GRETA is a 1998 freight ship. The Coast Guard has recorded 25 inspections since 2016, most recently in March 2026, along with 63 deficiencies — 1 with no resolution recorded — and 5 casualty investigations between 2006 and 2020.

Records from 2006 to 2026. Most recent: inspection, 2 March 2026.

Built
1998
Last inspected
2 March 2026
Documentation
Valid · documentation file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the General Dry Cargo Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 2 March 2026
…with no type recorded1
…past their stated due date1
Operational controls None recorded without a removal date
Years with a record 11 calendar years (2016–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

8971061
WDF3298
472604
Flag
UNITED STATES
Maury page id
psix-472604

Documentation record

Registered dimensions (L × B × D)147.0 ft × 50.0 ft × 8.0 ft
Registered tonnagegross 166 / net 112
ITC dimensions (L × B × D)147.0 ft × 50.0 ft × 8.0 ft
ITC tonnagegross 481 / net 144
BuilderGUNDERSON MARINE INC · PORTLAND, OR, UNITED STATES · built 1998
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portSEATTLE, WA
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 20 March 2026 · expires 30 April 2027
Service, as the file records itFreight Ship
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it112 - Regulatory (Subpart C or D), Net Ton
144 - Convention (Subpart B), Net Ton
497 - Displacement, Ton
890 - Dead Weight, Ton
166 - Regulatory (Subpart C or D), Gross Ton
481 - Convention (Subpart B), Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 2016 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 25

2 March 2026 Administrative Inspection · Examination of Repairs
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 8319537
26 February 2026 In-Service Inspection · Administrative Inspection
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 8317277
14 April 2025 COI Inspection · Deficiency Check
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8108175
27 November 2024 Examination of Repairs · In-Service Inspection
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 8040930
9 January 2024 Deficiency Check
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7847092
21 December 2023 Drydock Exam · Examination of Repairs · Annual Inspection · Deficiency Check · Internal Structural Exam
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 7841635
22 August 2023 Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7774289
1 May 2023 MTSA Verification · Administrative Inspection · Deficiency Check · Periodic Inspection
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 7680600
27 April 2022 Deficiency Check · Administrative Inspection · Annual Inspection · DAPI Audit
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7427378
16 December 2021 Drydock Exam · Examination of Repairs · Internal Structural Exam · Administrative Inspection
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 7372573
7 September 2021 Deficiency Check
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7312129
17 May 2021 Annual Inspection · Deficiency Check · Administrative Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7199165
22 December 2020 Examination of Repairs · Administrative Inspection
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 7124933
15 June 2020 Damage Survey · Deficiency Check · Administrative Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6977639
14 June 2020 Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6980374
7 April 2020 MTSA Verification · Administrative Inspection · COI Inspection
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 6950538
15 August 2019 Administrative Inspection
Administrative · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 6784687
6 May 2019 Annual Inspection · Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 6678389
27 February 2019 Examination of Repairs · Administrative Inspection · Drydock Exam · Internal Structural Exam
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 6629141
11 April 2018 Administrative Inspection · Periodic Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6389980
18 July 2017 Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6213085
13 March 2017 Administrative Inspection · Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6105184
14 December 2016 Internal Structural Exam · Drydock Exam · Administrative Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6059118
8 April 2016 Annual Inspection · DAPI Audit · MTSA Verification
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 5852047
15 January 2016 Damage Survey
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 5804714

