Records from 1998 to 2026. Most recent: inspection, 2 June 2026.
Inspection history · 31
2 June 2026
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 8387205
17 March 2025
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 8094797
25 June 2024
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7942121
1 March 2024
Administrative Inspection
Administrative · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7872902
24 April 2023
Deficiency Check · Administrative Inspection · COI Inspection · Drydock Exam
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7667254
16 May 2022
Deficiency Check · Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7452399
29 April 2021
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7196935
2 July 2020
Annual Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 6998544
11 June 2019
Annual Inspection · DAPI Audit
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 6711589
23 April 2018
Hull Examination · COI Inspection · Deficiency Check · DAPI Audit
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 6393920
19 May 2017
DAPI Audit · Annual Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 6153504
29 June 2016
DAPI Audit · Annual Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 5924860
17 June 2014
Annual Inspection · DAPI Audit
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 4890420
22 May 2012
Annual Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 4326040
23 June 2008
Hull Examination · COI Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 3240502
4 June 2007
Annual Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 2944703
1 May 2006
Annual Inspection · Examination of Repairs · Damage Survey
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 2637733
26 April 2006
Type not recorded
No type recorded · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 3191381
3 August 2005
Deficiency Check
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 2449860
15 June 2005
Annual Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 2383909
13 September 2004
Re-Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 2194607
16 September 2003
Administrative Inspection
Administrative · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1906255
1 July 2003
Deficiency Check · Hull Examination
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 1828241
20 June 2003
COI Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 1822509
9 December 2002
Re-Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 1716211
5 December 2001
Re-Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 1423691
28 February 2001
COI Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1059706
21 March 2000
Re-Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1412072
8 July 1999
Deficiency Check
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1091255
14 June 1999
Re-Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1381605
25 March 1998
Initial Certification · Inclining Experiment · Deficiency Check · Hull Examination
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 788509
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 2 April 2025
Resolved
The construction and arrangement of a vessel must allow the safe operation of the vessel. The port rudder upper bushing is cracked, replace in kind.
46 CFR 177.100
Code 50 c
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 May 2025
Resolved 9 April 2025
Resolution: Cleared
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 1 March 2024
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Action required: 705 - Other - as specified
Resolved 14 March 2024
Resolution: New COI issued.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 24 April 2023
Resolved
An adult life jacket must be provided for each person carried on board a vessel. Three lifejackets require replacing. Replace three lifejackets.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 May 2023
Resolved 30 May 2023
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 24 April 2023
Resolved
Each ring life buoy must be marked in clearly legible block capital letters with the vessel's name. Name has faded. Re-stencil vsl name ring buoy.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 May 2023
Resolved 30 May 2023
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 24 April 2023
Resolved
Each ring life buoy on a vessel must:
(2) Be readily accessible. Ring buoy in current location is not accessible. Re-install in accessible location.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 May 2023
Resolved 30 May 2023
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 24 April 2023
Resolved
All electrical equipment and circuits must be clearly marked and identified. Switches on control console not marked. Mark switches.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 May 2023
Resolved 30 May 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 24 April 2023
Resolved
Remote fuel shutoff stations must be marked in clearly legible letters at least 25 millimeters (1 inch) high indicating purpose of the valve and direction of operation. Fuel shut-off valve not marked. Mark fuel shut-off valve.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 May 2023
Resolved 30 May 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 24 April 2023
Resolved
An exposed hazard, such as gears or rotating machinery, must be properly protected by a cover, guard, or rail. Belts not covered by guards. Install guards.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 May 2023
Resolved 30 May 2023
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 24 April 2023
Resolved
A vessel is inspected for compliance with the standards required by this subchapter. Machinery, equipment, materials, and arrangements not covered by standards in this subchapter may be inspected in accordance with standards acceptable to the cognizant OCMI as good marine practice. Vsl does not have onboard the required SSMCP. Provide copy onboard, as required.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 May 2023
Resolved 30 May 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 24 April 2023
Resolved
A vessel must be provided with bilge pumps in accordance with Table 182.520(a). Bilge pump not pumping properly. Replace bilge pump with UL 1113 approved bilge pump.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 May 2023
Resolved 30 May 2023
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 16 May 2022
Resolved
An adult life jacket must be provided for each person carried on board a vessel. Replace three unserviceable lifejackets.
