← All vessels
STARFISH
Passenger (Inspected) · Passenger Ship class · Built 1970s · USCG East District (CGD-E) · Other hulls named STARFISH
STARFISH is a 1972 passenger vessel (inspected). The Coast Guard has recorded 85 inspections since 1985, most recently in August 2022, along with 193 deficiencies and 1 casualty investigation in 2022.
Records from 1985 to 2022. Most recent: inspection, 15 August 2022.
- Built
- 1972
- Last inspected
- 15 August 2022
- Documentation
- Expired · documentation file of 10 September 2026
- Deficiencies
- 193 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
- Casualties
- 1 investigation · 2022
Identity
541240
WDB8668
47234
Flag
UNITED STATES
366782630, 366962550 (licence lapsed)
Maury page id
psix-47234
Inspections, by type
…with no type recorded10
Years with a record
33 calendar years (1985–2022)
The 85 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
This record may be incomplete: the most recent inspection recorded for this vessel was 4 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.
Documentation record
Registered dimensions (L × B × D)64.5 ft × 26.8 ft × 8.4 ft
Registered tonnagegross 90 / net 61
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderANCLOTE MARINE WAYS INC · TARPON SPRINGS, FL, UNITED STATES · built 1972
Hull materialWood
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portSEA ISLE CITY, NJ
Trade endorsementsCoastwise, unrestricted
DocumentationExpired · issued 30 June 2004
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it90 - Regulatory (Subpart C or D), Gross Ton
61 - Regulatory (Subpart C or D), Net Ton
61 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Radio station licence
WDB8668MMSI 366962550 · cancelled · compulsorily equipped · granted 22 May 2014, cancelled 11 August 2022
WCZ8387MMSI 366782630 · expired · compulsorily equipped · granted 25 May 2000, cancelled 31 July 2010 · licensed under a name not among this hull’s recorded names (not shown)
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its
US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown.
A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.
Inspection history · 85
15 August 2022
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7534432
11 July 2022
Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7504070
11 July 2022
Administrative Inspection · In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7504254
11 July 2022
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7505657
6 June 2022
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7470180
19 January 2022
Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7400473
17 November 2021
Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7352871
12 May 2021
Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7199107
30 March 2021
Drydock Exam · Internal Structural Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7164740
13 August 2020
Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7035211
15 July 2019
Plan Review "T" Boat · Damage Survey
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6751151
13 May 2019
Annual Inspection · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6682761
23 April 2019
Deficiency Check · Drydock Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6667881
15 May 2018
Administrative Inspection
Administrative · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 6414678
7 May 2018
DAPI Audit · COI Inspection · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6408044
14 November 2017
Examination of Repairs · Construction Oversight · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6364622
25 May 2017
Administrative Inspection
Administrative · USCG East District (dp) · USCG East District (CGD-E) · Activity 6191809
7 April 2017
Deficiency Check · Examination of Repairs · COI Inspection · Deadweight Survey · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6137575
14 October 2016
Internal Structural Exam · Hull Examination · Examination of Repairs
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 6022471
24 June 2016
Administrative Inspection · DAPI Audit · Deficiency Check · Annual Inspection · Plan Review "T" Boat
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5917309
9 May 2016
Hull Examination · Internal Structural Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5872824
29 May 2014
Annual Inspection · In-Service Inspection · DAPI Audit
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4901805
1 December 2011
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4199263
25 March 2008
Annual Inspection · Hull Examination
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3170804
3 April 2007
COI Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2900482
3 April 2006
Hull Examination · Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2615253
23 June 2005
Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2399907
22 April 2004
Annual Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 2072647
30 December 2003
Hull Examination
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 2042251
3 March 2003
Annual Inspection · Damage Survey
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1752099
3 April 2002
COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1600659
1 November 2001
Hull Examination
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 772695
1 April 2001
Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1062298
19 March 2001
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1061442
19 March 2001
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1077384
26 April 2000
Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1052007
17 April 2000
Hull Examination
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 817594
27 January 2000
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 813968
22 June 1999
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 885194
7 April 1999
Deficiency Check · COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1122390
7 May 1998
Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 791950
6 April 1998
Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 791136
23 December 1997
Hull Examination
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1107866
17 May 1997
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 152068
16 April 1997
Administrative
Administrative · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1098646
2 April 1997
Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1091976
8 April 1996
COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1079894
12 March 1996
Hull Examination
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1371319
22 September 1995
Drydock Extension
Administrative · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 875221
22 August 1995
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 878702
24 April 1995
Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 843122
31 March 1995
Plan Review "T" Boat
Administrative · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 836383
6 May 1994
Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1169080
26 April 1994
Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1168112
31 March 1994
Hull Examination
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 855027
17 February 1994
Hull Examination
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 853692
26 October 1993
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 163474
23 September 1993
