Records from 2016 to 2022. Most recent: inspection, 15 August 2022.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 11 July 2022
Resolved
The vsl struck the Townsend Inlet Bridge, which resulted in an approximate 3-ft long by 9-in wide hole located in the engine room of the starboard pontoon. Provide the USCG a detailed salvage plan and tow plan in order to safely transport the vsl to a facility/yard for repairs.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 12 July 2022
Resolution: USCG satisfied with salvage and tow plan provided by Northstar Marine.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 11 July 2022
Resolved
Repairs or alterations to the hull, machinery, or equipment that affect the safety of the vessel must not be made without the approval of the cognizant OCMI...Vsl will proceed to Yanks Marine in Tuckahoe, NJ following the incident that occurred on 11JUL2022 to further assess the damage to the hull, machinery, and equipment. Submit a repair plan to USCG Sector Delaware Bay to be reviewed before any repair work begins on the vessel.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 19 August 2022
Resolution: Vsl has surrended its COI and vessel has been scrapped.
10 - Safety of Navigation › N/A - No Subsystem › Other (navigation)
Issued 27 April 2021
Resolved
Vessel masthead light and sidelights have no vertical seperation. Provide plan for relocation of lights to meet COLREGS.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 May 2021
Resolved 19 January 2022
Resolution: Vessel sidelights were relocated from the cabintop to the upper deck.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 27 April 2021
Resolved
Openings exist between the engine room and the space forward of the engine room at entrances port and starboard. This forward space is not considered in CO2 volume calculations. Make these openings vapor tight.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 May 2021
Resolved 17 November 2021
Resolution: Owner fabricated hatch cover to prevent migration of CO2 from space in event of fixed system activation.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 30 March 2021
Resolved
Vessel hull is not marked in accordance with 46 CFR 185.602. There are no draft or loading marks present on the vessel. Affix draft or loading marks in accordance with the vessel's stability letter.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 April 2021
Resolved 28 April 2021
Resolution: Permanent loading mark applied in accordance with stability letter.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 13 August 2020
Resolved
INOPERABLE BILGE SYSTEM, PORT AND STBD SIDE. VESSEL IS RESTRICTED FROM OPERATING WITH PASSENGERS UNTIL RECTIFIED.
46 CFR 182
Action required: 10 - Deficiency Rectified
Due 13 August 2020
Resolved 13 August 2020
Resolution: Corrected prior to inspectors leaving.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 13 August 2020
Resolved
FUEL TANK VENTS ARE REQUIRED TO BE FITTED WITH FLAME SCREENS. ADD 30X30 FLAME SCREENS TO THE END OF FUEL TANK GOOSENECK VENTS.
46 CFR 182.20-35 (d)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 August 2020
Resolved 21 September 2020
Resolution: Sent photos in it
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 13 August 2020
Resolved
Bilge alarms in space #3 and #4 activate together, fix this so they activate individually.
46 CFR 182.530
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 August 2020
Resolved 24 August 2020
Resolution: O/O emailed in photos showing new bilge alarm panel with old one removed and visible. Alarm shown for space #4 and another in space #3.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 13 August 2020
Resolved
The visual indicator for high bilge level alarm for space #4 is broken, fix or replace visual indicator.
46 CFR 182.530
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 August 2020
Resolved 24 August 2020
Resolution: O/O emailed in photos showing new bilge alarm panel with old one removed and visible. Alarm shown for space #4 and another in space #3.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 13 August 2020
Resolved
All 5 water light batteries are expired but still functional. Replace batteries with new.
46 180.175 (4)
Action required: 10 - Deficiency Rectified
Due 13 August 2020
Resolved 13 August 2020
Resolution: New batteries were installed on sight
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 13 August 2020
Resolved
Glue rubber gasket back on fwd port deck hatch. 46 CFR 171.124
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 August 2020
Resolved 27 August 2020
Resolution: sent in photos of glue used
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 13 August 2020
Resolved
Replace retro tape on life floats to be SOLAS approved type II. 46 CFR 180.200 (a) (2)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 August 2020
Resolved 17 August 2020
Resolution: [name withheld] emailed in photos showing new tape on life floats
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 15 July 2019
Resolved
Make permanent repairs to port engine. Vessel allowed to replace engine with another engine, in kind. Vessel restricted from carrying passengers until repairs have been verified and sea trials conducted to the satisfaction of an attending USCG Marine Inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 July 2019
Resolution: Verified proper installation of replacement engine.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 13 May 2019
Resolved
Prove audible bilge alarm for #5 space on starboard side.
