Records from 2006 to 2025. Most recent: inspection, 2 October 2025.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 2 October 2025
Resolved
Pipes used for wet exhaust lines must be Schedule 80 or corrosion-resistant material and adequately protected from mechanical damage. Starboard main engine wet exhaust piping has pin hole leak causing water to enter the engine room when operating. Make repairs to satisfaction of Marine Inspector. 46 CFR 182.430 (d)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 November 2025
Resolved 22 October 2025
Resolution: Stbd wet exhaust piping has been repaired.
02 - Structural Conditions › N/A - No Subsystem › Bulkhead -corrosion
Issued 5 March 2025
Resolved
Each watertight bulkhead must be of sufficient strength to be capable of remaining watertight with a head of water to the top of the bulkhead. Port side fuel line bulkhead penetration between fuel tank and engine compartments showing signs of wastage with approximate 1/8" openings around the hose penetration. Repair proposal requested to address wastage and openings in aluminum bulkhead requiring repair to maintain watertight integrity. 46CFR179.320(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 March 2025
Resolved 17 March 2025
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 5 March 2025
Resolved
At each inspection for certification of a vessel, the owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspections of the hull structure and its appurtenances, including the inspection and operation of all watertight closures in decks. Starboard engine hatch strut support rod missing. Requires installation of functioning rod. 46 CFR 176.802(a)(2)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 April 2025
Resolved 17 March 2025
18 - Maritime Labour Convention (Not Applicable to PSC Exams conducted in the U.S.) › N/A - No Subsystem › Other (Conditions of employment)
Issued 5 March 2025
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 April 2025
Resolved 17 March 2025
01 - Certificates & Documentation › 011 - Ships Certificates › USCG Certificate of Documentation (COD)
Issued 20 February 2024
Resolved
The person in command of a documented vessel must have on board that vessel the original Certificate of Documentation (COD) currently in effect for that vessel. Current COD not on vessel. Provide COD and keep on vessel.
46 CFR 67.313(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 March 2024
Resolved 1 March 2024
Resolution: COD provided and on vessel.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 20 February 2024
Resolved
Electrical equipment on a vessel must be installed and maintained to protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by or originating in electrical equipment, and electrical shock. Fuel gauge wire at fuel tank exposed and dead end wires present forward of black water tank. Replace and/or remove wires, as necessary.
46 CFR 183.200(b)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 March 2024
Resolved 19 March 2024
Resolution: All deficient wires removed.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 20 February 2024
Resolved
All cable and wire must be installed with metal supports spaced not more than 610 millimeters (24 inches) apart, and in such a manner as to avoid chafing and other damage. The use of plastic tie wraps must be limited to bundling or retention of multiple cable installations, and not used as a means of support. Cable supports missing in fuel tank space. Provide proper supports.
46 CFR 183.340(b)(4)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 March 2024
Resolved 19 March 2024
Resolution: Cable supports provided.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 20 February 2024
Resolved
All electrical equipment and circuits must be clearly marked and identified. Circuits not labeled near helm. Properly mark circuits.
46 CFR 183.220(d)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 March 2024
Resolved 19 March 2024
Resolution: Circuits properly labeled.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 20 February 2024
Resolved
Portable fire extinguishers must be located so that they are clearly visible and readily accessible from the space being protected. The installation and location
must be to the satisfaction of the Officer in Charge, Marine Inspection. Portable extinguisher bracket/frame starboard side of helm is severely degraded. Replace bracket/frame.
46 CFR 181.520
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 March 2024
Resolved 19 March 2024
Resolution: Bracket replaced.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 20 February 2024
Resolved
A vessel not required to have a power driven fire pump by § 181.300 must have at least three 9.5 liter (21/2 gallon) buckets, with an attached lanyard satisfactory to the cognizant OCMI, placed so as to be easily available during an emergency. The words “FIRE BUCKET” must be stenciled in a contrasting color on each bucket. Fire buckets not properly labeled and one fire bucket did not have the required lanyard. Properly label each fire bucket and provide adequate lanyards.
46 CFR 181.610
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 March 2024
Resolved 19 March 2024
Resolution: Fire buckets properly labeled and provided with appropriate lanyard.