Administrative
Administrative · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 844643
16 September 1993
Examination of Repairs
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1149613
15 September 1993
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 131189
24 August 1993
Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1157703
7 May 1993
COI Inspection · Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1155988
12 February 1993
Deficiency Check
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 836395
29 January 1993
Hull Examination · Deficiency Check
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 830938
9 September 1992
Deficiency Check
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 949735
21 July 1992
Re-Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 947131
22 October 1991
Deficiency Check
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 942432
30 July 1991
Hull Examination
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1246013
26 June 1991
Deficiency Check
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1229941
3 June 1991
Re-Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1230119
26 October 1990
Deficiency Check
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 920439
11 July 1990
COI Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1211557
4 April 1990
Deficiency Check
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 904010
22 February 1990
Deficiency Check
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1211343
17 January 1990
Deficiency Check · Hull Examination
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1224103
14 November 1989
Hull Examination
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1216137
15 August 1989
Deficiency Check
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1196035
19 July 1989
Re-Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 895184
23 September 1988
Deficiency Check
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1204641
25 August 1988
Hull Examination · Re-Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1349766
21 July 1987
COI Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1033398
13 February 1987
Hull Examination
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1323840
30 December 1986
Drydock Extension
Administrative · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1003917
21 July 1986
Re-Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1000124
1 July 1985
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 982033
Deficiency record · 193
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 11 July 2022
Resolved
The vsl struck the Townsend Inlet Bridge, which resulted in an approximate 3-ft long by 9-in wide hole located in the engine room of the starboard pontoon. Provide the USCG a detailed salvage plan and tow plan in order to safely transport the vsl to a facility/yard for repairs.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 11 July 2022
Resolved
Repairs or alterations to the hull, machinery, or equipment that affect the safety of the vessel must not be made without the approval of the cognizant OCMI...Vsl will proceed to Yanks Marine in Tuckahoe, NJ following the incident that occurred on 11JUL2022 to further assess the damage to the hull, machinery, and equipment. Submit a repair plan to USCG Sector Delaware Bay to be reviewed before any repair work begins on the vessel.
10 - Safety of Navigation › N/A - No Subsystem › Other (navigation)
Issued 27 April 2021
Resolved
Vessel masthead light and sidelights have no vertical seperation. Provide plan for relocation of lights to meet COLREGS.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 27 April 2021
Resolved
Openings exist between the engine room and the space forward of the engine room at entrances port and starboard. This forward space is not considered in CO2 volume calculations. Make these openings vapor tight.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 30 March 2021
Resolved
Vessel hull is not marked in accordance with 46 CFR 185.602. There are no draft or loading marks present on the vessel. Affix draft or loading marks in accordance with the vessel's stability letter.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 13 August 2020
Resolved
INOPERABLE BILGE SYSTEM, PORT AND STBD SIDE. VESSEL IS RESTRICTED FROM OPERATING WITH PASSENGERS UNTIL RECTIFIED.
46 CFR 182
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 13 August 2020
Resolved
FUEL TANK VENTS ARE REQUIRED TO BE FITTED WITH FLAME SCREENS. ADD 30X30 FLAME SCREENS TO THE END OF FUEL TANK GOOSENECK VENTS.
46 CFR 182.20-35 (d)
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 13 August 2020
Resolved
Bilge alarms in space #3 and #4 activate together, fix this so they activate individually.
46 CFR 182.530
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 13 August 2020
Resolved
The visual indicator for high bilge level alarm for space #4 is broken, fix or replace visual indicator.
46 CFR 182.530
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 13 August 2020
Resolved
All 5 water light batteries are expired but still functional. Replace batteries with new.
46 180.175 (4)
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 13 August 2020
Resolved
Glue rubber gasket back on fwd port deck hatch. 46 CFR 171.124
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 13 August 2020
Resolved
Replace retro tape on life floats to be SOLAS approved type II. 46 CFR 180.200 (a) (2)
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 15 July 2019
Resolved
Make permanent repairs to port engine. Vessel allowed to replace engine with another engine, in kind. Vessel restricted from carrying passengers until repairs have been verified and sea trials conducted to the satisfaction of an attending USCG Marine Inspector.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 13 May 2019
Resolved
Prove audible bilge alarm for #5 space on starboard side.
46 CFR 182.530
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 13 May 2019
Resolved
Ensure proper weathertight protection of structure in regards to the bow, bridge overhead, deck above lazarette, and deck near entrance to port engine room.
46 CFR 171.124(a)
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 13 May 2019
Resolved
Seal bulkhead penetration forward of ladder in port engine space.
46 CFR 171.14(a)
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 13 May 2019
Resolved
Provide logbook for drills and safety inspection requirements.
46 CFR 185.520
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 23 April 2019
Resolved
Correct port and starboard bilge piping as discussed. Ensure metallic valve is affixed to bulkhead in the forepeak.
09 - Working and Living Conditions › 091 - Living Conditions › Lighting (Accommodation)
Issued 23 April 2019
Resolved
Repair or replace light in tearboard engine room.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 23 April 2019
Resolved
Renew hose for jacketwater expansion tank in starboard engine room.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 23 April 2019
Resolved
In port lazarette, remove rot from frame aft of rudderpost and seal.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 23 April 2019
Resolved
Clean and seal stanchion backing plates in lazarette.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 23 April 2019
Resolved
In starboard lazarette, remove and seal zinc bolts.
