Records from 2003 to 2026. Most recent: inspection, 9 June 2026.
Inspection history · 23
9 June 2026
Annual Inspection
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 8397611
15 May 2026
Administrative Inspection
Administrative · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 8373909
30 April 2026
Hull Examination
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 8359345
18 July 2025
Administrative Inspection
Administrative · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 8188882
23 June 2025
Administrative Inspection
Administrative · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 8165465
4 June 2025
DAPI Audit · Deficiency Check · Annual Inspection
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 8152792
4 June 2024
Annual Inspection
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 7927345
23 April 2024
Hull Examination
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 7895798
26 April 2023
Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7675637
2 November 2022
In-Service Inspection
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7588316
28 April 2022
Hull Examination · Deficiency Check
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7439910
10 March 2022
COI Inspection
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7409356
13 April 2021
Annual Inspection
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 7183889
10 December 2020
Construction Oversight · Plan Review "T" Boat
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7215479
20 September 2020
Type not recorded
No type recorded · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 7061883
7 May 2020
Hull Examination
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6977593
10 June 2019
Plan Review "T" Boat · Construction Oversight
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6711949
21 May 2019
Annual Inspection
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6691992
8 May 2018
Annual Inspection
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6416359
23 April 2018
Hull Examination
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6400239
17 March 2017
Deficiency Check · COI Inspection
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6105520
4 April 2016
Examination of Repairs · Hull Examination · Annual Inspection · Deficiency Check
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 5847291
20 January 2016
Administrative Inspection
Administrative · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 5800448
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 4 June 2024
Resolved
A submersible electric bilge pump may be used as a power bilge pump if the pump is listed by an independent laboratory as meeting the requirements in UL 1113. The vessel's installed electric bilge pumps were not UL listed. Operator is to replace the electric bilge pumps with approved pumps that are UL listed.
46 CFR 182.520(e)(1)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 July 2024
Resolved 4 June 2025
Resolution: Verified UL listed submersible electric bilge pumps were installed in all required compartments.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 4 June 2024
No resolution recorded
A submersible electric bilge pump may be used as a power bilge pump if a positive shutoff valve is installed at the hull penetration. The Bilge pumps on the vessel were missing positive shutoff valves at the hull penetration. Operator is to install positive shutoff valves for the bilge pumps at the hull penetrations by next dry dock.
46 CFR 182.520 (e)(7)
Action required: 705 - Other - as specified
Due 30 April 2026 — due date passed with no resolution recorded
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 26 April 2023
Resolved
ALL MACHINERY AND EQUIPMENT MUST BE INSTALLED AND MAINTAINED IN SUCH A MANNER AS TO AFFORD ADEQUATE PROTECTION FROM CAUSING FIRE, EXPLOSION, MACHINERY FAILURE, AND PERSONAL INJURY. PIN HOLE LEAK LOCATED ON LUBE OIL HOSE STBD SIDE ENGINE. REPLACE AND ENSURE NO FURTHER LEAKAGE.
46CFR182.100
Condition: Damaged By Earlier Event
Action required: 60 - Rectify deficiencies prior to movement
Due 27 April 2023
Resolved 28 April 2023
Resolution: OPERATOR REPLACED HOSE AND PROVIDED EVIDENCE OF ENGINE RUNNING WITHOUT HOSE LEAKING.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance and inspections
Issued 26 April 2023
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 28 April 2023
Resolved 28 April 2023
Resolution: MASTER PROVIDED REPLACED AND INSTALLED VALID HRU.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 26 April 2023
Resolved
THE EPIRB TEST REQUIRED BY PARAGRAPH (a) SHALL BE LOGGED OR OTHERWISE DOCUMENTED, AS APPLICABLE. DOCUMENT MONTHLY EPIRB TESTS.
46CFR185.728(c)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 May 2023
Resolved 28 April 2023
Resolution: ONWER PROVIDED DOCUMENTATION THAT MONTHLY EPIRB TESTING IS BEING DOCUMENTED IN VESSEL LOG.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 2 November 2022
Resolved
While at the boatyard, identified the NORWESTER on blocks with the stbd shaft sheared just aft of the strut. Propulsion machinery must be suitable in type and design for propulsion requirements of the hull in which it is installed and capable of operating at constant marine load under such requirements without exceeding its designed limitations. Provide repair proposal.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 March 2023
Resolution: Replaced shafts, shaft logs, & props. Increased shaft size to 2.0 inches.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 10 March 2022
Resolved
A vessel of at least 7.9 meters (26 feet) in length must be provided with...bilge suctions for each watertight compartment. Compartment aft of the collision bulkhead had non-functional electric bilge pump. Replace bilge pump.
46 CFR 182.510(a)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 10 March 2022
Resolution: Owner provided video evidence of newly installed functional bilge pump.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 10 March 2022
Resolved
The owner or managing operator shall make sure that maintenance is carried out IAW [manufacturer's instructions]. Synthetic weak link on 22-person life float has past its expiration date. Replace weak link.
46 CFR 185.702(b)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 April 2022
Resolved 28 April 2022
Resolution: Weak link replaced.
