Records from 2005 to 2026. Most recent: inspection, 17 March 2026.
Documentation record
Registered dimensions (L × B × D)64.9 ft × 26.0 ft × 8.0 ft
Registered tonnagegross 83 / net 56
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderMILLER'S MARINE RAILWAY · DELTAVILLE, VA, UNITED STATES · built 1972
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portANNAPOLIS, MD
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 14 April 2026 · expires 30 April 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it83 - Regulatory (Subpart C or D), Gross Ton
56 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 22
17 March 2026
Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8328058
18 March 2025
Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8096765
9 May 2024
Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7909256
5 March 2024
Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7878193
14 November 2023
Deficiency Check · In-Service Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7824438
3 October 2023
Internal Structural Exam · Drydock Exam
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7802729
25 August 2023
Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7776357
31 May 2023
Administrative Inspection
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7701848
11 May 2023
Annual Inspection · In-Service Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7686085
2 February 2023
Administrative Inspection
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7630932
7 February 2022
Administrative Inspection · COI Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7392116
9 March 2021
Annual Inspection · Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7152897
29 September 2020
Examination of Repairs · Drydock Exam · Internal Structural Exam
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7067815
5 March 2020
Administrative Inspection · Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6921438
12 March 2019
DAPI Audit · MTSA Verification · Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6642021
21 August 2018
Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6542429
8 August 2018
Administrative Inspection
Administrative · Navigation Center · Activity 6504385
13 March 2018
Deficiency Check · Annual Inspection · MTSA Verification · DAPI Audit
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6392300
1 February 2018
Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6392681
15 December 2017
Drydock Exam · Internal Structural Exam
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6324865
14 February 2017
MTSA Verification · Administrative Inspection · DAPI Audit · COI Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6088002
17 March 2016
MTSA Verification · DAPI Audit · Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 5838847
14 - Pollution Prevention › 144 - MARPOL Annex IV (Not Applicable to PSC Exams conducted in the U.S.) › Other (MARPOL Annex IV)
Issued 5 March 2024
Resolved
When operating on a body of water where the discharge of treated or untreated sewage is prohibited by the EPA under 40 CFR 140.3 or 140.4, the operator must secure each type I, II, or III marine sanitation device (MSD) in a manner which prevents discharge of treated or untreated sewage. Acceptable methods of securing the device include: 1) closing the seacock and removing the handle, 2) padlocking the seacock in a closed position, or 3) using a non-releasable wire-tie to hold the seacock in the closed position.
The valve on the line from the MSD to overboard was not properly secured.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 March 2024
Resolved 9 May 2024
Resolution: MSD valve secured.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 5 March 2024
Resolved
The owner, managing operator, or a qualified servicing facility as appropriate shall conduct the following inspections and tests: for portable fire extinguishers, the inspections, maintenance, and hydrostatic pressure tests required by Chapter 4 of NFPA 10, with the frequency specified in NFPA 10.
The last visible hydrostatic test date stamped or otherwise marked on the 15 lb CO2 portable extinguisher in the engine room is February 2013. NFPA 10 requires hydrostatic testing of portable CO2 extinguishers at 5 year intervals.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 March 2024
Resolved 9 May 2024
Resolution: New CO2 extinguisher dates verified.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 5 March 2024
Resolved
Vital systems: mechanically propelled ‘S’ vessels which carry more than 49 passengers shall comply with the provisions of Subchapter F of this chapter. Nonmetallic flexible hose must be in accordance with SAE J1942. Nonmetallic flexible hose may be used in vital fresh and salt water systems in lengths not exceeding 30 inches.
There is a 4-5 foot section of flexible hose in the fire main supply piping in the engine room. The hose is connected via double hose clamps.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 April 2024
Resolved 9 May 2024
Resolution: Hose distance meets the 30 inch requirement.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 14 November 2023
Resolved
07103 - Bulkheads or decks of the “A” Class shall be composed of steel or equivalent metal construction, suitably stiffened and made intact with the main structure of the vessel, such as shell, structural bulkheads, and decks. They shall be so constructed that, if subjected to the standard fire test, they would be capable of preventing the passage of smoke and flame for 1 hour. In addition, they shall be so insulated with approved structural insulation. The engine room was missing insulation on the overhead in numerous areas.
46 CFR 177.10-5 "Old T"
46 CFR 72.05-10(c)(1)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 17 November 2023
Resolution: Recieved photographic evidence the insulation was replaced.
09 - Working and Living Conditions › 092 - Working Conditions › Protection machines/parts
Issued 14 November 2023
Resolved
09218 - Piping, including valves, pipe fittings and flanges, conveying vapor, gas, or liquid, the temperature of which exceeds 65.5 °C (150 °F), must be insulated where necessary to prevent injuries. There was missing lagging on the exhaust pipe for the starboard engine.
