← All vessels
SPIRIT OF NAVY PIER
Passenger (Inspected) · Passenger Ship class · Built 1990s · USCG Great Lakes District (CGD-GL) · Other hulls named SPIRIT OF NAVY PIER
SPIRIT OF NAVY PIER is a 1998 passenger vessel (inspected). The Coast Guard has recorded 104 inspections since 1997, most recently in June 2026, along with 179 deficiencies and 6 casualty investigations between 2007 and 2016.
Records from 1997 to 2026. Most recent: inspection, 8 June 2026.
- Built
- 1998
- Last inspected
- 8 June 2026
- Documentation
- Case Pending · documentation file of 10 September 2026
- Inspections
- 104
- Deficiencies
- 179 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
- Casualties
- 6 investigations · 2007–2016
Identity
1064928
WCY3193
472664
Flag
UNITED STATES
367350360
Maury page id
psix-472664
Inspections, by type
…with no type recorded8
Years with a record
28 calendar years (1997–2026)
The 104 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.
Documentation record
Registered dimensions (L × B × D)138.9 ft × 36.0 ft × 10.5 ft
Registered tonnagegross 97 / net 61
ITC dimensions (L × B × D)138.9 ft × 36.0 ft × 10.5 ft
ITC tonnagegross 949 / net 319
BuilderCHESAPEAKE SHIPBUILDING CORP · SALISBURY, MD, UNITED STATES · built 1998
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portCHICAGO, IL
Trade endorsementsCoastwise, unrestricted
DocumentationCase Pending · issued 29 April 2026 · expires 31 May 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it97 - Regulatory (Subpart C or D), Gross Ton
949 - Convention (Subpart B), Gross Ton
61 - Regulatory (Subpart C or D), Net Ton
319 - Convention (Subpart B), Net Ton
949 - Convention (Subpart B), Gross Ton
61 - Regulatory (Subpart C or D), Net Ton
319 - Convention (Subpart B), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Radio station licence
WCY3193MMSI 367350360 · active · compulsorily equipped · granted 9 March 2018, expires 22 April 2028
WCY3199MMSI not assigned · expired · compulsorily equipped · granted 22 April 1998, cancelled 28 June 2008 · licensed under a name not among this hull’s recorded names (not shown)
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its
US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown.
A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.
Inspection history · 104
8 June 2026
Excursion Permit
Administrative · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 8395104
13 March 2026
MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 8325626
9 October 2025
Excursion Permit
Administrative · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 8250243
14 April 2025
Deficiency Check
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 8111610
18 March 2025
Deficiency Check
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 8095681
10 March 2025
Annual Inspection
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 8090907
20 January 2025
Administrative Inspection
Administrative · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 8080650
5 August 2024
In-Service Inspection
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 7974577
6 March 2024
Annual Inspection
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 7874824
7 August 2023
Deficiency Check
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 7762650
14 July 2023
Plan Review (Other than "T")
Administrative · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 7742308
21 June 2023
Deficiency Check
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 7719694
28 April 2023
Deficiency Check
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 7677770
4 April 2023
Deficiency Check
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 7662898
22 March 2023
MTSA Verification · Annual Inspection · DAPI Audit
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 7654820
8 March 2023
Administrative Inspection
Administrative · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 7647366
19 January 2023
Deficiency Check
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 7623927
4 November 2022
Administrative Inspection
Administrative · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 7589336
20 October 2022
Deficiency Check
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 7581118
21 September 2022
Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 7563793
11 August 2022
In-Service Inspection · Deficiency Check
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 7530992
26 January 2022
COI Inspection · Drydock Extension · Deficiency Check · Administrative Inspection · Inclining Experiment
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 7388197
2 August 2021
Administrative Inspection · In-Service Inspection
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 7275059
15 September 2020
Administrative Inspection
Administrative · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 7073846
15 April 2020
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 7073914
28 January 2020
In-Service Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 6902117
28 March 2019
Deficiency Check · MTSA Verification
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 6651832
6 March 2019
MTSA Verification · Annual Inspection · DAPI Audit
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 6636185
4 February 2019
Administrative Inspection
Administrative · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 6619632
11 June 2018
Examination of Repairs · Damage Survey
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 6441327
23 May 2018
Deficiency Check · Administrative Inspection
Physical examination · Navigation Center · Activity 6421594
20 April 2018
Excursion Permit
Administrative · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 6395399
28 March 2018
MTSA Verification · DAPI Audit · Annual Inspection
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 6380963
3 November 2017
Drydock Exam · Administrative Inspection · Internal Structural Exam · Deficiency Check
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 6302697
30 March 2017
Deficiency Check
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 6114887
20 March 2017
Annual Inspection · DAPI Audit · Administrative Inspection
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 6109000
19 July 2016
Deficiency Check
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 5945577
8 July 2016
Type not recorded
No type recorded · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 5944587
25 April 2016
Administrative Inspection
Administrative · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 5861963
7 April 2016
In-Service Inspection · Deficiency Check
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 5849659
26 February 2016
DAPI Audit · COI Inspection · MTSA Verification
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 5822816
17 March 2014
Deficiency Check
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 4828453
6 March 2014
Deficiency Check
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 4810960
23 July 2012
Administrative Inspection
Administrative · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 4388300
5 July 2012
Deficiency Check
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 4368079
15 June 2012
Deficiency Check
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 4346782
21 May 2012
Administrative Inspection
Administrative · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 4317476
7 May 2012
Deficiency Check
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 4304744
18 January 2012
Plan Review (Other than "T") · Examination of Repairs · Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 4227064
20 August 2011
In-Service Inspection
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 4123680
19 February 2010
Administrative Inspection