Deficiency record · 63

07 - Fire Safety › N/A - No Subsystem › Personal equipment for fire safety
Issued 14 April 2025 Resolved
Each fire hose on each hydrant must have a combination solid stream and water spray fire hose nozzle approved under subpart 162.027 of this chapter. The fire nozzle in the machinery space is plastic and does not meet the standards in 46 CFR 162.027. 46 CFR 95.10-10(i)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 May 2025
Resolved 15 April 2025
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 14 April 2025 Resolved
Except as noted in paragraph (c) of this section, all enclosed spaces within the vessel shall be properly vented or ventilated. Means shall be provided to close off all vents and ventilators. The vent closures on the stacks do not completely close of vent openings. 46 CFR 92.15-10(a)
Action required: 705 - Other - as specified
Due 30 December 2025
Resolved 20 May 2026
Resolution: Vent closures found operational.
14 - Pollution Prevention › 141 - MARPOL Annex I › Pumping, piping and discharge arrangements
Issued 14 April 2025 No resolution recorded
The ship has a means on the weather deck near the discharge outlet to stop each pump that is used to discharge oily mixtures. There is no means to shut down the waste oil pump near the discharge outlet. 33 CFR 155.420(a)(5)
Action required: 705 - Other - as specified
Due 30 December 2025 — due date passed with no resolution recorded
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 14 April 2025 Resolved
The main steering gear and rudder stock must be of adequate strength for and capable of steering the vessel at maximum ahead service speed. The flanged packing collar and studs on the rudder stocks were found severely bent limiting crews ability to adjust and service packing material. 46 CFR 58.25-10(c)(1)
Action required: 705 - Other - as specified
Due 30 December 2025
Resolved 20 May 2026
Resolution: All rudder stock packing collars were replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 14 April 2025 Resolved
Piping systems for ships and barges must be designed, constructed, and inspected in accordance with ASME B31.1 (incorporated by reference; see § 56.01-2), as limited, modified, or replaced by specific requirements in this part. The bilge & ballast system piping, a vital system, was found with multiple unapproved non-metallic flexible hoses and hose clamps. Additionally, the fire main piping was found with unapproved metallic flexible hose connection. Return piping arrangements to originally approved drawings. 46 CFR 56.01-5
Action required: 705 - Other - as specified
Due 30 December 2025
Resolved 20 May 2026
Resolution: All unapproved non-metallic flexible hoses on ballast, bilge, and fire main piping removed and replaced with fixed piping.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 14 April 2025 Resolved
A stop-check valve or both a stop valve and a check valve are provided in each branch line. No stop-check valve was observed on the bilge suction in the lazarette. 46 CFR 56.50-50(c)(3)(ii)
Action required: 705 - Other - as specified
Due 30 December 2025
Resolved 20 May 2026
Resolution: Check valve installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 14 April 2025 Resolved
All vessels except unmanned barges must be provided with a satisfactory bilge pumping plant capable of pumping from and draining any watertight compartment except for ballast, oil, and water tanks. No fixed bilge piping arrangements were found on the manifold to take suction from the machinery space. 46 CFR 56.50-50(a)(2)
Action required: 705 - Other - as specified
Due 30 December 2025
Resolved 20 May 2026
Resolution: Bilge piping pickup installed for machinery space.
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 1 May 2024 Resolved
Get 6 additional parichute flares
Action required: 17 - Rectify deficiencies prior to departure
Due 1 May 2024
Resolved 3 May 2024
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 21 December 2023 Resolved
steering-gear compartment. Vessel doesn't have rudder angle indication in rudder room or at the emergincy steering location. Vessel has 30 days to provide a write plan for repair.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 June 2024
Resolved 15 May 2024
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 21 December 2023 Resolved
Vessel must submit update electrical one line drawings to MSC in 30 days.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 June 2024
Resolved 11 July 2024
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 1 May 2023 Resolved
Flexible pipe couplings of the compression type or slip on type ("Dresser Couplings") must not be used in systems where impingement of liquid on vital equipment may disable the ship. The vessel has numerous "Dresser Couplings" installed in various vital and non-vital systems throughout the engine room. Provide a plan to replace all couplings in the engine room and bring the piping systems into compliance with 46 CFR part 56.