Construction/Loadline › Hull › Hull Plating
Issued 27 October 2017
Resolved
Make vent penetrations watertight in way of forward compartment in STBD hull.
Construction/Loadline › Hull › Hull Plating
Issued 27 October 2017
Resolved
Identified rotten area on the side frame facing of frame #2 on the outboard side of forward compartment in STBD hull. Remove side facing on frame and further inspect 1 1/2" x 7 1/2" [name withheld] frame for decay. Replace 3/4" Marine Douglas Fir plywood facing in kind.
Construction/Loadline › Hull › Hull Plating
Issued 27 October 2017
Resolved
Identified rotten area of 1 ½” x 5 ½” [name withheld] clamp in bays 2 & 3 at deck edge in forward compartment, STBD hull.
Construction/Loadline › Hull › Hull Plating
Issued 27 October 2017
Resolved
Identified rotten area on “regular” frame #1 at frame connection at the clamp in forward compartment STBD hull. Repair 3/4" Marine Grade [name withheld] plywood in kind.
Construction/Loadline › Hull › Hull Plating
Issued 27 October 2017
Resolved
Identified rotten deck plywood in way of side shell, bays 1, 2 & 3 of forward compartment, STBD hull. Make permanent repairs to replace current temporary repair.
Construction/Loadline › Hull › Hull Plating
Issued 27 October 2017
Resolved
Identified rotten wood backing plate IWO of mooring post in forward compartment, STBD hull. Replace wooden backing plate, in kind, along with wasted internal fasteners.
Construction/Loadline › Hull › Hull Plating
Issued 27 October 2017
Resolved
Mooring post in forward compartment,STBD hull was temporarily repaired due to rotten wood. Make permanent repairs to mooring post, as discussed.
Construction/Loadline › Hull › Hull Plating
Issued 27 October 2017
Resolved
Identified rotten area of 1 ½” x 5 ½” [name withheld] clamp (approximately 5”) in bays 2 & 3 at deck edge in forward compartment, PORT hull. Make repairs to rotten area, as agreed.
Construction/Loadline › Hull › Hull Plating
Issued 27 October 2017
Resolved
Rotten deck plywood IWO of the side shell in bays 1, 2, & 3 of the void #2 STBD hull was temporarily repaired. Make permanent repairs to rotten plywood, as discussed.
Construction/Loadline › Hull › Hull Plating
Issued 27 October 2017
Resolved
Deck plywood IWO of side shell in void #2 STBD hull is rotten. Replace deck plywood, in kind.
Construction/Loadline › Hull › Hull Plating
Issued 27 October 2017
Resolved
Identified rotten inner side sheathing ½” Marine Douglas Fir plywood where frame #4 attaches at clamp in port engine room. Remove rotten wood and repair area, as discussed.
Construction/Loadline › Hull › Hull Plating
Issued 27 October 2017
Resolved
Aft bulkhead on the outboard side of the port engine room was temporarily repaired IWO fuel piping penetrations. Make a permanent repair to temporary repair to the satisfaction of the attending USCG Marine Inspector.
Construction/Loadline › Hull › Hull Plating
Issued 27 October 2017
Resolved
Deck plywood in the overhead above the main engine in the STBD engine room is rotten. Replace deck plywood, in kind.
Construction/Loadline › Hull › Hull Plating
Issued 27 October 2017
Resolved
PORT and STBD fuel tanks are significantly wasted and must be replaced. New fuel tank plans shall be submitted to the OCMI for approval prior to construction.
Construction/Loadline › Hull › Hull Plating
Issued 27 October 2017
Resolved
Fuel tank shutoff valve reach rod deck penetrations are not watertight. Make reach rod deck penetrations watertight IWO of PORT and STBD sides after replacing fuel tanks.
Construction/Loadline › Hull › Hull Plating
Issued 27 October 2017
Resolved
Deck plywood behind the ladder in the port fuel tank space is rotten and leaking. Replace plywood and repair leak, as discussed.
Construction/Loadline › Hull › Hull Plating
Issued 27 October 2017
Resolved
Deck plywood IWO the outboard side of the mooring post in the starboard lazarette is rotten and was temporarily repaired. Make permanent repairs to rotten deck plywood, as discussed.
Construction/Loadline › Structures › Deck Plating
Issued 25 July 2017
Resolved
Complete all worklist items issued by Marine Safety Detachment Fort Macon on 03JUL17 in order to receive credit drydock. These items must be completed to the satisfaction of the attending CG Marine Inspector by the specified date.