Administrative · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 3682409
4 January 2010
Damage Survey · Deficiency Check
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 3658181
31 December 2009
Type not recorded
No type recorded · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 3661033
5 July 2009
In-Service Inspection
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 3525628
20 April 2009
MTSA Verification · Deficiency Check
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 3456961
18 March 2009
Annual Inspection
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 3434908
2 March 2009
In-Service Inspection
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 3426521
6 February 2009
In-Service Inspection
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 3414543
14 January 2009
Administrative Inspection
Administrative · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 3393915
23 October 2008
Administrative Inspection
Administrative · Commandant (CG-CVC) · Activity 3350132
8 July 2008
Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 3261219
5 June 2008
Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 3228274
4 May 2008
Damage Survey · Deficiency Check
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 3200211
21 April 2008
MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 3187242
22 January 2008
Administrative Inspection
Administrative · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 3134438
22 October 2007
Hull Examination
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 3076275
16 April 2007
Deficiency Check
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 2909222
1 March 2007
Annual Inspection
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 2879317
10 January 2007
Administrative Inspection
Administrative · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 2853592
21 June 2006
Deficiency Check
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 2687146
4 May 2006
Deficiency Check
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 2640485
4 April 2006
COI Inspection · Deficiency Check
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 2616124
13 March 2006
Construction Oversight
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 2601281
15 August 2005
Deficiency Check
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 2464190
1 June 2005
Annual Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 2374276
27 August 2004
Deficiency Check · MTSA Verification
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 2178474
23 June 2004
MTSA Verification
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 2088802
29 March 2004
Deficiency Check · Re-Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 2026139
16 December 2003
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1971022
23 June 2003
Re-Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1875297
19 June 2003
Administrative Inspection
Administrative · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1821689
29 October 2002
Hull Examination · Internal Structural Exam
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 1681164
26 April 2002
Re-Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1606712
14 August 2001
Administrative
Administrative · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1069450
6 April 2001
COI Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1373413
19 June 2000
Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1062913
1 May 2000
Deficiency Check
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1412087
19 April 2000
Re-Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1406698
21 February 2000
Deficiency Check
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1433594
3 December 1999
Deficiency Check
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1453688
15 September 1999
Deficiency Check
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1119788
12 July 1999
Damage Survey
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1097725
3 July 1999
Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 100991
3 July 1999
Damage Survey
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1469911
7 June 1999
Administrative
Administrative · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 805849
22 April 1999
Re-Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1433479
30 March 1999
Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1381524
5 March 1999
Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1399059
28 December 1998
Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1378554
26 August 1998
Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 229067
21 May 1998
Deficiency Check
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1381380
1 May 1998
Administrative
Administrative · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1124690
9 April 1998
Initial Certification
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1459392
10 October 1997
Hull Examination
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1129702
Deficiency record · 179
03 - Water/Weathertight Conditions › N/A - No Subsystem › Windows, sidescuttles and deadlights
Issued 13 March 2026
Resolved
At each initial and subsequent inspection for certification of a vessel, the owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspections of the hull structure and its appurtenances, including the following:
(1) Inspection of all accessible parts of the exterior and interior of the hull, the watertight bulkheads, and weather decks.
Two windows in main deck dining room were removed due to damage. Vessel will cover openings with two sheets of 5/8" plywood. Passengers are not permitted in space until windows are replaced. Crewmembers are to conduct rounds of the space every 30 minutes. Vessel not to operate when actual weather conditions exceed three foot waves, 40kt winds from any direction, or 30kt winds from NE to SE. Vessel restricted to north of lighthouse when winds exceed 20kts from NE to SE.
07 - Fire Safety › N/A - No Subsystem › Main Vertical zone
Issued 13 March 2026
Resolved
A door in a stairtower, stairway, and main vertical zone bulkhead must meet the following additional requirements:
(i) A door must be of the self-closing type capable of closing against a 3.5 list of the vessel.
Door from the main deck to the lower galley is missing the closing mechanism.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 13 March 2026
Resolved
Each vessel must have adequate emergency lighting fitted along the line of escape to the main deck from all passenger and crew accommodation spaces located below the main deck.
Emergency light near galley deep fryer is missing.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 13 March 2026
Resolved
A door in a bulkhead required to be A-60, A-30, or A-15 Class must be of hollow steel or equivalent material construction, solidly filled with approved structural insulation, and capable of meeting the requirements of an A-15 Class bulkhead.
Port stern second deck stairway fire door is missing a strike plate.
09 - Working and Living Conditions › 091 - Living Conditions › Sanitary Facilities
Issued 13 March 2026
Resolved
At each inspection for certification and at every other vessel inspection, quarters, toilet and washing spaces, galleys, serving pantries, lockers, and similar spaces may be examined to determine that they are serviceable and in a sanitary condition.
The area behind the walk-in refrigerator in main deck galley contains trash and mold. Main deck female head toilet is clogged.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 13 March 2026
Resolved
Each vessel must have adequate emergency lighting fitted along the line of escape to the main deck from all passenger and crew accommodation spaces located below the main deck.
