Records from 2016 to 2026. Most recent: inspection, 20 May 2026.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 4 April 2025
Resolved
Make permanent repairs to longitudinal, starboard side, main deck frames in lazarette space. Expose and examine the adjacent transverse main deck structure to determine condition. Submit repair proposal identifying scope of repair. To be completed by next DD/ISE.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 10 April 2025
Resolution: Corrected.
04 - Emergency Systems › N/A - No Subsystem › Water level indicator
Issued 14 May 2024
Resolved
Inspect Alarms. Fwd bilge void bilge alarm was not mounted.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 May 2024
Resolved 10 April 2025
Resolution: Corrected.
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 14 May 2024
Resolved
Inspect lifesaving arrangements. EPIRB was not in a float free location.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 June 2024
Resolved 10 April 2025
Resolution: Corrected.
01 - Certificates & Documentation › 011 - Ships Certificates › USCG Certificate of Documentation (COD)
Issued 14 May 2024
Resolved
Provide current COD. COD was not provided.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 June 2024
Resolved 4 April 2025
Resolution: Corrected.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 24 May 2022
Resolved
Due to the structural concerns contained in MSC's structural plan review letter dated 22NOV99 and structural deficiencies identified during past vessel inspections the owner/operator is strictly prohibited from make any repairs, alterations, or modification to any vessels structures without the oversight/attendance of a CG Marine Inspector. The vessel shall be made available for annual drydocks over the next 05 years to monitor/access its structural fitness for service.
Condition: Design Flaw
Action required: 705 - Other - as specified
Resolved 24 May 2023
Resolution: Drydock requirement documented in special notes and Sector Mobile ltr# 22-257.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 19 February 2021
Resolved
Flexible hose runs must not penetrate watertight decks or bulkheads. Steering gear hydraulic flexible hoses penetrate bulkheads in lazarette, tank room and engine room. Seal penetrations with approved material.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 March 2021
Resolved 3 May 2021
Resolution: Installed proper thru-bulkhead penetrations.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 19 February 2021
Resolved
Connections must be made within an enclosure and the insulated cap of the connector must be secured to prevent loosening. Fire pump electrical cable is connected with twist-on wire nuts without an enclosure. Add enclosure and secure wire nuts.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 March 2021
Resolved 3 May 2021
Resolution: Repairs complete.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 28 January 2021
Resolved
At each initial and subsequent inspection for certification, a vessel shall operate the main propulsion machinery both ahead and astern. Turbo charger for the main diesel engine is inoperable. Vessel is unable to get underway. Vessel must complete suitable repairs and demonstrate man overboard and fire drill for certification.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 February 2021
Resolved 19 February 2021
Resolution: Repairs completed; drills conducted.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 28 January 2021
Resolved
Each life jacket carried on a vessel on an oceans route must have a life jacket light. Four lights inoperable. Replace lights.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 February 2021
Resolved 19 February 2021
Resolution: Batteries replaced.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 28 January 2021
Resolved
Each battery must be free from exposure to water or spray. Engine batteries have no covers. Install covers.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 February 2021
Resolved 19 February 2021
Resolution: Covers installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 28 January 2021
Resolved
Remote fuel shutoff stations must be marked. Placards are illegible. Replace placards.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 February 2021
Resolved 19 February 2021
Resolution: Placards added.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 11 March 2020
Resolved
The marine inspector may require any part or all of the propeller shafting to be drawn for examination of the shafting and stern bearing of a vessel whenever the condition of the shafting and bearings are in question. The STBD stern tube packing gland has a small leak.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 March 2020
Resolved 3 May 2021
Resolution: Verified no longer leaking.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 11 March 2020
Resolved
In systems and applications where flexible hoses are permitted to be clamped, double hose clamping is required. STBD engine raw water hose was missing a hose clamp.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 March 2020
Resolved 28 April 2020
Resolution: Additional hose clamp was installed.
