Documentation record
Registered dimensions (L × B × D)48.0 ft × 16.0 ft × 4.0 ft
Registered tonnagegross 20 / net 16
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderCARMAN BOATS INC · MARION, MD, UNITED STATES · built 1998
Hull materialFRP (Fiberglass)
PropulsionDiesel
Hull shapeShip
Hull configurationMonohull
Hailing portHIGHLANDS, NJ
Endorsements, as the file codes themcw_un, fi
DocumentationValid · issued 12 May 2026 · expires 30 April 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it20 - Simplified, Gross Ton
16 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
The full record for this vessel
Behind this panel: 18 inspections, each with its date, unit and type; 15 deficiencies with the resolution recorded against each, 1 without one; operational controls, none recorded without a removal date; no tow-unit appearances recorded; no other recorded names; the documentation record: dimensions, tonnage, builder, hailing port and endorsements. Every line is a record the Coast
Guard wrote; the counts above are the same counts as in the summary, and they are free.
Professional is $39 a month or $299 a year,
or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks
every detail section on every vessel page, fleet watch tied to your account, and ownership records
on request. Already a subscriber? Sign in.
Maury does not score, rate or grade vessels, at any price.
Inspection history · 18
8 October 2025
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8249039
7 October 2024
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8015312
27 June 2024
Drydock Exam · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7942178
29 August 2023
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7775227
15 August 2023
Type not recorded
No type recorded · USCGC HAMMERHEAD (WPB 87302) · USCG Northeast District (CGD-NE) · Activity 7772124
8 July 2022
Deficiency Check · COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7490832
29 June 2022
Internal Structural Exam · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7490790
6 April 2021
Administrative Inspection · COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7161909
24 June 2020
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6986531
15 April 2020
Drydock Exam · Internal Structural Exam · Hull Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6939567
18 July 2019
Annual Inspection · Administrative Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6753853
23 October 2018
Type not recorded
No type recorded · USCGC HAMMERHEAD (WPB 87302) · USCG Northeast District (CGD-NE) · Activity 6567645
9 July 2018
Annual Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6473475
2 April 2018
Internal Structural Exam · Hull Examination · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6392364
20 April 2017
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6128731
5 April 2016
COI Inspection · Hull Examination · Internal Structural Exam · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5847785
22 February 2016
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 5820709
22 January 2016
Administrative Inspection
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 5801724
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 8 October 2025
Resolved
A visual and audible alarm must be provided at the operating station to indicate a high water level. Vessel’s visual alarms were not operational for the following spaces: Lazarette, Engine room, and Tank space.
46 CFR 182.530
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 October 2025
Resolved 15 October 2025
Resolution: All three high water alarms has been replaced.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 8 October 2025
No resolution recorded
As appropriate for the intended voyage, a vessel must carry adequate and up-to-date: (1) Charts of large enough scale to make safe navigation possible. Vessel’s paper charts were dated from 2018.
46 CFR 184.420
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 November 2025 — due date passed with no resolution recorded
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 8 October 2025
Resolved
The Rules concerning lights shall be complied with from sunset to sunrise. Port sidelight is not operational. Repair port sidelight prior to operating between sunset and sunrise.
33 CFR 83.20(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 October 2025
Resolved 15 October 2025
Resolution: Recieved picture of newly installed port running light.
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 29 August 2023
Resolved
Each item of survival craft equipment must be of good quality, and efficient for the purpose it is intended to serve. The water light attached to the life float had loose battery connections, upon further inspection the battery was not the appropriate type for the water light. Replace battery on the water light in accordance with manufacture instructions.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 September 2023
Resolved 22 September 2023
Resolution: Received objective evidence via photograhs that the batteries were replaced on both water lights
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance and inspections
Issued 29 August 2023
Resolved
Each life jacket carried on a vessel on oceans, coastwise, or Great Lakes route, must have a life jacket light approved in accordance with § 161.012 in subchapter Q of this chapter. All lights attached to the life jackets were not working. Replace defective lights on each life jacket required on the COI to the satisfaction of the attending marine inspector. Vessel is restricted to no more than 20 miles from a harbor of safe refuge.