Emergency lighting fixture in engine room across from switchboard is not operational.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 13 March 2026
Resolved
At each inspection for certification and at every other vessel inspection all observed unsafe practices, fire hazards, and other hazardous situations must be corrected and all required guards and protective devices must be in satisfactory condition.
Emergency escape hatch for engine room was found blocked by table and chairs.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 13 March 2026
Resolved
Each vessel must be equipped with at least two operable portable battery lights. One of these lights must be located at the operating station and the other at the access to the propulsion machinery space.
Light at access to machinery space was missing.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 13 March 2026
Resolved
Electrical equipment on a vessel must be installed and maintained to:
(a) Provide services necessary for safety under normal and emergency conditions.
Light fixtures in the lazarette and bow thruster spaces are extinguished.
09 - Working and Living Conditions › 091 - Living Conditions › Water, pipes, tanks
Issued 13 March 2026
Resolved
A water heater must meet the requirements of Parts 53 and 63 in subchapter F of this chapter if rated at not more than 689 kPa (100 psig) and 121 °C (250 °F), except that an electric water heater is also acceptable if it:
(1) Has a capacity of not more than 454 liters (120 gallons):
(2) Has a heat input of not more than 58.6 kilowatts (200,000 Btu per hour);
(3) Is listed by Underwriters Laboratories (UL) under UL 174, “Household Electric Storage Tank Water Heaters,” UL 1453, “Electric Booster and Commercial Storage Tank Water Heaters,” or other standard specified by the Commandant; and
(4) Is protected by a pressure-temperature relief device.
Vessel is installing a new hot water heater in lower galley. Ensure heater is installed as per 46 CFR 119.320 as applicable, with a stated UL rating, and a pressure-temperature relief device.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 13 March 2026
Resolved
Electrical equipment on a vessel must be installed and maintained to: (c) Minimize accidental personnel contact with energized parts.
Potable water pump switches in galley void have exposed holes.
02 - Structural Conditions › N/A - No Subsystem › Decks - corrosion
Issued 10 March 2025
Resolved
Machinery, equipment, materials, and arrangements not covered by standards in this subchapter may be inspected in accordance with standards acceptable to the cognizant OCMI as good marine practice.
Stairs to upper deck along egress route have wastage.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 10 March 2025
Resolved
Employers must maintain records of chemical tests as provided in 49 CFR 40.333 and must make these records available to Coast Guard officials upon request.
Vessel could not provide proof of enrollment in a random drug testing program.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 10 March 2025
Resolved
Machinery, equipment, materials, and arrangements not covered by standards in this subchapter may be inspected in accordance with standards acceptable to the cognizant OCMI as good marine practice.
Starboard cargo loading door has wastage and is not weathertight.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 10 March 2025
Resolved
Machinery, equipment, materials, and arrangements not covered by standards in this subchapter may be inspected in accordance with standards acceptable to the cognizant OCMI as good marine practice.
Port cargo loading door has wastage.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 10 March 2025
Resolved
Each individual bilge suction must be fitted with a suitable strainer having an open area of not less than three times that of the suction pipe.
Replace strainer in compartment #3.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 10 March 2025
Resolved
The general construction of the vessel must be such as to minimize fire hazards insofar as it is reasonable and practicable.
Port aft main deck stairwell door frame has wastage.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 6 March 2024
Resolved
Cable and wire to power and lighting circuits must meet NEC 310-13, UL, UL Marine cable or UL boat cable. Various section of battery cable on the STBD Genset is welding cable.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 6 March 2024
Resolved
Fire Hazards and all other hazardous situations must be corrected and all required guards and protective devices must be in satisfactory condition. The Dry Stores overhead light diffuser is cracked.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 6 March 2024
Resolved
Each vessel must have adequate E-lighting fitted along the line of the escape route to the main deck from passenger and crew accommodation spaces. E-Light near the main deck exit is OOC.
05 - Radio Communications › N/A - No Subsystem › VHF EPIRB
Issued 22 March 2023
Resolved
EPIRB is missing the registration decal. Obtain and install the registration decal.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 22 March 2023
Resolved
Provide document from consortium with list of employees covered in random pool and records of EAP training for new employees.
07 - Fire Safety › N/A - No Subsystem › Fire control plan
Issued 22 March 2023
Resolved
Properly post fire control plan. Plan was not posted nor onboard. Plan must be Coast Guard approved.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 22 March 2023
Resolved
Provide records of VGP inspections and provide records of PARI forms being completed and submitted. None could be produced at attendance.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 22 March 2023
Resolved
Remove the hold back hooks and provide closure device for main deck aft port side stair tower door self closing.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 22 March 2023
Resolved
Make repairs to the door handle on fire screen door 2nd deck aft and forward, guide plate was removed, and handle was gapped and miss aligned.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 22 March 2023
Resolved
Outdoor aft 03 deck outlet cover was broken and exposed to weather. Replace cover.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 22 March 2023
Resolved
3rd deck general service 208/120 VAC panel on bridge has an open breaker slot. provide cover to prevent shock hazard.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 22 March 2023
Resolved
Underneath bridge console there are multiple surge protectors daisy chained. Permentantly mount and provide additional circuits decicated for loads.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 22 March 2023
Resolved
Provide labels for breakers being used on panel on the portside in the pilothouse.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 22 March 2023
Resolved
Galley general service 208/120 VAC panel needs knockout hole covered on side of panel.
