Documentation record
Registered dimensions (L × B × D)90.0 ft × 23.0 ft × 7.0 ft
Registered tonnagegross 90 / net 61
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderMONARK CUSTOM CRAFT,INC · JEANERETTE, LA, UNITED STATES · built 1973
Hull materialAluminum
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portGALLIANO, LA
Endorsements, as the file codes themcw_un
DocumentationExpired · issued 30 June 2004
Service, as the file records itOffshore Supply Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it90 - Regulatory (Subpart C or D), Gross Ton
61 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
The full record for this vessel
Behind this panel: 11 inspections, each with its date, unit and type; 21 deficiencies with the resolution recorded against each, 1 without one; 1 operational control with no removal date recorded; 1 other vessel inspected with it; no other recorded names; the documentation record: dimensions, tonnage, builder, hailing port and endorsements. Every line is a record the Coast
Guard wrote; the counts above are the same counts as in the summary, and they are free.
Professional is $39 a month or $299 a year,
or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks
every detail section on every vessel page, fleet watch tied to your account, and ownership records
on request. Already a subscriber? Sign in.
Maury does not score, rate or grade vessels, at any price.
Inspection history · 11
27 August 2021
Administrative Inspection
Administrative · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 7298503
12 December 2020
Administrative Inspection
Administrative · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 7110817
8 December 2020
Administrative Inspection
Administrative · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 7108612
18 December 2019
Annual Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 6872239
28 September 2019
Damage Survey · Deficiency Check
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 6823297
6 November 2018
Deficiency Check · Hull Examination
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 6567303
6 November 2018
Annual Inspection
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 6577522
11 December 2017
Type not recorded
No type recorded · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 6323759
5 October 2017
COI Inspection · Deficiency Check · DAPI Audit
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 6270524
7 December 2016
Deficiency Check · Annual Inspection
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 6051718
16 November 2016
Hull Examination
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 6042642
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 8 December 2020
No resolution recorded
Vessel is required to complete a hull exam every 2 yerars.
Vessel is overdue for hull exam.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 18 December 2019
Resolved
Replace E/R hatch gasket.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 9 January 2020
Resolution: Gasket replaced.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 18 December 2019
Resolved
Properly run wires portside accom. space.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 9 January 2020
Resolution: Wires ran properly.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 18 December 2019
Resolved
Replace retro tape on all 3 life rings.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 9 January 2020
Resolution: Tape replaced.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 18 December 2019
Resolved
Repair/replace frequency meter switch.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 9 January 2020
Resolution: Switch replaced.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 28 September 2019
Resolved
Demonstrate proper operation of navigation lights.
Action required: 17 - Rectify deficiencies prior to departure
Due 28 September 2019
Resolved 3 October 2019
Resolution: Nav lights are working properly.
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 5 October 2017
Resolved
Replace grab lines on port and stbd life rings.
Action required: 705 - Other - as specified
Due 5 November 2017
Resolved 24 October 2017
Resolution: New grab lines installed.
Documentation › Logs/Records › Logbook/Record (unofficial)
Issued 5 October 2017
Resolved
Update log book entries for safety drills and EPIRB tests.
Action required: 705 - Other - as specified
Due 5 November 2017
Resolved 5 October 2017
Resolution: Corrected on the spot
Operations/Management › Drug and Alcohol Testing › Testing, Equipment
Issued 7 December 2016
Resolved
Provide alcohol testing devices
Condition: Invalid
Action required: 705 - Other - as specified
Due 7 January 2017
Resolved 13 December 2016
Documentation › Markings/Placards › Warning Signs
Issued 7 December 2016
Resolved
Label 120V electrical panels in E/R and galley.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 7 December 2016
Resolved 7 December 2016
Communications › Alarms/Indicators › High Water Alarm
Issued 7 December 2016
Resolved
Prove proper operation of bilge high water alarms.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 7 December 2016
Resolved 7 December 2016
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 7 December 2016
Resolved
Prove proper operation of stern light.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 7 December 2016
Resolved 7 December 2016
Construction/Loadline › Hull › Hull Plating
Issued 16 November 2016
Resolved
Laz: Remove Splash Zone from aft port corner and make area available for inspection/repair as necessary.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 16 November 2016
Resolved 28 November 2016
Resolution: Splash zone removed and cracked weld gouged and rewelded.
Construction/Loadline › Hull › Longitudinal Frame
Issued 16 November 2016
Resolved
Laz: Re-weld longitudinal frame at transom.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 16 November 2016
Resolved 28 November 2016
Resolution: Frame rewelded.
Construction/Loadline › Hull › Weld
Issued 16 November 2016
Resolved
Laz: Re-weld longitudinal stringer on port side aft (broken/sloppy weld).
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 16 November 2016
Resolved 28 November 2016
Resolution: Stringer rewelded.
Construction/Loadline › Hull › Hull Plating
Issued 16 November 2016
Resolved
Laz: Remove unknown material fused to hull port side aft, and make available for inspection/repair as necessary.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 16 November 2016
Resolved 28 November 2016
Resolution: Bolt removed from limber hole, no repair needed.
Construction/Loadline › Hull › Bottom Plating
Issued 16 November 2016
Resolved
E/R: Remove Splash Zone from port fwd chine and make available for inspection/repair as necessary.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 16 November 2016
Resolved 28 November 2016
Resolution: Splash zone removed, area inspected; no repair needed.
Engineering › Fuel Oil Storage/Transfer System › Piping
Issued 16 November 2016
Resolved
E/R: Clean and repair weeping fuel piping and clean base of integral fuel tank wall to allow inspection.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 16 November 2016
Resolved 28 November 2016
Resolution: Base cleaned for inspection, all sat; weeping fuel line repaired.
Engineering › Steering Gear System › Hydraulic Hose
Issued 16 November 2016
Resolved
E/R: Repair leaking hydraulic fluid lines associated with hydraulic tank on aft b/h
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 16 November 2016
Resolved 28 November 2016
Resolution: Hydraulic leak repaired.
Engineering › Bilge Water Management System › Valve
Issued 16 November 2016
Resolved
Replace wasted forepeak bilge valve handle at reach rod.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 16 November 2016
Resolved 28 November 2016
Resolution: New valve and handle installed at reach rod.
Stability › Watertight Integrity › Weathertight Enclosure
Issued 16 November 2016
Resolved
Install wire or chain retention device on forepeak hatch
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 16 November 2016
Resolved 28 November 2016
Resolution: Chain installed.