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 20 February 2024
Resolved
A vessel on an oceans, coastwise, limited coastwise, or Great Lakes route must carry six hand red flare distress signals approved in accordance with § 160.021 in subchapter Q of this chapter, or other standard specified by the Commandant, including, but not limited to, approval series 160.121; and six hand orange smoke distress signals approved in accordance with § 160.037 in subchapter Q of this chapter, or other standard specified by the Commandant. Vessel only had six red flare distress signals. Provide the additional required six hand orange smoke distress signals. Vessels route
restricted to Lakes, bays, and sounds until flares are provided.
46 CFR 180.68(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 March 2024
Resolved 19 March 2024
Resolution: Flares provided and onboard.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 20 February 2024
Resolved
As appropriate for the intended voyage, a vessel must carry adequate and up-to-date charts of large enough scale to make safe navigation possible. Vessel not equipped with charts. Provide adequate charts.
46 CFR 184.420(a)(1)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 March 2024
Resolved 19 March 2024
Resolution: Charts provided and onboard.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 20 February 2024
Resolved
At each inspection for certification and at every other vessel inspection all observed unsafe practices, fire hazards, and other hazardous situations must be corrected and all required guards and protective devices must be in satisfactory condition. Corrosive build-up near fuel tank identified. Clean area and inspect for potential deterioration.
46 CFR 176.830(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 March 2024
Resolved 19 March 2024
Resolution: Build up clean and area inspected. Metal in satisfactory condition.
05 - Radio Communications › N/A - No Subsystem › VHF EPIRB
Issued 28 February 2023
Resolved
The name of the vessel must be marked or painted in clearly legible letters on each EPIRB. EPIRB not marked. Provide marking for EPIRB.
46 CFR 185.604(c)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 March 2023
Resolved 30 March 2023
Resolution: EPIRB marking provided.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 28 February 2023
Resolved
The master and crew of a vessel will be familiar with the content of and have mounted at the operating station, emergency instructions. Vessels emergency instructions missing.
46 CFR 185.510
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 March 2023
Resolved 5 April 2023
Resolution: Emergency instructions provided.
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 28 February 2023
Resolved
Firefighting drills and training shall be logged or otherwise documented for review by the Coast Guard upon request. The drill entry shall include the following information: Date of the drill and training; and general description of the drill scenario and training topics. Vessel unable to provide logs for fire fighting drills and training. Provide drill logs.
46 CFR 185.524(d)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 March 2023
Resolved 30 March 2023
Resolution: Drill log provided.
04 - Emergency Systems › N/A - No Subsystem › Abandon ship drills
Issued 28 February 2023
Resolved
Abandon ship and man overboard drills and training shall be logged or otherwise documented for review by the Coast Guard upon request. The drill entry shall include the following information: Date of the drill and training and scenario and training topics. Vessel unable to provide drill/training logs. Provide drill log.
46 CFR 185.520(f)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 March 2023
Resolved 30 March 2023
Resolution: Drill log provided.
05 - Radio Communications › N/A - No Subsystem › VHF EPIRB
Issued 28 February 2023
Resolved
The EPIRB test required shall be logged or otherwise documented. Vessel unable to provide log for EPIRB tests. Provide EPIRB test log.
46 CFR 185.728(c)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 March 2023
Resolved 30 March 2023
Resolution: EPIRB log provided.
10 - Safety of Navigation › N/A - No Subsystem › Nautical publications
Issued 28 February 2023
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 March 2023
Resolved 5 April 2023
Resolution: Nav pubs and charts provided.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 28 February 2023
Resolved
Each life jacket must be marked with Type I retroreflective material approved in 46 CFR 164.018. Two life jackets were not marked with appropriate retroreflective material. Provide appropriate markings to the satisfaction of the attending marine inspector. Passenger count reduced to 18.
46 CFR 185.604
Action required: 10 - Deficiency Rectified
Resolved 28 February 2023
Resolution: Retro tape provided for lifejackets.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 28 February 2023
Resolved
Electrical equipment must be installed to protect from electrical hazards. Electrical wiring leading to all around light nav light has torn outer sheathing. Provide new wiring to all around nav light.
46 CFR 183.200
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 March 2023
Resolved 30 March 2023
Resolution: New wiring provided.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 28 February 2023
Resolved
Vessel required to have one ring lifebuoy fitted with attached 60' lifeline, non-kinking, 5/16inch, breaking strength of 1,124 lbs, be of a dark color if synthetic,or of a type certified to be resistant to deterioration from ultraviolet light. Line not attached to ring buoy. Provide line attached to ring buoy.