09 - Working and Living Conditions › 092 - Working Conditions › Ventilation (Working spaces)
Issued 22 March 2023
Resolved
Overhead Fan in galley Portside aft was full of link and missing a filter. Clean and install filter.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 22 March 2023
Resolved
In Void No. 5 the power cables for the Refer/Freezer plants wire need supported 24" on center with metal supports.
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 22 March 2023
Resolved
Void 5 has multiple lights extinguished. Relamp all extinguished lights.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 22 March 2023
Resolved
Outlet cover for 220vac outlet at the main deck service station is missing the cover. Provide correct cover.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 22 March 2023
Resolved
Properly mount switch for vent fan main deck bow.
09 - Working and Living Conditions › 092 - Working Conditions › Warning notices
Issued 22 March 2023
Resolved
Properly mark escape hatch from Void No. 5. "Emergency Escape Keep Clear" on main deck side of hatch.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 22 March 2023
Resolved
Aft emergency light in the engineroom was extinguished. Replace light.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 22 March 2023
Resolved
Properly mount lighting cable between lights above the dishwasher in galley.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 22 March 2023
Resolved
Properly adjust weathertight door leading to bow to ensure full closure.
11 - Life Saving Appliances › N/A - No Subsystem › Immersion suits
Issued 22 March 2023
Resolved
Immersion suit manufacture date is 2010. Properly service suit IAW manufacture guidance and Coast Guard Policy ref. NVIC 01-08
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 21 September 2022
Resolved
The hatch to the #2 void requires a new gasket. The #2 void is showing signs that galley liquids are seeping into void 2 which is starting to cause corrosion. The gasket must be replaced and verified to the satisfaction of a CG Marine Inspector.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Windows, sidescuttles and deadlights
Issued 21 September 2022
Resolved
One of the starboard side aft windows on the main deck is fractured. Replace the broken glass to ensure water/weather tight integrity. To be verified to the satisfaction of a CG Marine Inspector.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 10 June 2022
Resolved
Fuel valves need labeling for emergency shutoff.
04 - Emergency Systems › N/A - No Subsystem › Muster list
Issued 10 June 2022
Resolved
Station Bill needs posting at operating station and in each crew accommodation spaces.
04 - Emergency Systems › N/A - No Subsystem › Muster list
Issued 10 June 2022
Resolved
Post emergecny instructions at operating station.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 10 June 2022
Resolved
Machinery space ventilation manual pull stations on main deck need to be labeled.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 10 June 2022
Resolved
Emergency escape hatches need labeling.
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 5 May 2022
Resolved
Vessel must perform drills underway and operate propulsion and auxiliary equipment in presence of OMCI prior to carrying passengers.
01 - Certificates & Documentation › 013 - Documents › Stability Information Booklet
Issued 5 May 2022
Resolved
Vessel must receive and post approved stability letter prior to carrying passengers.
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 5 May 2022
Resolved
EPIRB battery and hydrostatic release are expired. Replace prior to carrying passengers.
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of liferafts
Issued 5 May 2022
Resolved
Inflatable life rafts are not stowed with automatic release ability. All three life rafts are missing hydrostatic release. Install hydrostatic releases prior to carrying passengers.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 5 May 2022
Resolved
All lifejackets onboard must be marked/labeled with current vessel name prior to carrying passengers.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 5 May 2022
Resolved
03 Deck: A media box is open with exposed wiring on stbd aft side. Complete installation.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 5 May 2022
Resolved
03 Deck: In passageway, an overhead light fixture is missing/not installed.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 5 May 2022
Resolved
02 Deck: There is an open ended cable located port fwd side. Complete installation or remove.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 5 May 2022
Resolved
02 Deck: Properly mark/label 208VAC panel on bulkhead.
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 5 May 2022
Resolved
Main deck female head has a leaking pipe union in the overhead for grey water system. Make repairs.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 5 May 2022
Resolved
Main deck has multiple dead ended cables and missing light fixtures. Complete installation or remove.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 5 May 2022
Resolved
Replace insulation, approved, that was removed from capped pipe section in overhead of galley.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 5 May 2022
Resolved
Void 4/5 Space: Remove two dead ended cables in overhead of space.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 5 May 2022
Resolved
Void 4/5 Space: Restore lighting for 02 two foot light fixtures in space.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 5 May 2022
Resolved
03 Deck outside starboard life jacket stowage door needs label and amount.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 5 May 2022
Resolved
Main deck fire doors are not closing with activation from the bridge. Make repairs and test.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 5 May 2022
Resolved
Install/post fire control plans and current emergency evacuation plans prior to passengers.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 15 April 2020
Resolved
Due to COVID-29, modifications were delayed and vessel is not in service. Vessel must undergo full annual inspection prior to carrying passengers.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 28 January 2020
Resolved
Vessel undergoing modifications which effect the vessel's stability, structural fire protection, and electrical system. Carriage of passengers restricted until the Fire Control Plan, Emergency Evacuation Plan, and Electrical Plans are approved/verified and stability test is conducted.
46 CFR 115.700
10 - Safety of Navigation › N/A - No Subsystem › Other (navigation)
Issued 6 March 2019
Resolved
Steering system must be of suitable condition. Steering system leaking hydraulic fluid from valve during operation. Make repairs to the satisfaction of the attending marine inspector.