Action required: 705 - Other - as specified
Resolved 22 September 2023
Resolution: Received objective evidence via photograph that the lights were replaced on each life jacket
11 - Life Saving Appliances › N/A - No Subsystem › On board training and instructions
Issued 29 August 2023
Resolved
Placards containing instructions for the donning and use of the life jackets aboard the vessel must be posted in conspicuous places. Donning placards were not visible,place donning placard in a conspicuous place to the satisfaction of the attending marine inspector.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 September 2023
Resolved 22 September 2023
Resolution: Received objective evidence via photograph that the donning placard was placed in a conspicuous place
01 - Certificates & Documentation › 012 - Crew Certificates › Other (STCW)
Issued 8 July 2022
Resolved
Marine employers shall establish programs for the chemical testing for dangerous drugs on a random basis of crew members on inspected vessels who occupy a position, or perform the duties and functions of a position, required by the vessel's Certificate of Inspection. Deckhands not enrolled in a DAPI Consortium.
Condition: Invalid
Action required: 705 - Other - as specified
Due 15 July 2022
Resolved 18 July 2022
Resolution: Operator sent proof of enrollement for deckhand. (see deficiencies documents tab for details)
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 8 July 2022
Resolved
A pre-engineered fixed gas fire extinguishing system must have the following equipment at the operating station: a means to reset devices used to automatically shut down engines. Fireboy overide at operating station inoperable.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 July 2022
Resolved 22 July 2022
Resolution: Attended vessel, verified proper installation
11 - Life Saving Appliances › N/A - No Subsystem › Radio life-saving appliances
Issued 8 July 2022
Resolved
Each disposable hydrostatic release unit must be marked with an expiration date of two years after the date on which the unit is installed. Hydrostatic release unit installed greater than two years prior.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 July 2022
Resolved 18 July 2022
Resolution: Operator submitted photograph of and purchase reciept for hydrostatic release. (see deficiencies documents tab for details)
07 - Fire Safety › N/A - No Subsystem › Personal equipment for fire safety
Issued 18 July 2019
Resolved
The portable fire extinguisher bracket is broken, located immediately outside the cabin on the starboard cabin bulkhead. Replace broken bracket.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 6 August 2019
Resolution: Received photo of corrected deficiency. New brackets installed.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 18 July 2019
Resolved
Vessel did not provide annual DAPI report. Vessel must provide report (may be in the form a MIS report) showing number of individuals tested, number and type of chemcial tests and the number of positive results.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 6 August 2019
Resolution: Received copy of MIS report.
01 - Certificates & Documentation › 012 - Crew Certificates › Medical certificate
Issued 9 July 2018
Resolved
The marine employer must provide means to conduct alcohol testing after a serious marine incident. Owner provided proof of purchase for alcohol testing strips. Deficiency cleared.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 23 July 2018
Resolved 9 July 2018
Resolution: Owner purchased alcohol testing strips in the presence of attending marine inspectors.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 9 July 2018
Resolved
Found bilge pumps in all spaces were replaced with non UL listed equipment. Replace all submersible electric bilge pumps as meeting the requirements in UL 1113. Owner provided proof of purchase of UL 1113 listed bilge pumps. However, inspectors shall witness proper operation of bilge pumps once installed.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 July 2018
Resolved 23 July 2018
Resolution: The bilge pumps were replaced with pumps meeting the UL1113 stamdards and installed.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 9 July 2018
Resolved
Found hatch leading to lazarette with corroded gasket compromising watertight integrity. A hatch exposed to the weather must be watertight. Repair/replace gasket to maintain watertight integrity of hatch.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 July 2018
Resolved 23 July 2018
Resolution: The damaged gasket has been replaced with a new watertight gasket.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 9 July 2018
Resolved
A submersible electrical bilge pump may be used provided that a positive shut off valve is installed at the hull penetration. Vessel must provide a valve at each electrical submersible pump disharge penetration.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 July 2018
Resolved 23 July 2018
Resolution: The vessel's Captain installed positive shut off valves at the hull penetration points of the bilge pump systems.