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 3 July 2017
Resolved
Remove oil from engine room bilges./ 46CFR176.830(b)
Construction/Loadline › Penetrations › Valve Flange
Issued 3 July 2017
Resolved
Provide metallic penetration and valve arrangement for water line penetrations through forward engine room bulkhead./ 46CFR182.720(d)(1) and 46CFR182.404
Electrical › Electrical Distribution System (service) › Wiring
Issued 3 July 2017
Resolved
Remove dead-end wiring in #2 starboard compartment overhead./ 46CFR176.830(a)
Construction/Loadline › Penetrations › Gasket
Issued 3 July 2017
Resolved
Make electrical penetrations through forward engine room bulkhead watertight./ 46CFR179.320(c)
Construction/Loadline › Penetrations › Gasket
Issued 3 July 2017
Resolved
Make remote fuel shutoffs watertight./ 46CFR179.212
Electrical › Electrical Distribution System (service) › Grounding Conductor
Issued 3 July 2017
Resolved
Provide bonding wire for portside fuel tank fill line./ 46CFR182.445(g)
Electrical › Electrical Distribution System (service) › Wiring
Issued 3 July 2017
Resolved
Provide wire supports every 24 inches for electrical wire in fuel tank space./ 46CFR183.340(b)(4)
Engineering › Diesel Engine (propulsion-direct drive) › Exhaust Manifold
Issued 3 July 2017
Resolved
Repair exhaust leaks on starboard main engine, outboard manifold./ 46CFR176.830.
Electrical › Electrical Distribution System (service) › Grounding Conductor
Issued 3 July 2017
Resolved
Install electrical grounding wires in starboard lazarette./ 46CFR176.800
Stability › Intact Righting Energy › General
Issued 3 July 2017
Resolved
Only 43 passengers may be carried on the upper deck as per calculations done on this date (03JUL17).
Stability › Incline Test › General
Issued 2 May 2017
Resolved
CGMIs identified during vessel's current drydock that multiple weight changes have occurred since the vessel's simplified stability test was conducted on 5July1972. A new stability test must be conducted on this vessel prior to carrying passengers. If the vessel is to carry less than 49 passengers a simplified stability test may be conducted IAW 46CFR178.320(c)(2). (See attached for more)
Fire Fighting › Fixed CO2 Fire Extinguishing System › Piping
Issued 28 June 2016
Resolved
Replace corroded piping in CO2 fixed fire system in accordance with commandant type approved system.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Tanks
Issued 28 June 2016
Resolved
Conduct hydrostatic testing of fixed CO2 bottles or replace with serviceable bottles.
Documentation › Certificates/Documents › Stability Letter
Issued 24 June 2016
Resolved
Post stability letter
Documentation › Certificates/Documents › Certificate of Inspection
Issued 24 June 2016
Resolved
Post COI
Operations/Management › Drug and Alcohol Testing › EAP Training Requirements
Issued 24 June 2016
Resolved
Conduct annual drug and alcohol training with members in drug/alcohol program and make record.
Operations/Management › Drug and Alcohol Testing › Recordkeeping
Issued 24 June 2016
Resolved
Provide copy of company drug/alcohol program policy
Documentation › Logs/Records › Garbage Recordkeeping
Issued 24 June 2016
Resolved
Provide vessel's waste management plan
Lifesaving › Lifefloat › Serviceable
Issued 24 June 2016
Resolved
Provide spaces for lifefloats
Fire Fighting › Fixed Fire Detection System › Power Supply
Issued 24 June 2016
Resolved
Prove secondary power source for fire detection panel is functioning
Electrical › Electrical Distribution System (service) › Wiring
Issued 24 June 2016
Resolved
Remove wire nuts under wheelhouse and replace with rpoper connector
Stability › Watertight Integrity › Watertight Subdivision Standard
Issued 24 June 2016
Resolved
Remove plastic piping penetrations of watertight bulkheads
Engineering › Fuel Oil Service System › Filter
Issued 24 June 2016
Resolved
Install flame shield on Racor filter
Engineering › Bilge Water Management System › Piping
Issued 24 June 2016
Resolved
Remove PVC piping in bilge system and replace with acceptable material
Operations/Management › Pollution › Control of Discharge of Oil
Issued 24 June 2016
Resolved
Clean oil in engine room bilges
Unknown
Issued 24 June 2016
Resolved
Submit plans for alterations made to fire and bilge systems
Engineering › Bilge Water Management System › Piping
Issued 24 June 2016
Resolved
Add hose clamps to all flex hose in various piping systems on vessel
Stability › Watertight Integrity › General
Issued 24 June 2016
Resolved
Make main deck watertight in way of broken port side #4 compartment vent
Fire Fighting › Fire Main › Condition
Issued 24 June 2016
Resolved
Repair leak in fire main piping
Construction/Loadline › Hull › Hull Plating
Issued 24 June 2016
Resolved
Repair hull leak in #1 port side compartment between #1 & #2 frames in way of chine. prior to carrying passengers on a limited coastwise route.
Communications › Alarms/Indicators › Bilge Alarm
Issued 24 June 2016
Resolved
Prove proper operation of port hull #1 compartment bilge high level alarm.
Construction/Loadline › Hull › Side Shell
Issued 9 May 2016
Resolved
the outstanding worklist items that were extended to the end of the 2016 season because of your plan to conduct a full credit drydock exam and continue repairs in MSD Fort Macon’s AOR. The following list is the result of the remaining dry dock worklist items and outstanding plan review items.
