Records from 2001 to 2003. Most recent: inspection, 4 September 2003.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Electrical › Electric Supply System (service)
Issued 24 April 2003
Resolved
Make permanent and proper repairs to all exposed wiring and associated insulation in engine room to the satisfaction of class/administration. LEGACY COMPONENT DESC: Cable
Condition: Improper/Lack of Maintenance
Due 8 May 2003
Resolved 15 May 2003
Resolution: REPAIRS MADE TO EXPOSED WIRING AND ASSOCIATIED INSULATION IN ENGINE ROOM ATTESTED BY CLASS.
Fire Fighting › Structural - A Class Divisions
Issued 24 April 2003
Resolved
Have class determine proper location and boundary for paint locker and battery storage. LEGACY COMPONENT DESC: Decks - Flammable Liquids Storage Spaces
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 1 May 2003
Resolution: Paint locker was relocated.
Construction/Loadline › Hull
Issued 24 April 2003
Resolved
Have class approve proper repairs of holes in Bosun store overhead. LEGACY COMPONENT DESC: Overhead
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 1 May 2003
Construction/Loadline › Hull
Issued 24 April 2003
Resolved
Have class attest to structural integrity of overhead in chain locker and foundations for deck machinery. LEGACY COMPONENT DESC: Compartment integrity
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 May 2003
Resolution: STRUCTURAL REPAIRS MADE IN CHAIN LOCKER AND REPAIRS MADE TO THE FOUNDATIONS FOR THE DECK MACHINERY WERE INSPECTED AND DEEMED SATISFACTORY TO THE USCG.
Stability › Watertight Integrity
Issued 24 April 2003
Resolved
Have class attest to proper seal in bulkhead between captains cabin and fuel station.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 1 May 2003
Resolution: Removed cable from bulkhead and sealed bulkhead as per class recomendation.
Accommodation/Occupational Safety › Occupational Safety
Issued 24 April 2003
Resolved
Fumigate vermin in food stores before loading provisions. LEGACY COMPONENT DESC: Vermin infestation
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 1 May 2003
Resolution: Started fumigation of vermin.
Engineering › Diesel Engine (auxiliary)
Issued 24 April 2003
Resolved
Have class attest to proper installation of exhaust on emergency generator. LEGACY COMPONENT DESC: Emergency Generator
Condition: Improper/Lack of Maintenance
Due 8 May 2003
Resolved 1 May 2003
Electrical › Lighting (service)
Issued 24 April 2003
Resolved
Have class attest to proper installation of light covers throught vessel. LEGACY COMPONENT DESC: Lighting Fixture
Due 8 May 2003
Resolved 15 May 2003
Resolution: INSPECTION OF LIGHT COVERS THROUGHOUT THE SHIP ARE FOUND SATISFACTORY TO THE USCG.
Engineering › Diesel Engine (auxiliary)
Issued 24 April 2003
Resolved
Have class attest to proper repairs of gasket on emergency generator intake. LEGACY COMPONENT DESC: Emergency Generator
Due 8 May 2003
Resolved 15 May 2003
Resolution: REPAIRS MADE ON GASKET ON EMERGENCY GENERATOR INTAKE FOUND SATISFACTORY BY USCG.
Electrical › Electrical Distribution System (service)
Issued 24 April 2003
Resolved
Have class attest to proper installation of electrical wiring from batteries to emergency generator. LEGACY COMPONENT DESC: Wiring
Due 8 May 2003
Resolved 28 April 2003
Resolution: INSTALLATION OF ELECTRICAL WIRING FROM BATTERIES TO EMERGENCY GENERATOR SATISFACTORY TO CLASS.
Electrical › Electrical Distribution System (service)
Issued 24 April 2003
Resolved
Have class attest to proper repairs of wiring and exhaust on incinerator. LEGACY COMPONENT DESC: Wiring
Due 8 May 2003
Resolved 1 May 2003
Resolution: Covers were replaced and fixed wiring insulation.
Electrical › Electrical Distribution System (service)
Issued 24 April 2003
Resolved
Have class attest to the removal of electrical hazards in access to junction box in emergency generator room. LEGACY COMPONENT DESC: Junction Box
Due 8 May 2003
Resolved 1 May 2003
Electrical › Electric Generation Source (service)
Issued 24 April 2003
Resolved
Provide enclosure for batteries located in emergency generator room. LEGACY COMPONENT DESC: Battery Enclosure
Due 8 May 2003
Resolved 1 May 2003
Resolution: Witnessed installation of new battery box.
Pollution Prevention/Response › Prevention Equipment
Issued 24 April 2003
Resolved
Have class attest to proper repair of sewage line aft of MDE. LEGACY COMPONENT DESC: Sewage System Piping
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 1 May 2003
Resolution: Witnessed repair of line.
Pollution Prevention/Response › Prevention Equipment
Issued 24 April 2003
Resolved
Have class to attest to the proper containment of bunkering station. LEGACY COMPONENT DESC: Fixed Containment
Action required: 703 - Prior to bunkering operations
Resolved 15 May 2003
Resolution: INSPECTION OF CONTAINMENT BUNKERING STATION DEEMED SATISFACTORY BY USGC.
Engineering › Diesel Engine (auxiliary)
Issued 24 April 2003
Resolved
Have class to attest to proper installation of machinery guard around rotaring machinery (emergency generator, diesel generator, pully by over board discharge from OWS.) LEGACY COMPONENT DESC: Rotaring Machinery Guard
Due 8 May 2003
Resolved 15 May 2003
Resolution: INSPECTION OF THE MACHINERY GUARD AROUND ROTATING MACHINERY ON EMERGENCY GENERATOR AND DIESEL GENERATOR SATISFACTORY TO USCG.