46 CFR 180.70
Action required: 10 - Deficiency Rectified
Resolved 28 February 2023
Resolution: Line provided for ring buoy.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 28 February 2023
Resolved
Each ring life buoy must be marked in clearly legible block capital letters with the vessels name. Name not on ring buoy. Provide vessel name on ring buoy.
46 CFR 185.604(b)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 March 2023
Resolved 30 March 2023
Resolution: Name provided on ring buoy.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 28 February 2023
Resolved
All vessels must have operable navigation lights in accordance with the Navigation Rules. Port running light was inoperable, all around light was inoperable. Provide navigation lights that are in compliance with the Navigation Rules.
46 CFR 183.420
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 March 2023
Resolution: Nav lights operational.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 28 February 2023
Resolved
Each vessel certified to operate on a limited coastwise route in warm water must be provided with life floats of an aggregate capacity that will accommodate at least 50% of the total number of persons permitted on board. Current life float has non repairable damage. Provide new approved life floats to meet 50% of the total number of persons permitted.
46 CFR 180.205(c)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 March 2023
Resolved 5 April 2023
Resolution: New life float ordered.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 28 February 2023
Resolved
A vessel must carry either a first aid kit approved under approval series 160.041 or a kit with equivalent
contents and instructions. First aid kit did not have
all required items. Provide new first aid kit.
46 CFR 184.710
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 March 2023
Resolved 30 March 2023
Resolution: New first aid kit provided.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 28 February 2023
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 March 2023
Resolved 10 March 2023
Resolution: Valid AED pads provided.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 28 February 2023
Resolved
A submersible electric bilge pump may be used as a power bilge pump required by Table 182.520(a) only on a vessel of not more than 19.8 meters in length carrying not more than 49 passengers, other than a ferry, provided that the pump is listed by an independent laboratory as
meeting the requirements of UL 1113. Electric bilge
pumps onboard should be model 10-6UL or 14A-6UL if made
by Rule. Bilge pumps did not meet approvals. Provide appropriate bilge pumps.
46 CFR 182.520(e)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 March 2023
Resolved 10 March 2023
Resolution: UL 1113 bilge pumps provided.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 28 February 2023
Resolved
A visual and audible alarm must be provided at the operating station to indicate a high water level in each of the following normally unmanned spaces with through hull fitting. Bilge alarms at operating station not operational. Provide operational visual and audible bilge high level alarms.
46 CFR 182.530(a)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 March 2023
Resolution: High level alarms operational.
04 - Emergency Systems › N/A - No Subsystem › Water level indicator
Issued 28 February 2023
Resolved
A visual indicator must be provided at the operating station to indicate when any automatic bilge pump is operating. Bilge pump indicator at helm not operational. Provide visual indicator for bilge pump.
46 CFR 182.530(c)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 March 2023
Resolution: Visual indicator provided.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 28 February 2023
Resolved
Provision must be made for closing all supply duct cowls or scoops and exhaust duct discharge openings for a space protected by a fixed gas extinguishing system. All closure devices must be readily available and mounted in the vicinity of the vent. Ventilation duct opening engine space was not equipped with means of closure outside of the engine room. Provide means of closing ventilation.
46 CFR 182.465(h)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 March 2023
Resolution: Vent closure provided.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 28 February 2023
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 March 2023
Resolved 25 April 2023
Resolution: Completed satisfactory DAPI audit.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 28 February 2023
Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing fire, explosion, machinery failure, and personnel injury. Observed several flexible hoses on the engine and fuel tank with severely corroded end fittings. Renew hoses on engine and fuel tank.
46 CFR 182.100
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 March 2023
Resolved 5 April 2023
Resolution: New hoses provided.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 28 February 2023
Resolved
Connections must be made to battery terminals with permanent type connectors. Existing battery connection uses temporary wing-nut connectors. Properly install permanent type connectors on all battery installations.
46 CFR 183.350
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 March 2023
Resolved 30 March 2023
Resolution: Permanent type connectors provided.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 28 February 2023
Resolved
A hatch exposed to the weather must be watertight. Gasket material for each of the vessel's deck hatches does not provide a watertight seal and allow ingress of water. Engine room gasket missing. Provide hatch gasket to prevent ingress of water.
46 CFR 179.360
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 March 2023
Resolved 30 March 2023
Resolution: Hatch gaskets provided and fixed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 28 February 2023
Resolved
In systems and applications where flexible hoses are permitted to be clamped: Double hose clamping is required where practicable. Missing double hose clamps on bilge pump inlet and discharge side.