Action required: 10 - Deficiency Rectified
Due 16 May 2022
Resolved 16 May 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 16 May 2022
Resolved
A vessel must be provided with a main steering gear that is:
(1) Of adequate strength and capable of steering the vessel at all service speeds. Replace cracked bushing on bottom starboard air rudder.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 June 2022
Resolved 29 June 2022
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 11 June 2019
Resolved
Repair and prove proper operation prior to operating at night or in low visibility.
Action required: 10 - Deficiency Rectified
Due 11 June 2019
Resolved 2 July 2020
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 11 June 2019
Resolved
Provide watertight cover to receptacle below operators station.
Action required: 10 - Deficiency Rectified
Due 11 June 2019
Resolved 2 July 2020
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Pressure
Issued 23 April 2018
Resolved
Provide one 40 B:C fire extinguisher.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 27 April 2018
Resolved 26 April 2018
Lifesaving › Lifejacket/PFD (Type I) › Condition
Issued 19 May 2017
Resolved
Five adult PFD's were found unserviceable.
Action required: 705 - Other - as specified
Due 19 May 2017
Resolved 19 May 2017
Resolution: Corrected on the spot
Construction/Loadline › Hull › Hull Plating
Issued 23 June 2008
Resolved
Vessels tansom is to be cropped and renewed as original due to cracking through out. Repairs shall be completed to the satisfaction of the attending CG Marine Inspector prior to operating.
Action required: 705 - Other - as specified
Due 23 June 2008
Resolved 1 July 2008
Resolution: New transom installed.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 23 June 2008
Resolved
New 1st aid kit is to be provided prior to operating.
Action required: 705 - Other - as specified
Due 23 June 2008
Resolved 16 July 2008
Resolution: corrected
Electrical › Electrical Distribution System (service) › Wiring
Issued 23 June 2008
Resolved
Wiring harness IWO operators station was found with missing/wasted breakers and wiring. Approved drawings for new harness and installation of new harness is required prior to operating.
Action required: 705 - Other - as specified
Due 23 June 2008
Resolved 1 July 2008
Resolution: New wiring harness installed.
Engineering › Gasoline Engine (propulsion) › Exhaust Piping (4 cycle)
Issued 23 June 2008
Resolved
Clamps for exhaust piping supports were found wasted. Replacement required prior to operating.
Action required: 705 - Other - as specified
Due 23 June 2008
Resolved 23 July 2008
Resolution: corrected
Construction/Loadline › Hull › Hull Plating
Issued 1 May 2006
Resolved
Vessel sustained damage to the starboard bow rake and hull plating during collision, breaching the watertight integrity of the hull. COI subsequently pulled until satisfactory repairs made.
Action required: 705 - Other - as specified
Due 3 July 2006
Resolved 3 July 2006
Resolution: Witnessed satisfactory repairs.
Construction/Loadline › Hull › Side Shell
Issued 15 June 2005
Resolved
A repair proposal is to be provided addressing hull inset port side forward, cracked welds port side IWO of steps and hull. Proposal shall address repairs and time frame for completion and shall be submitted NLT 15JUL05.
Action required: 705 - Other - as specified
Due 15 July 2005
Resolved 3 August 2005
Resolution: Received e-mail from owner stating repairs had been completed. Adminstratively cleared requirement - will physically inspect during vessels drydocking in October 05.
Engineering › Fuel Oil Storage/Transfer System › Piping
Issued 15 June 2005
Resolved
Ground wire for fuel fill is to be renewed IAW 46 CFR 182.445(g).
Action required: 705 - Other - as specified
Due 15 July 2005
Resolved 3 August 2005
Resolution: Received e-mail from owner stating new ground wire had been installed.
Lifesaving › Lifebuoys › Serviceable
Issued 15 June 2005
Resolved
Vessels ring buoy is to be renewed IAW 46 CFR 180.70.
Action required: 705 - Other - as specified
Due 15 July 2005
Resolved 16 June 2005
Resolution: Received fax receipt confirming renewal of lifebuoy and line.
Construction/Loadline › Hull
Issued 20 June 2003
Resolved
PRESENT VESSEL FOR CREDIT DRYDOCK IMMEDIATELY PRIOR TO RETURNING TO SERVICE. VESSEL REQUIRED DRYDOCK 31MAR2003 - LAST DRYDOCK 25MAR1998. LEGACY COMPONENT DESC: Hull Plating
Condition: Placed in Improper Service
Due 1 July 2003
Resolved 1 July 2003
Resolution: OVERDUE-CORRECTED LTR OF CONCERN TO GO OUT WARNING O/O TO BE MORE DATE VIGILANT.