Stability › Incline Test › General
Issued 1 December 2011
Resolved
Based on a new Assumed Average Weight per Person (AAWPP) of 185lbs per person. The new regulations came into effect on December 01, 2011 (Federal Register Vol. 75, No. 239). Based on the new AAWPP your vessel has been restricted to the following passenger count: 126 passengers 03 crew
Construction/Loadline › Structures › Transverse Bulkhead
Issued 25 March 2008
Resolved
several areas noted of excessive angel hair. Needs to be cleaned, dried, and sealed
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Service
Issued 3 April 2007
Resolved
Complete required annual/6-year maintenance servicing of portable fire extinguishers.
Navigation › Piloting/Steering › Magnetic Compass
Issued 3 April 2007
Resolved
Make light for compass operational.
Communications › Radio Communications › EPIRB
Issued 3 April 2007
Resolved
Vessel restricted to 3 nautical miles until EPIRB properly installed.
Lifesaving › Lifejacket/PFD (General) › Retroreflective Material
Issued 3 April 2007
Resolved
Vessel may not carry more than 135 pax until 12 rejected lifejackets have retroreflective tape added.
Construction/Loadline › Structures › Scuttle
Issued 3 April 2007
Resolved
Provide lanyard for deck scuttle.
Lifesaving › Lifefloat › Lifeline
Issued 3 April 2007
Resolved
Replace wasted lines on lifefloats.
Lifesaving › Lifefloat › Markings
Issued 3 April 2007
Resolved
Re-stencil markings on lifefloats.
Engineering › Bilge Water Management System › Not Operational
Issued 3 April 2007
Resolved
Make stbd side bilge system operational.
Electrical › Electrical Distribution System (service) › Wiring
Issued 3 April 2007
Resolved
Remove dead end wire for old PA system.
Electrical › Electric Generation Source (service) › Generator
Issued 3 April 2007
Resolved
Make port side generator operational.
Engineering › Bilge Water Management System › Manifold
Issued 3 April 2007
Resolved
Replace wasted hose clamp on port side bilge manifold.
Engineering › Bilge Water Management System › Piping
Issued 3 April 2007
Resolved
Repair leak on bilge piping in engine room at aft bulkhead going to #4  compartments stbd side.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 2 June 2006
Resolved
Make permanent repairs to railling around deck.
Navigation › Piloting/Steering › Coast Guard Light List
Issued 2 June 2006
Resolved
Provide current light list
Engineering › Sea-water System (primary cooling) › Piping
Issued 2 June 2006
Resolved
Replace wasted exhaust hose on stbd mde.
Lifesaving › Lifefloat › Netting
Issued 2 June 2006
Resolved
Repair lines connecting netting to l/f.
Engineering › Sea-water System (primary cooling) › Valve
Issued 18 April 2006
Resolved
FOUND VALVE TO PORT GENERATOR WASTED. NEEDS TO BE REPLACED.
Engineering › Shafting/Propeller Arrangements › Strut Bearing
Issued 18 April 2006
Resolved
STBD AFT CUTLASS BEARING WORN AND NEEDS TO BE REPLACED.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 3 April 2006
Resolved
Provide current eye wash for first aid kit.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 1 January 2006
Resolved
VESSEL IS OVERDUE FOR SCHEDULED DRY-DOCK EXAM AND IS NO PERMITTED TO CARRY PASSENGERS UNTIL COMLETED.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 23 June 2005
Resolved
Stern light out. Correct prior to carrying passengers at night.
Documentation › Certificates/Documents › Certificate of Documentation (CG-1270)
Issued 25 May 2005
Resolved
Owner must prove current COD.
Pollution Prevention/Response › Prevention Equipment › Bilge Monitor
Issued 25 May 2005
Resolved
Bilge high level alaram inop. Prove proper operation.
Lifesaving › Lifefloat › Paddle
Issued 25 May 2005
Resolved
One L/F missing a paddle.
Engineering › Steering Gear System › Linkage
Issued 22 April 2004
Resolved
Provide universal for stbd steering gear system linkage.
Electrical › Diesel Engine (propulsion-reduction gear) › Wiring
Issued 22 April 2004
Resolved
Provide cable supports in engine room as indicated.
Electrical › Electric Generation Source (service)
Issued 8 January 2002
Resolved
Provide marine inspector with specifications for the installation of new Northern Lights Generator and conduct an operational test. LEGACY COMPONENT DESC: Generator
Operations/Management › Passenger Operations
Issued 8 January 2002
Resolved
Conduct underway check ride with marine inspector.
Construction/Loadline
Issued 1 April 2001
Resolved
SHOW PROPER OPERATION OF BILGE ALARMS IN COMPARTMENTS, 1,2,5, PORT SIDE AND#3 STARBOARD SIDE.
Lifesaving
Issued 1 April 2001
Resolved
PROVIDE PROPER LENGTH OF LINE FOR RING BUOY.