46 CFR 115.814
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 6 March 2019
Resolved
Drills must test individual elements of security plan. Log book did not properly recird elements of drill,deeming drills unsatisfactory. COnduct drills to the satisfaction of attending marine inspector.
33 CFR 104.230 (a)(b)
Fire Fighting › Structural - A Class Divisions › Doors
Issued 28 March 2018
Resolved
Adjust latch on Port Side main deck FSD entrance to galley.
Electrical › Electrical Distribution System (service) › Outlet Box
Issued 28 March 2018
Resolved
GFI port forward galley work area faulty, renew GFI.
Electrical › Lighting (emergency) › Battery Operated Lantern
Issued 28 March 2018
Resolved
E light 2nd deck inop.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Controls
Issued 21 March 2017
Resolved
Repair or replace time delay for CO2 system
Construction/Loadline › Hull › Longitudinal Frame
Issued 21 March 2017
Resolved
Space/Void 4, Frame 6, center line. Crop and renew during Nov 2017 DD and UT local area and present reslults to the attending marine inspector
Construction/Loadline › Structures › Superstructure
Issued 7 April 2016
Resolved
Starboard side weathertight door frame on Deck 1 between frames 30-32 has 3" crack between door frame and side shell of superstructure. Repair to weathertight condition to satisfaction of Marine Inspector. 46 CFR 116.1160(d)
Stability › Weathertight Integrity › General
Issued 7 April 2016
Resolved
Portside and Starboard side door on Deck 1 is not weathertight. Repair to satisfaction of Marine Inspector. 46 CFR 116.1160(d)
Construction/Loadline › Structures › Superstructure
Issued 3 March 2016
Resolved
Repair bulkhead and weathertight doors on starboard lifejacket locker. 46 CFR 115.802
Construction/Loadline › Structures › Superstructure
Issued 3 March 2016
Resolved
Repair bulkhead near observation deck lifejacket locker for weathertightness. 46 CFR 115.802
Electrical › Electric Supply System (service) › Cable
Issued 3 March 2016
Resolved
Remove exposed wiring on mast and properly secure to mast. 46 CFR 120.340
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 3 March 2016
Resolved
Repair/replace anchor light to operate as designed. 33 CFR 83.21(c)
Communications › Public Address System › Loudspeaker
Issued 3 March 2016
Resolved
Ensure Public Address is audible in forward internal stairway. 46 CFR 121.610(b)
Stability › Incline Test › General
Issued 11 May 2012
Resolved
Submit final updated lightship weight change calculations from vessel repowering as per MSC letter dated 31JAN2012.
Engineering › Engine Controls (Electric/Electronic) › Circuit Board
Issued 18 January 2012
Resolved
Amend and Submit to MSC Periodic Safety Test Procedures and Design verification and Failure analysis to address comment #2 on MSC letter of 14 Feb 2012 and have drawings approved By MSC.
Accommodation/Occupational Safety › Potable Water System › General
Issued 18 January 2012
Resolved
Submit plans for approval for the alteration of the potable water system to include relocation of hot water heaters, head tanks, piping and pumps.
Engineering › Diesel Engine (propulsion/auxiliary-electric) › Block
Issued 4 January 2010
Resolved
#2 Caterpillar Generator overheated and automatically shutdown due to high jacket water temperatures believed to be due to low jacket water levels.
Fire Fighting › Structural - A Class Divisions › Machinery Spaces
Issued 18 March 2009
Resolved
For all A-Class fire control boundarie penetrations must be designed IAW 46 CFR 16.415 (a)(2)(ii).
Fire Fighting › Structural - A Class Divisions › Machinery Spaces
Issued 18 March 2009
Resolved
Re-install insulation around engine room hatch IAW 46 CFR 116.415(a)(2)(i)
Accommodation/Occupational Safety › Refrigeration (stores) › General
Issued 18 March 2009
Resolved
Repair escape handle on #2 reefer IAW 46 CFR 115.830
Documentation › Markings/Placards › Capacity Marking
Issued 18 March 2009
Resolved
Provide placards that state max number of passengers on upper decks IAW 46 CFR 122.602(g) and vessel's stability letter.
Fire Fighting › Structural - A Class Divisions › Doors
Issued 18 March 2009
Resolved
Repair fire screen doors to the original condition IAW 46 CFR 116.435, located on main deck.
Electrical › Electrical Distribution System (service) › Ground Detection
Issued 5 June 2008
Resolved
Properly locate and eliminate ground found in E/R switchboard.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 5 June 2008
Resolved
Properly install ceiling and electrical components (lighting, etc.) in main deck fwd wait station.
Electrical › Electrical Distribution System (service) › Wiring
Issued 21 April 2008
Resolved
Provide cable supports in bow thruster space/ 1st & 3rd sections IAW 46 CFR 120.340(b)(4).
Electrical › Electrical Distribution System (service) › Wiring
Issued 21 April 2008
Resolved
Terminate electrical wiring under center shelves in galley IAW 46 CFR 120.340(i)(1).
Operations/Management › Lifesaving › Op Readiness/Maintenance/Inspection
Issued 21 April 2008
Resolved
Properly label emergency exit in Forward Galley, IAW 46 CFR 116.500(i).
Engineering › Freshwater System (jacketwater cooling) › Hose
Issued 21 April 2008
Resolved
Provide double hose clamp on stbd generator r/w piping IAW 46 CFR 119.410(c)(1).