46 CFR 182.410 (d) (1)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 March 2023
Resolved 30 March 2023
Resolution: Double hose clamps provided.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 28 February 2023
Resolved
The construction and arrangement of a vessel must allow the safe operations of the vessel in accordance with the terms of the COI giving consideration to provisions for protections against fire. Electrical inverter installed. Provide approval for installation or remove inverter and associated wiring.
46 CFR 177.100
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 March 2023
Resolution: Inverter removed.
02 - Structural Conditions › N/A - No Subsystem › Decks - corrosion
Issued 28 February 2023
Resolved
The construction and arrangement of a vessel must allow the safe operations of the vessel in accordance with the terms of the COI giving consideration to provisions for a seaworthy hull. Hole on main deck forward starboard side and forward port side. Temp repair made on port side hole. Provide proposal for permanent repairs to both holed areas and make repairs.
46 CFR 177.100
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 March 2023
Resolved 5 April 2023
Resolution: Repairs authorized and completed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 28 February 2023
Resolved
Shutoff valves, installed so as to close against the fuel flow, must be fitted in the fuel supply lines at the tank connection. The shutoff valve at the tank must be manually operable from outside the compartment in which the valve is located. The vessel's port and stbd fuel shutoff valve were not operable. Provide operable fuel shut off's.
46 CFR 182.455(b)(4)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 March 2023
Resolution: New fuel shutoff valves installed and tested.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 28 February 2023
Resolved
At each initial and subsequent inspection external inspection of fuel tanks shall be conducted. Tank top could not be inspected due to accumulation of debris on tank top. Clean tank top and make ready for inspection.
46 CFR 176.804
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 March 2023
Resolved 30 March 2023
Resolution: Tank top cleaned and made ready for inspection.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 28 February 2023
Resolved
The owner/operator shall make a vessel available for internal structural examinations annual for aluminum vessels. Internal structural examination could not be completed due to build up of dirt/debris on framing. interior hull and in bilges. Pressure wash/clean and make vessel ready for internal structural examination.
46 CFR 176.600
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 March 2023
Resolution: Vessel made available and ISE conducted.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 28 February 2023
Resolved
The construction and arrangement of a vessel must allow the safe operations of the vessel in accordance with the terms of the COI giving consideration to provisions for a seaworthy hull. Port side trim tab seal leaking. Provide seal that does not leak.
46 CFR 177.100
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 April 2023
Resolution: New seal installed.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 16 March 2022
Resolved
A pre-engineered fixed gas fire extinguishing system must be installed in accordance with the manufacturer's instructions. Fireboy override for port engine did not operate as designed and did not start engine. Prove proper operation of Fireboy system and show that override is operational.
46 CFR 181.420(a)(4)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 March 2022
Resolution: Pre-engineered fire fighting system operational.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 16 March 2022
Resolved
Exhaust piping must be supported by noncombustible hangers. Support for exhaust is broken causing piping to torque/strain which is causing system to leak from muffler and pipe connection near inlet. Provide working support and contain all leaks.
46 CFR 182.430(b)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 March 2022
Resolution: Exhaust bracket mounted.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 16 March 2022
Resolved
Vessel does not currently meet the requirements of Work Instruction 31 as required on the Conditions of Operation. Mandated crew posted on COI may not enter the water or act as lifeguard until policy and procedure provided. Provide written procedure.
46 CFR 176.103
Work Instruction 31
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 April 2022
Resolved 1 April 2022
Resolution: Procedures provided.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 16 March 2022
Resolved
All vessels must have navigation lights that are in compliance with Navigation Rules. All around light not operational. Provide operational all around light. No
nighttime operations until corrected.
46 CFR 183.420
Action required: 705 - Other - as specified
Due 16 April 2022
Resolved 31 March 2022
Resolution: Nav light provided.
01 - Certificates & Documentation › 012 - Crew Certificates › Medical certificate
Issued 16 March 2022
Resolved
The Coast Guard will issue a medical certificate to a mariner meeting the medical and physical standards for merchant mariners. Master unable to provide medical certificate. Provide medical certificate.