Lifesaving › Lifejacket/PFD (General)
Issued 9 December 2002
Resolved
1. Issued CG-835 to label location of lifejackets and separate child lifejackets from the adult lifejackets. LEGACY COMPONENT DESC: Storage
Condition: Unknown
Due 6 January 2003
Resolved 10 July 2003
Engineering › Fuel Oil Service System
Issued 9 December 2002
Resolved
2. Issued CG-835 to install a remote means of securing the fuel shutoff valve. (Found that in the case of a fire it would be extremely difficult to reach around the guard and secure the valve on the fuel tank.)
LEGACY COMPONENT DESC: Valve
Condition: Unknown
Due 6 January 2003
Resolved 10 January 2003
Documentation
Issued 14 June 1999
Resolved
VESSEL IS TO PROVIDE A COPY OF THE CONTRACT WITH A DRUG TESTING CONSORTIUM IAW 46 CFR 16 NLT 14JUL99.
Condition: Unknown
Due 14 June 1999
Resolved 14 June 1999
Fire Fighting
Issued 14 June 1999
Resolved
VESSELS FIRE BUCKETS ARE TO BE MARKED WITH THE WORDS "FIRE BUCKET" IAW 46 CFR 181.610 NLT 14JUL99.
Condition: Unknown
Due 14 June 1999
Resolved 14 June 1999
Electrical
Issued 14 June 1999
Resolved
VESSEL IS TO PROVIDE AN ADDITIONAL FLASHLIGHT IAW 46 CFR 183.430 NLT 14JUL99.
Condition: Unknown
Due 14 June 1999
Resolved 14 June 1999
Lifesaving
Issued 14 June 1999
Resolved
RING BUOY IS TO BE MARKED WITH THE VESSELS NAME IAW 46 CFR 185.604(b) NLT 14JUL99.
Condition: Unknown
Due 14 June 1999
Resolved 14 June 1999
Lifesaving
Issued 25 March 1998
Resolved
LABEL ALL PFD'D WITH VESSEL NAME.
Condition: Unknown
Due 26 March 1998
Resolved 27 April 1998
Fire Fighting
Issued 25 March 1998
Resolved
PROVIDE 3 2 1/2 GAL. BUCKETS WITH LANYARDS LABELED FIRE BUCKETS.
Condition: Unknown
Due 26 March 1998
Resolved 27 April 1998
Lifesaving
Issued 25 March 1998
Resolved
PROVIDE FIRST AID KIT.
Condition: Unknown
Due 26 March 1998
Resolved 27 April 1998
Lifesaving
Issued 25 March 1998
Resolved
PROVIDE LIFE JACKET DONNING INSTRUCTIONS.
Condition: Unknown
Due 26 March 1998
Resolved 27 April 1998
Engineering
Issued 25 March 1998
Resolved
LABEL FUEL SHUT OFF VALVES.
Condition: Unknown
Due 26 March 1998
Resolved 27 April 1998
Lifesaving
Issued 25 March 1998
Resolved
PROVIDE COPY OF EMERGENCY INSTRUCTIONS.
Condition: Unknown
Due 26 March 1998
Resolved 27 April 1998
Lifesaving
Issued 25 March 1998
Resolved
PROVIDE 60 FEET 5/16 INCH FLOATING LINE FOR RING BUOY.
Condition: Unknown
Due 26 March 1998
Resolved 27 April 1998
Lifesaving
Issued 25 March 1998
Resolved
APPLY RETRO REFLECTIVE TAPE TO RING BUOY.
Condition: Unknown
Due 26 March 1998
Resolved 27 April 1998
Lifesaving
Issued 25 March 1998
Resolved
PROVIDE DISTRESS FLARES WITH CONTAINER IAW 46 CFR 160.021,160.037.
Condition: Unknown
Due 26 March 1998
Resolved 27 April 1998
Documentation
Issued 25 March 1998
Resolved
APPLY FL STATE REGISTRATION NUMBERS TO BOW.
Condition: Unknown
Due 26 March 1998
Resolved 27 April 1998