Engineering › Diesel Engine (auxiliary)
Issued 24 April 2003
Resolved
Have class attest the proper installation of fuel hoses of appoved material on emergency generator. LEGACY COMPONENT DESC: Emergency Generator
Action required: 17 - Rectify deficiencies prior to departure
Resolved 1 May 2003
Resolution: Correct fuel line installed.
Operations/Management › Vessel Safety Management
Issued 24 April 2003
Resolved
Provide piping diagram of engine room in the language of crew. LEGACY COMPONENT DESC: Documentation Maintenance/Control
Due 24 April 2003
Resolved 15 May 2003
Resolution: INSPECTION OF PIPING DIAGRAM OF ENGINE ROOM IN THE LANGUAGE OF THE CREW SATISFACTORY TO USCG.
Construction/Loadline › Hull
Issued 24 April 2003
Resolved
Vessel detained due to structural frame failure in cargo hold. Class/flag to provide report of proper repair. LEGACY COMPONENT DESC: Transverse Frame
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 May 2003
Resolution: REPAIRS ON STRUCTURAL FRAMES IN CARGO HOLD SATISFACTORY TO USCG.
Electrical
Issued 24 January 2001
Resolved
Renew #2 ship's service generator battery cover.
Condition: Unknown
Due 24 February 2001
Resolved 2 February 2001
Lifesaving
Issued 24 January 2001
Resolved
Relocate paint, gasoline, and diesel to the paint locker.
Condition: Unknown
Due 24 February 2001
Resolved 2 February 2001
Electrical
Issued 24 January 2001
Resolved
Replace freezer extension cord with properly grounded cable.
Condition: Unknown
Due 29 January 2001
Resolved 29 January 2001
Fire Fighting
Issued 24 January 2001
Resolved
Prove proper operation of emergency fire pump.
Condition: Unknown
Due 24 February 2001
Resolved 2 February 2001
Engineering
Issued 24 January 2001
Resolved
Make repairs to #2 starting air compressor.
Condition: Unknown
Due 24 February 2001
Resolved 2 February 2001
Electrical
Issued 24 January 2001
Resolved
Properly route and secure communication cable in steering room.
Condition: Unknown
Due 24 February 2001
Resolved 2 February 2001
Electrical
Issued 24 January 2001
Resolved
Prove proper operation of emergency generator.
Condition: Unknown
Due 24 February 2001
Resolved 15 May 2003
Electrical
Issued 24 January 2001
Resolved
Remove electrical tape and connect wiring on fantail capstan properly.
Condition: Unknown
Due 24 February 2001
Resolved 2 February 2001
Documentation
Issued 24 January 2001
Resolved
Provide SOLAS training manual and fire control plan in spanish.
Condition: Unknown
Due 24 February 2001
Resolved 15 May 2003
Resolution: TRAINING MANUAL AND FCP WRITTEN IN THE LANGUAGE OF THE CREW.
Electrical
Issued 24 January 2001
Resolved
Properly ground freezer electrical circuit.
Condition: Unknown
Due 24 February 2001
Resolved 2 February 2001
Deck/Cargo
Issued 24 January 2001
Resolved
Make repairs to forward boom controls and clean oil.
Condition: Unknown
Due 24 February 2001
Resolved 2 February 2001
Electrical
Issued 24 January 2001
Resolved
Replace guards for #1 & #2 ship's service generators.
Condition: Unknown
Due 24 February 2001
Resolved 2 February 2001
Navigation
Issued 24 January 2001
Resolved
Post emergency steering gear instructions/diagram on bridge and steering gear room.
Condition: Unknown
Due 29 January 2001
Resolved 29 January 2001
Documentation
Issued 24 January 2001
Resolved
Post the watch schedule in accordance with STCW 95 VIII/1.
Condition: Unknown
Due 29 January 2001
Resolved 29 January 2001
Navigation
Issued 24 January 2001
Resolved
Post vessel maneuvering fact sheet (turning diagrams).
Condition: Unknown
Due 29 January 2001
Resolved 29 January 2001
Fire Fighting
Issued 24 January 2001
Resolved
Provide a fire hose for the fire station in the vicinity of engine room switchboard and forward of the house structure.
Condition: Unknown
Due 29 January 2001
Resolved 29 January 2001
Electrical
Issued 24 January 2001
Resolved
Renew non-conducting mat at engine room switchboard front.
Condition: Unknown
Due 24 February 2001
Resolved 2 February 2001
Electrical
Issued 24 January 2001
Resolved
Make repairs to #2 ship's service generator cooling system to satisfaction of class.
Condition: Unknown
Due 24 February 2001
Resolved 2 February 2001
Construction/Loadline
Issued 24 January 2001
Resolved
Demonstrate operation of oily water separator to the satisfaction of class.
Condition: Unknown
Due 24 February 2001
Resolved 2 February 2001
Documentation
Issued 24 January 2001
Resolved
Provide oil transfer procedures.
Condition: Unknown
Due 29 January 2001
Resolved 29 January 2001
Engineering
Issued 24 January 2001
Resolved
Prior to its use, make repairs to #1 fuel oil purifier.
Condition: Unknown
Due 24 February 2001
Resolved 2 February 2001
Engineering
Issued 24 January 2001
Resolved
Prove operation of remote fuel ventilation shut downs.
Condition: Unknown
Due 24 February 2001
Resolved 2 February 2001