46 CFR 15.401(c)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 April 2022
Resolved 17 March 2022
Resolution: [name withheld] confirmed by Hono REC.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 16 March 2022
Resolved
Each EAP education program must include at least the following elements: display and distribution of informational material; display and distribution of a community service hot-line telephone number for crewmember assistance, and display and distribution of the employer's policy regarding drug and alcohol use in the workplace. Employer’s drug and alcohol policy not onboard the vessel. Place a copy onboard.
46 CFR 16.401(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 April 2022
Resolved 25 March 2022
Resolution: Policy onboard.
10 - Safety of Navigation › N/A - No Subsystem › Nautical publications
Issued 16 March 2022
Resolved
As appropriate for the intended voyage a vessel must carry adequate and up-to-date Coast Guard Light List. Coast Guard Light List not provided. Provide Coast Guard Light List.
46 CFR 184.420(a)(3)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 April 2022
Resolved 25 March 2022
Resolution: Light list provided.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 16 March 2022
Resolved
Electrical equipment on a vessel must be maintained to protect passengers and crew. Radar removed and wiring still onboard. Remove all radar wiring from roof and throughout system to distribution panel.
46 CFR 183.200(b)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 April 2022
Resolved 31 March 2022
Resolution: Wiring removed.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 16 March 2022
Resolved
An adult life jacket must be provided for each person carried on board and a child lifejacket provided for at least 10% of the number permitted. Vessel missing 04 adult life jackets and 01 child life jacket. Provide missing life jackets. Maximum persons on board reduced to 18 until life jackets provided.
46 CFR 180.71
Action required: 705 - Other - as specified
Resolved 17 March 2022
Resolution: 4 adult and 1 child life jackets provided.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 16 March 2022
Resolved
All equipment must be maintained in such a manner as to afford adequate protection from fire or machinery failure. Fuel piping and fittings in tank room/from tank to engine room bulkhead severely corroded. Replace non-metallic hose with SAE J-1942 USCG approved hose and replace all corroded fittings.
46 CFR 182.100
46 CFR 182.720
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 April 2022
Resolved 17 March 2022
Resolution: New hoses and fittings provided.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 16 March 2022
Resolved
Machinery installed must be suitable for the vessel and its operation and for the purpose intended. JB weld located on stbd side turbo exhaust flange as temporary repair. Replace or make permanent repair to stbd side turbo flange.
46 CFR 182.100
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 April 2022
Resolved 31 March 2022
Resolution: Repair provided.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 16 March 2022
Resolved
Ring life buoy must be fitted with 60 ft lifeline. Life line not attached. Provide 60 ft lifeline.
46 CFR 180.70
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 April 2022
Resolved 31 March 2022
Resolution: 60ft of line provided.
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for survival craft
Issued 16 March 2022
Resolved
Life float light must be attached around the body of the life float and be 18 ft in length. Missing 18ft of line.
Provide 18 ft of line for life float light.
46 CFR 180.175(4)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 April 2022
Resolved 31 March 2022
Resolution: 18ft of line provided.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 16 August 2021
Resolved
An EAP training program must be conducted for the employer's crewmembers and supervisory personnel. The training program must include at least the following elements: the effects and consequences of drug and alcohol use on personal health, safety, and work environment; the manifestations and behavioral cues that may indicate drug and alcohol use and abuse; and documentation of training given to crewmembers and Supervisory personnel must receive at least 60 minutes of training. Provide proof of completed EAP training for all personnel.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 September 2021
Resolved 27 September 2021
Resolution: Owner provided requested documentation.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 16 August 2021
Resolved
Update Company Drug & Alcohol Policy to reflect sample provided in Marine Employer's Drug Testing Guide; additionally add items such as DER/SAP/EAP information.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 September 2021
Resolved 27 September 2021
Resolution: Owner provided requested documentation.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 16 August 2021
Resolved
The marine employer shall ensure that all persons directly involved in a serious marine incident are chemically tested for evidence of dangerous drugs and alcohol in accordance with the requirements of 46 CFR 4.06. Develop a plan for after hours collection for Post-Accident DOT chemical tests.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 September 2021
Resolved 27 September 2021
Resolution: Owner provided requested documentation.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 16 August 2021
Resolved
No marine employer shall engage or employ any individual to serve as a crewmember unless the individual passes a chemical test for dangerous drugs for that employer. Provide proof of pre-employment tests or acceptable alternative as required by this cite for individuals in a safety sensitive position.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 September 2021
Resolved 27 September 2021
Resolution: Owner provided requested documentation.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 16 August 2021
Resolved
Provide Letter of Regulatory Compliance for The Maritime Consortium.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 September 2021
Resolved 27 September 2021
Resolution: Owner provided requested documentation.