09 - Working and Living Conditions › 091 - Living Conditions › Other (crew and accommodation)
Issued 24 April 2019
Resolved
Proof of annual submission by consortium was unavailable at time of inspection. Provide documentation of annual submission to include employees covered.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 May 2019
Resolved 30 April 2019
Resolution: Master provided most recent annual report from owner, including crew list.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 24 April 2019
Resolved
26 lifejackets found with lights not securely attached. Each lifejacket required to have light must have such secured to front shoulder area of lifejacket.
Action required: 10 - Deficiency Rectified
Resolved 24 April 2019
Resolution: Crew properly secured lights to 26 lifejackets with UV resistant line.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 24 April 2019
Resolved
Each pipe that penetrates the hull must have a means to prevent water from entering the vessel. Two positive action valves found to be seized or inoperable in the following areas:
1) Port side engine room, forward
2) Aft bunk room
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 May 2019
Resolved 30 April 2019
Resolution: Verified installation of two new, bronze type ball valves at both through hull fittings: Port side engine room, forward and Aft bunk room.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Scuppers, inlets and discharges
Issued 24 April 2019
Resolved
Exhaust flex hose for generator is required to have two hose clamps at each connection point. Connection at through hull fitting was found to have one hose clamp removed. Re-install additional hose clamp to meet flexible hose installation requirements.
Action required: 10 - Deficiency Rectified
Resolved 24 April 2019
Resolution: Crew located and re-installed missing hose clamp at through hole connection.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 24 April 2019
Resolved
Deck rails must be designed and constructed to withstand a point load of 200lbs. Starboard aft section of handrail was found with two missing hardware screws at embarkation area. Install appropriate hardware to meet handrail design.
Action required: 10 - Deficiency Rectified
Resolved 24 April 2019
Resolution: Crew installed proper hardware at handrail mount at time of inspection.
11 - Life Saving Appliances › N/A - No Subsystem › Buoyant apparatus
Issued 24 April 2019
Resolved
Each life float and buoyant apparatus must be marked with name of vessel. Life float for vessel found without proper markings.
Action required: 10 - Deficiency Rectified
Resolved 24 April 2019
Resolution: Master properly marked life float with vessel name prior to inspectors departing.
09 - Working and Living Conditions › 091 - Living Conditions › Pipes, wires (insulation)
Issued 24 April 2019
Resolved
Electrical equipment must be installed and maintained to protect passengers, crew and vessel from electrical hazards. Dead end wire in passenger accommodation area found from prior A/C lighting installation.
Action required: 10 - Deficiency Rectified
Resolved 24 April 2019
Resolution: Master capped off and taped dead end wires, with remaining wire tucked into bulkhead penatration.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 24 April 2019
Resolved
COI must be posted under glass or other transparent material in a conspicuous place on the vessel where observation by passengers is likely.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 May 2019
Resolved 30 April 2019
Resolution: Verified COI properly mounted in passenger common space.
Personnel › Certificates/Documents/Licenses › License, Radio Officer
Issued 30 April 2018
Resolved
Provide valid Marine Radio Operator Permit. Vessel limited to no more than 1000 feet from land.
Action required: 705 - Other - as specified
Resolved 3 May 2018
Resolution: Vessel master provided a valid Marine Radio Operator Permit.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 30 April 2018
Resolved
Anchor light is inoperable; demonstrate proper operation. Vessel limited to daylight operations only.
Action required: 705 - Other - as specified
Due 31 May 2018
Resolved 29 May 2018
Resolution: All navigation lights tested SAT.
Fire Fighting › Fire Bucket › Quantity
Issued 30 April 2018
Resolved
Replace 01 fire bucket.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 May 2018
Resolution: A new fire bucket was provided.
Engineering › Bilge Water Management System › Pump
Issued 30 April 2018
Resolved
Replace bilge pump in accommodation bilge.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 May 2018
Resolution: A new bilge pump was installed.
Engineering › Bilge Water Management System › Pump
Issued 30 April 2018
Resolved
Provide visual indicator at operating station for bilge pump operation.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 May 2018
Resolved 29 May 2018
Resolution: All bilge pump operation station lights tested SAT.
Documentation › Manuals/Policy Documentation › Emergency Instructions
Issued 30 April 2018
Resolved
Post vessel-specific emergency instructions.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 May 2018
Resolution: Vessel-specific emergency instructions were posted.