Action required: 705 - Other - as specified
Due 31 December 2023
Resolved 1 May 2024
14 - Pollution Prevention › 141 - MARPOL Annex I › Pumping, piping and discharge arrangements
Issued 1 May 2023 Resolved
Oceangoing vessels over 100 GT and less than 400GT must have and installed pump with fixed piping to discharge oily mixtures to a reception facility installed. Provide a pumping and piping system for oily mixtures that meets 33 CFR 155.420 no later than December 2023.
Action required: 705 - Other - as specified
Due 31 December 2023
Resolved 1 May 2024
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 1 May 2023 Resolved
Non-metallic flexible hoses meeting the SAE J1942 standard may be used for the purpose of flexibility and not in lengths greater than 30 inches. Multiple hoses throughout the engine room in vital systems far exceed the 30-inch length requirement. Provide a plan and begin replacement of the hoses prior to the May 2024 operating season.
Action required: 705 - Other - as specified
Due 31 December 2023
Resolved 10 May 2024
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 1 May 2023 Resolved
All vessels shall be provided with a satisfactory bilge pumping plant capable of pumping from any watertight compartment. The machinery space is missing the required bilge suction line from the bilge manifold, it is currently blanked off. Install the bilge suction line and prove proper operation prior to sailing.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 1 May 2024
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 1 May 2023 Resolved
Multiple pieces of lifesaving and firefighting equipment obstructed by stowage on deck. Remove obstructions from all lifesaving and firefighting equipment.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 May 2023
Resolution: Obstructions removed.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 1 May 2023 Resolved
C-Strobe lifejacket light requires lithium ion battery per CG approva. Multiple C-Strobe lights were found to have alkaline batteries. Replace with lithium batteries prior to sailing.
Action required: 10 - Deficiency Rectified
Resolved 1 May 2023
Resolution: Lithium batteries acquired and installed.
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 1 May 2023 Resolved
A record of towline inspection must be kept on a vessel towing astern. No record was available.
Action required: 10 - Deficiency Rectified
Resolved 1 May 2023
Resolution: Record created.
09 - Working and Living Conditions › 091 - Living Conditions › Lighting (Accommodation)
Issued 1 May 2023 Resolved
Multiple berth lights found missing/unguarded/inoperable. Provide an operable light guarded from mechanical damage at each berth.
Action required: 705 - Other - as specified
Due 31 December 2023
Resolved 1 May 2024
09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 1 May 2023 Resolved
Multiple daisy-chained power strips located in staterooms and galley. Remove and/or replace with permanent installations.
Action required: 10 - Deficiency Rectified
Resolved 1 May 2023
Resolution: Power strips removed.
09 - Working and Living Conditions › 092 - Working Conditions › Structural features (ship)
Issued 1 May 2023 Resolved
Overhead insulation installed with damage control wedges holding insulation in place. Provide suitable means of retaining insulation.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 May 2023
Resolution: Permanent supports installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 27 April 2022 Resolved
Prove proper operation of overspeed on the Starboard John Deere generator
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 May 2022
Resolved 9 May 2022
Resolution: all sat
16 - International Ship & Port Facility Security (ISPS) › N/A - No Subsystem › Ship security officer
Issued 27 April 2022 Resolved
Provide update security plan onboard the vessel with the current CSO
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 May 2022
Resolved 2 May 2022
Resolution: provided
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 27 April 2022 Resolved
Provide and post schematic diagram of the CO2 system at the CO2 bottle storage location.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 May 2022
Resolved 2 May 2022
Resolution: provided
10 - Safety of Navigation › N/A - No Subsystem › Nautical publications
Issued 27 April 2022 Resolved
Provide onboard a current copy of the tides and currents
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 May 2022
Resolved 2 May 2022
Resolution: provided
09 - Working and Living Conditions › 092 - Working Conditions › Protection machines/parts
Issued 27 April 2022 Resolved