46 CFR 182.530
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 2 July 2019
Resolution: Hired electrician who found a loose wire at the operating station. Alarm works now.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 13 May 2019
Resolved
Ensure proper weathertight protection of structure in regards to the bow, bridge overhead, deck above lazarette, and deck near entrance to port engine room.
46 CFR 171.124(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 2 July 2019
Resolution: Vessel caulked around all through-hole penetrations in the overhead.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 13 May 2019
Resolved
Seal bulkhead penetration forward of ladder in port engine space.
46 CFR 171.14(a)
Action required: 10 - Deficiency Rectified
Resolved 2 July 2019
Resolution: Vessel sealed bulkhead penetration forward of ladder in the port engine space.
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 13 May 2019
Resolved
Provide logbook for drills and safety inspection requirements.
46 CFR 185.520
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 18 September 2019
Resolution: Vessel started logbook for drills and safety inspection requirements.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 23 April 2019
Resolved
Correct port and starboard bilge piping as discussed. Ensure metallic valve is affixed to bulkhead in the forepeak.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 May 2019
Resolved 13 May 2019
09 - Working and Living Conditions › 091 - Living Conditions › Lighting (Accommodation)
Issued 23 April 2019
Resolved
Repair or replace light in tearboard engine room.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 May 2019
Resolved 13 May 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 23 April 2019
Resolved
Renew hose for jacketwater expansion tank in starboard engine room.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 May 2019
Resolved 13 May 2019
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 23 April 2019
Resolved
In port lazarette, remove rot from frame aft of rudderpost and seal.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 May 2019
Resolved 13 May 2019
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 23 April 2019
Resolved
Clean and seal stanchion backing plates in lazarette.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 May 2019
Resolved 13 May 2019
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 23 April 2019
Resolved
In starboard lazarette, remove and seal zinc bolts.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 May 2019
Resolved 13 May 2019
Construction/Loadline › Hull › Hull Plating
Issued 27 October 2017
Resolved
Make vent penetrations watertight in way of forward compartment in STBD hull.
Action required: 705 - Other - as specified
Due 1 April 2018
Resolved 23 April 2019
Construction/Loadline › Hull › Hull Plating
Issued 27 October 2017
Resolved
Identified rotten area on the side frame facing of frame #2 on the outboard side of forward compartment in STBD hull. Remove side facing on frame and further inspect 1 1/2" x 7 1/2" [name withheld] frame for decay. Replace 3/4" Marine Douglas Fir plywood facing in kind.
Action required: 705 - Other - as specified
Due 1 April 2018
Resolved 23 April 2019
Construction/Loadline › Hull › Hull Plating
Issued 27 October 2017
Resolved
Identified rotten area of 1 ½” x 5 ½” [name withheld] clamp in bays 2 & 3 at deck edge in forward compartment, STBD hull.
Action required: 705 - Other - as specified
Due 1 April 2018
Resolved 23 April 2019
Construction/Loadline › Hull › Hull Plating
Issued 27 October 2017
Resolved
Identified rotten area on “regular” frame #1 at frame connection at the clamp in forward compartment STBD hull. Repair 3/4" Marine Grade [name withheld] plywood in kind.
Action required: 705 - Other - as specified
Due 1 April 2018
Resolved 23 April 2019
Construction/Loadline › Hull › Hull Plating
Issued 27 October 2017
Resolved
Identified rotten deck plywood in way of side shell, bays 1, 2 & 3 of forward compartment, STBD hull. Make permanent repairs to replace current temporary repair.
Action required: 705 - Other - as specified
Due 1 April 2018
Resolved 23 April 2019
Construction/Loadline › Hull › Hull Plating
Issued 27 October 2017
Resolved
Identified rotten wood backing plate IWO of mooring post in forward compartment, STBD hull. Replace wooden backing plate, in kind, along with wasted internal fasteners.
Action required: 705 - Other - as specified
Due 1 April 2018
Resolved 23 April 2019
Construction/Loadline › Hull › Hull Plating
Issued 27 October 2017
Resolved
Mooring post in forward compartment,STBD hull was temporarily repaired due to rotten wood. Make permanent repairs to mooring post, as discussed.