Engineering › Steering Gear System › Ram
Issued 30 April 2018
Resolved
Rudder only moves approximately 10 degrees port & stbd of amidships. Ensure rudder can move 35 degrees port & stbd.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 May 2018
Resolved 15 May 2018
Resolution: Def extended to next dry-dock/special note added.
Construction/Loadline › Hull › Side Shell
Issued 30 April 2018
Resolved
Provide repair proposal for 02 sections of stbd hull: coating rubbed off, glass exposed.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 May 2018
Resolved 15 May 2018
Resolution: Damage is on rub rail, no concern with structural integrity. Extended to next dry-dock/special note added.
Deck/Cargo › Mooring/Anchoring › Capstan
Issued 30 April 2018
Resolved
Permanently mount anchor windlass motor.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 May 2018
Resolved 15 May 2018
Resolution: Properly mounted.
Electrical › Lighting (service) › Lighting Fixture
Issued 30 April 2018
Resolved
Replace light in fwd bunk room.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 May 2018
Resolved 15 May 2018
Resolution: Light replaced.
Electrical › Electrical Distribution System (service) › Outlet Box
Issued 30 April 2018
Resolved
Replace/provide outlet covers in accommodation space and operating station.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 May 2018
Resolved 29 May 2018
Resolution: Electrical outlet lights properly covered.
Electrical › Electrical Distribution System (service) › Circuit Breaker
Issued 30 April 2018
Resolved
Re-label distribution panel breakers in accommodation space.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 May 2018
Resolved 15 May 2018
Resolution: Properly labeled.
Electrical › Electrical Distribution System (service) › Wiring
Issued 30 April 2018
Resolved
Make proper electrical connections for washdown pump wiring.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 May 2018
Resolved 15 May 2018
Resolution: Proper electrical connections made.
Electrical › Electrical Distribution System (service) › Wiring
Issued 30 April 2018
Resolved
Properly terminate wires for light over port engine.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 May 2018
Resolved 15 May 2018
Resolution: Dead end wires terminated in j-box.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 30 April 2018
Resolved
Provide junction box cover for anchor windlass motor.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 May 2018
Resolved 15 May 2018
Resolution: J-box cover installed.
Electrical › Electrical Distribution System (service) › Wiring
Issued 30 April 2018
Resolved
Cap dead end wire at bilge pump switch on engine room ladder.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 May 2018
Resolved 15 May 2018
Resolution: Wiring properly connected.
Stability › Watertight Integrity › Weathertight Enclosure
Issued 30 April 2018
Resolved
Prove proper operation of all hatch securing mechanisms.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 May 2018
Resolution: Master demonstrated proper operation of all hatch covers on weather deck.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 30 April 2018
Resolved
Provide proof that all outstanding user fees have been paid.
Action required: 705 - Other - as specified
Due 31 May 2018
Resolved 24 April 2019
Resolution: User fees are current.
Engineering › Steering Gear System › Rudder
Issued 30 April 2018
Resolved
Provide adequate rudder stops.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 May 2018
Resolved 15 May 2018
Resolution: Extended to next dry-dock exam/special note added.
Fire Fighting › Fire Pumps › Arrangement
Issued 18 April 2017
Resolved
The water/fire pump needs to be properly secured to mounting location.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 28 April 2017
Resolved 27 April 2017
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 18 April 2017
Resolved
Make repairs to small exhaust leak iwo the port engine turbo charger.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 21 April 2017
Resolved 21 April 2017
Resolution: Rcvd call from O/o stating he had repaired the turbo leak with new gasket. Took verbal due to COC ceremony.
Electrical › Electrical Distribution System (service) › Wiring
Issued 18 April 2017
Resolved
Both MDE battery start cables are laying in the bilge.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 28 April 2017
Resolved 27 April 2017
Resolution: Wires were triced up as required.
Engineering › Sea-water System (primary cooling) › Valve
Issued 18 April 2017
Resolved
Replace seal via the stbd seachest to remove small water leak.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 28 April 2017
Resolved 27 April 2017
Resolution: Leak was removed.