Engineering › Freshwater System (jacketwater cooling) › Hose
Issued 21 April 2008
Resolved
Replace r/w hose on port propulsion engine IAW 46 CFR 119.700.
Electrical › Electrical Distribution System (service) › Distribution Panel Bus
Issued 21 April 2008
Resolved
Provide a cover for electrical box on top of stbd generator IAW 46 CFR 120.200(b).
Fire Fighting › Structural - A Class Divisions › Fire Doors
Issued 21 April 2008
Resolved
Prove proper operation on main deck fire doors, proper spacing shall be IAW 46 CFR 116.435(b).
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 21 April 2008
Resolved
Provide waterlight on 3rd deck stbd lifering IAW 46CFR 117.70(d)(1).
Engineering › Non-conventional Propulsion/Steering › Hydraulic Steering Cylinder (jet)
Issued 21 April 2008
Resolved
Tighten hydraulic steering lines in rudder space to stop slow drip IAW 46 CFR 119.700.
Lifesaving › Lifejacket/PFD (Type I) › Marking
Issued 21 April 2008
Resolved
Properly label PFD's IAW 46CFR 122.604
Fire Fighting › Structural - A Class Divisions › Doors
Issued 21 April 2008
Resolved
Replace/renew stbd onloading door IAW 46 CFR115.818.
Accommodation/Occupational Safety › Occupational Safety › Rubbish/Waste Materials
Issued 21 April 2008
Resolved
Ensure sanitary conditions for bar stations IAW 116.435.
Construction/Loadline › Structures › Door
Issued 21 April 2008
Resolved
Ensure visual light for watertight door is operable IAW 46 CFR 170.255.
Fire Fighting › Means of Escape › Escape Route Signs
Issued 1 March 2007
Resolved
Label and clear from obstruction the emergency escape scuttles on Horizon deck.
Fire Fighting › Fixed Fire Detection System › Control Panel
Issued 1 March 2007
Resolved
Perform satisfactory test of fire alarm pull boxes and bridge alarm system in presence of CG marine inspector.
Accommodation/Occupational Safety › Potable Water System › General
Issued 1 March 2007
Resolved
Clean/replace frozen drink mixer drain line, Horizon bar.
Lifesaving › Inflatable Liferafts › Not on Board
Issued 6 April 2006
Resolved
This vessel is restricted to carry 350 passengers and 399 total persons during cold water period of 01 Oct-14 June due to not meeting the lifesaving equipment requirements for small passenger vessels in accordance with 46 CFR 117.206.
Personnel › Training › First Aid/CPR
Issued 6 April 2006
Resolved
Provide proof of training of crew in first aid/CPR.
Operations/Management › Lifesaving › Op Readiness/Maintenance/Inspection
Issued 6 April 2006
Resolved
Provide mounted at the operating station emergency instruction list in accordance with 46 CFR 122.510.
Fire Fighting › Miscellaneous Items › Waste Receptacles
Issued 6 April 2006
Resolved
Properly remove plastic trash cans from vessel, a couple are located on the bridge provide waste receptacles of non combustible material.
Engineering › Compressed Air System (control) › Receiver/Bottle
Issued 6 April 2006
Resolved
Make pressure vessel located under helm counsel ready for internal inspection and testing of the relief valve in accordance with 46 CFR 115.812.
Stability › Watertight Integrity › General
Issued 6 April 2006
Resolved
Replace cracked bridge window in accordance with 46 CFR 116.1010.
Lifesaving › Lifejacket/PFD (General) › Quantity
Issued 6 April 2006
Resolved
Vessel restricted to carry only 55 children or persons that are smaller than the lower size limit of the adult life jacket, since there are only 55 child-size lifejackets on board in accordance with 46 CFR 117.71.
Engineering › Diesel Engine (propulsion-reduction gear) › Bearing
Issued 6 April 2006
Resolved
Make both diesel engines and aft generator prepared to conduct machinery alarm testing in accordance with 46 CFR 115.804.
Electrical › Electrical Distribution System (service) › Circuit Breaker
Issued 13 March 2006
Resolved
correct electrical system and submitt approved plans to one-line to reflect same
Documentation › Safety/Response Plans/Programs › Vessel Response Plan
Issued 1 March 2006
Resolved
33U.S.C.1321(j)(D)(ii)-The NTVRP does not discuss the qualified individual's responsibilities for immediate communication with the NRC and notification of the oil spill removal organization.
Operations/Management › Lifesaving › Op Readiness/Maintenance/Inspection
Issued 1 June 2005
Resolved
Provide proof of first aid / CPR training to 50% of the crew. NVIC 1-91
Electrical › Electric Generation Source (service) › Circuit Breaker
Issued 1 June 2005
Resolved
Remove or Replace breaker in the 3rd Deck HVAC Panel (located on the bridge). Not being used any longer.