Action required: 705 - Other - as specified
Due 1 April 2018
Resolved 23 April 2019
Construction/Loadline › Hull › Hull Plating
Issued 27 October 2017
Resolved
Identified rotten area of 1 ½” x 5 ½” [name withheld] clamp (approximately 5”) in bays 2 & 3 at deck edge in forward compartment, PORT hull. Make repairs to rotten area, as agreed.
Action required: 705 - Other - as specified
Due 1 April 2018
Resolved 23 April 2019
Construction/Loadline › Hull › Hull Plating
Issued 27 October 2017
Resolved
Rotten deck plywood IWO of the side shell in bays 1, 2, & 3 of the void #2 STBD hull was temporarily repaired. Make permanent repairs to rotten plywood, as discussed.
Action required: 705 - Other - as specified
Due 1 April 2018
Resolved 12 April 2018
Construction/Loadline › Hull › Hull Plating
Issued 27 October 2017
Resolved
Deck plywood IWO of side shell in void #2 STBD hull is rotten. Replace deck plywood, in kind.
Action required: 705 - Other - as specified
Due 1 April 2018
Resolved 12 April 2018
Construction/Loadline › Hull › Hull Plating
Issued 27 October 2017
Resolved
Identified rotten inner side sheathing ½” Marine Douglas Fir plywood where frame #4 attaches at clamp in port engine room. Remove rotten wood and repair area, as discussed.
Action required: 705 - Other - as specified
Due 1 April 2018
Resolved 23 April 2019
Construction/Loadline › Hull › Hull Plating
Issued 27 October 2017
Resolved
Aft bulkhead on the outboard side of the port engine room was temporarily repaired IWO fuel piping penetrations. Make a permanent repair to temporary repair to the satisfaction of the attending USCG Marine Inspector.
Action required: 705 - Other - as specified
Due 1 April 2018
Resolved 23 April 2019
Construction/Loadline › Hull › Hull Plating
Issued 27 October 2017
Resolved
Deck plywood in the overhead above the main engine in the STBD engine room is rotten. Replace deck plywood, in kind.
Action required: 705 - Other - as specified
Due 1 April 2018
Resolved 23 April 2019
Construction/Loadline › Hull › Hull Plating
Issued 27 October 2017
Resolved
PORT and STBD fuel tanks are significantly wasted and must be replaced. New fuel tank plans shall be submitted to the OCMI for approval prior to construction.
Action required: 705 - Other - as specified
Due 1 April 2018
Resolved 23 April 2019
Construction/Loadline › Hull › Hull Plating
Issued 27 October 2017
Resolved
Fuel tank shutoff valve reach rod deck penetrations are not watertight. Make reach rod deck penetrations watertight IWO of PORT and STBD sides after replacing fuel tanks.
Action required: 705 - Other - as specified
Due 1 April 2018
Resolved 23 April 2019
Construction/Loadline › Hull › Hull Plating
Issued 27 October 2017
Resolved
Deck plywood behind the ladder in the port fuel tank space is rotten and leaking. Replace plywood and repair leak, as discussed.
Action required: 705 - Other - as specified
Due 1 April 2018
Resolved 23 April 2019
Construction/Loadline › Hull › Hull Plating
Issued 27 October 2017
Resolved
Deck plywood IWO the outboard side of the mooring post in the starboard lazarette is rotten and was temporarily repaired. Make permanent repairs to rotten deck plywood, as discussed.
Action required: 705 - Other - as specified
Due 1 April 2018
Resolved 23 April 2019
Construction/Loadline › Structures › Deck Plating
Issued 25 July 2017
Resolved
Complete all worklist items issued by Marine Safety Detachment Fort Macon on 03JUL17 in order to receive credit drydock. These items must be completed to the satisfaction of the attending CG Marine Inspector by the specified date.
Action required: 705 - Other - as specified
Due 1 December 2017
Resolved 25 October 2017
Resolution: Individual deficiencies were created for each worklist item.
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 3 July 2017
Resolved
Remove oil from engine room bilges./ 46CFR176.830(b)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 6 July 2017
Resolved 6 July 2017
Resolution: Witnessed satisfactory cleanliness of engine room bilges.