Prove means to prevent crew from coming into contact with port generator exhaust manifold, piping and turbo.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 May 2022
Resolved 25 July 2022
Resolution: all sat
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 27 April 2022 Resolved
Conduct fire, abandon ship and underway man overboard drills with a crew that meets the requirements of deficiencies on #1 with CG Marine Inspectors .
Action required: 701 - Prior to carriage of passengers/cargo
Due 27 April 2022
Resolved 4 May 2022
Resolution: drills sat
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 27 April 2022 Resolved
Provide means to show speed cannot exceed the maximum rated speed by more than 15 percent on the port generator.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 May 2022
Resolved 20 July 2023
Resolution: It was decided that regs changed and vessel is not required to test shutdowns.
18 - Maritime Labour Convention (Not Applicable to PSC Exams conducted in the U.S.) › N/A - No Subsystem › Other (Conditions of employment)
Issued 27 April 2022 Resolved
Provide prove crew has passed pre-employment drug testing and is enrolled in the companies DAPI program
Action required: 17 - Rectify deficiencies prior to departure
Due 27 April 2022
Resolved 2 May 2022
Resolution: provided
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 27 April 2022 Resolved
Post at Each entrance to a space storing carbon dioxide cylinders, a space protected by carbon dioxide systems, or any space into which carbon dioxide might migrate must be conspicuously marked as per 46 CFR 97.37-11
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 April 2022
Resolved 2 May 2022
Resolution: marked
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 27 April 2022 Resolved
Conduct emergency lighting and power systems testing as per 46 CFR 97.15-30 and log it as per 46 CFR 97.35-5 (g)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 May 2022
Resolved 9 May 2022
Resolution: all sat
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 27 April 2022 Resolved
Mark all Emergency lights with a minimum of 1/2” E
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 May 2022
Resolved 2 May 2022
Resolution: marked
01 - Certificates & Documentation › 011 - Ships Certificates › Cargo Ship Safety Radio (including exemption)
Issued 27 April 2022 Resolved
Provide a current FCC Bridge to Bridge Cert.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 May 2022
Resolved 2 May 2022
Resolution: provided
16 - International Ship & Port Facility Security (ISPS) › N/A - No Subsystem › Ship security plan
Issued 27 April 2022 Resolved
Provide proof that the annual audit has been completed.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 May 2022
Resolved 2 May 2022
Resolution: provided
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 27 April 2022 Resolved
move life ring buoy and light out from under the wheel house steps to an assessable location and up date fire/life saving plan.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 May 2022
Resolved 2 May 2022
Resolution: removed LR and updated fire control plan, vsl had 09 LR, required 08
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 27 April 2022 Resolved
Provide an non combustible means to retain movement of the oven.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 May 2022
Resolved 25 July 2022
Resolution: all sat
08 - Alarms › N/A - No Subsystem › Emergency signal
Issued 27 April 2022 Resolved
Post General alarm bell signage as per 46 CFR 97.37-7 for the engine room general alarm
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 May 2022
Resolved 2 May 2022
Resolution: posted
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 27 April 2022 Resolved
Repair damage installation in stairwell going to the engine room.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 May 2022
Resolved 2 May 2022
Resolution: repaired
16 - International Ship & Port Facility Security (ISPS) › N/A - No Subsystem › Security related defects
Issued 27 April 2022 Resolved
Renew restricted area markings
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 April 2022
Resolved 2 May 2022
Resolution: renewed
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 17 May 2021 Resolved
Holdback hooks, or other means of permanently holding the door open will not be permitted. FSDs at galley and stairway have permanent hold back devices (46 CFR 92.07-10(d)(4).
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 May 2021
Resolved 12 July 2021
Resolution: Rcvd attached email dtd 06Jul2021 w/ pics indicating holdback hook removal.
07 - Fire Safety › N/A - No Subsystem › Operation of Fire protection systems
Issued 17 May 2021 Resolved