14 - Pollution Prevention › 144 - MARPOL Annex IV (Not Applicable to PSC Exams conducted in the U.S.) › Sewage discharge connection
Issued 1 February 2021
Resolved
Sewage overboard valve not locked. Type III sewage holding tank shall be locked within 3 NM of shore. Provide lock for holding tank.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 March 2021
Resolved 8 February 2021
Resolution: Sewage overboard locked.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 1 February 2021
Resolved
Port side engine RPM gauge not operational. Provide operational RPM gauge for port side engine.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 March 2021
Resolved 13 April 2021
Resolution: RPM gauge sensor replaced.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 1 February 2021
Resolved
Company drug policy not onboard vessel. Provide copy of company drug policy and keep it on the vessel.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 March 2021
Resolved 8 February 2021
Resolution: Policy provided.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 1 February 2021
Resolved
While underway noted that port side engine did not respond to reverse throttle/shifting command. When put in reverse the engine went actually went forward. Make repairs to throttle/shifting mechanism.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 March 2021
Resolved 2 February 2021
Resolution: Bled system. All sat.
10 - Safety of Navigation › N/A - No Subsystem › Magnetic compass
Issued 28 February 2019
Resolved
Vessel is required illuminated compass in accordance with 46 CFR 184.402 for night operations. Compass light was not operational. Repair and prove operation in accordance with 46 CFR 176.816. Vessel is restricted to day light operations only.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 1 March 2019
Resolution: Light repaired.
05 - Radio Communications › N/A - No Subsystem › VHF radio installation
Issued 28 February 2019
Resolved
Vessel is required DSC VHF radio in accordance with 46 CFR 184.502. DSC function was not programmed. Program radio and prove function in accordance with 46 CFR 176.816.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 3 June 2019
Resolution: VHF DSC radio provided.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 28 February 2019
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 4 May 2019
Resolution: Station License provided.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 14 February 2019
Resolved
Stbd engine will not start. Prove operation of engine in accordance with 46 CFR 182.200.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 February 2019
Resolution: Spoke with third party technician [name withheld]. Stbd engine starter was replaced and engine started. Suspect starter windings/contacts were wet from water intrusion from port engine.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 13 July 2018
Resolved
13101-Propulsion machinery must be suitable in type and design for propulsion requirements of the hull in which it is installed and capable of operating at constant marine load under such requirements without exceeding its designed limitations. Propulsion engine is not capable of operating as designed.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 July 2018
Resolution: New engine installed. Seatrial observed.
Fire Fighting › Fixed Gas Fire Extinguishing System › Operating Controls
Issued 13 February 2018
Resolved
Upon activation, Fireboy does not secure engine. Repair in accordance with 46CFR 181.420.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 28 February 2018
Resolved 13 March 2018
Resolution: Fireboy system reapaired.
Documentation › Certificates/Documents › FCC Safety Radiotelephony Certificate
Issued 13 February 2018
Resolved
FCC Safety Radio Cert and Station License are expired. Provide in accordance with 47CFR.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 April 2018
Resolved 9 April 2018
Resolution: Certificates provided.
Stability › Watertight Integrity › General
Issued 13 February 2018
Resolved
Forward engine room bulkhead wire run is not sealed. Seal in acoordance with 46CFR 179.360.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 April 2018
Resolved 9 April 2018
Resolution: Penetrations sealed.
Stability › Intact Righting Energy › General
Issued 13 February 2018
Resolved
100 lbs of ballast required by stability letter is missing. Replace ballast in accordance 46 CFR 178.230.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 February 2018
Resolution: Ballast placed in bilge in location noted by stability letter.
Engineering › Diesel Engine (propulsion-reduction gear) › Exhaust Manifold
Issued 16 March 2017
Resolved
Repair or replace stbd exhaust muffler.
Due 15 April 2017
Resolved 17 March 2017
Resolution: Vessel repaired muffler.
Lifesaving › Lifebuoys › Serviceable
Issued 9 February 2016
Resolved
Life ring was not in serviceable condition.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 February 2016
Resolution: Vessel replaced life ring with new one.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 9 February 2016
Resolved
Vessels first aid kit does not have proper quantity of required equipment.
Due 9 March 2016
Resolved 10 March 2016
Resolution: Vessel purchased new CG approved First Aid Kit.