46 CFR 120.200(b)
Fire Fighting › Structural - A Class Divisions › Fire Doors
Issued 1 June 2005
Resolved
Remove all hold backs (door hooks) on fire doors. 46 CFR 116.435((c)(6)(ii)
Fire Fighting › Fire Hoses › Length
Issued 1 June 2005
Resolved
Ensure fire stations will reach all effective spaces with out compromising Main vertical zones or fire boundaries
46 CFR 118.320
Electrical › Electrical Distribution System (service) › Ground Detection
Issued 1 June 2005
Resolved
Locate and fix ground on main switchboard. 46 CFR 120.370
Fire Fighting › Structural - A Class Divisions › Fire Doors
Issued 1 June 2005
Resolved
Remount fire closure in busboy station for fire door. 46 CFR 116.435(b)(2)
Fire Fighting › Structural - A Class Divisions › Doors
Issued 1 June 2005
Resolved
Fix or replace door handle on main deck fire door and enure it closes properly 46 CFR 116.435b)(2)
Electrical › Lighting (emergency) › Lighting Fixture
Issued 1 June 2005
Resolved
Remount E lighting in engine room.46 CFR 120.432
Electrical › Electrical Distribution System (service) › Panelboard
Issued 1 June 2005
Resolved
Provide cover on breaker box above Busboy station on main deck. 46 CFR 120.200 (b)
Fire Fighting › Structural - A Class Divisions › Doors
Issued 1 June 2005
Resolved
Ensure all fire doors close properly.46 CFR 116.435
Stability › Incline Test › General
Issued 1 June 2005
Resolved
Re-address tonnage issue and recalculate.
Electrical › Lighting (emergency)
Issued 29 March 2004
Resolved
Replace light bulbs in e-light on 02 deck fwd. LEGACY COMPONENT DESC: Battery Operated Lantern
Electrical › Electrical Distribution System (emergency)
Issued 29 March 2004
Resolved
Repalce GFI Outlets in Galley and Machinery Space LEGACY COMPONENT DESC: Outlet Box
Electrical › Electrical Distribution System (emergency)
Issued 29 March 2004
Resolved
Cover blank open areas in light switch area, 02 Deck Service Area. LEGACY COMPONENT DESC: Switch
Fire Fighting › Combustible Materials
Issued 29 March 2004
Resolved
Replace all garbage cans w/ fire proof material. LEGACY COMPONENT DESC: Furniture/Furnishings
Fire Fighting › Ventilation Systems
Issued 29 March 2004
Resolved
Label vents and fuel shut-downs on 01 deck stbd.
Engineering
Issued 29 March 2004
Resolved
Repair Stbd Sewage Tank
Fire Fighting › Means of Escape › Doorways
Issued 23 June 2003
Resolved
FIRE DOORS ON HORIZON DECK AND VISTA DECK DO NOT CLOSE
Accommodation/Occupational Safety › Medical/First Aid
Issued 23 June 2003
Resolved
REPLACE EYE WASH AND IODINE SWABS IN FIRST AID KIT. LEGACY COMPONENT DESC: Medicine Chest
Documentation › Markings/Placards › Vessel Number (state)
Issued 23 June 2003
Resolved
PLACE HAILING PORT ON STERN
Construction/Loadline › Hull
Issued 29 October 2002
Resolved
Gauge pitted areas in way of Bow Thruster tunnel.
Engineering › Steering Gear System › Rudder
Issued 29 October 2002
Resolved
Take rudder-bearing clearances, prior to Credit Dry Dock..
Construction/Loadline › Penetrations › Gasket
Issued 29 October 2002
Resolved
Clean/remove paint from watertight door knife-edges (Between lower galley and aft store room).
Construction/Loadline › Penetrations › Gasket
Issued 29 October 2002
Resolved
Clean watertight hatch covers as needed throughout vessel.
Accommodation/Occupational Safety › Occupational Safety
Issued 29 October 2002
Resolved
Clean/remove debris and loose gear in compartments as indicated during inspection.
Fire Fighting › Fixed Fire Detection System
Issued 26 April 2002
Resolved
CONDUCT TEST OF SMOKE / FIRE DETECTION SYSTEMS. LEGACY COMPONENT DESC: Smoke Detectors
Operations/Management › Drills/Instruction
Issued 26 April 2002
Resolved
CONDUCT DRILLS WITH ENTIRE CREW, IN THE PRESENCE OF A QUALIFIED MARINE INSPECTOR.
Documentation
Issued 19 April 2000
Resolved
Renew Great Lakes Agreement
Engineering
Issued 19 April 2000
Resolved
Clean or renew S.S. Generator air filters
Fire Fighting
Issued 3 December 1999
Resolved
PROVIDE MEANS OF MANUALLY OPERATING THE PORT SIDE ENGINE ROOM VENTILATION FIRE DAMPER CLOSURE IN ACCORDANCE WITH 46 CFR 116.610(g)(4), TO THE SATIS- FACTION OF THE ATTENDING MARINE INSPECTOR AND COGNIZANT OCMI.
Electrical
Issued 3 December 1999
Resolved
REPLACE NEWLY INSTALLED (NON-APPROVED) ELECTRICAL CABLE FOR THE ENGINE ROOMVENTILATION SYSTEM WITH APPROVED MARINE GRADE CABLE, IN ACCORDANCE WITH 46 CFR 120.340, TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR AND THE COGNIZANT OCMI.
Construction/Loadline
Issued 3 July 1999
Resolved
Remove all liquid from all bilges no later than 10JUL99, and to the satis- faction of the attending marine inspector.
Construction/Loadline
Issued 3 July 1999
Resolved
Submit plan proposal for permanent repair of affected damaged area within the chain locker compartment & associated areas of the forward galley spaceand affected damaged focsel railing (bulwark), both port and starboard, no later than 10JUL99, to the satisfaction of the attending marine inspector.