Engineering › Bilge Water Management System › Pump
Issued 18 April 2017
Resolved
Properly mount the bilge pump in the engine room.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 28 April 2017
Resolved 27 April 2017
Resolution: Bilge pump was mounted correctly.
Engineering › Bilge Water Management System › Interface Detector
Issued 18 April 2017
Resolved
Properly remount the float switch in the lazarette.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 21 April 2017
Resolved 21 April 2017
Resolution: Float was remounted on 18 Apr but not reported until 21 Apr. Took verbal due to COC ceremony.
Engineering › Sea-water System (primary cooling) › Piping
Issued 18 April 2017
Resolved
Replace and double clamp hose from port engine cooler to exhaust piping.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 21 April 2017
Resolved 21 April 2017
Resolution: Corrected.
Construction/Loadline › Hull › Side Shell
Issued 18 April 2017
Resolved
Make permanent repairs to port side aft gunwhale area slightly damaged and delaminated due to small bumop with pier.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 18 May 2017
Resolved 28 April 2017
Resolution: Repairs have been completed.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 1 February 2016
Resolved
Numerous items in first aid kit were expired.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 February 2016
Resolved 9 February 2016
Resolution: New first aid kit is on board.
Electrical › Electric Supply System (service) › Battery Installation
Issued 1 February 2016
Resolved
Battery boxes are missing covers.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 16 February 2016
Resolved 9 February 2016
Resolution: Battery boxes have cover installed.
Communications › Radio Communications › EPIRB
Issued 1 February 2016
Resolved
EPIRB monthly test log is missing.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 16 February 2016
Resolved 9 February 2016
Resolution: EPIRB monthly test log is on board and up to date.
Lifesaving › Lifejacket/PFD (General) › Marking
Issued 1 February 2016
Resolved
Lifesaving equipment must have MAYPORT PRINCESS II inscribed on each piece.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 16 February 2016
Resolved 9 February 2016
Resolution: Name is properly inscribed on equipment.
Operations/Management › Navigation Safety › Navigation Underway, General
Issued 1 February 2016
Resolved
Starboard running light is INOP.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 16 February 2016
Resolved 9 February 2016
Resolution: Starboard running light is operational.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 1 February 2016
Resolved
Replace cover on junction box near microwave.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 16 February 2016
Resolved 9 February 2016
Resolution: Junction box is properly installed.
Fire Fighting › Portable CO2 Fire Extinguisher › Service
Issued 1 February 2016
Resolved
02 fire extinguishers have not been properly serviced.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 February 2016
Resolved 9 February 2016
Resolution: Fire extinguishers have been serviced.
Lifesaving › Lifefloat › Float-free Link
Issued 1 February 2016
Resolved
Life float weak link is not installed correctly.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 February 2016
Resolved 9 February 2016
Resolution: New float free link is installed.
Construction/Loadline › Penetrations › Bottom Plug Packing
Issued 1 February 2016
Resolved
Fill holes with fire retardant in lazzarete and tank room.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 16 February 2016
Resolved 9 February 2016
Resolution: Approved fire stop retardant was installed.
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 1 February 2016
Resolved
Grabline on life ring buoy is wasted.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 16 February 2016
Resolved 9 February 2016
Resolution: New grab line is intalled.
Lifesaving › Lifebuoys › Serviceable
Issued 1 February 2016
Resolved
Life ring buoy clip is wasted.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 February 2016
Resolved 9 February 2016
Resolution: New life ring buoy is installed.
Accommodation/Occupational Safety › Ventilation › General
Issued 1 February 2016
Resolved
Ventilation pipe, port side in engine room needs resealing.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 16 February 2016
Resolved 9 February 2016
Resolution: Pipe has been resealed.
Lifesaving › Lifejacket/PFD (General) › Lights
Issued 1 February 2016
Resolved
Lifejackets (25) are missing lights.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 February 2016
Resolved 9 February 2016
Resolution: Life jackets have lights.
Communications › Radio Communications › VHF Radiotelephone
Issued 1 February 2016
Resolved
Radio DSC is not connected to GPS.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 16 February 2016
Resolved 9 February 2016
Resolution: GPS is now connected to VHF-DSC radio.