It is the intent of this subpart to provide such markings as are necessary for the guidance of the person on board in case of an emergency. CO2 cylinder release and valve release instructions don't agree with cylinder control or valve control markings.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 May 2021
Resolved 12 July 2021
Resolution: Rcvd attached email dtd 06Jul2021 w/ pics indicating proper markings.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 17 May 2021 Resolved
The main steering gear and rudder stock must be capable of moving the rudder from 35 degrees on either side to 35 degrees on the other. Rudder indicator read 22 degrees to port and 26 degrees to starboard (46 CFR 58.25-10(b)(2).
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 17 June 2021
Resolved 12 July 2021
Resolution: Rcvd attached email dtd 06Jul2021 w/ pics showing proper rudder angle indication.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 17 May 2021 Resolved
The deck line shall be marked amidships on each side of the vessel. Deck line was painted black (hull color) while load line was marked in white (46 CFR 42.13-20(a)).
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 May 2021
Resolved 12 July 2021
Resolution: Rcvd attached email dtd 06Jul2021 w/ pics indicating marking of deck line.
09 - Working and Living Conditions › 091 - Living Conditions › Lighting (Accommodation)
Issued 17 May 2021 Resolved
Electric installations on vessels must ensure protection of passengers, crew, other persons, and the vessel from electrical hazards. Lighting fixture above master's stateroom desk rewired with extension chord (46 CFR 111.01-1(a)(2).
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 May 2021
Resolved 12 July 2021
Resolution: Rcvd attached email dtd 06Jul2021 w/ pics indicating lighting fixture & wire removed.
09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 17 May 2021 Resolved
There must be a sufficient number of receptacle outlets in the crew accommodations for an adequate level of habitability. Observed numerous power strips throughout superstructure (46 CFR 111.79-1(a)).
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 May 2021
Resolved 12 July 2021
Resolution: Rcvd attached email dtd 06Jul2021 indicating power strips removed.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 17 May 2021 Resolved
The operator of a vessel with a capacity of 250 or more barrrels of oil shall provide transfer procedures that meet the requirements of this part. Contents of transfer procedures of 33 CFR 155.750 not in order listed or by use of a cross-reference index page.
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 May 2021
Resolved 7 September 2021
Resolution: Rcvd email dtd 27Aug2021 w/ attachments showing proper xfer procedures.
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 17 May 2021 Resolved
AIS must be maintained in effective operating conditions, which includes the accurate input and upkeep of all AIS data fields and system updates. Vessel not transmitting IMO number while having IMO number 8971061 assigned (33 CFR 164.46(d)(2)(iv).
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 17 June 2021
Resolved 12 July 2021
Resolution: Rcvd attached email dtd 06Jul2021 w/ pics indicating AIS shows IMO number. Verified, also, through NAVCEN AIS Search.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 17 May 2021 Resolved
In the event of alterations involving the safety of the vessel, the applicable plans shall be submitted for approval covering the proposed work. Vessel replaced generator without Coast Guard approval or oversight. Provide electrical plans, specifications (including weights of removed and installed generator), and load analysis to the Marine Safety Center. Make vessel available for "as built" verification once submittal(s) approved (46 CFR 91.55-10(a).
Condition: Placed in Improper Service
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 January 2024
Resolution: Vessel provided approved electrical one line drawing and load analysis including generator specs and weights.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 15 June 2020 Resolved
Upon arrival in Naknek, AK make permanent repairs to hull damage iwo engine room bottom plating to the satisfaction of the attending marine inspector. Vessel is authorized to transit from Chefornak to Naknek to complete repairs.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 27 July 2020
Resolved 20 June 2020
Resolution: ABS attended for repairs
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 13 May 2019 Resolved
Vessel did not have the correct number of flares. It was missing 3 orange day smoke.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 24 May 2019
Resolution: Vessel purchased 3 new smoke flares.
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 13 May 2019 Resolved
Vessel's location for flares was not placarded.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 24 May 2019
