUT PANEL ON THE BRIDGE MISSING A BLANK._x001C_
Lifesaving
Issued 22 September 1993
Resolved
LIFEJACKET DONNING INSTRUCTIONS WERE NOT PROVIDED._x001C_
Navigation
Issued 22 September 1993
Resolved
STEERING CABLE NOT GREASED_x001C_
Unknown
Issued 22 September 1993
Resolved
DRUG TEST RECORDS NOT AVAILABLE_x001C_ _x001C_ _x001C_ _x001C_
Documentation
Issued 25 February 1992
Resolved
PROVIDE A WRITTEN WASTE MANAGEMENT PLAN.
Engineering
Issued 25 February 1992
Resolved
8: PROVIDE PROPER OPERATION OF LOW LUBE OIL TRIPS WITH AUDIBLE AND VISUAL ALARMS FOR EACH S/S DIESEL GENERATOR.
Engineering
Issued 25 February 1992
Resolved
9: PROVE PROPER OPERATION OF OVER SPEED TRIPS FOR EACH S/S DIESEL GENERATOR
Lifesaving
Issued 25 February 1992
Resolved
3: REPAIR OR REPLACE ALL RAT DAMAGED LIFE PRESERVERS WITH APPROVED MANUFACTORER'S REPAIR KIT._x001C_ _x001C_ _x001C_
Lifesaving
Issued 25 February 1992
Resolved
1: PROVIDE (28) ADULT AND (1) CHILD SIZE TYPE 1 LIFE JACKETS._x001C_ _x001C_ VSL IS RESTRICTED TO 335 TOTAL PERSONS UNTIL THIS REQUIREMENT IS MET._x001C_ _x001C_
Accommodation/Occupational Safety
Issued 25 February 1992
Resolved
4: PROVIDE SUITABLE LATCH FOR OVEN DOOR.
Lifesaving
Issued 25 February 1992
Resolved
5: PROVIDE AND EQUIP ALL BUOYANT APPARATUS AND LIFE FLOAT INSTALLATIONS IN ACCORDANCE WITH 46 CFR 180.15 AND 180.20. VSL IS RESTRICTED TO LAKES,BAYS,AND SOUNDS,NOT MORE THAN 1 MILE FROM SHORE ON THE INTRACOASTAL WATERWAY, MELBOURNE,FLORIDA TO 1 MILE SOUTH OF RICKENBACKER CAUSEWAY MIAMI, FLORIDA.
Accommodation/Occupational Safety
Issued 25 February 1992
Resolved
6: PROPERLY SECURE REFRIGERATORS FROM MOVEMENT.
Fire Fighting
Issued 25 February 1992
Resolved
7: PROVIDE PORTABLE HAND FIRE/BILGE PUMP WITH SUITABLE HOSE IN ACCORDANCE WITH 46 CFR 181.10-5.
Engineering
Issued 28 September 1990
Resolved
PROVIDE A SUITABLE BILGE SUCTION STRAINER THAT IS AT LEAST THREE TIMES THE DIAMETER OF THE BILGE PIPE IAW 46CRF 182.25-5(B).
Construction/Loadline
Issued 28 September 1990
Resolved
PROVIDE A DETAILED U.T. REPORT SHOWING THE LOCATION AND HULL THICKNESS AT EACH LOCATION.
Construction/Loadline
Issued 28 September 1990
Resolved
PROVIDE ORIGINAL HULL THICKNESS OF THE PLATES.
Electrical
Issued 28 September 1990
Resolved
PROVIDE A BATTERY BOX WITH A SUITABLE NON-CORROSIVE LINER FOR THE PORT DIESEL GENERATOR AND BLOCK FROM MOVEMENT.
Accommodation/Occupational Safety
Issued 28 September 1990
Resolved
CROP OUT AND INSERT THE WASTED AREA ON THE MSD HOLDING TANK WITH STEEL OF THE SAME DEMENSION.
Accommodation/Occupational Safety
Issued 19 October 1989
Resolved
REMOVE OVEN FROM GALLEY IAW OCMI 28AUG89 LETTER.
Documentation
Issued 19 October 1989
Resolved
SUPPLY AS BUILT PLANS FOR GALLEY/ACCOMODATION INSTALLATION AT STERN OF VESSEL. THIS SHOULD INCLUDE THE ELECTRICAL PLANS FOR THE GALLEY.
Accommodation/Occupational Safety
Issued 13 March 1989
Resolved
REMOVE ALL STORES FROM VOID SPACES PRIOR TO CARRYING PASSENGERS
Navigation
Issued 24 April 1986
Resolved
REPLACE BOTH RUDDER CUTLASS BEARINGS.
Construction/Loadline
Issued 24 April 1986
Resolved
REPLACE BROKEN WINDOWS AT STBD SIDE OF PILOT HOUSE AND MAIN DECK, PORT, SECOND FROM STERN.
Accommodation/Occupational Safety
Issued 24 April 1986
Resolved
REPAIR FRACTURED HADN RAIL AND BROKEN WELD AT BASE OF HAND RAIL SUPPORT, PORT AFT CORNER OF UPPER DECK.
Construction/Loadline
Issued 20 March 1986
Resolved
RENEW PORT SIDE STERN, MAIN DECK MOORING BITT.
Lifesaving
Issued 22 October 1984
Resolved
HAVE NAME AND CAPACITY OF PERSONS STENCILED ON BUOYANT APPARATUS WHERE NECESSARY. ALSO REMOVE NAMES OF OTHER VESSELS THAT WERE PREVIOUSLY STENCILED ON APPARATUS.
Construction/Loadline
Issued 22 October 1984
Resolved
REPLACE 3 BROKEN PANES OF GLASS ON PORT SIDE AND 3 BROKEN PANES OF GLASS STARBOARD SIDE. ALSO REMOVE GLASS PANES FROM WINDOWS 2,3,5,6 AND 7 ON BOTH PORT AND STARBOARD SIDES FOR EXAMINATION OF WINDOW PANES.
Lifesaving
Issued 22 October 1984
Resolved
REPLACE ONE (1) WATERLIGHT FOR BUOYANT APPARATUS ON CANOPY DECK.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.