01 - Certificates & Documentation › 012 - Crew Certificates › Certificates for master and officers
Issued 10 March 2022
Resolved
Each ship transporting more than six passengers for hire equipped with a radiotelephone station...must carry a radio operator who...hold[s] a marine radio operator permit or higher class license. Operator was unable to produce marine radio operator permit. Confirm carriage of radio operator permit for master.
47 CFR 80.159(e)(1)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 April 2022
Resolved 23 March 2023
Resolution: Vessel operator provided Marine Radio Operator Permit.
05 - Radio Communications › N/A - No Subsystem › VHF EPIRB
Issued 21 May 2019
Resolved
Replace expired battery on EPIRB prior to operating on Oceans Route. 46 CFR 185.728(b).
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 May 2019
Resolution: Battery replaced by Englund Marine. New expiration: 10-2024
05 - Radio Communications › N/A - No Subsystem › MF/HF Radio installation
Issued 21 May 2019
Resolved
Replace fast-blow fuse on SSB radio. 47 CFR 80.905
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 May 2019
Resolution: Fuse replaced; SSB radio works.
Communications › Radio Communications › EPIRB
Issued 8 May 2018
Resolved
Replace EPIRB hydrostatic release that expired on 03-2018.
Action required: 10 - Deficiency Rectified
Due 13 June 2018
Resolved 8 May 2018
Resolution: Corrected same day.
Lifesaving › Lifefloat › Float Free
Issued 8 May 2018
Resolved
Connect life floats to a float-free arrangement.
Action required: 10 - Deficiency Rectified
Resolved 8 May 2018
Resolution: Corrected same day.
Lifesaving › Lifefloat › Float-free Link
Issued 8 May 2018
Resolved
Replace weak link on 22-pers life float.
Action required: 10 - Deficiency Rectified
Resolved 8 May 2018
Resolution: Corrected same day.
Fire Fighting › Ventilation Systems › Ventilation Fire Dampers
Issued 8 May 2018
Resolved
Tether vent dampers to E/R vents.
Action required: 10 - Deficiency Rectified
Resolved 8 May 2018
Resolution: Corrected same day.
Engineering › Sea-water System (primary cooling) › Piping
Issued 17 March 2017
Resolved
Replace in kind non-metallic flexible hose for raw water intake on starboard engine.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 31 March 2017
Resolved 29 March 2017
Resolution: Replaced wasted raw water intake hose with new hose.
Navigation › Collision/Grounding Avoidance › Radar
Issued 17 March 2017
Resolved
Provide proof of proper operation of marine radar.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 31 March 2017
Resolved 22 March 2017
Resolution: Radar display was on and operating properly.
Engineering › Sea-water System (primary cooling) › Valve
Issued 12 April 2016
Resolved
Port and Starboard engine raw water valves and bait tank through-hull valve were ceased and needs to be replaced.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 May 2016
Resolved 12 April 2016
Engineering › Steering Gear System › Rudder
Issued 12 April 2016
Resolved
Hairline fractures were found on the port and starboard rudders and needs to be repaired.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 12 May 2016
Resolved 15 April 2016
Lifesaving › Lifefloat › Serviceable
Issued 5 April 2016
Resolved
Repair strap on aft lifefloat.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 5 May 2016
Resolved 12 April 2016
Fire Fighting › Remote Fuel Shutoff › General
Issued 5 April 2016
Resolved
Re-adjust rod connection to fuel shut off in the lazarrete and port fuel tank.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 5 May 2016
Resolved 12 April 2016
Engineering › Steering Gear System › Ram
Issued 5 April 2016
Resolved
Wood supporting steering gear ram is wasted and needs to be replaced.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 5 May 2016
Resolved 12 April 2016
Construction/Loadline › Hull › Side Shell
Issued 5 April 2016
Resolved
Tighten port bolts on aft diving platform.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 5 May 2016
Resolved 12 April 2016
Electrical › Electric Generation Source (service) › Grounding Conductor
Issued 5 April 2016
Resolved
Reattach grounding strap to port and starboard rudder post.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 5 May 2016
Resolved 12 April 2016
Engineering › Fuel Oil Storage/Transfer System › Tank
Issued 5 April 2016
Resolved
Starboard fuel tank forward top under support beam is showing signs of galvanic corrosion. Clean area for closer inspection during upcoming drydock exam. If repairs are needed, submit repair proposal.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 5 May 2016
Resolved 12 April 2016
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type III
Issued 5 April 2016
Resolved
MSD macerator has corroded wires and needs to be replaced or the macerator needs to be removed.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 5 May 2016
Resolved 12 April 2016
Construction/Loadline › Structures › Deck Plating
Issued 5 April 2016
Resolved
Significant delignification was found above the starboard battery box. Remove affected wood and make available for closer inspection during upcoming drydock. If repairs are needed, submit repair proposal.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 5 May 2016
Resolved 12 April 2016
Engineering › Feedwater/Condensate Water System › Support
Issued 5 April 2016
Resolved
Re-attach the port side supporting bracket for the fresh water tank.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 5 May 2016
Resolved 12 April 2016