Construction/Loadline › Penetrations › Valve Flange
Issued 3 July 2017
Resolved
Provide metallic penetration and valve arrangement for water line penetrations through forward engine room bulkhead./ 46CFR182.720(d)(1) and 46CFR182.404
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 17 July 2017
Resolved 6 July 2017
Resolution: Observed satisfactory valve.
Electrical › Electrical Distribution System (service) › Wiring
Issued 3 July 2017
Resolved
Remove dead-end wiring in #2 starboard compartment overhead./ 46CFR176.830(a)
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 17 July 2017
Resolved 18 July 2017
Construction/Loadline › Penetrations › Gasket
Issued 3 July 2017
Resolved
Make electrical penetrations through forward engine room bulkhead watertight./ 46CFR179.320(c)
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 17 July 2017
Resolved 6 July 2017
Resolution: Observed watertight electrical penetrations.
Construction/Loadline › Penetrations › Gasket
Issued 3 July 2017
Resolved
Make remote fuel shutoffs watertight./ 46CFR179.212
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 17 July 2017
Resolved 18 July 2017
Resolution: Cleared this deficiency as it will be rectified once the fuel tanks are replace in the fall.
Electrical › Electrical Distribution System (service) › Grounding Conductor
Issued 3 July 2017
Resolved
Provide bonding wire for portside fuel tank fill line./ 46CFR182.445(g)
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 17 July 2017
Resolved 18 July 2017
Electrical › Electrical Distribution System (service) › Wiring
Issued 3 July 2017
Resolved
Provide wire supports every 24 inches for electrical wire in fuel tank space./ 46CFR183.340(b)(4)
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 17 July 2017
Resolved 18 July 2017
Engineering › Diesel Engine (propulsion-direct drive) › Exhaust Manifold
Issued 3 July 2017
Resolved
Repair exhaust leaks on starboard main engine, outboard manifold./ 46CFR176.830.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 17 July 2017
Resolved 6 July 2017
Resolution: Observed repaired exhaust manifold in engine running and secured positions.
Electrical › Electrical Distribution System (service) › Grounding Conductor
Issued 3 July 2017
Resolved
Install electrical grounding wires in starboard lazarette./ 46CFR176.800
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 17 July 2017
Resolved 18 July 2017
Stability › Intact Righting Energy › General
Issued 3 July 2017
Resolved
Only 43 passengers may be carried on the upper deck as per calculations done on this date (03JUL17).
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 17 July 2017
Resolved 25 July 2017
Resolution: New temp COI issued.
Stability › Incline Test › General
Issued 2 May 2017
Resolved
CGMIs identified during vessel's current drydock that multiple weight changes have occurred since the vessel's simplified stability test was conducted on 5July1972. A new stability test must be conducted on this vessel prior to carrying passengers. If the vessel is to carry less than 49 passengers a simplified stability test may be conducted IAW 46CFR178.320(c)(2). (See attached for more)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 25 July 2017
Fire Fighting › Fixed CO2 Fire Extinguishing System › Piping
Issued 28 June 2016
Resolved
Replace corroded piping in CO2 fixed fire system in accordance with commandant type approved system.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 29 June 2016
Resolution: Piping was replaced by a third party company IAW the manufacturer's instructions based on his servicing report
Fire Fighting › Fixed CO2 Fire Extinguishing System › Tanks
Issued 28 June 2016
Resolved
Conduct hydrostatic testing of fixed CO2 bottles or replace with serviceable bottles.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 29 June 2016
Resolution: Bottles were cleaned and painted by third party servicing company. Received report for work completed.
Documentation › Certificates/Documents › Stability Letter
Issued 24 June 2016
Resolved
Post stability letter
Action required: 705 - Other - as specified
Due 8 July 2016
Resolved 28 June 2016
Resolution: Stability letter posted
Documentation › Certificates/Documents › Certificate of Inspection
Issued 24 June 2016
Resolved
Post COI
Action required: 705 - Other - as specified
Due 8 July 2016
Resolved 28 June 2016
Resolution: COI posted
Operations/Management › Drug and Alcohol Testing › EAP Training Requirements
Issued 24 June 2016
Resolved
Conduct annual drug and alcohol training with members in drug/alcohol program and make record.