Construction/Loadline
Issued 3 July 1999
Resolved
Affect permanent repairs to all affected damaged areas no later than 10AUG99, and to the satisfaction of the attending marine inspector.
Navigation
Issued 3 July 1999
Resolved
Vessel route restricted to within the inside of the Chicago Harbor outer harbor breakwall until permanent repairs have been affected and to the satisfaction of the attending marine inspector.
Accommodation/Occupational Safety
Issued 3 July 1999
Resolved
Remove paneling covering shell of interior hull in forward galley to accom-odate visual inspection of affected damaged area, no later than 10JUL99, & to the satisfaction of the attending marine inspector.
Documentation
Issued 30 March 1999
Resolved
Following completion of the ballast and Port fuel tank modifications, submit revised stability calculation to the CG Marine Safety Center for review and issuance of a new stability letter. Vsl is restricted to the carriage of 140 persons on the 4th deck when operating on PP waters.
Engineering
Issued 28 December 1998
Resolved
Provide at least one supply duct and one exhaust duct for adequate ventilation of the machinery space. Vent sizing and installation shall be IAW 46 CFR 119.465. Prior to the start of work, cognizant OCMI shall approve plans for the modification of the ventilation ducting.
Engineering
Issued 21 May 1998
Resolved
REMOVE AND PERMANENTLY CAP TEMPORARY FUEL SOUNDING TUBE ON FORWARD BULKHEADIN ENGINEROOM PRIOR TO ISSUANCE OF COI.
Fire Fighting
Issued 21 May 1998
Resolved
INSTALL FIRE SCREEN DOOR RELEASES ON BOTH SIDES OF ALL FIRE DOORS PRIOR TO ISSUANCE OF THE COI.
Electrical
Issued 21 May 1998
Resolved
REMOVE WIRE NUTS AD MAKE PROPER CONNECTIONS FOR WIRING ON FORWARD ENGINE ROOM BULKHEAD IN WAY OF THE FUEL SOUDING TUBE.
Electrical
Issued 21 May 1998
Resolved
PROPERLY SECURE WIRES WITH APPROVED TYPE METAL BANDING OR RELOCATE THEM ON TOP OF PROPERLY INSTALLED WIRE TRAYS OR HANGERS IN ENGINE ROOM AND VOID #5.
Fire Fighting
Issued 21 May 1998
Resolved
PROPERLY MOUNT ALL FIRE AXES.
Electrical
Issued 9 April 1998
Resolved
Seal all junction boxes and support all wires behind pilothouse consol.
Documentation
Issued 9 April 1998
Resolved
Provide copies of: FCC Safety Cert, FCC Station lic, FCC Operators lic.
Navigation
Issued 9 April 1998
Resolved
Prove porper operation of auxiliary steering system at 7 knots or 1/2 max ahead speed upon arrival [name withheld] zone.
Fire Fighting
Issued 9 April 1998
Resolved
Submit plan of current fire door release sut up to [name withheld] for approval.
Navigation
Issued 9 April 1998
Resolved
Calibrate rudder angle indicator in way of steering gear.
Lifesaving
Issued 9 April 1998
Resolved
Conduct man overboard drill to the satisfaction of [name withheld] upon arrival, and prior to carring passengers.
Navigation
Issued 9 April 1998
Resolved
Provide Tide & Current, light list, coast pilot, subchapter "K", and noticeto mariners.
Fire Fighting
Issued 9 April 1998
Resolved
prior to carring passengers the following items in MSC LTR dated 2APR98 must be completed: (a) B-0 bulkhead deck-deck, (b) Fire load calculations(c) Updated SPF plans, (d) Updated ventilation plans, (e) Updated egress plans.
Documentation
Issued 9 April 1998
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Fire Fighting
Issued 9 April 1998
Resolved
Reposition galley fire system nozzels.
Electrical
Issued 9 April 1998
Resolved
Provide chaffing protection for galley wires penetrating overheads.
Electrical
Issued 9 April 1998
Resolved
Make neon lighting connections inside of a junction box that is properly mounted.
Engineering
Issued 9 April 1998
Resolved
install additional bracket for fuel oil line STBD generator at foundation.
Electrical
Issued 9 April 1998
Resolved
Support ALL wires in ALL overheads throught vessel.
Electrical
Issued 9 April 1998
Resolved
Properly mount all junctions boxes in all overheads throught vessel.
Fire Fighting
Issued 9 April 1998
Resolved
Lable fire damper.
Electrical
Issued 9 April 1998
Resolved
Provide guard for light behind pilot house consol.
Documentation
Issued 9 April 1998
Resolved
Provide copy of vessel doucment.
Casualty record · 6
16 August 2007Routine · role: Involved in a Marine Casualty · activity 3050630
19 August 2007Routine · role: Involved in a Marine Casualty · activity 3050999
31 December 2009Routine · role: Involved in a Marine Casualty · activity 3661033
12 May 2011Routine · role: Transiting Vicinity of Primary Subject · 1 injured · activity 4052570
2 November 2014Routine · role: Involved in a Marine Casualty · activity 5059907
8 July 2016Routine · role: Involved in a Marine Casualty · 1 injured · activity 5944587
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.
Recorded names · 1
MYSTIC BLUE (2007–2016). Names as the Coast Guard recorded them in incident records, with the years they appear; some are renames and some are spelling variants.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.