Lifesaving
Issued 1 April 2001
Resolved
REPLACE ROTTED LINE ON LIFE FLOAT.
Documentation
Issued 1 April 2001
Resolved
MAXIMUM PASSENGER COUNT LIMITED TO 82 UNTIL ARRIVAL AND INSPECTION OF NEW LIFE FLOATS OR 01JUN01 AT WHICH TIME PASSENGER COUNT MAY REFLECT THE COI.
Construction/Loadline
Issued 17 April 2000
Resolved
FILL/REPAIR SEAM IN CENTER HULL TRANSOM.
Construction/Loadline
Issued 17 April 2000
Resolved
REFASTEN STBD HULL INBOARD SPRAY RAIL.
Construction/Loadline
Issued 17 April 2000
Resolved
SAND AND REPAIR HULL AS IDENTIFIED DURING INSPECTION.
Lifesaving
Issued 17 April 2000
Resolved
MAKE WELD REPAIRS TO HAND RAIL STANCHIONS IDENTIFIED DURING INSPECTION.
Construction/Loadline
Issued 17 April 2000
Resolved
REPAIR/REPLACE 2ND FRAME PORTSIDE ENGINE ROOM COMPARTMENT.
Navigation
Issued 17 April 2000
Resolved
REPAIR CRACK IN STARBOARD RUDDER.
Engineering
Issued 17 April 2000
Resolved
REPLACE/REPAIR PORT SHAFT INTERMEDIATE CUTLASS BEARING.
Construction/Loadline
Issued 17 April 2000
Resolved
MAKE REPAIR TO LONGITUDINAL BATTENS IN BOW TUNNEL.
Construction/Loadline
Issued 27 January 2000
Resolved
COMPLETE CREDIT DRY-DOCK EXAM PRIOR TO CARRIAGE OF ANY PASSENGERS.
Lifesaving
Issued 7 April 1999
Resolved
PROVIDE NEW HAND HOLD LINE ON RING BOUY.
Fire Fighting
Issued 7 April 1999
Resolved
SERVICE ALL PORTABLE FIRE FIRE EXTINQUISHERS.
Lifesaving
Issued 7 April 1999
Resolved
PROVIDE A TOTAL OF SIX ORANGE SMOKE SIGNAL FLARES.
Navigation
Issued 6 April 1998
Resolved
MAKE REPAIRS OR ADJUST PORT RUDDER POST STUFFING BOX.
Lifesaving
Issued 6 April 1998
Resolved
INSTALL WEAK LINK TO GROUP OF FOUR LIFE FLOATS WITH SINGLE PAINTER.
Lifesaving
Issued 6 April 1998
Resolved
PROVIDE INDIVIDUAL LINE FOR EACH LIFE FLOAT WEAK LINK.
Navigation
Issued 6 April 1998
Resolved
POST EMERGENCY BROADCAST PLACARD AT RADIO STATION.
Lifesaving
Issued 6 April 1998
Resolved
LASH PADDLES TO LIFE FLOATS.
Lifesaving
Issued 8 April 1996
Resolved
PRIOR TO CARRYING MORE THAN 132 ADULTS AND 8 CHILDREN, PROVIDE 15 ADULT AND7 CHILD PFD'S.
Lifesaving
Issued 8 April 1996
Resolved
REPLACE RETRO REFLECTIVE TAPE ON LIFEFLOATS.
Lifesaving
Issued 8 April 1996
Resolved
PROVIDE 2 PADDLES FOR EACH LIFEFLOAT.
Lifesaving
Issued 8 April 1996
Resolved
APPLY RETRO REFLECTIVE TAPE TO LIFE RING.
Electrical
Issued 26 April 1994
Resolved
INSTALL A GUARD OVER THE FAN BELT ON THE GENERATOR IN THE STARBOARD ENGINEROOM._x001C_ _x001C_ _x001C_
Construction/Loadline
Issued 31 March 1994
Resolved
PRIOR TO CARRYING PASSENGERS, COMPLETE ITEMS 1, 5, 25, 36, 37, 39 AND 40 ONTHE COMPREHENSIVE WORKLIST ISSUED DURING THE MARCH 1994 DRYDOCK EXAM. (MOSTLY MINOR ITEMS THAT CAN BE ACCOMPLISHED WITH THE VESSEL AFLOAT).
Construction/Loadline
Issued 16 September 1993
Resolved
RECAULK THE PORT SHAFT SKEG SUPPORT BASE PLATE WHERE LEAKING._x001C_ _x001C_ _x001C_ _x001C_
Lifesaving
Issued 7 May 1993
Resolved
Provide lights on all PFDs. The route is limited to Coastwise not more than 20 miles from a Harbor of Safe Refuge.
Construction/Loadline
Issued 7 May 1993
Resolved
Prior to carrying passengers, make the area in way of the port outboard propeller strut support tight to the satisfaction of the attending USCG inspector.
Engineering
Issued 7 May 1993
Resolved
Provide a guard over the generator fan belt.