46 CFR 116.970
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 17 November 2023
Resolution: Recieved photographic evidence the lagging was replaced.
04 - Emergency Systems › N/A - No Subsystem › Abandon ship drills
Issued 11 May 2023
Resolved
04110 - Each member of the crew shall participate in at least one abandon ship drill each month. Each abandon ship drill shall include…Abandon ship and man overboard drills and training shall be logged or otherwise documented for review by the Coast Guard upon request.
At time of attendance, there was no record of abandon ship drills being carried out onboard.
46 CFR 122.520
16c
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 16 May 2023
Resolution: Received photo evidence of abandon ship drill logs.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 11 May 2023
Resolved
07110 - One length of fire hose shall be provided for each fire hydrant required. If a garden hose is used, it shall be fitted with a commercial garden hose nozzle of good grade bronze or equivalent metal. When the fire pump was tested with the nozzle attached to the hose it impaired the water pressure.
46 CFR 176.25-50(a)
16c
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 16 May 2023
Resolution: Received a video of the fire nozzle working properly.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 11 May 2023
Resolved
04103 - At each vessel inspection the marine inspector shall require that all observed unsafe practices and hazardous situations be corrected. The emergency escape from the engine room does not have any lighting impeding safe escape from the space.
46 CFR 176.25-50(a)
50c
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 19 May 2023
Resolution: Received photographic evidence of the newly installed light by the engine room emergency exit.
05 - Radio Communications › N/A - No Subsystem › Main installation
Issued 11 May 2023
Resolved
05103 - A vessel must comply with the applicable requirements for any radio installations, as set forth in 47 CFR part 80. Vessels operated solely within 20 nautical miles of land must be equipped with a VHF-DSC radiotelephone installation meeting the requirements of § 80.1101(c)(2). The vessel’s radios are not properly equipped for VHF-DSC with GPS input.
46 CFR 121.502
47 CFR 80.905
47 CFR 80.1101(c)(2)
50c
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 June 2023
Resolved 25 August 2023
Resolution: A new VHF-DSC has been installed onboard.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 9 March 2021
Resolved
The minimum requirements for decks between the various spaces, where such decks form the boundaries of stepped main vertical zones, shall be as noted in table 72.05-10(f). Machinery spaces adjacent to public spaces of 500 square feet or less with combustible furnishings and isolated storerooms require an A-60 fire boundary. During inspection MI identified 04 areas of engine room overhead missing insulation.
46 CFR 116.115(a)
46 CFR 177.10-5(a)
"Old T"
46 CFR 72.05-10(f)
Table 72.05-10(f)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 March 2021
Resolved 16 March 2021
Resolution: Vessel O/O submitted photographic proof of replaced missing Fire insulation in the vessels engine room.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 9 March 2021
Resolved
Wiring joints and splices shall be mechanically secure and made in junction boxes. At time of inspection, MI observed wiring installed in junction box missing cover panel, making it not an enclosed space. Rectified on the spot.
46 CFR 120.115(a)
46 CFR 183.05-50(b)(1)
"Old T"
Action required: 10 - Deficiency Rectified
Due 9 March 2021
Resolved 9 March 2021
Resolution: Rectified on the spot
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 21 August 2018
Resolved
Provide proof of satisfactory repairs and proper operation of shaft coupling for the PORT Main Engine.
Action required: 701 - Prior to carriage of passengers/cargo
Due 22 August 2018
Resolved 21 August 2018
Resolution: Verified repairs and proper operation of shaft coupling for the PORT Main Engine. Vessel Operator supplied this office with copy of Service Tech Report. ALL SAT
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 8 August 2018
Resolved
Vsl is broadcasting: No static draft information and no dimension information (AIS Antenna Position ABCD values equals 0).
Condition: Invalid
Action required: 705 - Other - as specified
Due 8 September 2018
Resolved 18 October 2018
Resolution: Vessel has corrected AIS broadcasting deficiency.
Stability › Watertight Integrity › General
Issued 15 December 2017
Resolved
Conduct Sea Trials prior to “Carrying Passengers For Hire” to ensure proper operation of all repairs; including newly installed Port and Starboard rudder post/bearings, Port and Starboard MDE shafts. Sea Trials shall be conducted in the presence of a Coast Guard Marine Inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Due 9 January 2018
Resolved 13 March 2018
Resolution: Conducted statisfactory sea trial verifying proper operation of MDE shafts and bearings, all sat.
Stability › Watertight Integrity › General
Issued 15 December 2017
Resolved
Provide repair proposal for renewing the deteriorated/wasted metal in way of the forward bulkhead located in the engine room compartment.
Action required: 701 - Prior to carriage of passengers/cargo
Due 9 January 2018
Resolved 1 February 2018
Resolution: Vessel Owner provided satisfactory Repair Proposal to renewing the wasted metal, ALL SAT.