Resolution: Vessel correctly placarded location of flares.
10 - Safety of Navigation › N/A - No Subsystem › Nautical publications
Issued 13 May 2019 Resolved
Vessel had expired tide book.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 24 May 2019
Resolution: Vessel had new tide book.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 13 May 2019 Resolved
Vessel's anchor light was not visible due to cleanliness of lens.
Action required: 10 - Deficiency Rectified
Resolved 13 May 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 13 May 2019 Resolved
Vessel had portable bilge pumps in Laz connected in a fixed bilge pump configuration but did not comply with Vital system requirements.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 24 May 2019
Resolution: Vessel removed portable bilge pumps from laz.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 13 May 2019 Resolved
Vessel had 11 five gallon buckets of hydraulic oil and one corrosive liquid in lazarette.
Action required: 10 - Deficiency Rectified
Resolved 13 May 2019
Resolution: Vessel removed material rom laz.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 13 May 2019 Resolved
Vessel's Engine Room door is an A-60 door and is corroded and does not meet requirements for A-60.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 April 2020
Resolution: Replaced corroded metal on door.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 13 May 2019 Resolved
Vessels had door stopper on bridge door and was holding it open.
Action required: 10 - Deficiency Rectified
Resolved 13 May 2019
Resolution: Vessel removed door stop.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 10 May 2019 Resolved
Vessel's port side under bridge ladderwell light was filled with water and could be pulled all the way out from compartment.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 24 May 2019
Resolution: Installed new light.
Engineering › Diesel Engine (auxiliary) › Distributor (fuel injection)
Issued 11 April 2018 Resolved
Replace high pressure injection line sections from the high pressure fuel pump outlet to the injectors for cylinders #1 and #2 due to corrosion.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 April 2018
Resolved 17 April 2018
Resolution: High pressure fuel lines were replaced.
Electrical › Electric Supply System (service) › Cable
Issued 11 April 2018 Resolved
Hardwire the supply power for both battery chargers in the engine room with marine grade electrical wire of sufficient size and capacity into an approved sealed junction box.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 April 2018
Resolved 17 April 2018
Resolution: Chargers have been permanently wired into a junction box.
Electrical › Electric Supply System (service) › Cable
Issued 11 April 2018 Resolved
Permanently affix the bilge high level alarm in the lazerette space.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 April 2018
Resolved 17 April 2018
Resolution: High level alarm has been re-attached.
Engineering › Fuel Oil Service System › Valve
Issued 13 March 2017 Resolved
Repair or replace all three main engine duplex fuel oil strainer selector valves due to leaking valve body IAW 46CFR58.05-1.
Action required: 705 - Other - as specified
Due 17 March 2017
Resolved 14 March 2017
Resolution: Received notification and pictures from M/V GREATA's port engineer, [name withheld] that new valve service kits have been installed in all three main engine duplex fuel oil strainer selector valves correcting the diesel fuel oil leaks.
Engineering › Pressure Vessel › Safety Valve
Issued 11 April 2016 Resolved
In board air compressor relief valve releases above 150 psi. Repair or replace with properly functioning valve. 46CFR 54.15-5(a)
Action required: 705 - Other - as specified
Due 22 April 2016
Resolved 13 April 2016
Resolution: New relief valve bought and installed on vessel.
Lifesaving › Lifejacket/PFD (Type I) › Quantity
Issued 11 April 2016 Resolved
Provide (1) Adult Lifejacket.
Action required: 705 - Other - as specified
Resolved 12 April 2016
Resolution: New life jacket on board vessel.

Casualty record · 5

23 August 2006Routine · role: Involved in a Marine Casualty · activity 2765478
4 July 2010Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 injured · activity 3797395
16 October 2010Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · activity 3913815
7 May 2015Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 injured · activity 5121060
14 June 2020Routine · role: Involved in a Marine Casualty · activity 6980374
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Recorded names · 1

GRETA S AKPIK (2006). Names as the Coast Guard recorded them in incident records, with the years they appear; some are renames and some are spelling variants.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.