Electrical
Issued 7 May 1993
Resolved
Replace the light fixtures at the entrances to P/S engine spaces with nonexposed terminal type.
Lifesaving
Issued 7 May 1993
Resolved
Provide 1 adult and 1 child PFD. Total persons carried shall not exceed 146 adults; and children shall not exceed a total of 14.
Construction/Loadline
Issued 29 January 1993
Resolved
In 2nd compartment starboard side from bow, inboard side at after end of compartment scrape down angel hair and treat with wood preservative.
Construction/Loadline
Issued 29 January 1993
Resolved
In 2nd compartment from aft rebolt forward inboard vertical frame at bottom.
Engineering
Issued 29 January 1993
Resolved
Descale port/starboard fuel oil tanks.
Construction/Loadline
Issued 29 January 1993
Resolved
In stbd engine room, replace rotten vertical stiffeners at adjoining frame,inboard side midway compt.
Construction/Loadline
Issued 29 January 1993
Resolved
In starboard engine room inboard replace rotten vertical stiffeners at adjoining frame at after end of compartment.
Construction/Loadline
Issued 29 January 1993
Resolved
In engine room compartment at tunnel port side 3rd fore/aft stiffeners formoutboard, remove angel hair and treat with wood preservative.
Navigation
Issued 21 July 1992
Resolved
Replace stern light lens.
Electrical
Issued 21 July 1992
Resolved
Label electrical panel in port engine room.
Lifesaving
Issued 21 July 1992
Resolved
Renew reflective tape on all pfd's.
Lifesaving
Issued 21 July 1992
Resolved
Provide six red flares.
Fire Fighting
Issued 3 June 1991
Resolved
HYDRO 3 CO2 BII FIRE EXT'S BY 30SEP91.
Accommodation/Occupational Safety
Issued 3 June 1991
Resolved
REPAIR LOOSE RAILS.
Deck/Cargo
Issued 3 June 1991
Resolved
REPLACE STBD FWD BILGE SUCTION HOSE PRIOR TO CARRYING PASSENGERS.
Documentation
Issued 3 June 1991
Resolved
RENEW FCC STATION LICENSE BY 23OCT91.
Deck/Cargo
Issued 3 June 1991
Resolved
INSTALL CAPTIVE CHAIN - PORT BOW HATCH.
Lifesaving
Issued 3 June 1991
Resolved
REPLACE 2 OARS & STENCIL PRIOR TO CARRYING PASSENGERS.
Lifesaving
Issued 3 June 1991
Resolved
REPLACE ALL 18' LINES - L/FLOAT LIGHTS._x001C_ _x001C_ _x001C_ _x001C_
Navigation
Issued 3 June 1991
Resolved
REPAIR MASTHEAD LIGHT PRIOR TO CARRYING PASSENGERS.
Navigation
Issued 11 July 1990
Resolved
REPLACE EPIRB BATTERY BY 31OCT90.
Electrical
Issued 11 July 1990
Resolved
REPLACE FLOURESCENT LIGHT STBD WEATHERDECK MIDSHIPS.
Documentation
Issued 17 January 1990
Resolved
ARRANGE MAINTENANCE PLAN TO RENEW ALL BACKING PLATES FOR HAND RAILS AND REBED ALL ABOVE DECK FLANGES TO PREVENT ADDITIONAL ROT OF PLYWOOD DECK.
Deck/Cargo
Issued 17 January 1990
Resolved
REPLACE STBD ME SEA VALVE - WASTED STEM.
Navigation
Issued 17 January 1990
Resolved
REPLACE 4 FASTENERS FOR STBD RUDDER THRU HULL PLATE.
Navigation
Issued 17 January 1990
Resolved
INSTALL LONGER BOLTS AND LOCKNUTS ON RUDDER ARMS.
Construction/Loadline
Issued 17 January 1990
Resolved
REPAIR ROTTED DECK PLATE ON MAIN DECK PORT AFT CORNER AT TRANSOM; APPROX. 1 SQ FT.
Electrical
Issued 17 January 1990
Resolved
CORRECTLY MOUNT STBD ALT.
Construction/Loadline
Issued 17 January 1990
Resolved
REPAIR LEAKS - STBD EXH.
Engineering
Issued 17 January 1990
Resolved
TIGHTEN ALL ENGINE MOUNTS.
Construction/Loadline
Issued 17 January 1990
Resolved
FASTEN FLOOR AND REPAIR WASTED FLOOR FRAME, 3RD FWD FROM TRANSOM, PORT SIDEINBOARD.
Deck/Cargo
Issued 17 January 1990
Resolved
REPLACE STBD DG SEA VALVE (RUBBER).
Fire Fighting
Issued 19 July 1989
Resolved
REPAIR FIREPUMP TO GIVE ADEQUATE STREAM PRIOR TO CARRYING PASSENGERS.
Lifesaving
Issued 19 July 1989
Resolved
PROVIDE RETROREFLECTIVE TAPE FOR 3 ADULT PFD'S PRIOR TO EXCEEDING 20 MILES,COASTWISE, FROM A HARBOR OF SAFE REFUGE.