Action required: 705 - Other - as specified
Due 8 July 2016
Resolved 28 June 2016
Resolution: Crewmember training completed and recorded
Operations/Management › Drug and Alcohol Testing › Recordkeeping
Issued 24 June 2016
Resolved
Provide copy of company drug/alcohol program policy
Action required: 705 - Other - as specified
Due 8 July 2016
Resolved 28 June 2016
Resolution: Policy provided on board
Documentation › Logs/Records › Garbage Recordkeeping
Issued 24 June 2016
Resolved
Provide vessel's waste management plan
Action required: 705 - Other - as specified
Due 8 July 2016
Resolved 28 June 2016
Resolution: Garbage management plan provided on board
Lifesaving › Lifefloat › Serviceable
Issued 24 June 2016
Resolved
Provide spaces for lifefloats
Action required: 705 - Other - as specified
Due 8 July 2016
Resolved 28 June 2016
Resolution: spaces installed between lifefloats
Fire Fighting › Fixed Fire Detection System › Power Supply
Issued 24 June 2016
Resolved
Prove secondary power source for fire detection panel is functioning
Action required: 705 - Other - as specified
Due 8 July 2016
Resolved 28 June 2016
Resolution: Detector panel secondary power system was fixed by third party fire servicing company
Electrical › Electrical Distribution System (service) › Wiring
Issued 24 June 2016
Resolved
Remove wire nuts under wheelhouse and replace with rpoper connector
Action required: 705 - Other - as specified
Due 8 July 2016
Resolved 24 June 2016
Resolution: Cleared on the spot by replacing the wire nut with a butt connector
Stability › Watertight Integrity › Watertight Subdivision Standard
Issued 24 June 2016
Resolved
Remove plastic piping penetrations of watertight bulkheads
Action required: 705 - Other - as specified
Due 8 July 2016
Resolved 23 April 2019
Engineering › Fuel Oil Service System › Filter
Issued 24 June 2016
Resolved
Install flame shield on Racor filter
Action required: 705 - Other - as specified
Due 8 July 2016
Resolved 8 July 2016
Resolution: Received photos of installed flame shields
Engineering › Bilge Water Management System › Piping
Issued 24 June 2016
Resolved
Remove PVC piping in bilge system and replace with acceptable material
Action required: 705 - Other - as specified
Due 8 July 2016
Resolved 23 April 2019
Operations/Management › Pollution › Control of Discharge of Oil
Issued 24 June 2016
Resolved
Clean oil in engine room bilges
Action required: 705 - Other - as specified
Due 8 July 2016
Resolved 28 June 2016
Resolution: oil removed
Unknown
Issued 24 June 2016
Resolved
Submit plans for alterations made to fire and bilge systems
Action required: 705 - Other - as specified
Due 8 July 2016
Resolved 8 July 2016
Resolution: Received basic plans for modifications
Engineering › Bilge Water Management System › Piping
Issued 24 June 2016
Resolved
Add hose clamps to all flex hose in various piping systems on vessel
Action required: 705 - Other - as specified
Due 8 July 2016
Resolved 28 June 2016
Resolution: Additional hose clamps added
Stability › Watertight Integrity › General
Issued 24 June 2016
Resolved
Make main deck watertight in way of broken port side #4 compartment vent
Action required: 705 - Other - as specified
Due 8 July 2016
Resolved 28 June 2016
Resolution: Metallic gooseneck vent installed.
Fire Fighting › Fire Main › Condition
Issued 24 June 2016
Resolved
Repair leak in fire main piping
Action required: 705 - Other - as specified
Due 8 July 2016
Resolved 28 June 2016
Resolution: Tested fire main to verify no leaks
Construction/Loadline › Hull › Hull Plating
Issued 24 June 2016
Resolved
Repair hull leak in #1 port side compartment between #1 & #2 frames in way of chine. prior to carrying passengers on a limited coastwise route.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 June 2016
Resolution: O/O made a temporary repair with 5200 on the interior and exterior spray rail
Communications › Alarms/Indicators › Bilge Alarm
Issued 24 June 2016
Resolved
Prove proper operation of port hull #1 compartment bilge high level alarm.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 June 2016
Resolution: Verified operation on board
Construction/Loadline › Hull › Side Shell
Issued 9 May 2016
Resolved
the outstanding worklist items that were extended to the end of the 2016 season because of your plan to conduct a full credit drydock exam and continue repairs in MSD Fort Macon’s AOR. The following list is the result of the remaining dry dock worklist items and outstanding plan review items.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 November 2016
Resolved 23 April 2019