Lifesaving
Issued 19 July 1989
Resolved
REPAIR LIGHTS ON 13 ADULT PFD'S PRIOR TO EXCEEDING 20 MILES, COASTWISE, FROM A HARBOR OF SAFE REFUGE.
Lifesaving
Issued 19 July 1989
Resolved
PROVIDE NEW 60' DARK POLYPROPELENE LINE ON RING BUOY PRIOR TO CARRYING PASSENGERS.
Lifesaving
Issued 19 July 1989
Resolved
REPAIR RING BUOY LIGHT PRIOR TO CARRYING PASSENGERS.
Navigation
Issued 19 July 1989
Resolved
DEMONSTRATE SSB RADIO PRIOR TO EXCEEDING 20 MILES, COASTWISE, FROM A HARBOROF SAFE REFUGE.
Construction/Loadline
Issued 19 July 1989
Resolved
REPAIR LEAK AT CHINE, STBD SIDE OUTBOARD OF FRONT OF MAIN ENGINE. TO BE COMPLETED AT NEXT DRYDOCK (25FEB90).
Lifesaving
Issued 19 July 1989
Resolved
PROVIDE 3-6' LINE FOR RING BUOY LIGHT PRIOR TO CARRYING PASSENGERS.
Fire Fighting
Issued 19 July 1989
Resolved
PROVIDE METALLIC NOZZLE ON FIREHOSE PRIOR TO CARRYING PASSENGERS.
Lifesaving
Issued 19 July 1989
Resolved
STENCIL NAME AND CAPACITY, LASH PADDLES TO RAFT ON ALL 9 LIFEFLOATS PRIOR TO EXCEEDING 20 MILE, COASTWISE, FROM A HARBOR OF SAFE REFUGE.
Lifesaving
Issued 19 July 1989
Resolved
REPAIR 5 LIFEFLOAT LIGHTS PRIOR TO EXCEEDING 20 MILES, COASTWISE, FROM A HARBOR OF SAFE REFUGE.
Lifesaving
Issued 19 July 1989
Resolved
REPAIR 2 LIFEFLOAT NETS AND PENDENTS PRIOR TO EXCEEDING 20 MILES, COASTWISE, FROM A HARBOR OF SAFE REFUGE.
Lifesaving
Issued 19 July 1989
Resolved
PROVIDE A WATERTIGHT FLARE BOX PRIOR TO CARRYING PASSENGERS.
Lifesaving
Issued 19 July 1989
Resolved
PROVIDE 3 ORANGE AND 3 RED FLARES (ADDITIONAL) PRIOR TO CARRYING PASSENGERS.
Electrical
Issued 19 July 1989
Resolved
REPAIR LIGHT FIXTURE OVER BAITWELL.
Navigation
Issued 19 July 1989
Resolved
REPAIR PORT RUDDER LINKAGE PRIOR TO CARRYING PASSENGERS.
Construction/Loadline
Issued 19 July 1989
Resolved
REWELD CRACK IN STBD ENGINE EXHAUST, JUST BELOW INB MANIFOLD WATER INJECTION CONNECTION.
Electrical
Issued 19 July 1989
Resolved
PERMANENTLY INSTALL VOLT-AMP FREQ METER FOR AC GENERATOR.
Engineering
Issued 19 July 1989
Resolved
INSTALL MOUNTING BOLTS BOTH FUEL TANKS AFT.
Engineering
Issued 19 July 1989
Resolved
REPAIR PORT REMOTE F/O SHUT-OFF.
Navigation
Issued 19 July 1989
Resolved
TIGHTEN STEERING LINE BEARING HOUSING, FWD FUEL TANK SPACE PRIOR TO CARRYING PASSENGERS.
Engineering
Issued 19 July 1989
Resolved
REPLACE BOTH FUEL TANK FILL HOSES WITH APPROVED TYPE AND DOUBLE CLAMP BOTH ENDS PRIOR TO CARRYING PASSENGERS.
Engineering
Issued 25 August 1988
Resolved
PROVE OPERATION OF MAIN ENGINES.
Fire Fighting
Issued 25 August 1988
Resolved
PROVE OPERATION OF FIRE PUMP.
Lifesaving
Issued 25 August 1988
Resolved
OVERHAUL STRAPS AND NETTING ON FOUR (4) LIFEFLOATS. UNTIL THEN VESSEL IS LIMITED TO 60 PASSENGERS ON AN OCEAN ROUTE AND 120 PASSENGERS ON A COASTWISE ROUTE.
Navigation
Issued 25 August 1988
Resolved
CONTACT MSO TAMPA AND SET UP SEA TRIAL FOR VESSEL.
Construction/Loadline
Issued 25 August 1988
Resolved
INSTALL CAPTURE CHAINS ON MANHOLE COVERS.
Casualty record · 1
11 July 2022Routine · role: Subject of Search and Rescue · serious marine incident, as classified · at TOWNSEND'S INLET BRIDGE · activity 7505657
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.